MiCOM Protection Relay Testing with Omicron CMC: Practical Secondary Injection, Test Procedures, Trip Logic and Commissioning

Table Of Contents
  1. Introduction
  2. 1. Understanding MiCOM Relay Testing
  3. 2. Introduction to Omicron CMC Test Equipment
  4. 3. Omicron Test Universe Software
  5. 4. Preparing a MiCOM Relay for Testing
  6. 5. Connecting the Omicron CMC Test Set
  7. 6. First Test: Manual Injection Using QuickCMC
  8. 7. Overcurrent Protection Testing
  9. 8. Earth-Fault Protection Testing
  10. 9. Distance Protection Testing
  11. 10. Transformer Differential Protection Testing
  12. 11. Restricted Earth-Fault Protection Testing
  13. 12. Generator Protection Testing
  14. 13. Binary Input and Output Testing
  15. 14. Trip Logic and Circuit-Breaker Interface Testing
  16. 15. Testing IEC 61850 Communication with Omicron
  17. 16. Using State Sequencer for Functional Testing
  18. 17. Using Ramping for Pickup and Dropout Testing
  19. 18. Practical Example: Testing a MiCOM P143 Feeder Relay
  20. 19. Common Problems During Omicron Testing
  21. 20. Test Documentation and Reporting
  22. 21. Best Practices for MiCOM Relay Testing
  23. 22. MiCOM and Omicron Commissioning Checklist
  24. 23. Training on MiCOM Relay Testing and Commissioning
  25. Conclusion

Introduction

Testing and commissioning are essential activities in power system protection. A protection relay may have correctly calculated settings and a properly configured engineering project, but its performance must still be verified through practical testing.

MiCOM protection relays are used in feeder, transformer, generator, motor, and transmission line protection applications. Their testing requires an understanding of protection principles, relay settings, current and voltage injection, binary input and output circuits, trip logic, and circuit-breaker interfaces.

Omicron CMC test equipment, together with Test Universe software, provides a widely used platform for testing numerical protection relays. It allows engineers to generate controlled secondary currents and voltages, monitor relay responses, measure operating times, and verify protection characteristics.

This article explains the principles and practical workflow of testing MiCOM protection relays using Omicron CMC equipment. It covers test preparation, secondary injection, protection function testing, trip circuit verification, IEC 61850 considerations, and commissioning documentation.

The exact test procedure and acceptance criteria must always be based on the relay manual, approved protection settings, project specifications, and applicable testing standards.

1. Understanding MiCOM Relay Testing

MiCOM relay testing is performed to verify that the relay operates according to its intended protection design.

Testing generally includes:

  • Visual and mechanical inspection.
  • Device identification.
  • Configuration verification.
  • Protection setting verification.
  • Secondary current injection.
  • Secondary voltage injection.
  • Protection characteristic testing.
  • Operating time measurement.
  • Binary input and output testing.
  • Trip circuit verification.
  • Communication testing.
  • Functional testing.
  • Final commissioning checks.

The test scope depends on the relay application.

For example:

  • A feeder relay may require overcurrent and earth-fault testing.
  • A distance relay may require impedance characteristic testing.
  • A transformer differential relay may require differential and restricted earth-fault testing.
  • A generator protection relay may require stator earth-fault, differential, loss-of-excitation, and other function tests.

Testing should be designed around the actual protection functions enabled in the relay.

2. Introduction to Omicron CMC Test Equipment

Omicron CMC test sets are used for testing protection relays, meters, transducers, and other secondary equipment.

Depending on the specific CMC model and available options, the test set can provide:

  • AC current injection.
  • AC voltage injection.
  • Binary input monitoring.
  • Binary output control or simulation.
  • Timing measurements.
  • Frequency variation.
  • Phase-angle control.
  • Harmonic generation.
  • Transient signal generation.
  • Communication-based testing where supported.

Examples of CMC equipment include:

  • CMC 256plus.
  • CMC 356.
  • CMC 353.
  • CMC 430.
  • Other compatible CMC models.

The available current, voltage, power, frequency, and output capabilities differ between models.

Engineers must check the specific test set’s technical specifications before selecting a test method.

3. Omicron Test Universe Software

Test Universe is the software environment used with supported Omicron CMC test equipment.

It provides different test modules for testing protection functions.

Commonly used modules include:

Test moduleTypical application
QuickCMCManual current and voltage injection
State SequencerSequential state and timing tests
RampingPickup and dropout measurement
OvercurrentOvercurrent relay testing
DistanceDistance protection characteristic testing
Advanced DistanceAdvanced distance protection tests
DifferentialDifferential protection testing
TransPlayPlayback of recorded waveforms
HarmonicsHarmonic-related testing
Transient Ground FaultSpecific transient ground-fault applications

The availability of individual modules depends on the licensed Test Universe installation.

The appropriate module should be selected according to the relay function and the required test objective.

4. Preparing a MiCOM Relay for Testing

Good test preparation reduces errors and prevents unnecessary equipment operation.

4.1 Identify the relay

Record:

  • Relay model.
  • Complete order code.
  • Serial number.
  • Firmware version.
  • Hardware configuration.
  • Engineering software version.
  • Protection functions enabled.

4.2 Review the protection settings

Obtain the approved settings document and compare it with the relay configuration.

Review:

  • CT ratios.
  • VT ratios.
  • Rated frequency.
  • Protection pickup values.
  • Time delays.
  • Directional settings.
  • Characteristic selections.
  • Trip logic.
  • Output assignments.

Do not use an unapproved settings file as the reference for commissioning.

4.3 Review the wiring diagrams

Study the relevant drawings before connecting the test equipment.

Identify:

  • Current input terminals.
  • Voltage input terminals.
  • Binary inputs.
  • Trip outputs.
  • Auxiliary supply.
  • Circuit-breaker interfaces.
  • Test block connections.
  • Earth connections.

4.4 Establish a safe testing condition

Before testing:

  1. Obtain the required operational authorization.
  2. Confirm the relay’s protection status.
  3. Isolate trip circuits where required by the approved procedure.
  4. Verify test block positions.
  5. Confirm that external equipment cannot operate unexpectedly.
  6. Check the test area and equipment connections.
  7. Follow the site’s electrical safety procedures.

A test that accidentally operates a live circuit breaker can have serious consequences.

5. Connecting the Omicron CMC Test Set

The test set must be connected according to the relay’s wiring diagram and the selected test procedure.

5.1 Current injection connections

For current injection, connect the CMC current outputs to the relay’s current input circuits.

Check:

  • Phase identification.
  • Polarity.
  • Current input configuration.
  • Neutral or residual current connection.
  • Test block arrangement.
  • Current circuit isolation.

Never open an energized CT secondary circuit.

CT secondary circuits must be handled using approved shorting and isolation arrangements.

5.2 Voltage injection connections

Connect the CMC voltage outputs to the relay voltage inputs as required by the test plan.

Verify:

  • Phase sequence.
  • Voltage polarity.
  • Phase-to-neutral or phase-to-phase connection.
  • Voltage input rating.
  • VT secondary configuration.

5.3 Binary input connections

Binary inputs are used to detect external or relay-generated signals.

Typical applications include:

  • Circuit-breaker auxiliary contacts.
  • External blocking.
  • Protection initiation.
  • Trip circuit monitoring.
  • Test status.
  • Relay output feedback.

The test set’s binary input configuration must match the actual contact type and expected signal.

5.4 Binary output connections

Binary outputs may be used to verify relay operation.

Typical signals include:

  • General trip.
  • Protection start.
  • Alarm.
  • Breaker failure initiation.
  • Protection function operation.

Check the contact ratings and the external circuit arrangement before connecting test equipment.

6. First Test: Manual Injection Using QuickCMC

QuickCMC is useful for manually generating current and voltage signals.

It allows engineers to check relay measurements and observe the response to applied quantities.

Example: Three-phase current injection

Consider a feeder relay with the following illustrative settings:

  • Rated secondary current: 1 A.
  • Phase overcurrent pickup: 1.20 A.
  • Three-phase current injection: balanced.
  • Frequency: 50 Hz.

Apply the following currents:

Test pointPhase APhase BPhase C
10.80 A0.80 A0.80 A
21.00 A1.00 A1.00 A
31.15 A1.15 A1.15 A
41.25 A1.25 A1.25 A

The expected response depends on the configured protection characteristic and pickup tolerance.

Observe:

  • Measured current.
  • Protection start indication.
  • Pickup status.
  • Trip indication.
  • Output contact operation.

The example is illustrative. Actual test points and acceptance limits must be calculated from the approved settings and relay documentation.

7. Overcurrent Protection Testing

Overcurrent protection is one of the most common functions tested in MiCOM feeder relays.

Typical functions include:

  • Phase overcurrent.
  • Earth-fault overcurrent.
  • Instantaneous overcurrent.
  • Definite-time overcurrent.
  • Inverse-time overcurrent.
  • Directional overcurrent.

7.1 Pickup testing

The objective is to determine the current at which the protection function starts.

For example, if the phase overcurrent pickup setting is 1.20 A secondary, the engineer applies a current below pickup and gradually increases it.

A pickup test may include:

  1. Apply a current below the expected threshold.
  2. Confirm that the protection element does not start.
  3. Increase the current gradually.
  4. Record the pickup value.
  5. Compare the measured result with the permitted tolerance.
  6. Reduce the current and check dropout behavior.

The actual pickup tolerance must be taken from the relevant relay documentation.

7.2 Operating time testing

Operating time tests verify the delay between the application of a fault condition and the relay’s output operation.

For definite-time protection, the expected operating time is determined by the configured time delay.

For inverse-time protection, the operating time depends on the applied current and selected curve.

The engineer should compare measured operating times with the expected characteristic and applicable tolerances.

7.3 Inverse-time characteristics

Common inverse-time curves include:

  • Standard inverse.
  • Very inverse.
  • Extremely inverse.
  • Long-time inverse.

The actual curve options depend on the relay.

A general inverse-time relationship may be represented as:

[
t=\frac{k \times TMS}{(I/I_s)^\alpha-1}
]

where:

  • (t) is operating time.
  • (I) is applied current.
  • (I_s) is pickup current.
  • (TMS) is the time multiplier setting.
  • (k) and (\alpha) depend on the selected characteristic.

Use the manufacturer’s specified equation and curve constants for the actual MiCOM relay.

7.4 Testing using the Overcurrent module

The Omicron Overcurrent module can automate tests of supported overcurrent functions.

A typical workflow includes:

  1. Select the appropriate test object.
  2. Enter the relay pickup settings.
  3. Select the relevant characteristic.
  4. Enter the time multiplier or delay.
  5. Define test points.
  6. Configure the binary trip input.
  7. Run the test.
  8. Review measured operating times.
  9. Save the results.

8. Earth-Fault Protection Testing

Earth-fault protection detects current flowing through the earth-fault measurement path.

Depending on the relay design, earth-fault current may be derived from:

  • Residual current calculated from phase CTs.
  • A dedicated neutral CT.
  • A core-balance CT.
  • Another supported measurement arrangement.

Before testing, identify the actual earth-fault measurement method.

8.1 Residual current injection

For a residual current derived from phase currents:

[
I_N=I_A+I_B+I_C
]

The correct phasor relationship must be considered.

Balanced three-phase currents ideally produce zero residual current.

To simulate an earth fault, apply an appropriate unbalanced current condition.

8.2 Dedicated earth-fault input

If the relay uses a separate neutral or core-balance CT input, connect the test current to the relevant input according to the approved wiring diagram.

8.3 Directional earth-fault testing

For directional earth-fault protection, both current and voltage quantities may be required.

Testing should verify:

  • Polarizing voltage.
  • Residual current.
  • Phase relationship.
  • Directional characteristic.
  • Forward operation.
  • Reverse restraint or blocking, where configured.

The actual test method depends on the relay’s directional principle and settings.

9. Distance Protection Testing

Distance protection is commonly used for transmission and sub-transmission line protection.

MiCOM distance relays include models such as P441, P442, and P443, subject to their individual application and configuration.

Distance protection evaluates the apparent impedance seen by the relay.

The basic relationship is:

[
Z=\frac{V}{I}
]

The relay compares the measured impedance with configured protection characteristics.

9.1 Distance protection characteristics

Depending on the relay, available characteristics may include:

  • Mho.
  • Quadrilateral.
  • Other manufacturer-specific implementations.

9.2 Zone testing

Typical distance protection zones include:

  • Zone 1.
  • Zone 2.
  • Zone 3.
  • Additional zones where supported.

Each zone may have different reach and time-delay settings.

The test engineer should verify:

  • Zone reach.
  • Operating characteristic.
  • Directional behavior.
  • Operating time.
  • Phase selection.
  • Earth-fault compensation.
  • Fault resistance coverage where applicable.

9.3 Testing using the Omicron Distance module

The Distance module can be used to test impedance characteristics.

A typical workflow includes:

  1. Enter the relay nominal voltage and current.
  2. Enter the relevant CT and VT ratios.
  3. Define the impedance characteristic.
  4. Enter zone reaches and angles.
  5. Configure the test characteristic.
  6. Define test points.
  7. Select the appropriate fault loops.
  8. Configure binary trip detection.
  9. Execute the tests.
  10. Review the results.

Test points should cover both the operating and non-operating regions.

For example, a test may check a point inside Zone 1 and another outside the Zone 1 boundary.

The exact test points must be derived from the approved protection settings.

10. Transformer Differential Protection Testing

Transformer differential protection compares currents entering and leaving the protected transformer zone.

MiCOM transformer protection relays, including applicable P63x models, may provide differential and other transformer protection functions.

The test must account for transformer characteristics.

Important parameters include:

  • Transformer rated power.
  • Voltage ratio.
  • Vector group.
  • CT ratios.
  • Phase compensation.
  • Differential pickup.
  • Bias characteristic.
  • Harmonic restraint.
  • Restricted earth-fault configuration.

10.1 Differential current principle

A simplified differential current relationship is:

[
I_{diff}=|I_1-I_2|
]

The actual relay calculation may include ratio correction, vector compensation, phase adjustment, and other algorithms.

10.2 Bias characteristic testing

Differential relays commonly use a restraint or bias characteristic to improve stability during external faults and through-current conditions.

Testing should include:

  • Minimum differential pickup.
  • Restraint characteristic.
  • Operating region.
  • Non-operating region.
  • High-current behavior where applicable.

10.3 Harmonic restraint testing

Where supported and configured, verify harmonic restraint behavior under appropriate test conditions.

Do not assume identical harmonic algorithms across all MiCOM transformer relay generations.

10.4 Testing using the Differential module

The Omicron Differential module can support testing of differential protection characteristics.

A typical workflow includes:

  1. Enter transformer data.
  2. Enter CT information.
  3. Configure vector group and compensation.
  4. Enter differential settings.
  5. Define the bias characteristic.
  6. Configure test points.
  7. Apply the required current quantities.
  8. Measure relay operation.
  9. Compare the results with the expected characteristic.

The actual test configuration must reflect the relay’s implementation and the transformer protection scheme.

11. Restricted Earth-Fault Protection Testing

Restricted earth-fault protection is used to detect earth faults within a defined transformer or machine winding protection zone.

Testing requires an understanding of:

  • Neutral CT arrangement.
  • Phase CT arrangement.
  • CT polarity.
  • CT ratios.
  • Stabilizing resistor, where applicable.
  • High- or low-impedance implementation.
  • Relay-specific REF logic.

A test should verify:

  1. Correct CT circuit connections.
  2. Stability for external faults.
  3. Operation for internal earth faults.
  4. Pickup sensitivity.
  5. Trip output behavior.

For high-impedance schemes, the complete scheme design must be considered, including stabilizing components and voltage constraints.

Do not test an REF scheme using an isolated relay setting calculation alone.

12. Generator Protection Testing

MiCOM generator protection relays may include several protection functions.

Depending on the model and configuration, these may include:

  • Generator differential protection.
  • Stator earth-fault protection.
  • Rotor earth-fault protection.
  • Loss of excitation.
  • Reverse power.
  • Negative sequence.
  • Overvoltage.
  • Undervoltage.
  • Overfrequency.
  • Underfrequency.
  • Overcurrent.
  • Thermal protection.

Testing should be based on the generator protection design and the actual functions implemented in the relay.

Example: Reverse power testing

Reverse power protection detects power flowing in the unintended direction.

Testing requires appropriate voltage and current injection with controlled phase angles.

The engineer should verify:

  • Directional power measurement.
  • Pickup threshold.
  • Time delay.
  • Operating direction.
  • Trip output.

The test must account for the relay’s measurement convention and configured power direction.

13. Binary Input and Output Testing

Protection relay testing is not complete without checking binary input and output circuits.

13.1 Binary input testing

Binary inputs may receive signals from:

  • Circuit-breaker auxiliary contacts.
  • Disconnector status contacts.
  • External protection relays.
  • Blocking circuits.
  • Interlocking circuits.
  • Trip circuit supervision.
  • Control system outputs.

The test engineer should apply the appropriate input condition and verify the relay’s response.

13.2 Binary output testing

Binary outputs may operate:

  • Circuit-breaker trip circuits.
  • Alarm circuits.
  • Indication circuits.
  • Breaker failure initiation.
  • External protection logic.

Check the output contact state, assignment, and intended operation.

13.3 Contact timing

Where required, use the test set’s binary input timing capability to measure the time between relay operation and contact state change.

This helps verify the output behavior and the overall protection response.

14. Trip Logic and Circuit-Breaker Interface Testing

Protection logic determines how internal protection elements and external signals produce trip commands.

A relay may have several trip paths.

For example:

Overcurrent Protection
          |
          v
   Protection Logic
          |
          v
      Trip Matrix
          |
          v
      Trip Output
          |
          v
   Circuit Breaker

The actual arrangement depends on the project design.

Testing should verify:

  • Protection element initiation.
  • Trip logic.
  • Blocking conditions.
  • Trip matrix.
  • Output contact assignment.
  • Circuit-breaker interface.
  • Breaker auxiliary feedback.
  • Breaker failure initiation, where applicable.

Trip circuit precautions

Before testing trip circuits, establish the approved isolation and safety arrangements.

Verify whether the test is intended to operate an actual circuit breaker or only to verify the relay output.

Never assume that a relay trip output is isolated simply because secondary injection equipment is connected.

15. Testing IEC 61850 Communication with Omicron

Omicron test equipment can be used in different testing workflows involving IEC 61850, depending on the test set, software modules, and supported communication capabilities.

Engineers should distinguish between conventional secondary injection and testing that uses sampled values or GOOSE communication.

15.1 MMS testing

MMS is generally tested through the IEC 61850 client or SCADA engineering environment.

Verify:

  • Connection establishment.
  • Data model access.
  • Reporting.
  • Indications.
  • Quality.
  • Timestamps.
  • Controls where supported.

15.2 GOOSE testing

GOOSE testing verifies the transmission and reception of peer-to-peer signals.

Depending on the test equipment and test arrangement, engineers may use GOOSE simulation or monitoring capabilities.

Verify:

  • Publisher configuration.
  • Dataset.
  • GOOSE control block.
  • Subscriber mapping.
  • Received signal.
  • Application response.

15.3 Sampled Values testing

Sampled Values testing is relevant to process-bus systems where protection relays receive digitized current and voltage samples from merging units.

The required test arrangement depends on the relay, merging unit, test equipment, and supported IEC 61850-9-2 implementation.

Verify:

  • Sampled Values stream identification.
  • Dataset and data attributes.
  • Sampling configuration.
  • Synchronization.
  • Quality information.
  • Protection response.

Do not assume that every CMC model or software installation supports every process-bus test function.

16. Using State Sequencer for Functional Testing

State Sequencer is useful for testing protection functions that involve multiple operating conditions.

A test can contain several states, with each state defining:

  • Current values.
  • Voltage values.
  • Phase angles.
  • Frequency.
  • Duration.
  • Binary input expectations.

For example, a feeder protection test may include:

State 1 – Normal operation

Apply normal load current and voltage.

Expected result: no protection trip.

State 2 – Fault initiation

Apply a fault condition.

Expected result: protection starts.

State 3 – Trip operation

Maintain the fault condition until the relay operates.

Expected result: trip output changes state.

State 4 – Fault clearance

Remove the fault condition.

Expected result: relay resets according to its configured behavior.

This approach is useful for verifying the complete sequence rather than testing only individual pickup values.

17. Using Ramping for Pickup and Dropout Testing

Ramping gradually changes a selected electrical quantity.

It can be used to determine the pickup and dropout thresholds of supported protection functions.

Examples include:

  • Phase overcurrent pickup.
  • Earth-fault pickup.
  • Overvoltage pickup.
  • Undervoltage pickup.
  • Frequency protection thresholds.

A typical test includes:

  1. Select the quantity to be varied.
  2. Define the starting value.
  3. Define the final value.
  4. Select the ramp rate.
  5. Configure the relay indication or output used for detection.
  6. Execute the ramp.
  7. Record the pickup value.
  8. Reverse the ramp where appropriate to measure dropout.

Use ramp rates appropriate to the relay function and test requirements.

18. Practical Example: Testing a MiCOM P143 Feeder Relay

Consider a MiCOM P143 feeder protection relay configured with phase overcurrent, earth-fault, and breaker failure functions.

An Omicron CMC test set is used to perform secondary injection testing.

Test preparation

Record the relay settings and identify:

  • CT ratio.
  • Rated current.
  • Phase overcurrent pickup.
  • Earth-fault pickup.
  • Operating time.
  • Breaker failure delay.
  • Trip output assignment.

Test 1 – Phase overcurrent pickup

Apply balanced three-phase current.

Increase the current gradually until the protection element starts.

Record the measured pickup value.

Compare it with the approved setting and manufacturer’s tolerance.

Test 2 – Phase overcurrent operating time

Apply a selected current above pickup.

Start the timer when the fault condition is applied.

Stop the timer when the assigned trip output operates.

Compare the measured operating time with the expected characteristic.

Test 3 – Earth-fault pickup

Apply an appropriate residual or dedicated earth-fault current according to the relay’s measurement arrangement.

Increase the current until the earth-fault element starts.

Record the pickup value.

Test 4 – Breaker failure logic

Apply the required breaker failure initiation condition.

Simulate the relevant breaker status or current supervision conditions according to the approved test plan.

Verify the expected breaker failure output and timing.

Test 5 – Binary output verification

Confirm that the assigned trip and alarm outputs operate correctly.

Test 6 – Final verification

Restore the normal test arrangement and verify that all protection and communication functions are in the intended condition.

The example describes a testing concept, not a universal P143 test configuration. Actual function availability and settings must be verified for the specific relay.

19. Common Problems During Omicron Testing

Problem 1: Relay does not detect injected current

Possible causes:

  • Incorrect test connections.
  • Incorrect current input selection.
  • Open or incorrect CT circuit.
  • Wrong test configuration.
  • Incorrect scaling.
  • Incorrect phase assignment.

Recommended actions:

  • Check the wiring diagram.
  • Verify the current output and input connections.
  • Confirm the relay’s nominal current.
  • Check the measurement display.
  • Verify the test set output configuration.

Problem 2: Relay pickup value is incorrect

Possible causes:

  • Wrong secondary setting.
  • Incorrect CT ratio.
  • Incorrect current scaling.
  • Wrong measurement input.
  • Incorrect phase configuration.
  • Parameter interpretation error.

Recommended actions:

  • Compare the approved setting with the relay configuration.
  • Check the primary-to-secondary conversion.
  • Verify the test equipment configuration.
  • Confirm the relevant protection input.

Problem 3: Operating time is incorrect

Possible causes:

  • Incorrect curve selection.
  • Incorrect time multiplier.
  • Wrong applied current.
  • Incorrect timer start condition.
  • Incorrect binary input detection.
  • Additional relay logic delay.

Recommended actions:

  • Review the characteristic.
  • Check the applied current.
  • Confirm the timer start and stop conditions.
  • Review the trip matrix and logic.
  • Compare the result with the correct manufacturer curve.

Problem 4: Binary output does not operate

Possible causes:

  • Incorrect output assignment.
  • Protection element not enabled.
  • Blocking condition active.
  • Wrong binary output contact.
  • Incorrect test connection.

Recommended actions:

  • Check the relay logic.
  • Verify output mapping.
  • Inspect the relevant protection status.
  • Confirm the contact wiring.

Problem 5: Test Universe reports a failed test

Possible causes:

  • Test object configured incorrectly.
  • Incorrect relay characteristic.
  • Wrong test points.
  • Incorrect binary input mapping.
  • Measurement or timing tolerance too restrictive.

Recommended actions:

  • Review the test object parameters.
  • Verify the relay settings.
  • Check the binary connections.
  • Confirm the expected characteristic.
  • Investigate the measured values before changing tolerances.

Do not increase acceptance tolerances simply to make a failed test appear successful.

20. Test Documentation and Reporting

A professional commissioning test should produce clear, traceable documentation.

A useful report includes:

  • Project and substation identification.
  • Bay or equipment identification.
  • Relay model and serial number.
  • Firmware version.
  • Test equipment model.
  • Test equipment calibration information.
  • Approved protection settings.
  • Test module and test procedure.
  • Test points.
  • Expected results.
  • Measured results.
  • Acceptance criteria.
  • Pass or fail status.
  • Deviations and corrective actions.
  • Engineer and reviewer information.
  • Date of testing.

Test Universe test reports can help document test execution and measured results.

The report should clearly identify the configuration and test procedure used.

21. Best Practices for MiCOM Relay Testing

  1. Obtain approved protection settings before testing.
  2. Verify relay model and firmware.
  3. Inspect the test wiring before injection.
  4. Confirm CT and VT ratios.
  5. Use appropriate test modules.
  6. Test pickup and dropout values.
  7. Verify operating times.
  8. Test both operating and non-operating regions where relevant.
  9. Verify binary input and output assignments.
  10. Check trip logic and circuit-breaker interfaces.
  11. Test IEC 61850 services separately where applicable.
  12. Use appropriate test equipment and calibrated instruments.
  13. Record all test results.
  14. Investigate failed tests rather than adjusting tolerances without justification.
  15. Restore the approved operational configuration.
  16. Obtain the required final commissioning approval.

22. MiCOM and Omicron Commissioning Checklist

Before testing

  • Relay model and serial number recorded.
  • Firmware version recorded.
  • Approved settings obtained.
  • Wiring diagrams reviewed.
  • Test equipment identified.
  • Calibration status checked.
  • Test plan prepared.
  • Operational approval obtained.
  • Trip circuit safety arrangements confirmed.

Secondary injection

  • Current circuits checked.
  • Voltage circuits checked.
  • Phase sequence verified.
  • Measurement values checked.
  • Protection pickup tested.
  • Dropout tested where required.
  • Operating time tested.
  • Characteristic tested.
  • Non-operating region checked where required.

Logic and outputs

  • Binary inputs tested.
  • Binary outputs tested.
  • Trip matrix verified.
  • Blocking logic verified.
  • Breaker failure logic tested where applicable.
  • Circuit-breaker interface checked.

Communication

  • MMS communication tested where applicable.
  • GOOSE communication tested where applicable.
  • Sampled Values tested where applicable.
  • SCADA indications verified.
  • Quality and timestamps checked.

Completion

  • Test results saved.
  • Failed tests investigated.
  • Original wiring restored.
  • Protection settings verified.
  • Final configuration backed up.
  • Test report completed.
  • Return-to-service approval obtained.

23. Training on MiCOM Relay Testing and Commissioning

Practical relay testing requires a combination of protection theory, relay configuration knowledge, test equipment operation, and commissioning experience.

Elec-Engg provides training covering:

  • MiCOM relay protection functions.
  • Secondary injection testing.
  • Omicron CMC operation.
  • Test Universe modules.
  • Overcurrent and earth-fault testing.
  • Distance protection testing.
  • Transformer differential protection.
  • Generator protection testing.
  • Binary input/output verification.
  • Trip logic and breaker interface testing.
  • IEC 61850 communication testing.
  • Practical commissioning procedures.

Training is available through video courses, structured self-paced training, face-to-face courses, and customized in-house programs.

Practical courses by Dr Saeed Roostaee / Elec-Engg

Visit Elec-Engg for available power system protection and relay testing courses.

Conclusion

MiCOM protection relay testing is an essential part of commissioning, maintenance, and periodic protection system verification.

Using Omicron CMC equipment and Test Universe, engineers can perform systematic secondary injection tests, verify protection characteristics, measure operating times, and check relay input and output behavior.

However, the quality of testing depends on correct preparation, accurate settings, appropriate test connections, and clearly defined acceptance criteria.

Testing should verify not only individual protection elements but also the complete protection and control chain, including relay logic, trip outputs, circuit-breaker interfaces, and IEC 61850 communication where implemented.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top