Schneider Sepam Series 60 Protection Relays: Architecture, Protection Functions, Applications, Configuration, Settings and Testing
This article focuses on the Sepam Series 60 family and its use in more demanding protection and control applications. Exact protection functions, communication options and hardware configurations depend on the complete Sepam reference and installed modules; these must be checked against the applicable Schneider Electric documentation before engineering or commissioning.
- 1. Introduction to Sepam Series 60
- 2. Series 60 Model Selection and Applications
- 3. Hardware Architecture
- 4. Protection Functions and Engineering Considerations
- 5. Sepam Series 60 Engineering Software
- 6. Communication and IEC 61850 Integration
- 7. Practical Protection Setting Example — 11 kV Feeder
- 8. Testing and Commissioning
- 9. Troubleshooting Common Issues
- 10. Replacement and Migration Considerations
- 11. Practical Engineering Checklist
- 12. Training by Dr Saeed Roostaee / Elec-Engg
- 13. Conclusion
1. Introduction to Sepam Series 60
The Schneider Electric Sepam Series 60 is designed for complex distribution systems where protection, control, measurement and communication functions must be integrated into one numerical relay platform.
Unlike a general-purpose relay family in which one device is configured for many unrelated applications, Series 60 is organized around dedicated application types. Schneider Electric identifies eight models:
| Model | Main application |
|---|---|
| S60, S62 | Substation incomers and feeder protection |
| M61 | Motor protection |
| T60, T62 | Transformer protection |
| G60, G62 | Generator protection |
| C60 | Capacitor protection |
These are the Series 60 model designations. They should not be confused with Sepam Series 40 or Series 80 models. Schneider Electric Ireland+1
Series 60 is particularly relevant to engineers working with:
- Medium-voltage switchgear and distribution substations
- Industrial power distribution networks
- Transformer and motor protection
- Generator and capacitor-bank protection
- Protection coordination and selectivity
- Substation communication and remote monitoring
Important: Series 60 is a discontinued product range in some Schneider Electric regional catalogues. For replacement projects, verify availability, firmware, compatible accessories and migration options with Schneider Electric or an authorized supplier. Schneider Electric Indonesia
2. Series 60 Model Selection and Applications
2.1 S60 and S62 — Incomer and Feeder Protection
S60 and S62 are intended for substation incomers and outgoing feeders.
Typical applications include:
- Medium-voltage transformer incomers
- Distribution feeders
- Industrial plant distribution panels
- Bus-section and bus-coupler applications, subject to the protection scheme
- Radial and interconnected distribution networks
Depending on the selected model and configured functions, an engineering scheme may include phase overcurrent, earth-fault protection, voltage supervision, frequency protection and breaker control.
Typical protection functions to evaluate include:
| ANSI | Function | Engineering purpose |
|---|---|---|
| 50/51 | Phase overcurrent | Phase-fault protection |
| 50N/51N | Earth-fault overcurrent | Earth-fault detection |
| 67 | Directional overcurrent | Directional fault discrimination |
| 67N | Directional earth fault | Directional earth-fault discrimination |
| 27 | Undervoltage | Voltage supervision |
| 59 | Overvoltage | Overvoltage protection |
| 81U/81O | Under/overfrequency | Frequency supervision |
| 50BF | Breaker failure | Backup clearing when a breaker fails |
The actual availability of each function must be confirmed for the selected relay reference and application.
2.2 M61 — Motor Protection
M61 is the Series 60 model dedicated to motor protection.
Typical applications include:
- Medium-voltage induction motors
- Pumps and compressors
- Fans and blowers
- Conveyors
- Industrial process motors
Motor protection engineering should consider more than short-circuit protection. The relay scheme must account for motor starting current, starting duration, thermal capacity, operating duty and process requirements.
Functions to review for the specific M61 configuration include:
| ANSI | Function | Purpose |
|---|---|---|
| 49 | Thermal overload | Protects against overheating |
| 50/51 | Phase overcurrent | Detects phase faults |
| 50N/51N | Earth fault | Detects stator or cable earth faults |
| 46 | Negative sequence | Detects current unbalance |
| 48/51LR | Locked rotor or excessive starting time | Detects abnormal starting conditions |
| 37 | Undercurrent | Can identify loss of load |
| 27 | Undervoltage | Supervises supply voltage |
Do not assume that every function in this table is available in every M61 configuration. Confirm the application manual, firmware and function list.
2.3 T60 and T62 — Transformer Protection
T60 and T62 are intended for transformer protection applications.
Typical installations include:
- Distribution transformers
- Industrial plant transformers
- Medium-voltage transformer feeders
- Transformer incomers in industrial substations
Transformer protection engineering may involve:
- Phase overcurrent protection
- Earth-fault protection
- Restricted earth-fault protection, where supported by the selected scheme
- Thermal supervision
- Voltage and frequency supervision
- Transformer temperature inputs
- Breaker failure and backup protection
The protection design must distinguish between transformer internal faults and external through-faults. CT selection, CT polarity, ratio matching, transformer vector group and neutral earthing are essential considerations.
2.4 G60 and G62 — Generator Protection
G60 and G62 are the Series 60 models dedicated to generator applications.
Typical engineering considerations include:
- Generator phase overcurrent
- Stator earth-fault protection
- Reverse-power protection
- Negative-sequence protection
- Voltage and frequency protection
- Thermal supervision
- Generator backup protection
The exact protection coverage depends on the selected model and application. Do not assume that a Series 60 generator relay provides every protection function required for a complete generator protection system. Large generators may require a dedicated, multi-relay protection architecture.
2.5 C60 — Capacitor Protection
C60 is dedicated to capacitor-bank protection.
Capacitor-bank schemes require consideration of:
- Overcurrent
- Earth fault
- Overvoltage and undervoltage
- Unbalance detection
- Harmonic conditions
- Switching transients
- Discharge and reclosing requirements
The correct protection arrangement depends on the capacitor-bank connection, number of stages, grounding arrangement and manufacturer design.
The model-to-application mapping above follows Schneider Electric’s Series 60 product information. Schneider Electric Ireland+1
3. Hardware Architecture
Schneider Electric’s published Series 60 product information identifies the following platform characteristics:
| Component or feature | Published Series 60 characteristic |
|---|---|
| Current inputs | 4 |
| Voltage inputs | 3 |
| Binary inputs | Up to 28 |
| Binary outputs | Up to 16 |
| RTD inputs | 16 |
| Communication | Modbus port |
| IEC 61850 | Supported, including GOOSE |
| Logic | Logic equation editor |
| Memory | Removable memory cartridge |
| User interface | Three types of UMI |
These are platform-level published characteristics. The actual installed arrangement, options and usable channels must be checked against the relay’s complete reference and hardware documentation. Schneider Electric Ireland+1
3.1 Current Transformer Inputs
Current inputs receive signals from protection CTs.
Engineering checks include:
- CT primary and secondary ratings
- CT polarity
- Phase identification
- CT secondary earthing
- Burden and wiring integrity
- Correct assignment of phase and residual-current inputs
A wrong CT ratio or polarity can lead to incorrect measurements and protection operation.
3.2 Voltage Transformer Inputs
Voltage inputs are used by functions that require voltage measurement.
Typical checks include:
- VT primary and secondary ratings
- Phase sequence
- Phase-to-neutral and phase-to-phase wiring
- Fuse and miniature circuit-breaker arrangements
- VT secondary earthing
- Correct voltage input configuration
3.3 Binary Inputs and Outputs
Binary inputs can be used for signals such as:
- Circuit-breaker position
- Disconnector position
- Protection blocking
- External trip
- Local/remote selection
- Reset and interlocking signals
Binary outputs may be assigned to:
- Circuit-breaker trip
- Circuit-breaker close or close permissive
- Alarm indication
- Protection operation
- External annunciation
Output assignment and trip logic must be checked against the approved control schematic. Never assume a factory output assignment is suitable for a particular switchgear panel.
3.4 RTD Inputs
Series 60 product information identifies support for 16 RTD inputs. RTDs can be useful for temperature monitoring in applications such as motors and transformers, depending on the selected relay application and hardware configuration.
Check the supported sensor type, wiring arrangement, measurement range and alarm/trip logic before connecting temperature sensors.
4. Protection Functions and Engineering Considerations
Protection functions should be selected according to the electrical equipment, network earthing, fault levels and coordination study.
4.1 Phase Overcurrent Protection — ANSI 50/51
Phase overcurrent protection detects excessive current caused by phase faults or abnormal loading.
The engineering process normally includes:
- Determine the maximum load current.
- Calculate the minimum and maximum fault currents.
- Select the pickup current.
- Select the operating curve.
- Coordinate the relay with upstream and downstream devices.
- Verify operation at minimum fault current.
- Confirm the breaker clearing time.
4.2 Earth-Fault Protection — ANSI 50N/51N
Earth-fault protection detects current flowing through the earth-fault measurement circuit.
The correct setting depends on:
- System neutral earthing
- Minimum earth-fault current
- CT arrangement
- Residual current measurement method
- Downstream and upstream coordination
- Required sensitivity and stability
For sensitive earth-fault applications, the measurement method and CT characteristics must be reviewed carefully.
4.3 Directional Overcurrent — ANSI 67
Directional overcurrent protection is relevant where fault current can flow in more than one direction.
Typical applications include:
- Ring distribution networks
- Parallel incomers
- Networks with distributed generation
- Interconnected industrial systems
Correct voltage and current reference connections are essential. Phase rotation, polarization and directional characteristic settings must be validated during commissioning.
4.4 Voltage and Frequency Protection
Voltage and frequency functions may be used for:
- Supply abnormality detection
- Motor and generator protection schemes
- Load shedding
- Network separation
- Alarm and control logic
The engineer must distinguish between equipment protection and system-level operational requirements. Settings should be based on the applicable grid code, plant operating philosophy and coordination study.
5. Sepam Series 60 Engineering Software
Sepam relays are commonly engineered using Schneider Electric’s SFT2841 software. The software is used for configuration and parameter management, subject to compatibility with the relay model and firmware.
Typical engineering tasks include:
- Creating or opening a relay configuration
- Selecting the correct Sepam application
- Configuring CT and VT ratios
- Setting protection functions
- Configuring logic and output assignments
- Reviewing measurements
- Connecting to the relay
- Uploading and downloading settings
- Retrieving event and disturbance information
Before using an engineering project, confirm that the software version supports the relay’s reference and firmware. Keep a controlled backup of the original configuration.
5.1 Offline Engineering
Offline engineering allows the protection configuration to be prepared without connecting to the relay.
A recommended workflow is:
- Identify the complete relay reference.
- Confirm the application type.
- Select the correct hardware and options.
- Enter CT and VT data.
- Configure protection functions.
- Enter settings approved by the protection study.
- Configure binary inputs and outputs.
- Review logic equations.
- Save the project with a revision number.
- Perform an independent engineering review.
5.2 Online Engineering
Online engineering involves communication with the physical relay.
Before changing settings:
- Obtain the approved settings file.
- Record the existing configuration.
- Confirm the relay identity and firmware.
- Check the communication path.
- Establish the required operational permit.
- Confirm whether protection functions will be affected during the work.
After downloading, read back the settings where supported and compare them with the approved engineering file.
6. Communication and IEC 61850 Integration
Series 60 product information identifies Modbus communication and IEC 61850 with GOOSE support. The precise protocol options and configuration depend on the installed communication hardware and firmware. Schneider Electric Ireland+1
6.1 Modbus Communication
Modbus can be used to exchange measurements, status information and other supported data with a PLC, RTU or SCADA system.
Typical integration tasks include:
- Communication parameter configuration
- Address assignment
- Serial or Ethernet interface configuration, as applicable
- Register mapping
- Measurement verification
- Alarm and event integration
Do not assume that a particular register map applies to every firmware version. Use the relevant Schneider Electric communication documentation.
6.2 IEC 61850 and GOOSE
IEC 61850 integration can support communication between protection IEDs and substation automation systems.
Engineering tasks may include:
- IED identification
- Logical device and logical node review
- Dataset configuration
- GOOSE publisher and subscriber configuration
- Communication supervision
- Network and VLAN planning
- Testing of received and transmitted signals
GOOSE engineering must be validated end-to-end. A configuration file alone does not prove that the subscribed signal is received correctly or that the intended output operates.
6.3 Communication Testing
A practical communication test should verify:
- Correct physical connection.
- Correct IP address or serial settings.
- Correct protocol configuration.
- Correct device identification.
- Correct data mapping.
- Correct indication and quality status.
- Correct response to communication failure.
- Correct event and alarm reporting.
7. Practical Protection Setting Example — 11 kV Feeder
Consider an illustrative 11 kV feeder with the following data:
| Parameter | Value |
|---|---|
| Nominal voltage | 11 kV |
| Maximum load current | 180 A |
| CT ratio | 250/1 A |
| Maximum three-phase fault current | 5 kA |
| Minimum remote fault current | 900 A |
The values are illustrative only. They are not recommended settings for a real installation.
7.1 Convert Primary Current to Secondary Current
For a 250/1 A CT:
\[ I_s = I_p \times \frac{1}{250} \]
At the maximum load current:
\[ I_s = 180 \times \frac{1}{250} = 0.72\text{ A} \]
A proposed pickup must be above the expected maximum operating current, with suitable allowance for overload and operating conditions.
7.2 Illustrative Pickup Selection
Assume, for explanation only, a primary pickup of 225 A:
\[ I_{s,\text{pickup}} = \frac{225}{250} = 0.9\text{ A} \]
This is 1.25 times the stated maximum load current.
The engineer must then verify:
- Whether the pickup is compatible with the relay’s available setting range.
- Whether the minimum fault current is sufficiently above pickup.
- Whether the selected curve provides discrimination.
- Whether the upstream and downstream devices coordinate.
- Whether the CT can reproduce the fault current without unacceptable saturation.
7.3 Coordination Review
The final time-current coordination study should include:
- Downstream feeder protection
- Upstream incomer protection
- Transformer protection
- Maximum and minimum fault levels
- Cable thermal limits
- Circuit-breaker operating time
- CT performance
The relay setting is not complete until the entire protection chain has been checked.
8. Testing and Commissioning
Testing must be performed by qualified personnel using approved procedures and appropriate test equipment.
8.1 Pre-Commissioning Checks
Before secondary injection:
- Verify relay model and serial number.
- Confirm auxiliary supply voltage.
- Inspect CT and VT wiring.
- Verify CT shorting links and earthing.
- Check binary input wiring.
- Check trip and alarm output wiring.
- Confirm breaker status feedback.
- Verify the approved settings file.
8.2 Secondary Injection Testing
A typical test plan includes:
| Test | Purpose |
|---|---|
| Phase current measurement | Verify current scaling and phase assignment |
| Earth-fault measurement | Verify residual-current measurement |
| Overcurrent pickup | Confirm pickup accuracy |
| Overcurrent timing | Verify operating time |
| Directional test | Confirm directional decision, where used |
| Voltage function test | Verify voltage pickup and timing, where configured |
| Binary input test | Verify status and blocking signals |
| Output test | Confirm assigned relay outputs |
| Trip circuit test | Verify the complete trip path |
| Event record check | Confirm event capture and time information |
Test values and tolerances must be taken from the applicable relay documentation and project specifications.
8.3 End-to-End Trip Test
A complete trip test should verify the chain from the injected fault quantity to the circuit-breaker trip mechanism.
Confirm:
- The relay measures the injected current or voltage correctly.
- The protection function starts.
- The operating timer behaves as expected.
- The trip logic operates.
- The assigned output changes state.
- The trip circuit operates.
- The breaker opens.
- The correct indications and events are recorded.
8.4 Communication and GOOSE Testing
Where communication is used for protection or control, test both normal operation and failure conditions.
For GOOSE applications, verify the publisher, subscriber, dataset, configuration revision, network path and actual IED response. Do not rely solely on a successful engineering software download.
9. Troubleshooting Common Issues
| Problem | Possible cause | Recommended checks |
|---|---|---|
| Incorrect current measurement | CT ratio or wiring error | Check CT ratio, polarity and phase assignment |
| Unexpected earth-fault measurement | Incorrect residual circuit | Verify CT arrangement and wiring |
| Protection does not pick up | Incorrect setting or blocked function | Check settings, enable status and blocking logic |
| Nuisance trip | Incorrect coordination or measurement issue | Review fault records, CT performance and settings |
| Directional element operates incorrectly | Incorrect voltage/current reference | Verify phase sequence and polarization |
| Binary input not detected | Wiring or configuration issue | Check input voltage and assignment |
| Trip output does not operate | Logic or output assignment problem | Review trip logic and output configuration |
| SCADA indication incorrect | Register or data mapping issue | Check communication map and data scaling |
| GOOSE signal not received | Network or configuration mismatch | Check dataset, subscription, VLAN and network path |
| Replacement relay does not load configuration | Reference or firmware mismatch | Verify model, hardware and firmware compatibility |
9.1 Event Records and Remote Indications
When troubleshooting communication with a SCADA system, do not assume that a protection status bit will retain the trip indication indefinitely.
Schneider Electric explains that Sepam remote indication bits may reset after the protection pickup clears unless latching is enabled. The manufacturer recommends using time-tagged event information rather than relying only on transient status bits to capture all protection events. Schneider Electric USA
This is important when investigating intermittent communication failures or missed trip indications.
10. Replacement and Migration Considerations
Because Series 60 is discontinued in some markets, replacement engineering requires more than selecting a relay with a similar front panel.
Before replacing a Series 60 relay, document:
- Complete relay reference
- Firmware version
- CT and VT input requirements
- Binary input and output allocation
- Trip and close logic
- Protection settings
- Communication protocol and data mapping
- IEC 61850 configuration, where applicable
- RTD and accessory requirements
- Panel cut-out and wiring arrangements
The replacement device must be validated against the original protection philosophy. A migration project should include settings review, wiring verification, functional testing, communication testing and an approved commissioning procedure.
11. Practical Engineering Checklist
Use this checklist when working on a Sepam Series 60 installation.
- Confirm the exact model: S60, S62, M61, T60, T62, G60, G62 or C60.
- Record the relay reference, serial number and firmware.
- Obtain the correct Schneider Electric user manual.
- Back up the existing configuration.
- Verify CT and VT ratios and wiring.
- Review the protection study and approved settings.
- Check binary input and output assignments.
- Verify trip logic and breaker feedback.
- Test protection pickup and timing.
- Test the complete trip circuit.
- Verify Modbus or IEC 61850 communication, where installed.
- Test alarms, events and disturbance records.
- Save the final configuration and test report.
12. Training by Dr Saeed Roostaee / Elec-Engg
Practical training is essential for engineers who work with numerical protection relays in substations and industrial power systems. Understanding the protection function alone is not enough; engineers must also be able to configure the relay, interpret measurements, verify settings, test trip logic and troubleshoot communication problems.
Practical courses by Dr Saeed Roostaee / Elec-Engg cover power system protection, protection relay engineering, substation automation and IEC 61850 applications.
Relevant training topics include:
- Protection relay fundamentals and application engineering
- CT and VT circuits
- Overcurrent and earth-fault protection
- Transformer, motor and generator protection
- Relay configuration and settings management
- Secondary injection testing and commissioning
- IEC 61850, GOOSE and substation communication
- Practical troubleshooting using engineering software and test equipment
Explore the training resources at Elec-Engg.
13. Conclusion
Sepam Series 60 provides application-oriented protection for feeders, motors, transformers, generators and capacitor banks. Its published platform features include multiple current and voltage inputs, extensive binary I/O, RTD inputs, logic equations, Modbus communication and IEC 61850 with GOOSE.
For successful engineering, the most important steps are selecting the correct application model, verifying the hardware and firmware, applying coordinated protection settings, testing the complete trip chain and validating communication with the substation automation system.
