  1. Introduction
  2. 1. What Are IEC 61850 Sampled Values?
  3. 2. What Is a Process Bus?
  4. 3. What Is a Merging Unit?
  5. 4. IEC 61850-9-2 and Sampled Values Communication
  6. 5. Sampled Values Message Structure
  7. 6. IEC 61850-9-2LE and IEC 61869-9
  8. 7. Sampling Rates and Sample Counter
  9. 8. Time Synchronization in Sampled Values Systems
  10. 9. Sampled Values and MiCOM Protection Relays
  11. 10. SCL Configuration for Sampled Values
  12. 11. Sampled Values and GOOSE Together in a Digital Substation
  13. 12. Practical Example: Digital Feeder Protection
  14. 13. Sampled Values Testing and Commissioning
  15. 14. Wireshark Analysis of Sampled Values
  16. 15. Common Sampled Values Problems and Troubleshooting
  17. 16. Cybersecurity and Process Bus Protection
  18. 17. Best Practices for Digital Substation Engineers
  19. 18. Sampled Values Commissioning Checklist
  20. 19. Conclusion
  21. Practical IEC 61850 and MiCOM Training by Dr Saeed Roostaee – Elec-Engg

Introduction

IEC 61850 Sampled Values (SV) is one of the key technologies used in digital substations. It allows current and voltage measurements to be transmitted digitally over Ethernet instead of relying exclusively on conventional copper wiring between instrument transformers and protection relays.

In a traditional substation, current transformers (CTs) and voltage transformers (VTs) are connected directly to protection relays through secondary wiring. Each relay receives analogue current and voltage signals through dedicated electrical circuits.

In a digital substation using a process bus, a Merging Unit (MU) samples analogue current and voltage signals and converts them into digital data streams. These streams are transmitted over Ethernet using the IEC 61850-9-2 Sampled Values mechanism.

A compatible protection IED can subscribe to these streams and use the sampled measurements for protection and control functions.

For engineers working with MiCOM protection relays, understanding SV is important when designing, integrating and commissioning digital substation systems.

Important MiCOM compatibility note: IEC 61850 Sampled Values support is not universal across MiCOM relays. The presence of IEC 61850 MMS or GOOSE capability does not automatically mean that a relay can receive or process SV streams. Always verify the exact model, order code, communication hardware, firmware and supported services using the manufacturer’s documentation.

1. What Are IEC 61850 Sampled Values?

Sampled Values are digital representations of analogue electrical measurements.

Instead of transmitting current and voltage through conventional CT and VT secondary wiring, a Merging Unit samples the analogue signals and publishes digital samples through an Ethernet network.

The receiving device processes these samples according to its supported application and configuration.

The measurements commonly include:

  • Phase A current.
  • Phase B current.
  • Phase C current.
  • Neutral or residual current, where applicable.
  • Phase-to-phase voltages.
  • Phase-to-neutral voltages.
  • Other measurement channels supported by the Merging Unit.

Sampled Values are primarily specified in IEC 61850-9-2, with important implementation and engineering guidance provided by related IEC 61850 documents.

Traditional wiring versus Sampled Values

Traditional substationDigital process bus
CT/VT secondary wiring to relayCT/VT signals to Merging Unit
Analogue current and voltage inputsDigital Sampled Values
Multiple copper circuitsShared Ethernet infrastructure
Relay measures analogue inputs directlyCompatible relay processes digital samples
Physical wiring between equipmentCommunication-based measurement transfer

The process bus changes the way measurement signals are distributed throughout the substation.

2. What Is a Process Bus?

A process bus is the communication network that connects primary-process interfaces, such as Merging Units, with protection and control IEDs.

It carries real-time information from the substation primary equipment to the secondary protection and control systems.

The main communication technologies associated with the process bus include:

  • Sampled Values for current and voltage measurements.
  • GOOSE for fast status, protection and control signals.
  • Other Ethernet-based communication services where required by the system design.

Station bus versus process bus

These two networks have different primary purposes.

FeatureStation busProcess bus
Main purposeStation-level communicationPrimary-process communication
Typical informationMeasurements, alarms, events and controlsSampled currents, voltages and fast signals
Main protocolsMMS and GOOSESampled Values and GOOSE
Connected equipmentProtection IEDs, SCADA servers, gateways and HMIsMerging Units and process-level IEDs
Typical applicationsSCADA and station automationProtection and process interface

A substation may use physically separate networks or an appropriately engineered integrated architecture. The design must satisfy the project’s performance, availability and cybersecurity requirements.

3. What Is a Merging Unit?

A Merging Unit is an intelligent electronic device that receives analogue signals from instrument transformers and converts them into digital Sampled Values streams.

It acts as the interface between the primary electrical system and the digital process bus.

Main functions of a Merging Unit

A Merging Unit may perform the following functions:

  1. Receive analogue current signals.
  2. Receive analogue voltage signals.
  3. Sample the analogue signals.
  4. Convert the samples into digital values.
  5. Associate samples with timing information.
  6. Publish Sampled Values frames.
  7. Support synchronization using an appropriate time source.
  8. Provide diagnostic and supervision information.

The actual functions depend on the device design.

Example

Consider a 132 kV feeder with three phase CTs and three phase VTs.

Instead of connecting all six analogue signals directly to a protection relay, they can be connected to a suitable Merging Unit.

The Merging Unit publishes the sampled measurements over Ethernet.

A compatible protection IED can then use the digital measurements for supported protection functions.

4. IEC 61850-9-2 and Sampled Values Communication

IEC 61850-9-2 specifies the mapping of sampled measurement values onto Ethernet communication.

Sampled Values are transmitted using Ethernet frames rather than conventional TCP/IP-based MMS communication.

This distinction is important when engineers analyze the process bus using network tools.

Main communication characteristics

  • Ethernet-based communication.
  • Multicast transmission in typical process bus architectures.
  • Time-sensitive periodic sample transmission.
  • Sample synchronization requirements.
  • Configurable data streams.
  • Communication supervision.

Unlike MMS, Sampled Values do not use TCP port 102.

They are Ethernet-based frames with their own protocol identification and message structure.

Sampled Values versus MMS and GOOSE

FeatureMMSGOOSESampled Values
Main purposeClient-server communicationFast event and status communicationDigital measurement transmission
Typical dataMeasurements, reports, controlsBinary and other event dataCurrent and voltage samples
CommunicationTCP/IPEthernet multicastEthernet multicast
Typical mappingMMS over TCP/IPIEC 61850 GOOSEIEC 61850-9-2
Time behaviorApplication-dependentEvent-driven with retransmissionsPeriodic transmission
Typical useSCADAInterlocking and protection signalsProcess bus measurements

5. Sampled Values Message Structure

An SV message contains sampled measurement information and associated protocol fields.

Engineers should understand the following concepts:

  • APPID.
  • svID.
  • smpCnt.
  • confRev.
  • noASDU.
  • ASDU.
  • Dataset.
  • Sampled measurement values.
  • Synchronization and quality information, where included in the implementation.

The exact structure depends on the selected IEC 61850 edition and implementation profile.

5.1 APPID

APPID is an application identifier used in the Ethernet communication.

It helps identify the application stream and distinguish it from other Ethernet application traffic.

5.2 svID

svID identifies the Sampled Values stream.

For example, a Merging Unit may publish a stream identified by a project-specific name such as:

MU_FEEDER01_SV

This is an illustrative name, not a mandatory naming convention.

5.3 smpCnt

smpCnt represents the sample counter.

It allows receiving equipment to identify the sequence of samples.

Engineers can use it to investigate:

  • Missing samples.
  • Repeated samples.
  • Sequence discontinuities.
  • Synchronization problems.
  • Communication interruptions.

The counter behavior and rollover depend on the applicable SV profile.

5.4 confRev

confRev represents the configuration revision associated with the Sampled Values control block.

It helps identify changes to the configured SV stream.

It should not be confused with the device firmware version.

5.5 ASDU

ASDU stands for Application Service Data Unit.

An SV Ethernet frame may contain one or more ASDUs, depending on the selected implementation.

The ASDU contains the sampled data and associated information.

6. IEC 61850-9-2LE and IEC 61869-9

Engineers frequently encounter the terms IEC 61850-9-2LE and IEC 61869-9 when working with digital instrument transformers and process bus systems.

They are related, but they should not be treated as interchangeable terms.

IEC 61850-9-2LE

IEC 61850-9-2LE refers to a widely used implementation guideline based on IEC 61850-9-2.

It was developed to improve interoperability by defining a more specific implementation profile.

It is particularly associated with conventional process bus applications using defined sampling rates and message formats.

IEC 61869-9

IEC 61869-9 defines digital interface requirements for instrument transformers.

It provides a more comprehensive framework for digital measurement transmission.

Why engineers must distinguish them

When integrating a Merging Unit with a protection relay, it is not sufficient to confirm that both devices support IEC 61850.

Engineers must verify that the devices support compatible Sampled Values profiles.

Check:

  • Supported standard edition.
  • Sampling rate.
  • Number of samples per period.
  • Dataset structure.
  • Encoding.
  • Synchronization requirements.
  • Quality information.
  • Configuration parameters.

Two devices may both advertise IEC 61850 compatibility but still be incompatible for a particular SV application.

7. Sampling Rates and Sample Counter

The sampling rate is one of the most important parameters in a process bus application.

A Merging Unit samples the analogue signal at a defined frequency and publishes the resulting digital values.

Commonly encountered profiles include:

  • 80 samples per nominal power-frequency cycle.
  • 256 samples per nominal power-frequency cycle.

These are examples of commonly used sampling profiles, not universal requirements for every process bus.

Example: 50 Hz system

For a 50 Hz system:

At 80 samples per cycle:

\[ 80 \times 50 = 4000 \text{ samples/second} \]

At 256 samples per cycle:

\[ 256 \times 50 = 12800 \text{ samples/second} \]

Example: 60 Hz system

For a 60 Hz system:

At 80 samples per cycle:

\[ 80 \times 60 = 4800 \text{ samples/second} \]

At 256 samples per cycle:

\[ 256 \times 60 = 15360 \text{ samples/second} \]

The receiving protection IED must support the relevant sampling profile.

A mismatch can prevent the correct processing of the measurement stream.

8. Time Synchronization in Sampled Values Systems

Time synchronization is essential in digital substations.

Sampled Values systems require coordinated sampling behavior so that the receiving equipment can correctly interpret the measurements.

Common synchronization methods include:

  • IEEE 1588 Precision Time Protocol (PTP).
  • IEC/IEEE 61850-9-3 power utility profile.
  • Other supported synchronization arrangements defined by the project.

Why synchronization matters

Consider a protection application that uses current measurements from different Merging Units.

If those measurements are not correctly synchronized, the receiving system may interpret them with an incorrect relative time relationship.

This can affect applications such as:

  • Line differential protection.
  • Busbar differential protection.
  • Transformer differential protection.
  • Current comparison.
  • Other functions using measurements from multiple locations.

Synchronization checks

During commissioning, verify:

  1. The selected time synchronization profile.
  2. Grandmaster clock availability.
  3. PTP network configuration.
  4. Merging Unit synchronization status.
  5. Sample synchronization quality.
  6. Alarm behavior following loss of synchronization.
  7. Recovery following restoration.

The acceptable synchronization performance must be determined from the protection application and equipment specifications.

9. Sampled Values and MiCOM Protection Relays

MiCOM protection relays are used in many applications, including feeder, transformer, generator and line protection.

However, engineers must distinguish between IEC 61850 communication support and Sampled Values processing support.

A relay may support:

  • MMS communication.
  • GOOSE communication.
  • IEC 61850 logical nodes.
  • SCADA integration.

But it may not necessarily support SV inputs.

What must be verified?

Before selecting a MiCOM relay for a process bus project, examine:

ItemWhat to verify
Relay modelExact MiCOM model and generation
Order codeInstalled hardware and communication options
FirmwareSupported communication features
SV receiverWhether the relay can subscribe to Sampled Values
Sampling profileSupported sample rates and profiles
SynchronizationSupported time synchronization method
DatasetCompatible SV data structure
Protection functionsFunctions that can use SV measurements
Engineering toolsSupported configuration workflow
DocumentationMICS, PICS, PIXIT, ICD and release notes, as applicable

Do not assume that an IEC 61850-enabled MiCOM relay can automatically replace its conventional analogue CT and VT inputs with digital SV measurements.

If a specific MiCOM model does not support the required SV functionality, an alternative protection IED or an approved system architecture must be considered.

10. SCL Configuration for Sampled Values

Substation Configuration Language (SCL) is used to describe and exchange IEC 61850 system configuration information.

SCL files can contain information related to IEDs, communication networks, datasets, control blocks and external references.

For Sampled Values applications, relevant configuration information may include:

  • IED names.
  • Logical devices and logical nodes.
  • Sampled Values control blocks.
  • Datasets.
  • Communication parameters.
  • Multicast MAC addresses.
  • APPID.
  • VLAN ID.
  • VLAN priority.
  • Subscriber references.

Main SCL file types

FilePurpose
ICDIED Capability Description
CIDConfigured IED Description
IIDInstantiated IED Description
SCDSubstation Configuration Description
SSDSystem Specification Description

Sampled Values control block

An SV control block defines the publication of a Sampled Values dataset.

Depending on the implementation, configuration may include parameters such as:

  • Control block name.
  • svID.
  • Dataset reference.
  • confRev.
  • Multicast address.
  • APPID.
  • VLAN information.
  • Sampling-related parameters.

The exact configuration model must be checked against the supported SCL edition and device implementation.

Important engineering point

Do not assume that every MiCOM engineering tool can perform complete process bus system configuration.

The relay engineering tool, system configuration tool and Merging Unit configuration software may have separate responsibilities.

Use the manufacturer’s supported engineering workflow.

11. Sampled Values and GOOSE Together in a Digital Substation

A digital substation may use both SV and GOOSE for protection applications.

Sampled Values carry the measurement information.

GOOSE carries event and status information.

For example, a feeder protection system may receive:

  • Phase currents through SV.
  • Phase voltages through SV.
  • Circuit-breaker position through GOOSE.
  • Interlocking status through GOOSE.
  • Trip-related signals through GOOSE.

Practical example

Consider a feeder protection IED receiving current samples from a Merging Unit.

The protection IED processes the measurements and detects an overcurrent condition.

The protection application then operates the relevant trip logic.

A trip command may be transmitted through a supported GOOSE application or through a conventional hardwired output, depending on the system design.

The complete protection chain must be engineered and tested.

12. Practical Example: Digital Feeder Protection

Consider a 33 kV feeder with the following equipment:

  • Three-phase CTs.
  • Three-phase VTs.
  • One Merging Unit.
  • One compatible protection IED.
  • One Ethernet process bus.
  • One engineering workstation.
  • One time synchronization source.

Step 1 – Connect the instrument transformers

Connect the CT and VT secondary circuits to the appropriate Merging Unit analogue inputs.

Verify:

  • CT ratio.
  • VT ratio.
  • Polarity.
  • Phase identification.
  • Secondary wiring.
  • Earthing arrangements.
  • Input ratings.

Step 2 – Configure the Merging Unit

Configure the Merging Unit according to the approved project design.

Set the required measurement channels, sampling profile and synchronization arrangement.

Step 3 – Configure the Sampled Values stream

Configure the SV control block and associated dataset.

Check:

  • svID.
  • APPID.
  • Dataset reference.
  • Multicast address.
  • VLAN ID.
  • VLAN priority.
  • Sampling parameters.

Step 4 – Configure the receiving protection IED

Confirm that the receiving IED supports the required SV profile.

Configure the SV subscription using the manufacturer’s supported engineering procedure.

Step 5 – Verify sample reception

Check that the protection IED receives the expected sample stream.

Verify:

  • Correct phase sequence.
  • Sample counter behavior.
  • Current magnitude.
  • Voltage magnitude.
  • Synchronization status.
  • Communication quality.

Step 6 – Test the protection application

Inject suitable test signals into the Merging Unit inputs or use an approved process bus test arrangement.

Verify the complete protection response, including the trip logic and output path.

13. Sampled Values Testing and Commissioning

Testing is critical because an incorrect SV configuration can affect the measurement signals used by protection functions.

A complete test should cover both communication and protection performance.

13.1 Merging Unit tests

  • Verify analogue input configuration.
  • Check CT and VT ratios.
  • Verify phase identification.
  • Check polarity.
  • Confirm the sampling profile.
  • Verify time synchronization.
  • Confirm SV publication.

13.2 Network tests

  • Verify Ethernet connectivity.
  • Check multicast transmission.
  • Verify VLAN configuration.
  • Check network loading.
  • Confirm the correct multicast address.
  • Verify redundancy, where applicable.

13.3 Receiving IED tests

  • Confirm SV subscription.
  • Check the sample counter.
  • Verify phase sequence.
  • Confirm current and voltage scaling.
  • Check synchronization quality.
  • Verify loss-of-SV supervision.
  • Confirm recovery after communication restoration.

13.4 Protection tests

  • Test overcurrent functions.
  • Test directional functions, where applicable.
  • Test differential functions, where applicable.
  • Verify trip logic.
  • Test circuit-breaker failure logic, where applicable.
  • Confirm event recording.
  • Verify disturbance recording.

Only functions supported by the specific relay and project configuration should be included.

14. Wireshark Analysis of Sampled Values

Wireshark is useful for investigating process bus communication.

It can help identify SV frames, inspect communication parameters and investigate network problems.

Common filters

Sampled Values display filter:

sv

GOOSE display filter:

goose

GOOSE EtherType:

eth.type == 0x88b8

VLAN traffic:

vlan

Specific Ethernet source address:

eth.src == aa:bb:cc:dd:ee:ff

The example MAC address must be replaced with the actual address.

What should engineers inspect?

  • SV stream identification.
  • APPID.
  • Sample counter.
  • Dataset information.
  • VLAN tagging.
  • Multicast destination address.
  • Missing or irregular frames.
  • Duplicate frames.
  • Network delays and packet loss.

The exact fields available in Wireshark depend on the capture and protocol implementation.

A packet capture alone does not prove that the protection relay is correctly processing the measurements. The received values must also be verified at the device and protection-application level.

15. Common Sampled Values Problems and Troubleshooting

ProblemPossible causeRecommended action
SV stream not receivedIncorrect multicast address or VLANVerify publisher and subscriber configuration
Protection IED cannot subscribeSV unsupported or incompatible profileCheck exact device capabilities
Incorrect current magnitudeCT ratio or scaling mismatchVerify instrument transformer and MU settings
Incorrect phase sequenceWiring or channel mapping errorCheck phase identification
Sample counter irregularitiesNetwork loss or publisher issueAnalyze packet capture and MU diagnostics
Synchronization alarmPTP or clock configuration issueCheck grandmaster and synchronization status
Protection operates incorrectlyWrong measurements or mappingVerify the complete measurement chain
Communication disappears intermittentlyNetwork congestion or topology issueCheck switches, multicast and network loading
SV configuration mismatchDifferent datasets or control block settingsCompare SCL and device configurations
Measurements are unavailable after restartConfiguration or startup dependencyCheck device initialization and recovery behavior

16. Cybersecurity and Process Bus Protection

Process bus networks carry information used directly by protection and control applications.

They therefore require careful cybersecurity engineering.

Recommended practices include:

  • Separate process bus and engineering access according to the approved architecture.
  • Restrict physical access to network switches.
  • Control engineering workstation access.
  • Use secure configuration management.
  • Disable unused switch ports.
  • Monitor network traffic.
  • Maintain firmware and configuration records.
  • Control remote access.
  • Use approved VLAN and firewall arrangements.
  • Protect SCL files and device configuration backups.

Network segmentation must not interfere with the real-time communication requirements of SV and GOOSE.

Any security control introduced into the process bus should be validated for performance and interoperability.

17. Best Practices for Digital Substation Engineers

When engineering an IEC 61850 Sampled Values system:

  1. Confirm that every device supports the required SV profile.
  2. Verify the exact IEC 61850 edition and implementation.
  3. Confirm Merging Unit and relay compatibility.
  4. Check CT and VT scaling.
  5. Verify phase identification and polarity.
  6. Design the process bus network carefully.
  7. Configure multicast and VLAN parameters.
  8. Provide a suitable time synchronization architecture.
  9. Monitor sample counters and synchronization quality.
  10. Test loss and restoration of SV communication.
  11. Verify the protection application using approved test equipment.
  12. Maintain SCL files and configuration backups.
  13. Revalidate the system after firmware or configuration changes.

18. Sampled Values Commissioning Checklist

Merging Unit

  • Confirm device model and firmware.
  • Verify CT and VT wiring.
  • Check CT and VT ratios.
  • Confirm polarity and phase sequence.
  • Verify sampling rate.
  • Confirm SV publication.
  • Check synchronization.

Process bus

  • Verify Ethernet connections.
  • Check multicast configuration.
  • Confirm VLAN ID and priority.
  • Check network traffic.
  • Verify redundancy, if used.
  • Confirm network diagnostics.

Protection IED

  • Verify SV compatibility.
  • Confirm subscriber configuration.
  • Check svID and dataset mapping.
  • Verify current and voltage measurements.
  • Check sample counter.
  • Verify loss-of-SV supervision.
  • Confirm recovery after restoration.

Protection application

  • Test relevant protection functions.
  • Verify trip logic.
  • Check circuit-breaker interface.
  • Confirm event recording.
  • Verify disturbance records.
  • Save commissioning results.

19. Conclusion

IEC 61850 Sampled Values provide the foundation for digital measurement transmission in modern process bus substations.

By using Merging Units, sampled current and voltage signals can be transmitted over Ethernet to compatible protection and control IEDs.

This approach can reduce conventional secondary wiring, improve measurement distribution and support advanced digital substation architectures.

For MiCOM protection systems, engineers must carefully verify whether the exact relay supports SV reception and the required sampling profile. IEC 61850 MMS and GOOSE support alone is not sufficient evidence of Sampled Values compatibility.

Successful implementation requires coordinated engineering of the Merging Units, Ethernet network, synchronization system, SCL configuration and protection applications.

Practical IEC 61850 and MiCOM Training by Dr Saeed Roostaee – Elec-Engg

Elec-Engg provides practical training for protection, commissioning and substation automation engineers.

Relevant subjects include:

  • MiCOM protection relay engineering.
  • IEC 61850 MMS and GOOSE.
  • Sampled Values and process bus fundamentals.
  • Merging Unit configuration.
  • SCL and IEC 61850 system engineering.
  • Ethernet network configuration.
  • Wireshark communication analysis.
  • Protection testing and commissioning.
  • Digital substation architecture and troubleshooting.

Training is available through video courses, structured self-paced training, face-to-face courses and customized in-house programs.

Visit Elec-Engg for practical power system protection and substation automation training.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top