MV and LV Switchgear Test Procedure (SIMPPRIME, SIVACON)
The aim of this document is a description of the responsibilities of the test procedure during all stages related to the switchboard. This guide direction is prepared for related stages to the pre-commissioning and commissioning of switchgear.
Part I, Pdf, 400 pages
Part II, pdf, 100 pages
To Download, contact us