- 1. Introduction to SIPROTEC 4 7SS52 Busbar Protection
- 2. Main Applications of SIPROTEC 4 7SS52
- 3. SIPROTEC 4 7SS52 System Architecture
- 4. Operating Principle of Busbar Differential Protection – ANSI 87B
- 5. Busbar Zones – Main and Selective Protection
- 6. Check Zone – Independent Busbar Supervision
- 7. Isolator Replica and Switching Position Monitoring
- 8. CT Supervision and Differential Current Monitoring
- 9. CT Saturation Stability
- 10. Busbar Protection Operating Time
- 11. Circuit-Breaker Failure Protection – ANSI 50BF
- 12. End-Fault Protection and Coupler Bay Protection
- 13. Busbar Protection Settings
- 14. DIGSI 4 Engineering and Configuration
- 15. Binary Inputs and Outputs
- 16. IEC 61850 and Substation Automation Integration
- 17. Testing and Commissioning of SIPROTEC 4 7SS52
- 18. Common Problems and Troubleshooting
- 19. SIPROTEC 4 7SS52 Compared with SIPROTEC 5 7SS85
- 20. Training on Siemens SIPROTEC 4 7SS52 – Elec-Engg
- 21. Conclusion
This article covers the Siemens SIPROTEC 4 7SS52 numerical busbar protection system, including its operating principle, busbar zones, check zone, CT circuits, isolator replica, circuit-breaker failure protection, DIGSI 4 engineering, testing and commissioning.
The 7SS52 is designed for selective and fast protection of busbar systems in medium-, high- and extra-high-voltage substations. Unlike a conventional single protection relay, it is a distributed protection system comprising a central unit and bay-related acquisition and control units.
Siemens SIPROTEC 4 7SS52 – Complete Guide to Numerical Busbar Protection

1. Introduction to SIPROTEC 4 7SS52 Busbar Protection
Busbars are among the most important components of an electrical substation. They connect incoming feeders, outgoing feeders, transformers, generators and bus couplers.
A fault on a busbar can affect several circuits simultaneously. If the fault is not cleared quickly, it may cause:
- Extensive equipment damage.
- Loss of multiple feeders.
- Interruption of power supply.
- Instability in the electrical network.
- Damage to circuit breakers and associated equipment.
The Siemens SIPROTEC 4 7SS52 is a numerical, distributed busbar and circuit-breaker failure protection system. It uses current measurements from the individual bays and information about the busbar switching arrangement to identify the faulty bus section and selectively trip the associated circuit breakers.
Unlike a conventional standalone protection relay, the 7SS52 consists of a central unit and distributed bay units connected through a communication system.
2. Main Applications of SIPROTEC 4 7SS52
The 7SS52 is designed for busbar protection in substations with different busbar arrangements.
Typical applications include:
- Single busbar systems.
- Double busbar systems.
- Double busbar with transfer busbar.
- Double busbar with bus coupler.
- Multiple busbar arrangements.
- Three-busbar systems.
- Up to quintuple busbar arrangements, including transfer busbars.
- High-voltage and extra-high-voltage substations.
- Substations with a large number of incoming and outgoing bays.
The system supports up to 12 bus zones, 12 auxiliary bus sections and 48 bay units, subject to the system configuration. Siemens Industry Support+1
3. SIPROTEC 4 7SS52 System Architecture
The 7SS52 uses a distributed architecture consisting of the following main components:
3.1 Central Unit
The central unit performs the main protection processing and system supervision.
Its responsibilities include:
- Receiving measured current information from bay units.
- Processing busbar differential protection.
- Calculating differential and stabilizing currents.
- Processing busbar zone allocation.
- Evaluating the check zone.
- Performing central circuit-breaker failure protection functions.
- Monitoring the health of bay units and communication.
- Generating trip and alarm commands.
- Recording protection events.
The central unit is the main processing element of the protection system.
3.2 Bay Units
Bay units are installed in the individual switchgear bays.
They acquire current measurements and switching information and communicate this data to the central unit.
Typical bay information includes:
- Three-phase current measurements.
- Circuit-breaker status.
- Disconnector status.
- Earthing switch status, where configured.
- External protection signals.
- Trip and control signals.
- Bay supervision information.
The bay unit also provides local control and indication functions according to its configuration.
3.3 Communication System
Communication between the central unit and bay units is essential for correct system operation.
The communication system transfers:
- Measured current values.
- Switching position information.
- Trip commands.
- Blocking signals.
- Supervision information.
- Device status and alarms.
The communication links and their supervision must be engineered according to the Siemens system documentation.
3.4 Typical 7SS52 system arrangement
A simplified arrangement is:
- Central unit.
- Bay units.
- Current transformers.
- Circuit breakers.
- Busbar disconnectors.
- Bus coupler and transfer busbar equipment.
- Fibre-optic communication connections.
- Auxiliary DC supplies.
- Trip circuits.
- Station control and alarm interfaces.
The actual number of bay units and communication connections depends on the substation design.
4. Operating Principle of Busbar Differential Protection – ANSI 87B
The 7SS52 uses the differential protection principle to detect faults within the busbar protection zone.
The relay compares the currents entering and leaving a busbar zone.
For an ideal busbar under normal operating conditions:
\[ I_{\mathrm{diff}} = \left|\sum_{i=1}^{n} I_i\right| \approx 0 \]
Where:
- \(I_i\) represents the current contribution from each connected bay.
- \(n\) represents the number of connected bays.
- \(I_{\mathrm{diff}}\) is the differential current.
For an internal busbar fault, the current balance is disturbed and the differential current increases.
The relay evaluates the differential current together with a stabilizing quantity to distinguish internal faults from external faults.
External fault
During an external fault, a high through-current may flow through the busbar.
The differential protection must remain stable even if CT errors or CT saturation occur.
Internal fault
During an internal busbar fault, the differential current rises and the protection identifies the affected zone.
The system then issues selective trip commands to the circuit breakers connected to that zone.
The 7SS52 uses through-current stabilization and separate protection measurements to improve security and selectivity. Siemens Industry Support+1
5. Busbar Zones – Main and Selective Protection
Busbar protection must identify exactly which section of the busbar is faulty.
This is achieved through the definition of protection zones.
For example, consider a double busbar system:
- Busbar 1.
- Busbar 2.
- Bus coupler.
- Incoming feeder.
- Outgoing feeders.
- Transformer feeders.
The busbar protection system assigns the current measurements from each bay to the relevant protection zones based on the switching arrangement.
When a feeder is connected to Busbar 1, its current measurement contributes to the Busbar 1 differential calculation.
If the disconnector position changes and the feeder is transferred to Busbar 2, the current measurement is assigned to the appropriate zone according to the switching information.
Important zone-related concepts
- Bus zone (BZ).
- Auxiliary bus section (AB).
- Check zone (CZ).
- Bay allocation.
- Bus coupler allocation.
- Disconnector position monitoring.
The 7SS52 supports up to 12 bus zones and 12 auxiliary bus sections. Siemens Industry Support+1
6. Check Zone – Independent Busbar Supervision
One of the important features of the 7SS52 is its check zone.
The check zone provides an additional differential measurement independent of the disconnector replica used for the selective busbar zones.
The system makes its trip decision using three independent measurements:
- Two measurements based on the busbar configuration.
- One measurement covering all busbar sections independently of the disconnector replica.
This provides an additional security check before a busbar trip is issued.
Why is the check zone important?
Consider a double busbar substation where the disconnector status is incorrectly indicated.
The selective protection zone may assign a bay to the wrong busbar.
The check zone provides an independent measurement that helps verify whether the fault is genuinely within the overall protected busbar system.
This helps reduce the risk of unwanted tripping caused by incorrect switching information.
The check zone has its own differential protection characteristic and settings. Siemens Industry Support+1
7. Isolator Replica and Switching Position Monitoring
The isolator replica is a critical part of busbar protection engineering.
In a double busbar substation, feeders can be connected to different busbars using disconnectors.
The protection system must know the actual switching arrangement to assign each bay to the correct differential protection zone.
Typical switching equipment includes:
- Busbar 1 disconnector.
- Busbar 2 disconnector.
- Bus coupler disconnectors.
- Transfer busbar disconnector.
- Circuit breaker.
- Earthing switch.
Disconnector position signals
The relay normally receives auxiliary contacts representing the open and closed positions.
The protection system uses these signals to determine the connection of the bay.
For example:
| Busbar 1 disconnector | Busbar 2 disconnector | Typical bay allocation |
|---|---|---|
| Closed | Open | Busbar 1 |
| Open | Closed | Busbar 2 |
| Open | Open | Disconnected |
| Closed | Closed | Special or abnormal switching condition requiring configured handling |
The actual treatment of abnormal and intermediate positions must follow the project design and Siemens configuration instructions.
Disconnector supervision
The 7SS52 supervises the plausibility of isolator position information.
Possible problems include:
- Both auxiliary contacts indicating open.
- Both contacts indicating closed.
- Loss of auxiliary DC supply.
- Incorrect binary input wiring.
- Failure of the disconnector mechanism.
- Incorrect switching sequence.
- Communication failure from the bay unit.
Depending on the configuration, the system can issue an alarm, use a defined fallback position or block the affected protection zone. Siemens Industry Support+1
8. CT Supervision and Differential Current Monitoring
Current transformer circuits are essential for reliable busbar differential protection.
Incorrect CT measurements can produce unwanted differential current or prevent correct operation.
The 7SS52 includes differential current supervision and measured-value monitoring.
Typical conditions requiring supervision include:
- CT secondary circuit interruption.
- Incorrect CT polarity.
- Incorrect CT ratio.
- CT saturation.
- Current measurement failure.
- Bay unit measurement error.
- Abnormal differential current under normal system conditions.
Differential current supervision
The system can monitor differential current during operation.
If the measured differential current exceeds the configured supervision threshold for the specified time, the system can generate an alarm or block protection according to the configured mode.
The supervision settings are separate from the main busbar protection operating thresholds.
Do not confuse differential current supervision with the main differential protection function. ManualsLib+1
9. CT Saturation Stability
During an external short circuit, a very high current may flow through the CTs.
If one CT saturates earlier than the others, the measured currents may become unequal.
This can create a false differential current.
The 7SS52 uses through-current stabilization to maintain protection stability during external faults and CT saturation.
Important CT engineering considerations include:
- CT ratio.
- CT accuracy class.
- CT knee-point voltage where applicable.
- CT secondary resistance.
- Lead resistance.
- Connected burden.
- Maximum external fault current.
- System X/R ratio.
- CT saturation performance.
CT selection must be based on the fault level and the protection system design. A correct relay setting cannot compensate for an unsuitable CT installation.
10. Busbar Protection Operating Time
Fast operation is important because a busbar fault can involve several connected circuits.
Siemens documentation specifies a typical busbar protection tripping time of approximately 15 ms for the 7SS52 protection function.
The actual total fault-clearing time will also include:
- Relay operating time.
- Output relay time.
- Auxiliary relay time, if used.
- Circuit-breaker opening time.
- Arc extinction time.
Therefore, the complete fault-clearing time must be calculated using the installed circuit breakers and trip circuit components. Siemens Industry Support+1
11. Circuit-Breaker Failure Protection – ANSI 50BF
The 7SS52 also provides circuit-breaker failure protection.
This function detects a circuit breaker that fails to interrupt current after receiving a trip command.
Breaker failure can occur because of:
- Mechanical failure.
- Trip coil failure.
- DC supply failure.
- Circuit-breaker mechanism problems.
- Incorrect trip circuit wiring.
- Failure of the breaker operating mechanism.
11.1 Breaker failure following a feeder fault
If a feeder protection relay detects a fault and sends a trip command but the breaker fails to open, the breaker failure protection can initiate additional tripping.
Depending on the configured mode, this may involve:
- Tripping the associated busbar zone.
- Tripping other breakers required to isolate the faulty bay.
- Sending a transfer trip signal to the remote line terminal.
11.2 Breaker failure following a busbar fault
If a busbar fault is detected and one of the associated circuit breakers fails to open, the 7SS52 can initiate additional tripping and transfer trip signals to clear the fault from the remote source.
11.3 Breaker failure operating modes
The 7SS52 manual describes different breaker failure operating modes, including:
- One-stage breaker failure with overcurrent detection.
- Two-stage breaker failure with trip repetition.
- Unbalance-based detection.
- Trip repetition followed by unbalance detection.
- External breaker failure initiation.
The available mode can be selected for each bay to suit the application. cache.industry.siemens.com+1
12. End-Fault Protection and Coupler Bay Protection
The 7SS52 also provides protection functions for particular circuit-breaker and bus coupler arrangements.
End-fault protection
A fault can occur between the current transformer and the circuit breaker of a line.
Depending on the CT and breaker arrangement, this fault may not be cleared by the normal line or busbar protection in the expected way.
End-fault protection identifies the relevant fault condition and initiates the required tripping signals.
Coupler bay protection
The system can detect and disconnect faults in the bus coupler bay between the current transformers and circuit breaker, using current measurement and selective unbalance.
These functions must be configured according to the actual bay arrangement and CT locations. Siemens Industry Support+1
13. Busbar Protection Settings
The 7SS52 has several settings for the busbar differential protection and its supervision functions.
The following are important engineering parameters.
13.1 Busbar differential pickup
The differential pickup defines the minimum operating differential current.
The setting must be selected considering:
- Maximum load current.
- CT errors.
- CT saturation.
- Maximum external fault current.
- Minimum internal fault current.
- System configuration.
- Manufacturer recommendations.
13.2 Stabilizing factor
The stabilizing factor determines the relationship between the differential operating current and the stabilizing current.
It helps the protection remain stable during external faults.
The settings for busbar-selective zones and the check zone are configurable independently.
13.3 Check zone pickup
The check zone has its own differential current threshold.
It must be coordinated with the selective busbar protection zones.
13.4 Earth-fault characteristic
The 7SS52 provides a separate earth-fault characteristic in the documented protection design.
Its settings must be selected according to the network grounding arrangement and the intended protection sensitivity.
13.5 Differential current supervision
Configure:
- Differential current supervision threshold.
- Time delay.
- Alarm or blocking response.
- Busbar zone supervision mode.
- Check zone supervision mode.
13.6 Isolator supervision
Configure the treatment of:
- Isolator malfunction.
- Auxiliary DC failure.
- Implausible switching positions.
- Switching position timeout.
- Blocking behaviour.
13.7 Breaker failure settings
Important breaker failure parameters include:
- Breaker failure current threshold.
- Breaker failure time delay.
- Start and release supervision.
- Sensitive characteristic, where used.
- Transfer trip logic.
- Bay-specific operating mode.
The actual parameter ranges and default values must be taken from the correct 7SS52 firmware manual and project setting file. ManualsLib+2
14. DIGSI 4 Engineering and Configuration
The SIPROTEC 4 7SS52 is a distributed protection system, so engineering involves more than configuring an individual relay.
The engineer must define the overall busbar arrangement, bay allocation, communication structure and trip logic.
Typical engineering tasks include:
- Creating the protection project.
- Selecting the correct 7SS52 system and hardware configuration.
- Defining the central unit.
- Defining the bay units.
- Configuring the bay names and numbers.
- Defining the busbar arrangement.
- Assigning each bay to the relevant busbar zones.
- Configuring bus coupler and transfer busbar arrangements.
- Configuring CT ratios and measuring inputs.
- Defining isolator replica signals.
- Configuring differential protection.
- Configuring the check zone.
- Configuring breaker failure protection.
- Defining trip outputs.
- Configuring alarms and supervision.
- Checking the communication structure.
- Preparing and validating the system configuration.
- Downloading the configuration to the relevant units.
The engineering software and version must be compatible with the installed 7SS52 firmware. Do not assume that a configuration prepared for one system version can be downloaded directly to another.
15. Binary Inputs and Outputs
The binary inputs and outputs connect the 7SS52 system to the switchgear and substation control circuits.
Typical binary inputs
- Busbar disconnector 1 open/closed.
- Busbar disconnector 2 open/closed.
- Transfer busbar disconnector status.
- Circuit breaker open/closed.
- External breaker failure start.
- External breaker failure release.
- External trip signals.
- Protection blocking signals.
- Test and maintenance signals.
- Auxiliary DC supervision.
Typical binary outputs
- Busbar trip.
- Circuit-breaker trip.
- Breaker failure trip.
- Transfer trip.
- Bay alarm.
- Isolator fault alarm.
- Communication failure alarm.
- Differential current supervision alarm.
- Device failure alarm.
- General protection alarm.
The signal assignment must be checked against the approved trip matrix and station control design.
16. IEC 61850 and Substation Automation Integration
When designing a substation automation system around SIPROTEC 4 equipment, it is important to distinguish the protection communication architecture from the station-level SCADA architecture.
The 7SS52 uses its own central-unit and bay-unit communication arrangement for the distributed busbar protection functions.
Station automation integration may include:
- Protection trip and alarm signals.
- Circuit-breaker status.
- Disconnector position.
- Device health and supervision.
- Event and fault indications.
- SCADA communication through the supported interfaces and system configuration.
Do not assume that the 7SS52 has the same IEC 61850 and GOOSE engineering capabilities as a SIPROTEC 5 7SS85 system. Verify the exact 7SS52 hardware, firmware and communication documentation before specifying station-bus integration.
17. Testing and Commissioning of SIPROTEC 4 7SS52
Commissioning a distributed busbar protection system requires testing the complete system, not just the central unit.
The tests should cover:
- Central unit.
- Bay units.
- CT circuits.
- Switching position inputs.
- Communication links.
- Busbar zone allocation.
- Differential protection.
- Check zone.
- Breaker failure protection.
- Trip outputs.
- Alarm and supervision functions.
17.1 Initial inspection
Check:
- Correct central unit and bay unit models.
- Hardware configuration.
- Auxiliary DC supply.
- Earthing arrangements.
- Communication wiring.
- CT secondary wiring.
- Binary input and output wiring.
- Circuit-breaker trip circuits.
- Approved configuration and settings.
17.2 CT circuit testing
Verify:
- CT ratio.
- CT polarity.
- Phase identification.
- Secondary continuity.
- Correct current input assignment.
- CT earthing.
- Current measurement values.
Where possible, confirm current measurements at the central unit and relevant bay units.
17.3 Isolator replica testing
This is a particularly important part of 7SS52 commissioning.
Test each disconnector position signal.
For example:
- Open Busbar 1 disconnector.
- Confirm the corresponding indication.
- Close Busbar 1 disconnector.
- Confirm the corresponding indication.
- Repeat for Busbar 2 disconnector.
- Test the bus coupler arrangement.
- Test transfer busbar switching, where applicable.
- Test abnormal and contradictory indications.
- Verify the resulting busbar zone allocation.
Confirm that the system assigns the bay to the correct protection zone for every approved switching condition.
17.4 Differential protection tests
Use an appropriate relay test system and the manufacturer’s test procedures.
Typical checks include:
- Differential pickup.
- Stabilizing characteristic.
- Stability during simulated external faults.
- Operation for simulated internal faults.
- Phase-selective tripping.
- Busbar zone selectivity.
- Check zone operation.
- Supervision and blocking functions.
The test plan must consider the distributed architecture and all relevant current inputs.
17.5 Check zone testing
Verify that the check zone evaluates the intended current measurements independently of the isolator replica.
Test the conditions for which the check zone should permit or prevent a busbar trip.
17.6 Breaker failure protection tests
Test:
- Breaker failure start.
- Current detection.
- Time delay.
- Trip repetition, where configured.
- Selective busbar zone tripping.
- Transfer trip signals.
- Reset and release conditions.
17.7 Communication testing
Verify communication between the central unit and all bay units.
Check:
- Communication link health.
- Bay unit identification.
- Correct measured value transfer.
- Communication failure alarm.
- Protection response to a bay unit failure.
- Recovery after communication is restored.
17.8 Trip circuit testing
Verify the complete tripping path from the protection system to the circuit breaker.
Confirm:
- Correct breaker trip output.
- Correct trip coil operation.
- Circuit-breaker auxiliary contacts.
- Breaker failure initiation.
- Lockout relay operation, where used.
- Alarm and event indications.
17.9 Final commissioning checks
Before returning the system to service:
- Confirm all bays are correctly configured.
- Confirm all CT circuits are in service.
- Confirm the isolator replica matches the actual switchgear.
- Confirm all communication links are healthy.
- Confirm protection zones are enabled.
- Remove temporary test blocks.
- Restore trip circuits.
- Verify the final alarm status.
- Save the final configuration and test records.
18. Common Problems and Troubleshooting
| Problem | Possible cause | Recommended checks |
|---|---|---|
| Differential current alarm | CT wiring or measurement error | Check CT polarity, ratios and current inputs |
| Unwanted busbar trip | Incorrect zone allocation or CT problem | Review isolator replica and current measurements |
| Wrong bay allocation | Incorrect disconnector status | Check auxiliary contacts and binary input wiring |
| Isolator fault alarm | Implausible or missing position signals | Check auxiliary DC and position contacts |
| Bay unit communication failure | Fibre or communication hardware problem | Inspect communication connections and diagnostics |
| Check zone does not permit trip | Incorrect configuration or current measurement | Verify check zone settings and measured values |
| Breaker failure does not operate | Incorrect start, current threshold or timing | Check BF inputs, current measurement and time delay |
| Transfer trip not received | Communication or remote trip logic issue | Test the complete intertrip path |
| Differential current during external fault | CT saturation or CT mismatch | Review CT performance and system fault levels |
| Protection zone remains blocked | Supervision or isolator fault condition | Identify the blocking source before resetting |
Do not reset protection blocks or change differential settings without first identifying the cause of the alarm.
19. SIPROTEC 4 7SS52 Compared with SIPROTEC 5 7SS85
The SIPROTEC 4 7SS52 and SIPROTEC 5 7SS85 are different generations of Siemens numerical busbar protection systems.
| Feature | SIPROTEC 4 7SS52 | SIPROTEC 5 7SS85 |
|---|---|---|
| Product generation | SIPROTEC 4 | SIPROTEC 5 |
| Protection architecture | Distributed central and bay units | SIPROTEC 5 system architecture |
| Main application | Numerical busbar protection | Numerical busbar protection |
| Busbar configuration | Supports complex multi-bus arrangements | Supports complex busbar arrangements |
| Engineering environment | SIPROTEC 4 engineering tools | DIGSI 5 |
| Product status | Cancelled product | Successor product family indicated by Siemens |
Legacy productSiemens lists the 7SS5220 central unit as cancelled since 31 March 2024, with SIPROTEC 5 7SS85 indicated as its successor. This is important when preparing new project specifications, spare-parts strategies or replacement studies. Siemens DE
For existing installations, replacement planning should include a detailed review of the busbar arrangement, CT inputs, bay count, communication system, trip matrix and commissioning requirements.
20. Training on Siemens SIPROTEC 4 7SS52 – Elec-Engg
Elec-Engg provides practical training in Siemens protection relays, numerical busbar protection, substation automation and protection system commissioning.
Our training is intended for protection engineers, commissioning engineers, testing engineers, substation engineers and electrical maintenance professionals.
Training topics can include:
- SIPROTEC 4 7SS52 system architecture.
- Central unit and bay units.
- Busbar differential protection – ANSI 87B.
- Busbar zone configuration.
- Check zone protection.
- Isolator replica and switching logic.
- CT circuit engineering.
- CT saturation and differential stability.
- Circuit-breaker failure protection – ANSI 50BF.
- End-fault protection.
- DIGSI 4 engineering and configuration.
- Binary inputs and outputs.
- Communication supervision.
- Busbar protection testing and commissioning.
- Troubleshooting and event analysis.
- SIPROTEC 4 to SIPROTEC 5 replacement considerations.
Available training methods:
- Online training.
- Structured self-paced training.
- Customized in-house training for companies and utilities.
- Face-to-face training.
- Practical relay testing and commissioning training.
For more information about protection and substation automation courses, visit:
- iemens 7SS52 relay
- SIPROTEC 4 7SS52
- Siemens numerical busbar protection
- Busbar differential protection
- ANSI 87B protection
- Busbar check zone
- Busbar isolator replica
- Busbar CT supervision
- Circuit breaker failure protection
- ANSI 50BF
- SIPROTEC 4 central unit
- SIPROTEC 4 bay unit
- 7SS52 DIGSI 4
- Busbar protection testing
- Siemens 7SS85
Elec-Engg – Practical Courses by Dr Saeed Roostaee / Elec-Engg

21. Conclusion
The Siemens SIPROTEC 4 7SS52 is a distributed numerical busbar and circuit-breaker failure protection system designed for complex substation arrangements.
Its main features include selective busbar differential protection, independent check-zone measurement, isolator replica supervision, CT saturation stability, circuit-breaker failure protection and support for multiple busbar configurations.
Successful application requires correct system architecture, CT engineering, bay allocation, switching position monitoring, communication supervision and comprehensive commissioning.
Although the 7SS52 is now a cancelled product, it remains important for engineers who operate, maintain, test and upgrade existing SIPROTEC 4 substations.