IEC 61850 MMS Testing in MiCOM Relays: Practical Client-Server Communication, Reporting, Controls and Troubleshooting

1. Introduction

MMS (Manufacturing Message Specification) is one of the principal communication services used in IEC 61850-based substation automation systems. It enables communication between protection relays, bay controllers, SCADA systems, gateways and engineering workstations.

In substations equipped with MiCOM protection relays, MMS is commonly used for:

  • Reading protection and measurement information
  • Monitoring circuit breaker status
  • Receiving alarms and events
  • Retrieving disturbance and fault-related information where supported
  • Receiving buffered and unbuffered reports
  • Executing supported remote control operations
  • Monitoring IED health and communication status

Unlike GOOSE, which provides fast event-based communication over Ethernet multicast, MMS uses a client-server communication model.

A station-level SCADA system or gateway normally acts as the MMS client, while the MiCOM relay acts as the IEC 61850 server.

This article explains how to test MMS communication in supported MiCOM relays, including connection establishment, data access, reporting, controls, Wireshark analysis and practical commissioning procedures.

Note: The exact MMS services, data model, reporting features and control capabilities depend on the MiCOM relay model, communication hardware, firmware and IEC 61850 implementation. Always check the applicable technical documentation.

2. Understanding MMS Communication in IEC 61850

MMS is an application-layer communication protocol used by IEC 61850 for client-server information exchange.

The IEC 61850 server inside a protection relay exposes its data model to clients.

The client can access supported information through standardized services.

A typical arrangement includes:

  • MiCOM protection relay acting as an IEC 61850 server
  • SCADA or station gateway acting as an MMS client
  • Ethernet communication network
  • Engineering workstation for configuration and testing

Typical MMS client-server architecture

MiCOM Protection Relay

IEC 61850 Server

Logical devices · Logical nodes · Data objects

MMS over TCP/IP

TCP port 102 (standard MMS mapping)

Substation Ethernet Network

IP connectivity · Switches · Network security

SCADA / Station Gateway

IEC 61850 Client

Data access · Reports · Controls

The client establishes communication with the server and accesses the information exposed by the relay.

3. MMS Versus GOOSE

MMS and GOOSE are both important IEC 61850 communication services, but they serve different purposes.

FeatureMMSGOOSE
Communication modelClient-serverPublisher-subscriber
TransportTCP/IPEthernet multicast
Standard portTCP 102EtherType 0x88B8
Main applicationMonitoring, reporting and controlsFast event-based signaling
Communication initiationClient establishes associationPublisher transmits messages
Typical useSCADA integrationInterlocking and protection signaling
Data accessRead and supported servicesPublished datasets
Event handlingReporting servicesEvent-driven message updates

For example, a MiCOM feeder relay may use MMS to send breaker status and protection alarms to SCADA, while GOOSE is used to transmit a blocking signal to another protection relay.

Both services can operate simultaneously over the substation Ethernet network.

4. Understanding the IEC 61850 Data Model Used by MMS

Before testing MMS, engineers must understand how the relay’s information is organized.

IEC 61850 uses a hierarchical data model.

IEC 61850 data model

IED

MiCOM protection relay

Logical Device (LD)

Protection / measurement / control

Logical Node (LN)

PTOC · PDIS · PTRC · XCBR · MMXU

Data Object (DO)

Op · Pos · A · PhV

Data Attribute (DA)

stVal · q · t · mag · units

For example, a circuit breaker position may be represented using the XCBR logical node and its Pos data object.

The data object can contain attributes such as:

  • stVal – status value
  • q – quality
  • t – timestamp

The exact data reference depends on the relay’s IEC 61850 data model.

4.1 Functional constraints

Functional constraints define the purpose of data attributes.

Common examples include:

Functional constraintMeaning
STStatus information
MXMeasurements
COControl
SPSetpoint
CFConfiguration
DCDescription
RPUnbuffered reporting
BRBuffered reporting

When troubleshooting MMS data access, it is important to identify the correct functional constraint.

A data attribute may exist in the relay’s model but not be available through the particular service or access method being tested.

5. Step 1 – Prepare the MMS Communication Environment

Before testing MMS communication, confirm the network and device configuration.

Check the following:

  • MiCOM relay IP address
  • SCADA or engineering workstation IP address
  • Subnet mask
  • Gateway, where applicable
  • Ethernet connection
  • Relay IEC 61850 server configuration
  • Client communication configuration
  • Firewall and network access rules

Example network configuration

DeviceIP address
MiCOM Feeder Relay 1192.168.10.11
MiCOM Feeder Relay 2192.168.10.12
Station Gateway192.168.10.100
Engineering Workstation192.168.10.200

These are illustrative addresses only.

The actual network addressing must follow the approved substation design.

Check basic connectivity

From the engineering workstation, test the relay’s IP connectivity using the operating system’s network diagnostic tools.

For example:

ping 192.168.10.11

A successful ping confirms basic IP reachability, but it does not prove that the MMS server is operational.

The engineer must also verify the TCP connection and IEC 61850 services.

6. Step 2 – Verify the MMS Server in the MiCOM Relay

The MiCOM relay must have its IEC 61850 server communication correctly configured.

Depending on the product, the relevant configuration may include:

  • IEC 61850 communication enablement
  • Network interface configuration
  • Server access parameters
  • IED name
  • Logical device configuration
  • Supported data model
  • Reporting configuration
  • Control model configuration

Check the relay’s communication status and available diagnostics.

If the relay supports communication monitoring, inspect relevant indications and diagnostic records.

The server must be active and accessible before an MMS client can establish a connection.

7. Step 3 – Establish an MMS Association

An MMS client must establish communication with the IEC 61850 server.

The process generally involves several stages:

  1. Establish IP connectivity.
  2. Establish a TCP connection to the MMS service.
  3. Establish the required lower-layer communication associations.
  4. Exchange application-level association information.
  5. Establish the MMS association.
  6. Access the IEC 61850 server model.

MMS over the IEC 61850 standard mapping commonly uses TCP port 102.

Wireshark filter for MMS communication

Use the following display filter:

tcp.port == 102

This allows the engineer to inspect traffic associated with the standard MMS TCP port.

Check:

  • TCP connection establishment
  • TCP connection termination
  • Connection resets
  • Retransmissions
  • Unexpected disconnections
  • Application association traffic, where decoded

A TCP connection alone does not confirm a successful MMS association. The application-level communication must also be established.

8. Step 4 – Discover the IEC 61850 Server Data Model

After communication is established, the client needs to identify the server’s available information.

IEC 61850 provides services for discovering the server model.

Depending on the client and server implementation, these include:

  • Server directory
  • Logical device directory
  • Logical node directory
  • Data object directory
  • Data attribute directory
  • Data set directory
  • Report control block directory

For example, an IEC 61850 client may discover that a MiCOM relay contains logical nodes associated with:

  • Protection
  • Measurement
  • Circuit breaker control
  • Device health
  • Generic indications

The available model should be compared with the applicable MICS and ICD documentation.

A common troubleshooting mistake is assuming that every logical node described in the IEC 61850 standard must be available in every MiCOM relay.

The actual implementation must be verified.

9. Step 5 – Test MMS Read Services

Reading information is one of the most common MMS applications.

A client can read supported data attributes from the relay’s IEC 61850 server.

Typical information includes:

  • Circuit breaker position
  • Protection start indications
  • Protection trip indications
  • Current measurements
  • Voltage measurements
  • Frequency
  • Alarm information
  • Device health

Example: Reading circuit breaker position

The client accesses the circuit breaker logical node and reads the relevant position data object.

A simplified conceptual reference might look like:

IED_NAMELD0/XCBR1.Pos.stVal

This is an illustrative IEC 61850-style reference, not a guaranteed MiCOM data reference.

The actual logical device name, logical node instance and data object structure must be obtained from the relay’s data model.

Verify the quality attribute

When reading status information, engineers should not inspect only the status value.

The quality attribute q is also important.

It can indicate whether the information is valid, questionable, invalid or affected by other quality conditions.

The timestamp t may also be relevant when assessing the freshness of the information.

For reliable SCADA integration, status, quality and timestamp behavior should be considered together.

10. Step 6 – Test MMS Measurement Values

MiCOM relays may expose measurements through logical nodes such as MMXU, depending on the model and implementation.

Typical measurements include:

  • Phase currents
  • Phase voltages
  • Active power
  • Reactive power
  • Apparent power
  • Frequency
  • Power factor

For example, a current measurement may be represented through a measurement logical node and an appropriate data object.

A measurement commonly includes:

  • Magnitude
  • Quality
  • Timestamp
  • Unit and scaling information, where provided

Measurement verification

Compare the values reported by MMS against:

  1. Relay front-panel measurements.
  2. Engineering software measurements.
  3. Secondary injection test values.
  4. Expected primary or secondary quantities after considering CT and VT ratios.

A mismatch may result from incorrect scaling, incorrect data mapping, CT/VT configuration or a misunderstanding of the measurement reference.

Do not assume that the MMS value is always displayed in the same units as the relay’s front panel.

11. Step 7 – Configure and Test MMS Datasets

A dataset is a collection of IEC 61850 data references.

Datasets are commonly used by report control blocks to define which information is sent to a client.

For example, a feeder relay dataset may include:

InformationExample logical node
Overcurrent startPTOC
Earth fault indicationSupported protection LN
Protection tripPTRC
Circuit breaker positionXCBR
Current measurementMMXU
Relay healthDevice-specific data model

The engineer should check:

  • Dataset name
  • Dataset members
  • Valid data references
  • Functional constraints
  • Supported reporting services
  • Client compatibility

When a client reads a dataset, verify that the returned values correspond to the intended data attributes.

12. Step 8 – Test MMS Reporting

Reporting is one of the most important MMS functions in substation SCADA integration.

Instead of continuously polling every data point, the client can receive reports when configured conditions occur.

IEC 61850 provides two important types of report control blocks.

12.1 URCB – Unbuffered Report Control Block

An unbuffered report control block is used to send reports while the client is connected and reporting is enabled.

It does not provide the same persistent event buffering behavior as a BRCB.

If the client disconnects, events occurring during the interruption may not be available later through that unbuffered reporting mechanism.

12.2 BRCB – Buffered Report Control Block

A buffered report control block supports buffering of reports according to the server’s implementation.

This can help preserve event information during temporary communication interruptions.

When the client reconnects, it may retrieve buffered information according to the configured reporting and buffer behavior.

12.3 Important report control parameters

ParameterPurpose
RptIDReport identifier
DatSetAssociated dataset
BufTmBuffer time
TrgOpsTrigger options
IntgPdIntegrity period
OptFldsOptional report fields
RptEnaReport enable state
ResvReservation behavior, where supported

The exact set of supported parameters depends on the relay and its IEC 61850 implementation.

12.4 Report trigger options

Reporting may be triggered by different conditions, including:

  • Data change
  • Quality change
  • Data update
  • Integrity period
  • General interrogation

A practical SCADA test should verify that the required triggers operate correctly.

12.5 Practical reporting test

Consider a feeder relay connected to a station-level SCADA system.

The engineer wants to receive circuit breaker position changes and protection trip indications.

The test procedure is:

  1. Confirm the required dataset.
  2. Verify the report control block.
  3. Establish the MMS association.
  4. Enable reporting from the client.
  5. Change the relevant signal under an approved test condition.
  6. Confirm that the report is received.
  7. Check the reported data value.
  8. Check quality and timestamp information.
  9. Verify the report identifier and dataset.
  10. Repeat for the required events.

13. Step 9 – Test General Interrogation

General interrogation (GI) is used to request the current values of the relevant data associated with reporting.

It is useful when the client establishes communication or needs to synchronize its process image with the server.

For example, after a SCADA gateway reconnects to a MiCOM relay, it may perform general interrogation to obtain the current breaker position and protection status.

The test should verify:

  • GI request is accepted.
  • Expected data is returned.
  • Current values are correct.
  • Quality information is available as expected.
  • No required points are missing.

The exact GI support and behavior must be checked against the server and client implementation.

14. Step 10 – Test MMS Control Services

IEC 61850 supports different control models for operating controllable objects.

A MiCOM relay may expose supported control objects for functions such as:

  • Circuit breaker operation
  • Disconnector operation
  • Other configured switching functions

The control model must be checked for the specific object and relay.

Common control models include:

Control modelGeneral description
Status-onlyObject is monitored but not controlled through that control service
Direct control with normal securityDirect operation using the configured control procedure
SBO with normal securitySelect Before Operate with normal security
Direct control with enhanced securityDirect operation with enhanced security
SBO with enhanced securitySelect Before Operate with enhanced security

The actual supported models and command behavior depend on the implementation.

14.1 Direct control

With direct control, the client issues the control operation according to the configured control model.

14.2 Select Before Operate (SBO)

With Select Before Operate, the client first selects the object and then issues the operate command.

This can help reduce the risk of unintended operations.

Enhanced-security control models include additional checks and status handling compared with normal-security models.

14.3 Practical control test

For a breaker control application, verify:

  1. Correct control object reference.
  2. Correct control model.
  3. Client permission and authorization.
  4. Select operation, if required.
  5. Operate command.
  6. Command termination and response.
  7. Breaker position feedback.
  8. Indication of failed or rejected commands.

Safety note: Do not perform live breaker operations without an approved switching program, authorization, operational coordination and the required safety precautions. Commissioning tests should use an approved test arrangement.

15. Step 11 – Analyze MMS Communication Using Wireshark

Wireshark can help engineers diagnose communication problems between the MiCOM relay and the MMS client.

Useful display filters include:

MMS TCP traffic

tcp.port == 102

TCP connection resets

tcp.flags.reset == 1

TCP retransmissions

tcp.analysis.retransmission

Depending on the Wireshark version and enabled protocol dissectors, MMS-related protocol layers may be displayed in decoded form.

The engineer can investigate:

  • TCP connection establishment
  • MMS association attempts
  • Client requests
  • Server responses
  • Reporting traffic
  • Connection interruptions
  • Retransmissions and resets

Not every packet capture will contain fully decoded MMS application information. This can depend on the protocol mapping, capture completeness and decoder support.

16. Step 12 – Common MMS Communication Problems

ProblemPossible causeRecommended check
No connection to relayIP or network problemCheck IP configuration and connectivity
TCP connection failurePort blocked or server unavailableCheck TCP port 102 and server status
MMS association rejectedApplication configuration mismatchReview association and client settings
Data object not foundIncorrect data referenceCheck MICS and server model
Read request failsUnsupported service or access restrictionCheck implementation and permissions
Measurement incorrectScaling or mapping issueCompare with relay and test values
Reports not receivedRCB or client configuration problemCheck dataset, RCB and enable state
Buffered events missingBuffer or reservation behaviorCheck BRCB configuration and client handling
Control command rejectedWrong control model or authorizationCheck object configuration and access
Intermittent communicationNetwork or server instabilityInspect packet captures and diagnostics

16.1 MMS association failure

If the client cannot establish an MMS association, investigate the problem in stages:

  1. Confirm the relay is powered and operational.
  2. Check the Ethernet link.
  3. Verify the IP address.
  4. Check TCP port 102 connectivity.
  5. Confirm that the IEC 61850 server is enabled.
  6. Review client configuration.
  7. Check any security or access restrictions.
  8. Examine the packet capture.

This approach helps separate network problems from application-level configuration problems.

16.2 Data object not available

A data object may be unavailable because:

  • It is not implemented by the relay.
  • The logical device name is incorrect.
  • The logical node instance is different.
  • The data object reference is incorrect.
  • The required functional constraint is wrong.
  • The requested service is not supported.

Always use the actual device data model rather than assuming a standard logical node or object is implemented.

16.3 Reporting does not work

If the relay responds to MMS read requests but does not send reports, check:

  • Report control block configuration
  • Dataset membership
  • Report enable state
  • Trigger options
  • Client association
  • Client reservation, where relevant
  • Buffer behavior
  • Supported report features

The fact that data can be read does not prove that reporting is configured correctly.

17. MMS Testing Versus GOOSE Testing

Both MMS and GOOSE should be included in IEC 61850 commissioning, but their testing procedures are different.

Test activityMMSGOOSE
Basic network testIP and TCP connectivityEthernet multicast delivery
Communication setupClient-server associationPublisher transmission and subscriber reception
Data verificationRead data attributesInspect published dataset
Event verificationReportsGOOSE state changes
Control verificationSupported control servicesApplication mapping and logic
Packet captureTCP port 102EtherType 0x88B8
Main troubleshooting focusAssociation, services, datasets and reportsMulticast, VLAN, mapping and supervision

An IEC 61850 commissioning plan should cover both services where they are used in the project.

18. Practical MMS Commissioning Checklist

Device and network preparation

  • Confirm MiCOM model and firmware.
  • Check the applicable IEC 61850 documentation.
  • Verify relay IP address.
  • Verify client IP address.
  • Confirm Ethernet connectivity.
  • Confirm MMS server availability.
  • Check TCP port 102 connectivity.

Data model testing

  • Establish MMS association.
  • Discover server directory.
  • Discover logical devices.
  • Discover logical nodes.
  • Verify data object references.
  • Test data attribute reads.
  • Verify quality and timestamp.

Reporting testing

  • Verify datasets.
  • Verify report control blocks.
  • Test URCB where used.
  • Test BRCB where used.
  • Verify trigger options.
  • Test general interrogation.
  • Test event reporting.
  • Test recovery after communication interruption.

Control testing

  • Verify controllable object references.
  • Confirm supported control model.
  • Check authorization.
  • Test selection and operation where applicable.
  • Verify command response.
  • Confirm actual feedback.

Documentation

  • Save packet captures.
  • Record test results.
  • Document communication parameters.
  • Record any configuration changes.
  • Archive approved SCL files and relay configurations.

19. Conclusion

MMS testing is essential for verifying IEC 61850 client-server communication between MiCOM protection relays and station-level systems.

A complete MMS commissioning process should verify basic network connectivity, association establishment, server data model discovery, data access, measurement values, reporting, general interrogation and supported control services.

Wireshark provides useful evidence of network-level communication, while IEC 61850 client tools and relay diagnostics help verify the actual application services.

The most important principle is to test the complete communication function rather than relying only on a successful TCP connection or a successful data read.

By following a structured procedure, engineers can identify configuration errors, improve SCADA integration and ensure that the IEC 61850 communication functions operate according to the project requirements.

20. Practical MiCOM and IEC 61850 Training by Elec-Engg

Elec-Engg provides practical training in power system protection, MiCOM protection relays and substation automation.

Our training covers:

  • MiCOM protection relay engineering
  • IEC 61850 architecture and data modeling
  • MMS client-server communication
  • IEC 61850 data access and reporting
  • Buffered and unbuffered report control blocks
  • General interrogation
  • IEC 61850 control models
  • GOOSE publishing and subscription
  • SCL, ICD, CID and SCD files
  • Wireshark-based communication analysis
  • IEC 61850 testing and commissioning

Training is available through video courses, structured self-paced training, face-to-face sessions and customized in-house programs.