Medium Voltage and Low Voltage Switchgear Test Procedure

MV and LV  Switchgear Test Procedure (SIMPPRIME, SIVACON)

MV and LV Switchgear Testing Procedures – Siemens SIMOPRIME and SIVACON

Introduction

Medium-voltage (MV) and low-voltage (LV) switchgear testing is an essential part of electrical installation, pre-commissioning, commissioning, and maintenance activities.

Proper testing helps verify that switchgear assemblies are correctly installed, electrically sound, mechanically functional, and ready for safe operation.

This technical document describes the responsibilities and testing procedures associated with switchboards throughout the different stages of their lifecycle, with particular emphasis on pre-commissioning and commissioning.

The material covers Siemens switchgear platforms, including SIMOPRIME medium-voltage switchgear and SIVACON low-voltage switchgear.

Scope of the Switchgear Test Procedure

The purpose of this guide is to provide a structured approach to switchgear inspection and testing activities.

The procedures are intended to support engineers and technicians involved in:

  • Switchgear installation and inspection.
  • Pre-commissioning activities.
  • Electrical and mechanical verification.
  • Functional testing.
  • Protection and control circuit testing.
  • Circuit-breaker operation and interlock verification.
  • Commissioning and readiness for energization.

Testing requirements must always be checked against the applicable switchgear model, manufacturer documentation, project specifications, and relevant electrical standards.

MV Switchgear – Siemens SIMOPRIME

SIMOPRIME is a Siemens medium-voltage switchgear product family.

MV switchgear testing generally includes verification of the equipment condition, primary circuits, secondary wiring, switching devices, protection interfaces, and safety interlocks.

Typical testing and inspection activities may include:

  • Visual and mechanical inspection.
  • Main circuit and earthing connections.
  • Circuit-breaker mechanical operation.
  • Electrical operation and control circuit checks.
  • Interlocking and safety function verification.
  • Current transformer and voltage transformer circuit checks.
  • Protection relay testing and trip verification.
  • Auxiliary supply and indication checks.
  • Final commissioning inspections.

LV Switchgear – Siemens SIVACON

SIVACON is a Siemens low-voltage switchgear product family.

LV switchgear testing focuses on assembly verification, busbar systems, circuit-breaker operation, control circuits, protection devices, and functional performance.

Typical activities may include:

  • Visual inspection and assembly verification.
  • Busbar and electrical connection checks.
  • Circuit-breaker inspection and operation.
  • Insulation and continuity testing, as applicable.
  • Protection device configuration and functional checks.
  • Control and indication circuit testing.
  • Mechanical and electrical interlock verification.
  • Final commissioning and documentation.

Pre-Commissioning and Commissioning

Pre-commissioning and commissioning are important stages in ensuring that MV and LV switchgear installations meet the required technical and operational criteria.

A structured test procedure helps engineers identify installation defects, wiring errors, incorrect settings, mechanical problems, and functional issues before energization.

The final test scope and acceptance criteria should be established from the manufacturer’s instructions, approved project documents, and applicable standards.

Technical Document Details

This resource is provided in two PDF parts:

Part I

  • Format: PDF
  • Length: 400 pages

Part II

  • Format: PDF
  • Length: 100 pages

Total: 500 pages

Download and Access

To obtain the MV and LV Switchgear Testing Procedure documents covering Siemens SIMOPRIME and SIVACON, please contact Elec-Engg.

Contact Elec-Engg

You can also use the following download link:

Click here to download

Practical Training by Elec-Engg

Elec-Engg provides practical technical training for electrical engineers involved in switchgear, power system protection, commissioning, and substation automation.

Training formats include:

  • Online instructor-led courses.
  • Structured self-paced training.
  • Face-to-face technical training.
  • Customized in-house training for companies and utilities.

Our training focuses on practical engineering knowledge, equipment operation, protection systems, testing procedures, and commissioning activities.

The aim of this document is a description of the responsibilities of the test procedure during all stages related to the switchboard. This guide direction is prepared for related stages to the pre-commissioning and commissioning of switchgear.


Part I, Pdf, 400 pages

Part II, pdf, 100 pages


To Download, contact us

(Click here to Download

Leave a Comment

Your email address will not be published. Required fields are marked *

11 thoughts on “Medium Voltage and Low Voltage Switchgear Test Procedure”

Scroll to Top