- 1. Introduction to ABB REL670
- 2. Main Applications of REL670
- 3. Operating Principle of Distance Protection
- 4. Distance Protection Zones
- 5. Distance Protection Characteristics
- 6. Main Distance Protection Functions in REL670
- 7. Phase Selection
- 8. Load Encroachment and Power Swing Considerations
- 9. Teleprotection and Communication-Assisted Schemes
- 10. Protection of Series-Compensated Lines
- 11. Additional Protection Functions
- 12. Auto-Reclosing and Synchronism Check
- 13. Circuit-Breaker Failure Protection
- 14. CT and VT Requirements
- 15. Line Impedance and Protection Settings
- 16. PCM600 Configuration and Engineering
- 17. IEC 61850 Communication in REL670
- 18. Testing and Commissioning of REL670
- 19. Common REL670 Problems and Troubleshooting
- 20. REL670 Compared with Other ABB Relays
- 21. Frequently Asked Questions About ABB REL670
- What is ABB REL670 used for?
- What is the main protection function of REL670?
- Does REL670 support quadrilateral distance protection?
- Does REL670 support mho distance protection?
- Can REL670 protect series-compensated lines?
- Can REL670 communicate using IEC 61850?
- Which software is used to configure REL670?
- Can REL670 be tested using OMICRON?
- Is REL670 suitable for generator protection?
- 22. Conclusion
- Related Articles
ABB REL670 Distance Protection Relay – Complete Technical Guide
1. Introduction to ABB REL670
The ABB REL670 is a numerical line distance protection relay from the ABB Relion 670 series. It is designed to protect overhead transmission lines and other suitable high-voltage line applications.
Distance protection is widely used in transmission networks because it can estimate the location of a fault by measuring the apparent impedance between the relay installation point and the fault.
The REL670 combines distance protection with additional protection, control, monitoring, communication and automation functions. Depending on the selected product version and configuration, it can support applications such as:
- Main and backup protection of transmission lines
- Distance protection for single-circuit and double-circuit lines
- Protection of series-compensated lines
- Teleprotection schemes using communication between line terminals
- Backup overcurrent and earth-fault protection
- Auto-reclosing and synchronism check
- Circuit-breaker failure protection
- Disturbance recording and fault analysis
- IEC 61850 substation communication
The actual function set depends on the REL670 product version, ordering code, hardware and configured application.
2. Main Applications of REL670
The REL670 is primarily intended for line distance protection in transmission and sub-transmission networks.
2.1 Transmission line protection
Distance protection is commonly applied to high-voltage transmission lines where fast and selective fault clearance is required.
The relay measures the voltage and current at the line terminal and calculates the apparent impedance. The measured impedance is compared with configured protection zones.
2.2 Backup protection
The REL670 can also provide backup protection using additional functions such as:
- Phase overcurrent protection
- Directional phase overcurrent protection
- Residual overcurrent protection
- Directional residual overcurrent protection
- Negative-sequence overcurrent protection
- Undervoltage and overvoltage protection
2.3 Series-compensated transmission lines
Series capacitors are used to improve power transfer capability and system stability. However, series compensation can introduce additional challenges for conventional distance protection, including voltage inversion and current inversion.
REL670 version 2.2 includes distance protection functions intended for series-compensated line applications. ABB also introduced improved transient directional detection based on RALDA principles for this application.
The protection design must consider the actual compensation arrangement, system conditions and selected relay functions.
3. Operating Principle of Distance Protection
The basic principle of distance protection is based on the relationship between voltage, current and impedance.
The apparent impedance measured by the relay is:
Z = V / I
Where:
- Z is the measured impedance
- V is the measured voltage
- I is the measured current
For a transmission line, impedance is approximately proportional to line length. Therefore, the measured impedance can provide an indication of how far a fault is from the relay location.
For example, if the impedance of a protected line is 10 ohms and a fault occurs at approximately 50% of the line length, the measured impedance may be around 5 ohms under suitable assumptions.
In practical applications, the relay must also account for fault resistance, source impedance, remote infeed, load current, line configuration and measurement errors.
4. Distance Protection Zones
Distance protection normally uses several protection zones with different reaches and operating times.
Zone 1 – Instantaneous protection
Zone 1 normally covers approximately 80–90% of the protected line.
It is usually configured with no intentional time delay. The reach is deliberately set below the complete line impedance to avoid unwanted operation for faults beyond the remote busbar.
The exact reach must be determined through a protection coordination study.
Zone 2 – Time-delayed protection
Zone 2 normally covers the remaining part of the protected line and provides an additional reach into the next line section.
It operates with a time delay to coordinate with the protection at the remote terminal and adjacent network.
Zone 3 – Remote backup protection
Zone 3 may provide backup protection for faults beyond the remote busbar.
Its reach and time delay must be coordinated with the protection of adjacent transmission lines and other network elements.
Reverse-looking zones
Some applications require reverse-looking distance elements for protection coordination, teleprotection logic or backup functions.
The required directional characteristics and settings depend on the protection philosophy.
5. Distance Protection Characteristics
Distance protection can use different impedance characteristics. The selected characteristic affects sensitivity, selectivity and security.
5.1 Quadrilateral characteristic
A quadrilateral characteristic provides separate resistive and reactive reach settings.
It is particularly useful where fault resistance is significant, such as in long transmission lines or applications involving high-resistance earth faults.
The independent resistive and reactive boundaries allow the protection engineer to optimize coverage while limiting unwanted operation during heavy load conditions.
5.2 Mho characteristic
The mho characteristic is commonly used in transmission line protection.
It has an inherently directional characteristic and is often suitable for long transmission lines and applications where power swings and load encroachment must be considered.
5.3 Earth-fault distance protection
Earth-fault distance protection requires compensation for the zero-sequence impedance of the line.
The relay uses phase and residual quantities to calculate the apparent impedance for phase-to-earth faults.
The zero-sequence compensation factor is important for correct reach measurement.
A commonly used representation is:
K0 = (Z0 − Z1) / (3 × Z1)
Where:
- Z0 is the zero-sequence line impedance
- Z1 is the positive-sequence line impedance
The exact compensation convention used in the relay settings must be checked against the applicable ABB documentation.
6. Main Distance Protection Functions in REL670
The REL670 product documentation identifies several impedance protection functions. Their availability and quantity depend on the selected configuration.
| Function name | Application |
|---|---|
| ZMQPDIS / ZMQAPDIS | Quadrilateral distance protection zone |
| ZMQAPDIS-related directional functions | Directional supervision for quadrilateral distance protection |
| ZMCPDIS / ZMCAPDIS | Distance protection for series-compensated line applications |
| ZMHPDIS | Full-scheme mho distance protection |
| ZMMPDIS / ZMMAPDIS | Full-scheme quadrilateral distance protection for earth faults |
| FRPSPDIS | Phase selection with quadrilateral characteristic |
| ZSMGAPC | Mho impedance supervision logic |
| FMPSPDIS | Faulty phase identification with load encroachment |
The exact function names, available instances and relationships between function blocks should be verified in the application manual for the installed product version.
7. Phase Selection
Correct faulted-phase identification is essential for selective tripping and successful single-pole auto-reclosing.
The relay must distinguish between:
- Phase-to-earth faults
- Phase-to-phase faults
- Two-phase-to-earth faults
- Three-phase faults
For example, a phase-A-to-earth fault should be correctly identified so that the appropriate protection and circuit-breaker pole logic can operate.
Incorrect phase selection can affect single-pole tripping, auto-reclosing and teleprotection schemes.
8. Load Encroachment and Power Swing Considerations
8.1 Load encroachment
During heavy loading conditions, the apparent impedance seen by a distance relay can enter a distance protection characteristic.
This can cause unwanted operation if the protection is not properly supervised.
Load encroachment logic helps distinguish between load conditions and fault conditions.
The engineer should verify the maximum expected load, emergency loading, power factor and system operating conditions when configuring the protection.
8.2 Power swing detection and blocking
Power swings can occur following major disturbances, line outages or changes in generation and load.
During a stable power swing, the apparent impedance may move through the distance protection characteristic even though no short circuit exists.
Power swing detection and blocking functions can prevent unwanted distance protection operation during stable swings, according to the configured application.
Out-of-step protection is a separate protection consideration and should be engineered according to the network stability and protection philosophy.
9. Teleprotection and Communication-Assisted Schemes
For important transmission lines, communication between the two line terminals can improve fault-clearing speed.
Common teleprotection principles include:
- Permissive Overreach Transfer Trip (POTT)
- Permissive Underreach Transfer Trip (PUTT)
- Blocking schemes
- Direct transfer trip
- Communication-assisted acceleration of distance protection
A communication-assisted scheme typically combines local protection measurements with a signal received from the remote terminal.
The exact scheme logic and supported functions must be checked for the selected REL670 product version and application configuration. Do not assume that every teleprotection scheme is automatically available or enabled in every relay.
Important engineering considerations include:
- Communication channel availability
- Channel delay and asymmetry
- Signal supervision
- Weak-infeed conditions
- Echo logic, where supported and required
- Current reversal conditions
- Channel failure response
- End-to-end testing
10. Protection of Series-Compensated Lines
Series compensation changes the apparent impedance of a transmission line and can affect conventional distance protection.
Potential challenges include:
- Voltage inversion
- Current inversion
- Sub-synchronous components
- Transient changes in the measured impedance
- Directional element security
ABB’s REL670 version 2.2 documentation describes improved distance protection for series-compensated lines, including high-speed transient direction detection based on RALDA principles.
For these applications, the protection engineer should study the complete compensation arrangement, including capacitor location, MOV protection, bypass breakers and the electrical position of the compensation equipment.
11. Additional Protection Functions
In addition to distance protection, REL670 can provide several supplementary protection functions, depending on configuration.
Current protection
- Instantaneous phase overcurrent protection (PHPIOC)
- Four-step phase overcurrent protection (OC4PTOC)
- Instantaneous residual overcurrent protection (EFPIOC)
- Directional residual overcurrent protection (EF4PTOC)
- Negative-sequence overcurrent protection (NS4PTOC)
- Sensitive directional residual overcurrent and power protection (SDEPSDE)
- Thermal overload protection (LCPTTR / LFPTTR)
- Voltage-restrained overcurrent protection (VRPVOC)
Voltage protection
- Two-step undervoltage protection (UV2PTUV)
- Two-step overvoltage protection (OV2PTOV)
- Residual overvoltage protection (ROV2PTOV)
- Overexcitation protection (OEXPVPH)
- Loss-of-voltage check (LOVPTUV)
Frequency protection
- Underfrequency protection (SAPTUF)
- Overfrequency protection (SAPTOF)
- Rate-of-change-of-frequency protection (where included in the selected configuration)
Other functions
- Breaker failure protection (CCRBRF)
- Stub protection (STBPTOC)
- Pole discordance protection (CCPDSC)
- Directional overpower and underpower protection (GOPPDOP / GUPPDUP)
- Broken conductor check (BRCPTOC)
- Fuse failure supervision (FUFSPVC)
- Current circuit supervision (CCSSPVC)
These functions can provide backup protection and improve the overall protection and monitoring capability of the line bay.
12. Auto-Reclosing and Synchronism Check
Auto-reclosing is widely used on overhead transmission lines because many faults are transient.
After a protection trip, the auto-reclosing function can initiate a reclose attempt following a configured dead time.
Important considerations include:
- Single-pole or three-pole auto-reclosing
- Dead-time settings
- Reclaim time
- Single-shot or multi-shot schemes, where supported
- Coordination with remote-end protection
- Synchronism-check conditions
- Dead-line and live-line conditions
- Circuit-breaker readiness
Synchronism check is important when reconnecting two energized parts of a power system.
The relay should verify the relevant voltage magnitude, phase angle and frequency difference conditions before permitting closing.
The application engineer must coordinate auto-reclosing logic with the circuit-breaker arrangement and the overall substation control scheme.
13. Circuit-Breaker Failure Protection
Circuit-breaker failure protection is used when a breaker does not interrupt the fault current after receiving a trip command.
The protection typically supervises the trip command and current conditions. If the breaker fails to clear the fault within the configured time, additional breakers are tripped to isolate the fault.
Important settings include:
- Breaker-failure current threshold
- Initiation logic
- Retrip time
- Backup trip time
- Current detection criteria
- Breaker auxiliary contact supervision
- Coordination with busbar protection and adjacent bays
The breaker-failure scheme should be tested as part of the complete protection system, not only as an isolated relay function.
14. CT and VT Requirements
Correct current and voltage measurement is essential for reliable distance protection.
Current transformers
The engineer should verify:
- CT ratio
- CT polarity
- CT secondary rating
- CT accuracy class
- CT burden
- CT saturation performance
- Correct phase identification
- Neutral or residual current connection
Voltage transformers
The engineer should verify:
- VT ratio
- VT polarity
- Phase sequence
- Secondary earthing
- Voltage input configuration
- Open-delta or residual voltage connection, where applicable
- Fuse failure supervision
Incorrect CT or VT wiring can cause incorrect impedance measurement and unwanted distance protection operation.

15. Line Impedance and Protection Settings
Accurate line impedance data is essential for distance protection.
The protection engineer should obtain or calculate:
- Positive-sequence resistance (R1)
- Positive-sequence reactance (X1)
- Zero-sequence resistance (R0)
- Zero-sequence reactance (X0)
- Line length
- Mutual coupling data, where relevant
- System frequency
- CT and VT ratios
For a simple uniform line, the impedance is proportional to line length. However, practical setting calculations must also consider the network configuration, source infeed, remote-end contribution and fault resistance.
Important distance protection setting parameters
| Setting | Purpose |
|---|---|
| Zone 1 reach | Defines the primary instantaneous protection reach |
| Zone 2 reach | Provides extended, time-delayed protection |
| Zone 3 reach | Provides remote backup protection, where applied |
| Zone operating times | Coordinates protection with adjacent network sections |
| Resistive reach | Determines resistance coverage |
| Reactive reach | Determines reactance coverage |
| Zero-sequence compensation | Corrects earth-fault distance measurement |
| Directional settings | Defines forward and reverse operation |
| Load encroachment settings | Helps prevent operation during heavy loading |
| Power swing settings | Supervises distance elements during power swings |
All settings should be validated through a protection coordination study and the applicable ABB setting guidance.

16. PCM600 Configuration and Engineering
ABB PCM600 (Protection and Control IED Manager) is used for engineering and configuration of compatible ABB Relion protection and control IEDs.
Typical REL670 engineering activities include:
- Create or open the PCM600 project.
- Add the REL670 IED with the correct product and connectivity package.
- Verify the installed product version.
- Configure the hardware and signal connections.
- Configure the application functions.
- Set CT and VT data.
- Enter line impedance and distance protection settings.
- Configure protection logic and trip outputs.
- Configure communication and IEC 61850 data.
- Validate the configuration.
- Download the configuration to the IED.
- Verify operation and retrieve event records.
The correct PCM600 version and connectivity package are important. They must be compatible with the installed REL670 product version.
17. IEC 61850 Communication in REL670
REL670 can be integrated into IEC 61850-based substation automation systems, subject to the product configuration and supported communication options.
Typical communication capabilities include:
- IEC 61850 MMS for monitoring and control
- IEC 61850 GOOSE for fast peer-to-peer communication
- SCL engineering files
- Logical nodes and data objects
- Event and disturbance information
- Integration with station-level systems
GOOSE applications
GOOSE communication may be used for functions such as:
- Interlocking
- Breaker status exchange
- Direct inter-IED signals
- Protection scheme signals
- Breaker failure initiation or related logic
The engineer must verify the publisher and subscriber configuration, dataset, control block, VLAN settings, priority and communication supervision.
IEC 61850 engineering workflow
A typical engineering workflow includes:
- Configure the IED in PCM600.
- Define the required IEC 61850 data.
- Export the appropriate SCL file.
- Integrate the IED into the station configuration.
- Configure GOOSE publishers and subscribers.
- Import the updated configuration as required.
- Verify communication and signal operation.
- Test the complete application.
18. Testing and Commissioning of REL670
Testing should cover both individual protection functions and the complete protection scheme.
18.1 Visual and wiring inspection
- Verify relay type and ordering information.
- Check auxiliary DC supply.
- Inspect CT and VT wiring.
- Verify trip and close circuits.
- Check binary inputs and outputs.
- Confirm communication connections.
- Verify grounding and panel wiring.
18.2 Secondary injection testing
A secondary injection test set, such as an OMICRON CMC, can be used to test the relay’s measuring and protection functions.
Typical tests include:
- Current and voltage measurement
- Phase rotation
- Distance zone reach
- Zone operating time
- Directional operation
- Phase selection
- Earth-fault distance measurement
- Load encroachment
- Power swing logic, where applicable
- Overcurrent and earth-fault protection
- Breaker failure logic
- Auto-reclosing and synchronism check
18.3 Distance protection testing
For distance protection, test points should be applied inside and outside each configured zone.
The test engineer should verify:
- Correct impedance measurement
- Correct operating direction
- Zone reach
- Zone operating time
- Resistive reach
- Earth-fault compensation
- Phase selection
- Trip output assignment
For quadrilateral characteristics, test points should cover the relevant resistive and reactive boundaries.
For mho characteristics, test points should verify the configured characteristic and directional operation.
18.4 Teleprotection and end-to-end testing
Where a communication-assisted scheme is used, testing should include both line terminals.
Verify:
- Transmitted and received signals
- Communication channel supervision
- Permissive or blocking logic
- Trip acceleration
- Weak-infeed logic, if configured
- Channel failure response
- Correct operation for internal and external faults
18.5 IEC 61850 testing
For IEC 61850 applications, verify:
- MMS communication
- GOOSE publishing
- GOOSE subscription
- Data mapping
- Quality and validity indications
- Communication supervision
- Correct operation of the connected application logic
19. Common REL670 Problems and Troubleshooting
Problem 1: Incorrect distance measurement
Possible causes:
- Incorrect CT or VT ratio
- Incorrect phase connection
- Incorrect line impedance settings
- Incorrect zero-sequence compensation
- Incorrect voltage or current polarity
Recommended checks: compare the relay measurements with independent secondary injection measurements and verify the line data.
Problem 2: Distance protection operates during heavy loading
Possible causes:
- Incorrect zone reach
- Insufficient load encroachment coverage
- Incorrect system operating assumptions
- Incorrect power swing supervision
Recommended checks: review maximum load conditions and verify the configured distance characteristic.
Problem 3: Earth-fault distance protection has incorrect reach
Possible causes:
- Incorrect zero-sequence impedance
- Incorrect residual current measurement
- Incorrect CT connection
- Incorrect earth-fault compensation settings
- Mutual coupling effects not considered
Recommended checks: verify the sequence impedance data and the relay’s compensation settings.
Problem 4: Teleprotection does not operate correctly
Possible causes:
- Incorrect communication mapping
- Missing or incorrect GOOSE signals
- Communication channel failure
- Incorrect scheme logic
- Incorrect signal supervision
Recommended checks: test both terminals and verify the complete communication-assisted protection scheme.
Problem 5: Auto-reclosing does not initiate
Possible causes:
- Incorrect initiation logic
- Reclosing blocked by protection or control logic
- Circuit-breaker not ready
- Incorrect dead-time settings
- Missing synchronism-check permission
Recommended checks: review the complete auto-reclosing sequence and monitor the relevant logic signals.
20. REL670 Compared with Other ABB Relays
ABB has several protection IEDs designed for different applications. The correct selection depends on the required protection philosophy, network configuration and product availability.
| Relay | Main application |
|---|---|
| REG670 | Generator protection |
| RET670 | Transformer protection |
| RED670 | Line differential protection |
| REL670 | Line distance protection |
| REL650 | Line distance protection in applications supported by its product configuration |
| REC670 | Bay control and related protection and control applications |
REL670 vs RED670
REL670 is primarily associated with line distance protection, while RED670 is primarily designed for line differential protection.
Distance protection calculates apparent impedance from local voltage and current measurements. Line differential protection compares currents from the line terminals using a communication channel.
Both approaches can be used in transmission line protection schemes, depending on the network requirements.
21. Frequently Asked Questions About ABB REL670
What is ABB REL670 used for?
ABB REL670 is a numerical line distance protection relay designed mainly for overhead transmission and sub-transmission line protection.
What is the main protection function of REL670?
Its main protection application is distance protection, using measured voltage and current to determine the apparent impedance to a fault.
Does REL670 support quadrilateral distance protection?
Yes. The REL670 product documentation describes quadrilateral distance protection functions, including functions for earth-fault distance protection.
Does REL670 support mho distance protection?
Yes. The REL670 version 2.2 documentation includes full-scheme mho distance protection functions.
Can REL670 protect series-compensated lines?
REL670 version 2.2 includes functions intended for series-compensated line applications, including improved transient directional detection based on RALDA principles.
Can REL670 communicate using IEC 61850?
Yes. REL670 supports IEC 61850-based substation integration, with communication capabilities depending on the product configuration.
Which software is used to configure REL670?
ABB PCM600 is used for engineering and configuration of compatible REL670 IEDs.
Can REL670 be tested using OMICRON?
Yes. Suitable OMICRON CMC test equipment and Test Universe modules can be used for secondary injection and protection scheme testing.
Is REL670 suitable for generator protection?
REL670 is primarily a line distance protection IED. ABB REG670 is the dedicated generator protection product in the Relion 670 series.
22. Conclusion
The ABB REL670 is an advanced line distance protection IED designed for transmission and sub-transmission network applications. Its distance protection capabilities, supplementary protection functions, communication features and integration with ABB PCM600 make it suitable for a range of line protection schemes.
A successful REL670 application requires more than entering distance zone settings. Engineers must understand line impedance calculations, CT and VT circuits, zero-sequence compensation, protection coordination, teleprotection, IEC 61850 communication and complete commissioning procedures.
For protection engineers, commissioning engineers and substation automation specialists, practical knowledge of REL670 configuration, testing and troubleshooting is essential for reliable transmission line protection.
Elec-Engg – Practical Power System Protection and Substation Automation Training
Explore more technical articles and training resources covering ABB protection relays, PCM600, IEC 61850, distance protection and relay testing.
Related Articles
- ABB REG670 Generator Protection Relay
- ABB RET670 Transformer Protection Relay
- ABB RED670 Line Differential Protection Relay
- ABB PCM600 Engineering Software – Complete Guide
- Distance Protection – Operating Principle, Zones and Settings
- IEC 61850 Communication in Protection Relays
- Transmission Line Protection and Teleprotection Schemes