Siemens SIPROTEC 4 7VE6: 7VE61 & 7VE63 Automatic Synchronizing Guide

The Siemens SIPROTEC 4 7VE6 series is designed for synchronizing generators and electrical power systems. It is used in power plants, substations and industrial power networks where two electrical systems must be connected safely and reliably.

Unlike a conventional synchronism-check relay that only supervises closing conditions, the 7VE6 can also perform automatic generator synchronization. Depending on the device variant and ordered balancing functions, it can issue control pulses to adjust generator voltage and frequency before closing the circuit breaker.

Siemens SIPROTEC 4 7VE6 – Complete Guide to Automatic Synchronizing and Synchronism Check Relays (7VE61 and 7VE63)

This article covers the 7VE61 and 7VE63, synchronizing principles, voltage and frequency matching, phase-angle control, DIGSI 4 configuration, settings, testing and commissioning.

1. Overview of SIPROTEC 4 7VE6

The 7VE6 family includes two principal variants:

  • 7VE61: Automatic synchronizing device with 1.5-channel synchronizing capability.
  • 7VE63: Automatic synchronizing device with 2-channel synchronizing capability.

The devices can be applied to generator-to-grid synchronization, busbar coupling and other power-system paralleling operations.

The 7VE6 provides functions for:

  • Automatic synchronization.
  • Synchronism check.
  • Voltage matching.
  • Frequency matching.
  • Phase-angle monitoring.
  • Circuit breaker closing-time compensation.
  • Dead-bus and dead-line supervision.
  • Multiple synchronizing points.
  • Synchronizing test operation.
  • Optional control pulses for generator voltage and speed regulation.
  • Integration with external control and protection systems.

The exact functionality depends on the device variant, order code and configured function groups. In particular, automatic voltage and frequency balancing requires the appropriate balancing-command variant. support.industry.siemens.com+2

2. 7VE61 vs 7VE63

The main difference between the 7VE61 and 7VE63 is their synchronizing channel arrangement.

Feature7VE617VE63
Product familySIPROTEC 4SIPROTEC 4
Main applicationGenerator synchronizationGenerator synchronization
Synchronizing arrangement1.5-channel2-channel
Automatic synchronizationVariant dependentVariant dependent
Synchronism checkAvailable according to configurationAvailable according to configuration
Voltage and frequency balancingDepends on ordered variantDepends on ordered variant
Multiple synchronizing pointsSupported through configured function groupsSupported through configured function groups

The 7VE61’s 1.5-channel arrangement and the 7VE63’s 2-channel arrangement are intended for different synchronizing applications. The appropriate model should be selected according to the number of breakers, measuring points and the required synchronizing philosophy. cache.industry.siemens.com+1

3. Applications of SIPROTEC 4 7VE6

The 7VE6 is used in several types of power-system installations.

3.1 Generator-to-grid synchronization

One of the most common applications is connecting a generator to an energized power grid.

Before the generator circuit breaker closes, the device compares generator voltage and frequency with the grid voltage and frequency.

The objective is to ensure that:

  • Generator voltage is sufficiently close to grid voltage.
  • Generator frequency is close to grid frequency.
  • Phase-angle difference is within the permitted range.
  • The expected phase angle at contact closure is suitable.

3.2 Generator-to-busbar synchronization

In power plants with multiple generators, each generator may be synchronized to a common busbar.

The 7VE6 can be configured for the relevant generator and busbar voltage measurements and the associated circuit breaker.

3.3 Busbar coupling

Synchronizing is also required when connecting two energized busbar sections.

The relay compares the voltage signals from both sides of the coupling circuit breaker and permits closing according to the configured synchronizing criteria.

3.4 Multiple synchronizing points

The 7VE6 supports multiple synchronizing function groups. The Siemens manual describes configurations for several synchronizing points, including applications in 1.5 circuit breaker arrangements.

A single-channel synchrocheck arrangement can also monitor several circuit breakers in parallel, reducing wiring and switching requirements in suitable applications.

4. Principle of Automatic Synchronization

Automatic synchronization is the process of matching an incoming generator or electrical system to an energized network before connecting them.

The 7VE6 measures the electrical quantities on both sides of the circuit breaker.

The main quantities are:

  1. Voltage magnitude.
  2. Frequency.
  3. Phase-angle difference.
  4. Phase sequence.
  5. Circuit breaker operating time.

The basic comparisons are:

\[ \Delta U = U_2-U_1 \]

\[ \Delta f = f_2-f_1 \]

\[ \Delta \varphi = \varphi_2-\varphi_1 \]

Where:

  • \(U_1\): Reference system voltage.
  • \(U_2\): Incoming generator or second system voltage.
  • \(f_1\): Reference system frequency.
  • \(f_2\): Incoming system frequency.
  • \(\Delta \varphi\): Phase-angle difference.

The relay evaluates these quantities and determines whether the systems are in synchronous or asynchronous conditions.

If the configured conditions are not fulfilled and the ordered balancing functions are available, the device can issue voltage and frequency adjustment pulses to the external controllers.

When the synchronizing conditions are fulfilled, the device issues the configured circuit breaker closing command or synchronism release. support.industry.siemens.com+1

5. Voltage Matching

Voltage matching is an important part of generator synchronization.

If the generator voltage is significantly different from the grid voltage, closing the generator circuit breaker can cause unwanted reactive current and voltage disturbances.

The 7VE6 compares the two measured voltages and can issue adjustment pulses to the generator voltage controller or transformer tap changer, depending on the selected configuration.

Typical control arrangements include:

  • Pulse commands to the generator AVR.
  • Voltage increase command.
  • Voltage decrease command.
  • Transformer tap changer control, where applicable.
  • Voltage matching through an external controller.

The device supports different voltage balancing modes, including pulse-based adjustment and tap-changer operation, depending on the configured function and ordered variant.

The voltage controller settings include parameters for pulse duration, maximum pulse duration, voltage change rate, pause time and voltage smoothing. cache.industry.siemens.com+1

6. Frequency Matching

Frequency matching is used to bring the incoming generator frequency close to the network frequency.

For example:

  • Grid frequency: 50 Hz.
  • Generator frequency: 49.70 Hz.
  • Frequency difference: 0.30 Hz.

The relay evaluates the frequency difference and, when the relevant balancing function is configured, sends increase or decrease pulses to the turbine or engine speed controller.

The frequency balancing function can include:

  • Frequency increase pulse.
  • Frequency decrease pulse.
  • Minimum pulse duration.
  • Maximum pulse duration.
  • Frequency change rate.
  • Controller pause time.
  • Frequency setpoint.
  • Kick pulse function.

The kick pulse is particularly useful when the two systems have almost identical frequencies but a remaining phase-angle difference. A small frequency adjustment can gradually move the phase angle toward the desired closing point. cache.industry.siemens.com+1

7. Phase-Angle Difference and Slip Frequency

Phase-angle difference is one of the most important parameters in synchronization.

Even if the generator and grid have the same voltage and frequency, the generator may not be in phase with the grid.

The phase angle changes when the two systems have different frequencies.

The approximate relationship is:

\[ \frac{d\varphi}{dt}=360^\circ \times \Delta f \]

For example, if the frequency difference is 0.1 Hz:

\[ \frac{d\varphi}{dt}=36^\circ/s \]

This means the phase-angle difference changes by approximately 36 degrees per second.

The relay uses the measured frequency difference and phase-angle relationship to determine whether the systems can be connected safely.

The configured synchronizing limits must account for the generator, network and circuit breaker characteristics.

8. Circuit Breaker Closing-Time Compensation

The circuit breaker does not close instantaneously after receiving the closing command.

There is a mechanical operating delay between energizing the closing coil and the actual contact closure.

The 7VE6 considers the configured breaker closing time when determining the appropriate closing command instant.

A simplified relationship is:

\[ \varphi_{\text{command}} = \varphi_{\text{target}}- 360^\circ \times \Delta f \times t_{\text{CB}} \]

Where:

  • \(\varphi_{\text{command}}\): Phase angle at the command instant.
  • \(\varphi_{\text{target}}\): Desired phase angle at contact closure.
  • \(\Delta f\): Frequency difference.
  • \(t_{\text{CB}}\): Circuit breaker closing time.

The exact control calculation depends on the relay’s synchronization mode and configuration.

The circuit breaker closing time must be measured or obtained from reliable manufacturer data. An incorrect setting can lead to an unsuitable phase angle at the moment of contact closure. support.industry.siemens.com+1

9. Synchronism Check vs Automatic Synchronization

It is important to distinguish these two functions.

FunctionSynchronism checkAutomatic synchronization
Voltage measurementYesYes
Frequency measurementYesYes
Phase-angle measurementYesYes
Permissive closing supervisionYesYes
Automatic voltage adjustmentNo, not by itselfYes, if balancing function is configured
Automatic frequency adjustmentNo, not by itselfYes, if balancing function is configured
Controller pulse outputsNot inherently requiredUsed when configured
Circuit breaker closing commandAccording to applicationAccording to application

The 7VE6 can perform both types of operation, depending on its configuration and ordered functions. A device configured only for synchronism check should not be assumed to regulate generator speed or voltage. cache.industry.siemens.com+1

10. Voltage Transformer Connections

Correct voltage transformer connections are essential for reliable synchronization.

The relay compares two voltage measuring points:

  • Reference voltage.
  • Incoming system voltage.

The selected voltage connection must correspond to the actual electrical arrangement.

Important engineering checks include:

  • VT primary voltage.
  • VT secondary voltage.
  • Phase assignment.
  • Polarity.
  • Phase sequence.
  • Voltage input allocation.
  • Transformer vector-group compensation, where applicable.
  • Correct association between measuring inputs and circuit breakers.

The 7VE6 manual includes connection examples for three-phase synchronizing and synchrocheck arrangements. It also describes alternative measuring arrangements for multiple synchronizing points. cache.industry.siemens.com+1

11. Multiple Synchronizing Function Groups

One useful feature of the 7VE6 is its support for multiple synchronizing function groups.

The Siemens manual describes up to eight synchronizing function groups, with individual settings for the different synchronizing applications.

These groups allow the device to be engineered for different circuit breakers or synchronizing points within the installation.

Typical configuration tasks include:

  • Enable or disable a synchronizing function group.
  • Select the circuit breaker associated with the group.
  • Assign voltage measuring inputs.
  • Configure voltage and frequency limits.
  • Set phase-angle limits.
  • Configure circuit breaker closing time.
  • Select voltage and frequency balancing modes.
  • Assign binary input and output signals.

The relevant setting addresses for function group 1 begin at 6101, while subsequent groups use corresponding address blocks. The exact number and availability of groups should be checked against the device configuration. cache.industry.siemens.com+1

12. Dead-Bus and Dead-Line Supervision

The 7VE6 can be configured for switching applications involving energized and de-energized systems.

Typical conditions include:

  • Reference system live, incoming system dead.
  • Reference system dead, incoming system live.
  • Both systems energized and requiring synchronism.
  • Both systems de-energized.

The relay uses configured voltage thresholds to identify whether the measured systems are energized or de-energized.

These functions are important in generator startup, busbar energization and selected switching arrangements.

Dead-bus closing must be carefully coordinated with the overall protection and operating philosophy. The fact that a busbar is de-energized does not automatically mean that closing is safe. support.industry.siemens.com+1

13. DIGSI 4 Engineering and Configuration

The SIPROTEC 4 7VE61 and 7VE63 are configured using DIGSI 4.

A typical engineering procedure includes:

  1. Create a new DIGSI 4 project.
  2. Insert the correct 7VE61 or 7VE63 device.
  3. Check the device MLFB/order number.
  4. Configure the available functions.
  5. Configure the voltage measurement inputs.
  6. Enter nominal voltage and frequency data.
  7. Create the required synchronizing function groups.
  8. Select the circuit breaker associated with each group.
  9. Configure voltage and frequency limits.
  10. Configure phase-angle limits.
  11. Enter circuit breaker closing time.
  12. Configure voltage balancing, if available.
  13. Configure frequency balancing, if available.
  14. Assign binary inputs and outputs.
  15. Configure indications and alarms.
  16. Transfer the settings to the device.
  17. Verify measured values and perform functional testing.

DIGSI provides separate setting areas for synchronizing function groups, including power system data, voltage balancing, frequency balancing and tap changer settings. cache.industry.siemens.com+1

14. Important 7VE6 Settings

The following settings are examples of important parameters documented in the Siemens manual. They are not recommended universal setting values. Actual values must be selected based on the generator, network, VT arrangement, breaker and operating philosophy.

SettingPurpose
6101 SynchronizingEnables or disables synchronizing function group 1
6102 SyncSDSelects the switching device associated with the function group
6103 UminMinimum operating voltage
6104 UmaxMaximum operating voltage
6121 T-SYN. DURATIONMaximum synchronizing duration
6122 PHASE SEQUENCEPhase-sequence supervision
6120 T-CB closeCircuit breaker operating time
6130 dU ASYN U2>U1Maximum asynchronous voltage difference in one direction
6132 df ASYN f2>f1Maximum asynchronous frequency difference
6140 SYNC PERMIS.Permits switching under synchronous conditions
6141 F SYNCHRONFrequency threshold for synchronous/asynchronous classification
6144 dα SYN α2>α1Maximum synchronous phase-angle difference
6146 T SYNC-DELAYRelease delay under synchronous conditions
6170 U BALANCINGSelects voltage balancing mode
6180 f BALANCINGSelects frequency balancing mode
6187 KICK PULSEEnables the frequency kick-pulse function, where available

The setting addresses shown above relate to the first synchronizing function group. Other function groups use corresponding address ranges. Check the applicable manual and DIGSI parameter list for the specific device. PDF+1

15. Binary Inputs and Outputs

The binary inputs and outputs connect the 7VE6 to the generator control system, circuit breaker and external equipment.

Typical signal functions include:

  • Synchronization start.
  • Synchronization stop.
  • Synchronization blocking.
  • Synchronization test.
  • Circuit breaker position.
  • Circuit breaker closing command.
  • Synchronism release.
  • Voltage increase and decrease.
  • Frequency increase and decrease.
  • Tap changer control.

The manual describes a start input >Sync Start for initiating a parallel connection. A short pulse is sufficient to start the sequence, while a stop input or blocking input can interrupt it.

The device also supports a synchronization test mode. In this mode, the normal closing outputs are suppressed and test indications are generated instead. This is particularly useful during commissioning. support.industry.siemens.com+1

16. Automatic Synchronization Sequence – Practical Example

Consider a generator that must be connected to a 50 Hz grid.

Initial conditions:

  • Grid voltage: 11 kV.
  • Grid frequency: 50 Hz.
  • Generator voltage: 10.5 kV.
  • Generator frequency: 49.70 Hz.
  • Circuit breaker: Open.

A typical automatic synchronization sequence is:

Step 1 – Start command

The operator or plant control system initiates synchronization.

Step 2 – Voltage measurement

The 7VE6 measures the generator and grid voltages and verifies that the measuring signals are valid.

Step 3 – Voltage balancing

If the voltage difference is outside the configured limit, the relay issues an appropriate voltage adjustment pulse, if voltage balancing is configured.

Step 4 – Frequency balancing

The relay compares generator and grid frequencies. If necessary, it sends a speed increase or decrease pulse to the governor.

Step 5 – Phase-angle monitoring

The relay monitors the phase-angle difference and slip frequency.

Step 6 – Closing time compensation

The relay calculates the appropriate closing command instant based on the configured breaker closing time.

Step 7 – Circuit breaker closing

When the required conditions are satisfied, the relay issues the configured closing command.

Step 8 – Synchronization completed

The circuit breaker closes and the generator is connected to the grid.

The actual sequence, control pulse logic and closing criteria depend on the device configuration and the plant control philosophy.

17. Testing and Commissioning of SIPROTEC 4 7VE6

Testing the 7VE6 requires verification of the voltage measurements, frequency measurements, phase-angle calculations, balancing outputs and circuit breaker closing logic.

An OMICRON CMC test set with suitable voltage injection capabilities can be used for secondary injection testing.

17.1 Voltage measurement test

Verify the voltage measurement inputs.

Check:

  • Voltage magnitude.
  • Phase sequence.
  • Phase assignment.
  • VT ratio.
  • Voltage input allocation.
  • Transformer angle compensation, where applicable.

17.2 Frequency measurement test

Inject signals at different frequencies and verify that the measured frequency and frequency difference correspond to the test values.

For a 50 Hz application, test the configured operating range around nominal frequency.

17.3 Phase-angle test

Apply voltage signals with controlled phase-angle differences.

Verify:

  • Measured phase-angle difference.
  • Direction of phase-angle movement.
  • Synchronism detection.
  • Closing release conditions.
  • Blocking outside the configured angle limits.

17.4 Voltage balancing test

For devices with voltage balancing enabled, simulate a voltage difference and verify the increase/decrease control outputs.

Check minimum pulse duration, maximum pulse duration and controller pause time.

17.5 Frequency balancing test

Simulate a frequency difference and verify the frequency increase and decrease outputs.

Check the pulse duration and direction of the control command.

17.6 Circuit breaker closing-time test

Verify the configured circuit breaker operating time.

Where possible, measure the actual time between energizing the closing coil and the breaker contacts making.

17.7 Synchronization test mode

Use the device’s synchronization test function to verify the synchronizing process without operating the normal closing outputs.

The Siemens manual explains that in this mode the normal close-release indications and closing relays are suppressed, while test indications are generated. support.industry.siemens.com+1

17.8 Final functional test

Perform a complete functional test involving:

  • Start and stop commands.
  • Synchronization blocking.
  • Voltage balancing.
  • Frequency balancing.
  • Synchronism detection.
  • Circuit breaker close command.
  • Circuit breaker position feedback.
  • Alarm and event indications.
  • Communication with the plant control system.

Safety note: Never connect a secondary injection test set to live VT circuits without an approved isolation and test procedure. Confirm that test mode, breaker isolation and output blocking are correctly applied before testing.

18. Common Problems and Troubleshooting

ProblemPossible causeRecommended check
Synchronization does not startStart signal missing or function group disabledCheck binary input and function-group settings
Incorrect voltage measurementVT wiring, polarity or ratio errorVerify voltage circuits and power system data
Incorrect phase-angle measurementWrong phase assignment or sequenceCheck VT connections and phase-sequence setting
Generator voltage does not increaseIncorrect balancing output assignmentCheck voltage control outputs and wiring
Generator frequency does not changeIncorrect governor interfaceCheck frequency balancing output and controller
Synchronization takes too longLimits too restrictive or controller response too slowCheck limits, pulse duration and pause time
Close command is not issuedSynchronizing conditions not fulfilledReview measured voltage, frequency and angle
Breaker closes at an incorrect angleIncorrect breaker closing timeVerify actual breaker operating time
Tap changer does not operateIncorrect tap changer configuration or signal assignmentCheck control mode and binary outputs
Synchronization test does not operateTest command or test configuration missingCheck test input and device indications
Multiple synchronizing points conflictIncorrect function-group or breaker assignmentCheck each group’s measuring inputs and breaker selection

19. 7VE6 Compared with 7VK61

The 7VE6 and 7VK61 should not be considered interchangeable.

FeatureSIPROTEC 4 7VE6SIPROTEC 4 7VK61
Main purposeDedicated synchronizing deviceCircuit breaker management
Automatic generator synchronizationYes, with appropriate variant and configurationNot the primary purpose
Voltage balancingAvailable with appropriate configurationNot the main function
Frequency balancingAvailable with appropriate configurationNot the main function
Synchronism checkYesAvailable according to configuration
Multiple synchronizing pointsMultiple function groupsApplication dependent
Main applicationGenerator and system parallelingBreaker management and closing supervision

For generator synchronization projects requiring automatic voltage and frequency matching, the 7VE6 is the dedicated solution in this SIPROTEC 4 range. The 7VK61 is intended for a different breaker-management application.

20. Practical Training on Siemens SIPROTEC 4 and Generator Synchronization

Elec-Engg provides practical training in Siemens protection relays, generator protection, synchronization, DIGSI engineering and relay testing.

Our training can include:

  • SIPROTEC 4 7VE61 and 7VE63 configuration.
  • Automatic generator synchronization.
  • Synchronism check and ANSI 25.
  • Voltage and frequency balancing.
  • Generator AVR and governor interface.
  • Circuit breaker closing-time compensation.
  • DIGSI 4 engineering.
  • Binary input and output configuration.
  • OMICRON CMC testing and commissioning.
  • Troubleshooting and practical case studies.

Training is available through online courses, structured self-paced training, customized company and utility programs, and face-to-face practical sessions.

Visit Elec-Engg for practical courses by Dr Saeed Roostaee / Elec-Engg.

21. Conclusion

The Siemens SIPROTEC 4 7VE6 series is designed for reliable synchronization of generators and electrical systems. The 7VE61 and 7VE63 provide different synchronizing channel arrangements and can be configured for synchronism check and automatic synchronization.

Its ability to measure voltage, frequency and phase-angle differences, together with optional voltage and frequency balancing, makes it useful in power plants and substations.

Understanding the voltage measurement circuits, balancing commands, circuit breaker closing time, DIGSI 4 settings and commissioning procedures is essential for engineers responsible for generator synchronization and power system operation.