- 1. Introduction
- 2. Understanding GOOSE Communication
- 3. GOOSE Message Structure and Important Parameters
- 4. GOOSE Testing: What Must Be Verified?
- 5. Practical Example: GOOSE Protection Trip Between Two MiCOM Relays
- 6. Step 1 – Review the GOOSE Configuration Before Testing
- 7. Step 2 – Check the Publisher Relay
- 8. Step 3 – Check GOOSE Communication Using Wireshark
- 9. Step 4 – Test GOOSE State Changes
- 10. Step 5 – Check GOOSE Retransmission Behavior
- 11. Step 6 – Test the GOOSE Subscriber
- 12. Step 7 – Perform End-to-End GOOSE Functional Testing
- 13. Step 8 – Test GOOSE Communication Failure and Recovery
- 14. Step 9 – Troubleshoot Common GOOSE Problems
- 15. Practical GOOSE Test Cases for MiCOM Relays
- 16. GOOSE Testing Versus Conventional Hardwired Testing
- 17. GOOSE Testing and Cybersecurity Considerations
- 18. Practical GOOSE Commissioning Checklist
- 19. Conclusion
- 20. Practical MiCOM and IEC 61850 Training by Elec-Engg
1. Introduction
GOOSE (Generic Object Oriented Substation Event) is one of the most important communication services in IEC 61850-based substation automation systems. It enables fast exchange of status information, protection signals, interlocking commands and other event-based information between intelligent electronic devices (IEDs).
In substations using MiCOM protection relays, GOOSE communication can reduce the need for conventional hardwired connections between devices. It can be used for applications such as:
- Circuit breaker interlocking
- Protection trip signaling
- Breaker failure initiation and transfer
- Busbar protection signaling
- Transformer protection intertripping
- Feeder protection blocking
- Auto-reclosing coordination
- Breaker status exchange
- Load shedding and automation
However, configuring a GOOSE message does not automatically guarantee that the complete application will operate correctly.
Engineers must test the publisher, Ethernet network, subscriber, signal mapping, relay logic and final application response.
This article explains how to test IEC 61850 GOOSE communication in supported MiCOM relays, including practical commissioning procedures, Wireshark analysis, troubleshooting and functional verification.
Important: GOOSE capabilities and engineering procedures vary between MiCOM models, hardware versions and firmware. Always confirm the applicable services, data model and testing procedures in the relay’s technical documentation.
2. Understanding GOOSE Communication
GOOSE is an IEC 61850 communication service designed for fast event-based information exchange between IEDs.
Unlike MMS, which uses a client-server communication model over TCP/IP, GOOSE uses Ethernet multicast messages.
A GOOSE publisher transmits information to the network, and one or more subscribers receive and process the published information.
GOOSE publisher and subscriber architecture
MiCOM Relay 1
Publisher
Protection trip / breaker status
Ethernet multicast GOOSE
Substation Ethernet Network
Switches · VLAN · Multicast forwarding
MiCOM Relay 2
Subscriber
Interlocking logic
Bay Controller
Subscriber
Status monitoring
Conceptual example. Actual publisher and subscriber roles depend on device capabilities and project design.
One GOOSE publisher can communicate with multiple subscribers, provided that the network and receiving devices are configured accordingly.
3. GOOSE Message Structure and Important Parameters
To test GOOSE communication effectively, engineers should understand the main fields and parameters included in a GOOSE message.
Important fields include:
| Parameter | Description |
|---|---|
| GoCB reference | Identifies the GOOSE control block |
| Dataset reference | Identifies the published dataset |
| GoID | GOOSE identifier |
| AppID | Application identifier |
| MAC address | Ethernet destination multicast address |
| VLAN ID | VLAN identifier, if configured |
| VLAN priority | Ethernet priority, if configured |
| ConfRev | GOOSE configuration revision |
| stNum | State number |
| sqNum | Sequence number |
| timeAllowedToLive | Expected maximum time before the next message |
| datSet | Dataset reference |
| goID | GOOSE identifier |
| allData | Published data values |
Some field names are case-sensitive in the protocol representation. The table includes both commonly discussed fields and their protocol-style names.
3.1 State number (stNum)
The state number changes when the published dataset state changes.
For example, if a feeder protection relay publishes a breaker position and the breaker changes from closed to open, the publisher’s GOOSE state information is updated.
The state number helps the subscriber recognize a new state.
3.2 Sequence number (sqNum)
The sequence number changes as GOOSE messages are retransmitted within a particular state.
It helps distinguish successive transmissions of the same state.
3.3 Time allowed to live
The timeAllowedToLive field indicates the maximum expected time before the next message is due.
The subscriber can use this information for communication supervision.
If messages stop arriving within the expected time, the subscriber can detect a communication interruption and apply its configured failure behavior.
3.4 Configuration revision (ConfRev)
ConfRev identifies the configuration revision associated with the GOOSE control block and its dataset.
When relevant configuration changes are made, the revision must be handled consistently between publisher and subscriber.
It is not the relay firmware revision.
4. GOOSE Testing: What Must Be Verified?
A complete GOOSE test should cover several layers.
| Testing layer | What to verify |
|---|---|
| Publisher | GOOSE messages are transmitted |
| Network | Ethernet multicast traffic reaches the required ports |
| Subscriber | Messages are received and recognized |
| Data mapping | Correct data attributes are assigned |
| Application logic | Received information operates the intended logic |
| Output | The correct physical or logical response occurs |
| Supervision | Communication failure is detected and handled correctly |
It is important to separate communication testing from application testing.
For example, Wireshark may confirm that a GOOSE message is being transmitted, but it cannot by itself confirm that the receiving MiCOM relay has mapped the signal correctly into its protection or control logic.
5. Practical Example: GOOSE Protection Trip Between Two MiCOM Relays
Consider a substation with two feeder bays.
- MiCOM Relay 1 provides feeder protection.
- MiCOM Relay 2 receives a protection trip signal.
- The trip signal is transmitted through GOOSE.
- The receiving relay uses the signal in its configured application logic.
The purpose of the test is to verify the complete communication chain.
Example protection trip signal path
MiCOM Relay 1
Protection function operates
Trip signal changes state
GOOSE publisher
Dataset and control block
Ethernet network
Multicast message transmission
MiCOM Relay 2
GOOSE subscriber and input mapping
Configured application response
Interlocking, blocking or trip logic as designed
The test should verify each stage separately before performing an end-to-end functional test.
6. Step 1 – Review the GOOSE Configuration Before Testing
Before starting the commissioning test, review the approved engineering configuration.
Check the following:
Publisher information
- Publisher IED name
- Logical device
- Logical node
- GOOSE control block
- Dataset reference
- Published data attributes
- AppID
- Destination multicast MAC address
- VLAN ID and priority, where used
- ConfRev
Subscriber information
- Subscriber IED name
- Publisher reference
- Dataset reference
- External references
- Signal mapping
- Application logic
- Communication supervision settings
Network information
- Switch port configuration
- VLAN configuration
- Multicast forwarding
- Network redundancy arrangement, where applicable
- Port mirroring or network tap availability for packet capture
Compare the configuration of the publisher and subscriber against the approved SCD and device-specific configuration files.
Do not assume that the latest SCD file is necessarily the configuration currently loaded into the relay.
7. Step 2 – Check the Publisher Relay
The first practical test is to confirm that the publishing MiCOM relay is transmitting GOOSE messages.
Check:
- Relay communication interface is operational.
- Correct GOOSE configuration is active.
- Required dataset is configured.
- GOOSE control block is enabled.
- Publisher communication parameters are correct.
- No relevant communication or configuration alarm is active.
Where supported, use the relay’s diagnostic or communication monitoring functions to inspect the GOOSE status.
The available diagnostic information depends on the model and firmware.
A relay can have a correctly configured GOOSE dataset but still fail to transmit because of an incorrect control block configuration, disabled service or communication interface problem.
8. Step 3 – Check GOOSE Communication Using Wireshark
Wireshark is one of the most useful tools for IEC 61850 GOOSE troubleshooting.
It allows engineers to inspect the actual Ethernet frames transmitted by the publisher.
8.1 Configure the packet capture
Connect the engineering workstation to a suitable network observation point.
Possible methods include:
- Managed switch port mirroring
- Network TAP
- Approved monitoring port
- Direct connection in a controlled test arrangement
A normal connection to an arbitrary switch port may not show multicast traffic exchanged between other switch ports.
8.2 Apply the GOOSE display filter
Use the following Wireshark display filter:
goose
GOOSE messages use Ethernet EtherType 0x88B8.
An alternative filter is:
eth.type == 0x88b8
The filter should display the GOOSE packets visible to the capture interface.
8.3 Inspect the packet details
Check the following fields:
| Field | What to verify |
|---|---|
| Source MAC | Expected publisher interface |
| Destination MAC | Configured multicast address |
| VLAN ID | Expected VLAN, if used |
| AppID | Correct application identifier |
| GoCB reference | Correct control block |
| Dataset reference | Expected dataset |
| ConfRev | Consistent with approved configuration |
| stNum | Changes when dataset state changes |
| sqNum | Advances during retransmissions |
| allData | Contains expected published values |
The exact packet details depend on the message and the protocol decoder.
9. Step 4 – Test GOOSE State Changes
After confirming that GOOSE messages are being transmitted, test whether the published information changes correctly when the source signal changes.
For example, consider a dataset containing:
- Circuit breaker position
- Protection trip indication
- Protection start indication
The engineer should arrange an approved test condition that causes the relevant signal to change.
A simplified expected sequence is:
| Test condition | Expected publisher behavior |
|---|---|
| Normal state | GOOSE message contains normal values |
| Protection start | Relevant data attribute changes |
| Protection trip | Trip indication changes |
| Breaker opens | Breaker position changes |
| Return to normal | Relevant values return according to the application design |
Observe the message in Wireshark.
When the published dataset changes, the state number should reflect the new state according to the GOOSE protocol behavior.
Do not rely on the packet count alone. Verify the actual data values.
10. Step 5 – Check GOOSE Retransmission Behavior
GOOSE uses a retransmission mechanism.
When a state change occurs, the publisher sends the updated message and retransmits it at progressively increasing intervals until the steady-state transmission interval is reached.
This is important because subscribers must be able to detect communication interruptions.
During testing, inspect:
- Time intervals between successive messages
- State number changes
- Sequence number progression
timeAllowedToLive- Behavior after a new event
- Steady-state retransmission behavior
Do not assume that every MiCOM relay uses identical retransmission timing. Verify the expected behavior against the applicable configuration and device documentation.
What should the engineer observe?
During a state change, the publisher generally transmits the new state promptly and retransmits it more frequently at first.
As time passes without another state change, the retransmission interval increases toward the configured steady-state interval.
The subscriber uses the incoming message and supervision information to monitor communication.
11. Step 6 – Test the GOOSE Subscriber
After verifying the publisher, test the receiving MiCOM relay.
The subscriber test should confirm:
- Correct publisher identification
- Correct dataset reference
- Correct external reference
- Correct data type
- Correct signal polarity or state interpretation
- Correct application input mapping
- Correct response of the configured logic
Example: Breaker status subscription
A receiving relay subscribes to the circuit breaker position from another IED.
The engineer should verify:
- The publisher sends the breaker position.
- The message reaches the subscriber’s network interface.
- The subscriber recognizes the message.
- The external reference is mapped correctly.
- The internal application receives the expected status.
- The relevant logic responds correctly.
Where the relay offers diagnostic indications for GOOSE reception, use them as supporting evidence.
The actual application should also be verified through the approved commissioning test procedure.
12. Step 7 – Perform End-to-End GOOSE Functional Testing
End-to-end testing verifies the entire application rather than only the communication packets.
Consider a protection trip transfer application.
The test should cover:
- Initiating condition at the publisher.
- Protection or logic signal operation.
- Publisher dataset update.
- GOOSE message transmission.
- Network delivery.
- Subscriber reception.
- External signal mapping.
- Subscriber logic response.
- Intended final output or application action.
The engineer should record the result of every stage.
For protection-critical applications, use approved test procedures, appropriate test equipment and safe isolation arrangements. Do not initiate actual breaker operations unless specifically authorized by the commissioning plan.
13. Step 8 – Test GOOSE Communication Failure and Recovery
GOOSE communication supervision is essential for applications that depend on receiving timely information from another IED.
A commissioning test should include controlled communication failure and recovery scenarios where permitted by the project test plan.
Possible test conditions include:
- Disconnecting the publisher’s communication link
- Blocking the relevant multicast traffic in a controlled test environment
- Interrupting the network path
- Restoring the communication connection
- Restarting an IED under an approved test procedure
Observe the subscriber’s behavior.
Check:
- Whether a communication failure is detected
- Whether the expected alarm or diagnostic indication appears
- Whether the application enters the intended failure state
- Whether the communication status recovers correctly
- Whether the application returns to normal as designed
The correct failure response must be defined by the protection and automation design. A communication failure should not be assumed to produce a universal trip or blocking action.
14. Step 9 – Troubleshoot Common GOOSE Problems
The following table summarizes common problems encountered during MiCOM GOOSE commissioning.
| Problem | Possible cause | Recommended investigation |
|---|---|---|
| No GOOSE packet visible | Publisher not transmitting or wrong capture point | Check publisher and switch mirroring |
| GOOSE packet visible but subscriber does not respond | Incorrect subscriber configuration | Check ExtRef and application mapping |
| Wrong signal value | Incorrect dataset or data mapping | Inspect allData and source reference |
| Subscriber communication alarm | Missing or delayed messages | Check network and publisher supervision |
| Incorrect VLAN | Switch and IED settings inconsistent | Verify VLAN configuration |
| GOOSE messages not forwarded | Multicast filtering or switch configuration | Check switch multicast handling |
| Configuration mismatch | Publisher and subscriber project versions differ | Compare SCD and loaded configurations |
| Wrong publisher identified | Incorrect MAC, AppID or references | Compare message with approved design |
| Signal remains in an unexpected state | Application mapping or failure handling issue | Inspect subscriber logic and quality/status |
| Intermittent communication | Network congestion, link faults or topology problems | Check switch logs and packet capture |
14.1 GOOSE messages are not visible in Wireshark
Possible causes include:
- Incorrect capture interface
- Switch port mirroring not configured
- Incorrect port mirroring source or destination
- Publisher not transmitting
- VLAN filtering
- Network path problem
First verify that the capture point can actually observe the publisher’s traffic.
14.2 GOOSE is visible but the subscriber does not operate
This is a common commissioning problem.
The publisher may be transmitting correctly, but the receiving relay may not recognize or use the message.
Check:
- Publisher IED reference
- Dataset reference
- GOOSE control block
- AppID
- Multicast MAC address
- ConfRev
- External references
- Subscriber configuration
- Application logic mapping
Also check whether the subscriber’s supported implementation accepts the data types and configuration being published.
14.3 ConfRev mismatch
A difference in the expected configuration revision can indicate that publisher and subscriber configurations are not aligned.
Check the approved SCD file and the actual configurations loaded into both devices.
Do not simply change the revision value to clear an alarm without understanding the underlying configuration difference.
14.4 Incorrect GOOSE signal polarity
A signal may be received but interpreted incorrectly by the application.
For example, the engineering design may define a particular Boolean value as breaker closed, while the receiving logic uses the opposite interpretation.
Check the data model, signal definition and application mapping.
15. Practical GOOSE Test Cases for MiCOM Relays
The following examples can be used as a starting point when developing a project-specific commissioning test plan.
| Test case | Test objective | Expected result |
|---|---|---|
| GOOSE publisher test | Verify message transmission | Correct GOOSE message visible |
| Dataset test | Verify published values | Expected data attributes present |
| State change test | Verify event update | New state reflected in message |
| Retransmission test | Verify message retransmission | Expected sequence and timing behavior |
| Subscriber test | Verify message reception | Subscriber recognizes the message |
| Signal mapping test | Verify external reference | Correct internal signal changes |
| Application test | Verify protection/control logic | Intended logic response |
| Communication failure test | Verify supervision | Failure detected and handled as designed |
| Recovery test | Verify restoration | Communication and application recover as designed |
| Network test | Verify Ethernet forwarding | Required multicast traffic reaches the subscriber |
For each test, record:
- Test identification
- Date and test engineer
- Publisher IED
- Subscriber IED
- Dataset and GOOSE control block
- Test condition
- Expected result
- Actual result
- Evidence, such as packet captures
- Pass/fail status
- Corrective actions
16. GOOSE Testing Versus Conventional Hardwired Testing
GOOSE communication can replace selected hardwired signal connections, but it does not eliminate the need for engineering and functional verification.
| Item | Hardwired signaling | GOOSE signaling |
|---|---|---|
| Signal transmission | Copper wiring | Ethernet multicast |
| Signal mapping | Terminals and wiring diagrams | Datasets and external references |
| Interconnection | Physical wiring | Communication network |
| Troubleshooting | Wiring and electrical measurements | Network capture and IED diagnostics |
| Expansion | Additional wiring may be required | Engineering and network changes |
| Failure modes | Cable and contact faults | Network and communication faults |
| Testing | Electrical and functional tests | Communication and functional tests |
The selection between hardwired and GOOSE signaling should be based on the protection philosophy, availability requirements, network architecture, engineering standards and project specifications.
For critical protection functions, the design must explicitly address communication failure behavior and the required dependability and security.
17. GOOSE Testing and Cybersecurity Considerations
GOOSE communication is an important part of substation operational technology.
It should be included in the substation cybersecurity design.
Recommended considerations include:
- Restrict physical access to network equipment.
- Use network segmentation.
- Configure VLANs according to the approved design.
- Restrict unauthorized engineering access.
- Control changes to SCL files and IED configurations.
- Maintain approved configuration backups.
- Monitor network switches and communication health.
- Follow the organization’s IEC 62351 and cybersecurity requirements where applicable.
GOOSE traffic should not be treated as trusted simply because it is exchanged inside a substation network.
Configuration management and controlled engineering access are important for maintaining the integrity of protection and automation communication.
18. Practical GOOSE Commissioning Checklist
Use the following checklist when testing supported MiCOM GOOSE applications.
Before testing
- Confirm publisher and subscriber models.
- Check IEC 61850 capabilities.
- Review the approved SCD.
- Confirm the correct configuration is loaded.
- Check dataset and GOOSE control block references.
- Verify multicast MAC address.
- Verify AppID.
- Verify VLAN configuration.
- Check ConfRev.
- Confirm the network observation point.
Publisher testing
- Confirm GOOSE transmission.
- Check dataset values.
- Verify state changes.
- Inspect retransmission behavior.
- Record packet capture evidence.
Subscriber testing
- Confirm message reception.
- Verify external references.
- Check signal mapping.
- Verify application logic.
- Test the intended output or response.
Failure and recovery testing
- Test communication interruption under an approved procedure.
- Verify supervision and alarms.
- Verify configured failure behavior.
- Restore communication.
- Confirm normal operation.
Documentation
- Save Wireshark captures.
- Record test results.
- Document configuration changes.
- Archive final approved configuration files.
19. Conclusion
GOOSE testing is an essential part of IEC 61850 commissioning in substations using MiCOM protection relays.
A successful test must verify more than the presence of Ethernet packets. It must confirm that the publisher transmits the correct information, the network delivers the messages, the subscriber recognizes them, the signals are mapped correctly and the intended protection or automation application operates as designed.
Wireshark, IED diagnostics, system configuration files and functional test equipment all contribute to a complete commissioning process.
By following a structured approach, engineers can identify communication problems more efficiently and improve the reliability of IEC 61850-based protection and substation automation systems.
20. Practical MiCOM and IEC 61850 Training by Elec-Engg
Elec-Engg provides practical training in power system protection, MiCOM relays and substation automation.
Our training covers:
- MiCOM protection relay engineering
- IEC 61850 architecture and data modeling
- MMS communication and reporting
- GOOSE publisher and subscriber configuration
- GOOSE datasets and control blocks
- SCL, ICD, CID and SCD files
- GOOSE testing and commissioning
- Wireshark packet analysis
- IEC 61850 troubleshooting
- Practical protection and automation applications