The MiCOM P922G belongs to the MiCOM voltage protection relay range. This article focuses on its engineering application, voltage protection principles, configuration considerations and commissioning approach. Exact functions and setting ranges must always be confirmed against the installed model’s technical documentation.

Important model identification: The MiCOM P922G is not simply the standard MiCOM P922 voltage-and-frequency relay. Schneider Electric identifies the P922G as an interconnection protection relay for distributed generators operating in parallel with the utility grid. Its principal purpose is to detect abnormal grid voltage and frequency conditions and initiate generator disconnection when required by the configured protection scheme. Schneider Electric UK+1

1. Introduction to MiCOM P922G

The MiCOM P922G is designed for generator-grid interconnection protection, particularly in distributed generation applications.

When a generator operates in parallel with the utility network, the protection system must monitor grid conditions and disconnect the generator when specified limits are exceeded.

Typical applications include:

  • Distributed generation plants.
  • Industrial generators operating in parallel with the utility.
  • Small power generation installations.
  • Embedded generation systems.
  • Generator interconnection protection panels.
  • Grid-connected generation requiring voltage and frequency monitoring.

The P922G provides voltage and frequency protection, programmable logic, configurable output relays, measurements, event information and disturbance recording.

Schneider Electric groups the P922G with its generator interconnection protection solutions. Schneider Electric UK+1

2. Main Protection Functions

The principal protection functions documented for the P922G include:

FunctionANSI codePurpose
Undervoltage27Detects low network voltage
Overvoltage59Detects excessive network voltage
Residual overvoltage59NDetects abnormal residual voltage
Underfrequency81UDetects frequency below the permitted limit
Overfrequency81ODetects frequency above the permitted limit

The relay also provides configurable auxiliary functions and output logic.

Important: Do not assume that every function available in the wider P921/P922/P923 family is available in the P922G. The P922G has its own technical guide and application documentation. For example, the rate-of-change-of-frequency function associated with certain P923 configurations should not automatically be attributed to the P922G. Circuit imprimé+1

3. Undervoltage Protection – ANSI 27

Undervoltage protection monitors the measured network voltage and detects when it falls below a configured threshold.

This function is important for generator interconnection because abnormal voltage conditions may indicate:

  • A network fault.
  • Loss of utility supply.
  • Severe voltage depression.
  • Abnormal network operating conditions.

The relay provides configurable undervoltage thresholds and associated operating delays.

3.1 Engineering considerations

When configuring undervoltage protection, engineers should consider:

  • Nominal system voltage.
  • VT primary and secondary ratios.
  • Phase-to-neutral or phase-to-phase measurement.
  • Minimum permitted grid voltage.
  • Protection operating delay.
  • Coordination with utility requirements.
  • Generator disconnection requirements.

The selected voltage threshold and time delay must follow the applicable grid interconnection requirements, not arbitrary generic values.

4. Overvoltage Protection – ANSI 59

Overvoltage protection detects excessive voltage at the generator-grid connection point.

Possible causes include:

  • Network voltage regulation problems.
  • Sudden load rejection.
  • Generator voltage control problems.
  • Abnormal system operating conditions.
  • Incorrect voltage regulator operation.

The P922G provides configurable overvoltage protection with threshold and timing settings.

The engineer should coordinate the relay settings with the generator capability, voltage regulator characteristics and utility grid-code requirements.

5. Residual Overvoltage Protection – ANSI 59N

Residual overvoltage protection monitors the residual voltage component.

For a three-phase voltage measurement system:

\[ V_0=\frac{V_A+V_B+V_C}{3} \]

Where:

  • \(V_A\) is phase-A voltage.
  • \(V_B\) is phase-B voltage.
  • \(V_C\) is phase-C voltage.
  • \(V_0\) is the zero-sequence voltage component.

An abnormal residual voltage can indicate an earth fault or an unbalanced network condition, depending on the VT connection and grounding arrangement.

The P922G calculates the residual voltage internally from the measured phase voltages in the applicable configuration. Circuit imprimé

6. Frequency Protection – ANSI 81

Frequency protection is particularly important for generator interconnection.

A generator connected to a utility network must operate within the permitted frequency range. Abnormal frequency conditions may indicate a system disturbance or loss of normal grid operation.

The P922G provides multiple configurable frequency thresholds.

The documented frequency setting range is related to the selected nominal frequency:

\[ f_{\text{setting}}=f_n\pm10\text{ Hz} \]

Where \(f_n\) is the nominal frequency, normally 50 Hz or 60 Hz according to the system.

The relay provides six frequency thresholds, each with an associated definite-time delay. Frequency protection is supervised by a minimum measured-voltage condition to avoid unreliable frequency operation during low-voltage conditions. Circuit imprimé

6.1 Underfrequency protection

Underfrequency protection detects when the measured frequency falls below a configured threshold.

Potential causes include:

  • Generation shortage.
  • Large load disturbances.
  • Network separation.
  • Loss of generation.
  • Abnormal island operation.

6.2 Overfrequency protection

Overfrequency protection detects when the measured frequency exceeds the configured threshold.

Possible causes include:

  • Sudden load rejection.
  • Excess generation.
  • Generator control problems.
  • Islanded operation with an imbalance between generation and load.

6.3 Frequency protection coordination

Frequency thresholds and operating delays must be coordinated with:

  • Utility grid-code requirements.
  • Generator operating limits.
  • Generator governor characteristics.
  • Underfrequency load shedding schemes.
  • System protection and stability requirements.

The P922G should not be confused with a complete generator load-shedding or islanding-control system. Its role is determined by the configured interconnection protection scheme.

7. Voltage Transformer (VT) Connections

Correct VT connection and relay configuration are essential for reliable voltage protection.

The P922G supports different voltage input arrangements, including:

  • Three phase-to-neutral VT connections.
  • Three phase-to-phase VT connections.

The relay configuration must match the actual secondary wiring.

7.1 Three phase-to-neutral connection

With three phase-to-neutral VT inputs, the relay receives:

  • \(V_A\)
  • \(V_B\)
  • \(V_C\)

The relay can calculate the residual voltage:

\[ V_0=\frac{V_A+V_B+V_C}{3} \]

7.2 Three phase-to-phase connection

With three phase-to-phase VT inputs, the relay receives:

  • \(V_{AB}\)
  • \(V_{BC}\)
  • \(V_{CA}\)

The phase-to-phase protection mode must be selected accordingly.

7.3 Important commissioning checks

Verify:

  • VT primary and secondary ratings.
  • VT fuse and MCB arrangements.
  • Phase identification.
  • Phase sequence.
  • VT polarity.
  • Neutral and earth connections.
  • Voltage input assignment.
  • Correct relay voltage connection configuration.

Incorrect VT wiring or configuration can cause incorrect voltage measurements and protection operation. Circuit imprimé

8. Protection Settings and Configuration

The P922G settings must be developed according to the generator interconnection study and the applicable utility requirements.

The main settings areas include:

Setting groupEngineering considerations
General configurationNominal system and relay configuration
VT configurationVT connection type and voltage ratio
UndervoltageThresholds and operating delays
OvervoltageThresholds and operating delays
Residual overvoltageResidual voltage threshold and delay
FrequencySix frequency thresholds and delays
Frequency supervisionMinimum voltage threshold for frequency protection
Output relaysTrip and alarm contact configuration
Logic inputsExternal trip, blocking and reset signals
CommunicationModbus parameters and remote access permissions
RecordingDisturbance recording and trigger configuration

8.1 Voltage settings

Voltage settings are entered according to the relay’s configured measurement arrangement and VT secondary ratings.

For example, the engineer must distinguish between:

  • Phase-to-neutral voltage.
  • Phase-to-phase voltage.
  • Primary system voltage.
  • Secondary VT voltage.

Do not enter primary system values into a setting field that expects secondary voltage.

8.2 Frequency settings

The P922G supports six frequency thresholds, each with a definite-time delay.

The engineer should identify which thresholds are assigned to underfrequency and which are assigned to overfrequency.

The frequency supervision voltage must also be configured to prevent frequency protection from operating incorrectly when the measured voltage is too low.

8.3 Output relay configuration

The P922G provides configurable output contacts, including RL1 and RL2.

The output configuration must be coordinated with the external trip circuit.

For certain interconnection arrangements, the manufacturer application documentation describes positive-security output configuration. This is particularly relevant when the relay auxiliary supply is derived from an AC source and a fail-safe trip arrangement is required. The exact circuit design must follow the manufacturer’s application guidance. Circuit imprimé

9. Generator Disconnection and Trip Logic

The main purpose of the P922G interconnection protection scheme is to disconnect the generator from the utility network when the configured protection criteria are met.

A simplified protection sequence is:

  1. The relay measures the grid voltage and frequency.
  2. The measured values are compared with the configured thresholds.
  3. The relevant protection element starts.
  4. The operating timer runs.
  5. The protection element issues a trip or alarm signal.
  6. The configured output relay operates.
  7. The generator circuit breaker receives the trip command.
  8. The generator is disconnected from the grid.

The actual logic depends on the protection design, external interlocks and circuit breaker arrangement.

9.1 Fail-safe considerations

The protection designer should consider what happens if:

  • The relay auxiliary supply fails.
  • The VT supply is lost.
  • A VT fuse operates.
  • The output circuit is interrupted.
  • The generator circuit breaker fails to open.

The trip circuit should be designed so that failures do not create an unsafe generator-grid connection.

10. Communications and Substation Integration

The P922G supports Modbus communication for remote monitoring and data access.

Typical applications include:

  • Reading measured voltages.
  • Monitoring frequency.
  • Reading protection status.
  • Monitoring alarms.
  • Retrieving relay information.
  • Integrating the relay into a plant monitoring system.

Communication engineering should include:

  • Modbus protocol configuration.
  • Relay address.
  • Baud rate.
  • Communication wiring.
  • Master-device configuration.
  • Data mapping.
  • Read/write permissions.

The relay documentation also describes remote setting permissions. Remote setting changes should be controlled through an appropriate access policy. Circuit imprimé

11. Measurements and Disturbance Recording

The P922G provides measured voltage values and calculated quantities.

Depending on the VT connection, measurements include:

  • Phase-to-neutral voltages.
  • Phase-to-phase voltages.
  • Residual voltage.
  • Frequency.
  • Other calculated voltage quantities supported by the selected configuration.

The relay provides disturbance recording with configurable pre-fault and post-fault recording periods. Its technical documentation specifies a fixed sampling rate of 32 samples per cycle and records logical input/output states. Circuit imprimé

Disturbance records can help engineers investigate:

  • Voltage dips.
  • Voltage rises.
  • Frequency excursions.
  • Generator disconnections.
  • VT circuit problems.
  • Unexpected relay operation.

12. Testing and Commissioning of MiCOM P922G

Testing must verify the complete protection scheme, including voltage measurement, frequency measurement, logic, output contacts and circuit breaker trip circuits.

12.1 Initial inspection

Before applying test signals, verify:

  • Relay model and serial number.
  • Auxiliary supply.
  • VT wiring.
  • Relay earthing.
  • Binary input wiring.
  • Output relay wiring.
  • Circuit breaker trip connections.
  • Communication connections.
  • Relay self-supervision status.

12.2 Voltage injection testing

Use a suitable secondary injection test set to apply voltage signals to the relay.

Test:

  • Normal balanced three-phase voltage.
  • Undervoltage conditions.
  • Overvoltage conditions.
  • Phase voltage imbalance.
  • Residual voltage.
  • Phase sequence.
  • VT circuit supervision, where configured.

12.3 Undervoltage testing

For each enabled undervoltage stage:

  1. Apply normal rated voltage.
  2. Reduce the voltage below the configured threshold.
  3. Confirm the protection pickup.
  4. Measure the operating time.
  5. Confirm the configured output.
  6. Increase the voltage above the reset level.
  7. Verify correct reset behaviour.

12.4 Overvoltage testing

For each enabled overvoltage stage:

  1. Apply normal rated voltage.
  2. Increase the voltage above the configured threshold.
  3. Verify pickup.
  4. Measure operating time.
  5. Verify the trip or alarm output.
  6. Reduce the voltage and confirm reset.

12.5 Residual overvoltage testing

Apply a suitable unbalanced three-phase voltage condition to produce the required residual voltage.

Verify:

  • Calculated residual voltage.
  • Pickup threshold.
  • Operating delay.
  • Output operation.
  • Reset behaviour.

12.6 Frequency testing

Use a relay test set capable of generating controlled voltage waveforms at different frequencies.

Test:

  • Underfrequency thresholds.
  • Overfrequency thresholds.
  • Operating delays.
  • Frequency supervision.
  • Reset behaviour.
  • Protection output logic.

Ensure the test voltage remains above the configured frequency supervision threshold when testing frequency protection.

12.7 Output and trip circuit testing

Test:

  • RL1 operation.
  • RL2 operation.
  • Alarm outputs.
  • Trip outputs.
  • Configured latching functions.
  • Reset inputs.
  • Circuit breaker trip circuit.
  • External interlocking logic.

12.8 Modbus communication testing

Verify:

  • Communication establishment.
  • Relay address.
  • Baud rate.
  • Correct measurement values.
  • Protection status indications.
  • Alarm indications.
  • Permitted remote operations.

12.9 End-to-end functional testing

Where the P922G is part of a generator interconnection protection panel, the final test should verify the entire chain from simulated grid abnormality to generator circuit breaker disconnection.

The commissioning report should include injected values, pickup levels, operating times, output contact states and final test results.

13. Common MiCOM P922G Problems and Troubleshooting

ProblemPossible causeRecommended checks
Undervoltage protection operates unexpectedlyIncorrect VT ratio or voltage connectionCheck VT wiring and configuration
Overvoltage alarm remains activeIncorrect threshold or abnormal input voltageCheck measured values and settings
Residual voltage is incorrectVT polarity or phase connection problemVerify all three voltage inputs
Frequency protection does not operateFrequency supervision voltage too lowCheck measured voltage and supervision threshold
Incorrect frequency measurementVT wiring or test signal problemCheck phase sequence and injected waveform
Trip output does not operateIncorrect output assignment or logicCheck RL1/RL2 configuration and logic
Generator does not disconnectTrip circuit or breaker wiring problemCheck trip circuit continuity and breaker operation
Modbus communication failsIncorrect communication parametersCheck address, baud rate and wiring
Disturbance record is unavailableRecording configuration or trigger problemCheck recording settings and trigger conditions

Always investigate the relay event records, measured values, protection indications and external trip circuit before changing protection settings.

14. MiCOM P922G Compared with MiCOM P922 and P923

The model names are similar, but the P922G must be treated as a distinct interconnection relay.

FeatureP922GP922P923
Main applicationGenerator-grid interconnectionVoltage and frequency protectionVoltage and frequency protection
UndervoltageYesYesYes
OvervoltageYesYesYes
Residual overvoltageYesYesYes
Frequency protectionYesYesYes
Negative-sequence voltage protectionDo not assume availabilityYesYes
Positive-sequence undervoltageDo not assume availabilityYesYes
Rate of change of frequencyDo not assume availabilityNoYes
Delta U / Delta TDo not assume availabilityNoYes

The P922 and P923 functions listed above are based on the P92x family documentation. The P922G has separate documentation and must be configured according to its own manual. Circuit imprimé+2

15. Advantages of MiCOM P922G

The main advantages include:

  • Dedicated application for generator-grid interconnection protection.
  • Voltage and frequency monitoring.
  • Configurable protection thresholds and delays.
  • Residual voltage protection.
  • Multiple frequency thresholds.
  • Configurable output relay contacts.
  • Programmable logic inputs and outputs.
  • Modbus communication.
  • Voltage and frequency measurements.
  • Disturbance recording.
  • Compact solution for generator interconnection protection panels.

16. MiCOM P922G Training by Elec-Engg

Elec-Engg provides practical training in power system protection, generator protection and substation automation for engineers working in utilities, power plants, industrial facilities and engineering companies.

Our training programs cover:

  • Generator protection fundamentals.
  • Generator-grid interconnection protection.
  • Voltage and frequency protection.
  • Undervoltage and overvoltage protection.
  • Residual voltage and earth fault principles.
  • Grid protection and disconnection requirements.
  • CT and VT circuit analysis.
  • Protection relay settings and coordination.
  • Relay testing using Omicron CMC and Test Universe.
  • Commissioning and troubleshooting.
  • Disturbance recording and fault analysis.

Training delivery methods:

  • Online live training.
  • Structured self-paced training.
  • Face-to-face training.
  • Customized in-house training for companies and utilities.

Training can be adapted to the installed relay models, project requirements and practical needs of protection and commissioning engineers.

Visit Elec-Engg to explore our power system protection and substation automation training programs.

17. Conclusion

The MiCOM P922G is a specialized interconnection protection relay designed to monitor voltage and frequency conditions when distributed generators operate in parallel with the utility network.

Its undervoltage, overvoltage, residual overvoltage and frequency protection functions provide the basic protection elements required for generator disconnection under abnormal grid conditions.

Correct VT configuration, protection threshold selection, output relay logic and complete trip circuit testing are essential for reliable operation.

For engineers maintaining existing P922G installations, understanding the relay’s dedicated technical documentation is particularly important because its functions should not be confused with those of the standard P922 and P923 voltage and frequency relays.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top