MV and LV Switchgear Test Procedure (SIMPPRIME, SIVACON)
MV and LV Switchgear Testing Procedures – Siemens SIMOPRIME and SIVACON
Introduction
Medium-voltage (MV) and low-voltage (LV) switchgear testing is an essential part of electrical installation, pre-commissioning, commissioning, and maintenance activities.
Proper testing helps verify that switchgear assemblies are correctly installed, electrically sound, mechanically functional, and ready for safe operation.
This technical document describes the responsibilities and testing procedures associated with switchboards throughout the different stages of their lifecycle, with particular emphasis on pre-commissioning and commissioning.
The material covers Siemens switchgear platforms, including SIMOPRIME medium-voltage switchgear and SIVACON low-voltage switchgear.
Scope of the Switchgear Test Procedure
The purpose of this guide is to provide a structured approach to switchgear inspection and testing activities.
The procedures are intended to support engineers and technicians involved in:
- Switchgear installation and inspection.
- Pre-commissioning activities.
- Electrical and mechanical verification.
- Functional testing.
- Protection and control circuit testing.
- Circuit-breaker operation and interlock verification.
- Commissioning and readiness for energization.
Testing requirements must always be checked against the applicable switchgear model, manufacturer documentation, project specifications, and relevant electrical standards.
MV Switchgear – Siemens SIMOPRIME
SIMOPRIME is a Siemens medium-voltage switchgear product family.
MV switchgear testing generally includes verification of the equipment condition, primary circuits, secondary wiring, switching devices, protection interfaces, and safety interlocks.
Typical testing and inspection activities may include:
- Visual and mechanical inspection.
- Main circuit and earthing connections.
- Circuit-breaker mechanical operation.
- Electrical operation and control circuit checks.
- Interlocking and safety function verification.
- Current transformer and voltage transformer circuit checks.
- Protection relay testing and trip verification.
- Auxiliary supply and indication checks.
- Final commissioning inspections.
LV Switchgear – Siemens SIVACON
SIVACON is a Siemens low-voltage switchgear product family.
LV switchgear testing focuses on assembly verification, busbar systems, circuit-breaker operation, control circuits, protection devices, and functional performance.
Typical activities may include:
- Visual inspection and assembly verification.
- Busbar and electrical connection checks.
- Circuit-breaker inspection and operation.
- Insulation and continuity testing, as applicable.
- Protection device configuration and functional checks.
- Control and indication circuit testing.
- Mechanical and electrical interlock verification.
- Final commissioning and documentation.
Pre-Commissioning and Commissioning
Pre-commissioning and commissioning are important stages in ensuring that MV and LV switchgear installations meet the required technical and operational criteria.
A structured test procedure helps engineers identify installation defects, wiring errors, incorrect settings, mechanical problems, and functional issues before energization.
The final test scope and acceptance criteria should be established from the manufacturer’s instructions, approved project documents, and applicable standards.
Technical Document Details
This resource is provided in two PDF parts:
Part I
- Format: PDF
- Length: 400 pages
Part II
- Format: PDF
- Length: 100 pages
Total: 500 pages
Download and Access
To obtain the MV and LV Switchgear Testing Procedure documents covering Siemens SIMOPRIME and SIVACON, please contact Elec-Engg.
You can also use the following download link:
Practical Training by Elec-Engg
Elec-Engg provides practical technical training for electrical engineers involved in switchgear, power system protection, commissioning, and substation automation.
Training formats include:
- Online instructor-led courses.
- Structured self-paced training.
- Face-to-face technical training.
- Customized in-house training for companies and utilities.
Our training focuses on practical engineering knowledge, equipment operation, protection systems, testing procedures, and commissioning activities.
The aim of this document is a description of the responsibilities of the test procedure during all stages related to the switchboard. This guide direction is prepared for related stages to the pre-commissioning and commissioning of switchgear.
Part I, Pdf, 400 pages
Part II, pdf, 100 pages
To Download, contact us


For Indian user, could not payment right now.. please share link sir for purchase.
Please send me your Procedure.
kindly check your email
Please send me your Procedure.
This file is available only for our full pack training users
hi,
please share procedure and link for purchase
kindly send request on our WhatsApp: +989129613659
Please send me details and cost for this course.
please send your requests to our WhatsApp team: +989129613659
Please send me this copy.
Thank you very much.
Please contact our support team on WhatsApp +989129613659