MODULE 1 — SICAM SCC FUNDAMENTALS
Lesson 1.1 — What Is SICAM SCC?
Gallery 1 — Course Title
Screenshot:
Clean title screen:
SICAM SCC Practical Training
Substation SCADA & HMI Engineering
Voice:
“Welcome to the SICAM SCC Practical Training course. In this course, we will focus on the practical engineering and operation of SICAM SCC in substation automation systems.”
Gallery 2 — What SCC Does
Screenshot:
SICAM SCC main/runtime screen.
Highlight:
- Main navigation
- Process picture
- Alarm area
- Status area
- Operator controls
Voice:
“SICAM SCC provides the operator interface for monitoring and controlling the substation process. It presents information received from the automation system and allows authorized operators to interact with the process.”
Gallery 3 — From Field to Operator
Screenshot/diagram:
Primary Equipment
↓
Protection & Control IEDs
↓
IEC 61850 / Communication
↓
SICAM PAS
↓
SICAM SCC
↓
Operator
Voice:
“This is the basic signal path that we will follow throughout the course. Information starts at the physical process and protection and control devices, passes through the communication and station automation layer, reaches SICAM PAS, and is finally presented to the operator through SICAM SCC.”
Lesson 1.2 — SCC in Substation Automation
Gallery 4 — Substation Automation Architecture
Screenshot:
Complete architecture showing:
- Bay level
- IEDs
- Station bus
- SICAM PAS
- SICAM SCC
- Operator station
Voice:
“SICAM SCC should not be considered as an isolated HMI application. It is one part of the complete substation automation architecture.”

Gallery 5 — Bay Level
Screenshot:
IEDs and primary equipment.
Highlight:
- Protection relay
- Breaker
- Disconnector
- CT/PT
- Measurements
Voice:
“At bay level, protection and control devices acquire information from the electrical process and perform protection, measurement and control functions.”
Gallery 6 — Station Level
Screenshot:
PAS and SCC.
Voice:
“At station level, the automation system collects and processes this information. SICAM SCC then provides the operator with a graphical representation of the station.”
Lesson 1.3 — SCC and WinCC
Gallery 7 — WinCC/SCC Engineering Environment
Screenshot:
WinCC Explorer / SCC engineering environment.
Voice:
“SICAM SCC is closely associated with the WinCC engineering environment. However, in this course our focus is not generic WinCC programming. Our focus is the use of the environment for practical substation SCADA engineering.”
Gallery 8 — Engineering vs Runtime
Screenshot:
Side-by-side:
Engineering
- Project configuration
- Graphics
- Alarms
- Users
- Data
Runtime
- Process visualization
- Alarms
- Controls
- Events
Voice:
“It is important to distinguish engineering from runtime. Engineering is where we build and configure the system. Runtime is where the operator monitors and controls the actual process.”

Lesson 1.4 — Typical SCC Architecture
Gallery 9 — Complete Architecture
Screenshot:
Full architecture.
Voice:
“This architecture will be our reference throughout the course. When something does not work, we will use this signal chain to determine where the problem exists.”
Gallery 10 — Troubleshooting Signal Chain
Screenshot:
Same architecture with numbered stages:
- IED
- Communication
- PAS
- SCC
- Graphic
- Operator
Voice:
“For example, if a breaker status does not change on the SCC screen, we should not immediately assume that the graphic is wrong. We must trace the signal from the IED through PAS and finally into SCC.”
Practical Exercise 1
Gallery 11 — Exercise
Screenshot:
Architecture with blank labels.
Voice:
“Your first exercise is to identify each component of the architecture and explain the role of each layer.”
MODULE 2 — INSTALLATION, PROJECT AND ENGINEERING ENVIRONMENT
Lesson 2.1 — Software Environment
Gallery 12 — Installed Components
Screenshot:
Actual installed Siemens/SICAM/WinCC components.
Voice:
“Before starting engineering, we need to understand the installed software environment. The exact components and menus depend on the installed product versions and engineering configuration.”

Gallery 13 — Version Information
Screenshot:
Version information screen.
Highlight:
- SCC version
- WinCC version
- PAS version
- Engineering components
Voice:
“Version compatibility is particularly important in engineering projects. Always document the versions used for the project.”
Lesson 2.2 — Creating a Project
Gallery 14 — New Project
Screenshot:
New project dialog.
Voice:
“We begin by creating or opening the engineering project. In a real project, this step should be followed by a clear project naming and documentation convention.”
Gallery 15 — Project Properties
Screenshot:
Project properties.
Voice:
“Project properties contain important information about the project environment. Before engineering, verify the project configuration rather than assuming that default settings are suitable.”
Gallery 16 — WinCC Explorer
Screenshot:
WinCC Explorer.
Highlight:
- Computer
- Tag Management
- Alarm Logging
- Graphics
- User Administration
- Archives
Voice:
“This environment provides access to the major engineering components that we will use during the course.”
Gallery 17 — Project Tree
Screenshot:
Expanded project tree.
Voice:
“A well-organized project structure becomes increasingly important as the number of bays, signals and graphics increases.”
Lesson 2.3 — Engineering Workflow
Gallery 18 — Engineering Workflow
Screenshot/diagram:
Project
↓
Communication/Data
↓
Process Information
↓
Graphics
↓
Alarms
↓
Controls
↓
Users
↓
Runtime Test
↓
Commissioning
Voice:
“This is the engineering workflow we will follow. We first establish the project and process data, then build the operator interface, configure alarms and controls, define users and finally test the complete system.”
Practical Exercise 2
Gallery 19 — Exercise: Create Project
Screenshot:
Project creation screen.
Voice:
“For this exercise, create a training project and inspect the main project structure. Identify where graphics, alarms, process data and user administration are configured.”
MODULE 3 — PAS TO SCC INTEGRATION
Lesson 3.1 — PAS and SCC Relationship
Gallery 20 — PAS to SCC
Screenshot/diagram:
IED
↓
IEC 61850
↓
SICAM PAS
↓
SICAM SCC
Voice:
“SICAM PAS and SICAM SCC perform different but complementary tasks. PAS handles station automation and process information, while SCC presents this information to the operator.”
Gallery 21 — Process Information
Screenshot:
PAS process information/data point view.
Voice:
“Before building an SCC graphic, we need to understand the process information available from the automation system.”
Lesson 3.2 — Binary Status
Gallery 22 — Breaker Status
Screenshot:
Breaker status signal in PAS/SCC.
Voice:
“A simple example is breaker position. The breaker may provide open, closed or intermediate status. SCC uses this information to represent the actual process state.”
Gallery 23 — Disconnector Status
Screenshot:
Disconnector signals.
Voice:
“The same principle applies to disconnectors and other switchgear.”
Lesson 3.3 — Analog Measurements
Gallery 24 — Measurements
Screenshot:
Voltage/current/P/Q/frequency values.
Voice:
“Analog process values can include voltage, current, active power, reactive power and frequency. Correct engineering units and scaling are essential.”
Gallery 25 — Measurement Quality
Screenshot:
Process value with quality/status information.
Voice:
“Do not look only at the numerical value. Quality information can indicate whether the value is valid, uncertain, substituted or affected by a communication problem.”
Lesson 3.4 — Commands
Gallery 26 — Breaker Command
Screenshot:
Control object/dialog.
Voice:
“Commands are different from indications. An indication tells us what happened. A command requests that the process change state.”
Gallery 27 — Command Feedback
Screenshot:
Command followed by breaker status.
Voice:
“After a command, we must verify the feedback. A successful command is not simply the moment when the operator clicks the button. We must confirm that the physical or logical process state changed as expected.”
Lesson 3.5 — Signal Tracing
Gallery 28 — Signal Trace
Screenshot:
One breaker signal followed through:
IED → PAS → SCC
Voice:
“This is one of the most important troubleshooting techniques in the course. When a signal is missing, trace it through every layer rather than changing the graphic immediately.”
Practical Exercise 3
Gallery 29 — Exercise: Breaker Status
Screenshot:
Breaker signal.
Task:
- Identify breaker status
- Trace it in PAS
- Display it in SCC
- Change the breaker state
- Verify SCC feedback
Gallery 30 — Exercise: Measurement
Screenshot:
Voltage/current/P/Q.
Task:
“Trace at least one analog value from the source through PAS and into SCC.”
MODULE 4 — GRAPHICS AND SINGLE-LINE DIAGRAMS
Lesson 4.1 — Graphics Designer
Gallery 31 — Graphics Designer
Screenshot:
Graphics Designer open.
Voice:
“The graphics environment is where we create the operator’s visual representation of the substation.”
Gallery 32 — New Process Picture
Screenshot:
New process picture.
Voice:
“We begin by creating a process picture. The picture should be designed around the operator’s needs rather than simply reproducing engineering drawings.”
Lesson 4.2 — Basic Objects
Gallery 33 — Basic Graphic Objects
Screenshot:
Objects such as:
- Line
- Rectangle
- Text
- Symbol
- Button
Voice:
“These basic objects form the building blocks of the operator interface.”

Gallery 34 — Busbar
Screenshot:
Busbar graphic.
Voice:
“The busbar should clearly represent the electrical topology.”
Gallery 35 — Breaker
Screenshot:
Breaker symbol.
Voice:
“The breaker symbol must provide an immediate visual indication of the equipment state.”



Gallery 36 — Disconnector
Screenshot:
Disconnector symbol.
Voice:
“Disconnectors are represented separately because their operational meaning differs from a circuit breaker.”
Lesson 4.3 — Dynamic Objects
Gallery 37 — Static vs Dynamic
Screenshot:
Same object shown in static and dynamic states.
Voice:
“A static symbol only represents an object visually. A dynamic object changes according to process information.”
Gallery 38 — Breaker Open
Screenshot:
Breaker open.
Voice:
“This is an example of the breaker in the open state.”
Gallery 39 — Breaker Closed
Screenshot:
Breaker closed.
Voice:
“After the process state changes, the graphic should represent the closed state.”
Gallery 40 — Intermediate/Unknown State
Screenshot:
Intermediate or abnormal state.
Voice:
“We should also consider abnormal or intermediate conditions. These states can be important during switching operations and troubleshooting.”
Lesson 4.4 — Measurements on SLD
Gallery 41 — Measurement Display
Screenshot:
Voltage/current/P/Q next to bay.
Voice:
“Measurements should be positioned close enough to the relevant equipment to make their meaning immediately clear.”
Lesson 4.5 — Navigation
Gallery 42 — Main Overview
Screenshot:
Substation overview.
Gallery 43 — Bay Screen
Screenshot:
Detailed bay.
Gallery 44 — Navigation Buttons
Screenshot:
Buttons linking overview and bay screens.
Voice:
“A practical SCADA project normally uses several levels of visualization. The overview provides the overall situation, while bay screens provide more detailed information.”

Practical Exercise 4
Gallery 45 — Target SLD
Screenshot:
Target bay configuration.
Task:
Create:
- Busbar
- Two disconnectors
- One breaker
- Feeder
- Measurements
- Status indications
- Navigation
Gallery 46 — Completed SLD
Screenshot:
Completed practical bay.
Voice:
“This is the expected result of the graphics exercise.”
MODULE 5 — SWITCHGEAR MONITORING AND CONTROL
Lesson 5.1 — Monitoring Breakers
Gallery 47 — Breaker States
Screenshot:
Open / closed / intermediate.
Voice:
“Correct state representation is fundamental to safe operation. The operator must be able to distinguish normal states and abnormal states.”
Gallery 48 — Communication Failure
Screenshot:
Breaker with invalid/communication status.
Voice:
“A communication failure must not be confused with an actual equipment state.”
Lesson 5.2 — Local and Remote
Gallery 49 — Local/Remote Status
Screenshot:
Local/remote indication.
Voice:
“Before attempting a remote command, we must verify whether remote control is available.”
Gallery 50 — Switching Authority
Screenshot:
Control authority/status.
Voice:
“Control authority determines whether a particular operator or system is permitted to perform the requested operation.”
Lesson 5.3 — Control Dialog
Gallery 51 — Control Dialog
Screenshot:
Breaker control window.
Voice:
“This control dialog allows the operator to issue an authorized command.”
Gallery 52 — Command
Screenshot:
Command action.
Voice:
“Before issuing a command, verify the equipment, its current state, the operating authority and the intended action.”
Gallery 53 — Feedback
Screenshot:
Breaker state after command.
Voice:
“After the command, verify the feedback. The final state is more important than the button press itself.”
Gallery 54 — Failed Command
Screenshot:
Failed command/unsuccessful operation.
Voice:
“If the command fails, do not immediately repeat the command. First determine why it failed. Possible causes include communication problems, local mode, interlocking, permission problems or equipment conditions.”
Practical Exercise 5
Gallery 55 — Control Test
Screenshot:
Before command.
Gallery 56 — Command
Screenshot:
Control action.
Gallery 57 — Feedback
Screenshot:
New breaker state.
Task:
“Perform the command sequence and document the initial state, command and final feedback.”
MODULE 6 — ALARM LOGGING, EVENTS AND MESSAGES
Lesson 6.1 — Alarm vs Event
Gallery 58 — Alarm/Event Concept
Screenshot/diagram:
Process Change
↓
Event
+
Abnormal Condition
↓
Alarm
Voice:
“An event records something that happened. An alarm normally indicates a condition that requires operator attention.”
Lesson 6.2 — Alarm Logging
Gallery 59 — Alarm Logging
Screenshot:
Alarm Logging configuration.
Voice:
“Alarm Logging provides the framework for managing process alarms and messages.”
Gallery 60 — Alarm List
Screenshot:
Runtime alarm list.
Highlight:
- Time
- Message
- Priority
- State
- Acknowledgement
Voice:
“The operator should be able to understand what happened, when it happened and whether the alarm has been acknowledged.”
Gallery 61 — Message Classes
Screenshot:
Message classes.
Voice:
“Message classes help organize different types of process information.”
Gallery 62 — Alarm Priority
Screenshot:
Priority configuration.
Voice:
“Priority should reflect the operational significance of the condition. The goal is not simply to create more alarms, but to provide useful information to the operator.”
Lesson 6.3 — Acknowledgement
Gallery 63 — Unacknowledged Alarm
Screenshot:
Alarm before acknowledgement.
Gallery 64 — Acknowledged Alarm
Screenshot:
Alarm after acknowledgement.
Voice:
“Acknowledgement tells the system that the operator has recognized the alarm. It does not necessarily mean that the underlying condition has disappeared.”
Lesson 6.4 — Historical Events
Gallery 65 — Event History
Screenshot:
Historical event list.
Voice:
“Historical events are particularly useful during disturbance analysis and troubleshooting.”
Gallery 66 — Filtering
Screenshot:
Filter by time/source/message.
Voice:
“Filtering allows the operator or engineer to reduce a large event list to the information relevant to the investigation.”
Practical Exercise 6
Gallery 67 — Simulated Protection Alarm
Screenshot:
Protection operation alarm.
Gallery 68 — Communication Alarm
Screenshot:
Communication alarm.
Gallery 69 — Breaker Change
Screenshot:
Breaker event.
Gallery 70 — Filtered History
Screenshot:
Filtered event list.
Task:
“Generate or simulate several events and verify their appearance, acknowledgement, timestamp and historical record.”
MODULE 7 — MEASUREMENTS, TRENDS AND PROCESS VALUES
Lesson 7.1 — Analog Process Values
Gallery 71 — Voltage
Screenshot:
Voltage display.
Gallery 72 — Current
Screenshot:
Current display.
Gallery 73 — Active Power
Screenshot:
P display.
Gallery 74 — Reactive Power
Screenshot:
Q display.
Gallery 75 — Frequency
Screenshot:
Frequency display.
Voice:
“Typical electrical measurements include voltage, current, active power, reactive power and frequency. These values provide the operator with an overview of the electrical condition of the substation.”
Lesson 7.2 — Units and Scaling
Gallery 76 — Engineering Units
Screenshot:
Example of value with unit.
Voice:
“Always verify the engineering unit and scaling. A technically correct numerical value can still be misleading if the scaling or unit is incorrect.”
Lesson 7.3 — Trends
Gallery 77 — Trend Configuration
Screenshot:
Trend configuration.
Gallery 78 — Runtime Trend
Screenshot:
Trend display.
Voice:
“Trends provide historical visualization of process values and can help identify changing operating conditions.”
Practical Exercise 7
Gallery 79 — Measurement Dashboard
Screenshot:
U, I, P, Q, frequency.
Task:
“Create a measurement display and configure at least one trend for an electrical quantity.”
MODULE 8 — USER MANAGEMENT AND SECURITY
Lesson 8.1 — Users and Groups
Gallery 80 — User Administration
Screenshot:
User management.
Voice:
“User management determines who can access the system and which operations each user is authorized to perform.”
Gallery 81 — Operator Group
Screenshot:
Operator group permissions.
Voice:
“An operator normally needs access to process monitoring and authorized operational functions.”
Gallery 82 — Engineer Group
Screenshot:
Engineering permissions.
Voice:
“Engineering users may require additional access for diagnostics and configuration.”
Gallery 83 — Administrative Access
Screenshot:
Administrator permissions.
Voice:
“Administrative access should be controlled carefully because it can affect the complete system configuration.”
Lesson 8.2 — Login/Logout
Gallery 84 — Login
Screenshot:
Login screen.
Gallery 85 — Logged-In User
Screenshot:
Runtime showing user.
Gallery 86 — Logout
Screenshot:
Logout action.
Practical Exercise 8
Gallery 87 — Permission Test
Screenshot:
Operator attempting restricted function.
Voice:
“Test the permissions rather than assuming they work correctly. Verify what each user can and cannot do.”
MODULE 9 — TIME SYNCHRONIZATION AND EVENT TIMESTAMPING
Lesson 9.1 — Why Time Matters
Gallery 88 — Event Timeline
Screenshot/diagram:
10:32:15.100 Protection Trip
10:32:15.120 Breaker Open
10:32:15.150 Alarm
10:32:15.200 Operator Acknowledgement
Voice:
“In substation automation, accurate timestamps are essential. During a disturbance, the sequence of events can be as important as the events themselves.”
Lesson 9.2 — Time Synchronization
Gallery 89 — NTP Architecture
Screenshot/diagram:
Time Source
↓
SICAM PAS
↓
SCC / IEDs
Voice:
“The station architecture should use a consistent time reference so that different devices report events using a common time base.”
Gallery 90 — Time Configuration
Screenshot:
Actual time configuration screen.
Gallery 91 — Timestamp Problem
Screenshot:
Events with inconsistent timestamps.
Voice:
“If timestamps are inconsistent, investigate the time source, synchronization status, timezone and device configuration.”
Practical Exercise 9
Gallery 92 — Timestamp Analysis
Screenshot:
Three or more events with different timestamps.
Task:
“Determine whether the event sequence is technically consistent and identify possible time synchronization problems.”
MODULE 10 — DIAGNOSTICS AND TROUBLESHOOTING
Lesson 10.1 — Troubleshooting Philosophy
Gallery 93 — Troubleshooting Flowchart
Screenshot/diagram:
Problem
↓
Identify Signal
↓
Check Source
↓
Check Communication
↓
Check PAS
↓
Check SCC
↓
Check Graphic
↓
Test
Voice:
“The most effective troubleshooting approach is systematic. We should move through the signal chain step by step rather than making random configuration changes.”
Lesson 10.2 — Breaker Status Not Updating
Gallery 94 — Problem Screen
Screenshot:
Breaker remains in old state.
Voice:
“Imagine that the physical breaker has changed state, but the SCC graphic has not changed.”
Gallery 95 — Check PAS
Screenshot:
PAS signal.
Voice:
“First, determine whether PAS receives the new state.”
Gallery 96 — Check SCC
Screenshot:
SCC process value.
Voice:
“If PAS contains the correct state but SCC does not, continue the investigation on the SCC side.”
Lesson 10.3 — Missing Measurement
Gallery 97 — Missing Measurement
Screenshot:
Blank/invalid value.
Voice:
“A missing measurement can result from the source device, communication, data processing, scaling or visualization.”
Gallery 98 — Measurement Trace
Screenshot:
Source → PAS → SCC.
Lesson 10.4 — Alarm Not Appearing
Gallery 99 — Missing Alarm
Screenshot:
Expected alarm absent.
Voice:
“Check whether the source condition exists, whether the signal reaches PAS, whether the message is correctly configured and whether the SCC alarm configuration is correct.”
Lesson 10.5 — Command Failure
Gallery 100 — Command Failure
Screenshot:
Failed control.
Voice:
“Command failures require a structured investigation. Check authorization, local or remote mode, communication, interlocking, command configuration and feedback.”
Lesson 10.6 — Communication Failure
Gallery 101 — Communication Diagnostic
Screenshot:
Communication status/diagnostics.
Voice:
“Communication diagnostics can help distinguish a process problem from a communication problem.”
Gallery 102 — Troubleshooting Checklist
Screenshot:
□ Source device
□ Communication
□ PAS
□ Process data
□ SCC data
□ Graphic
□ Alarm configuration
□ User permissions
□ Time synchronization
Voice:
“ ”
Practical Exercise 10
Gallery 103 — Fault 1
Breaker status not updating.
Gallery 104 — Fault 2
Measurement missing.
Gallery 105 — Fault 3
Alarm missing.
Gallery 106 — Fault 4
Command unsuccessful.
Gallery 107 — Fault 5
Incorrect timestamp.
Voice:
“For the troubleshooting exercise, investigate each fault systematically. Do not change multiple parameters at the same time. Identify the cause first, then make the correction and retest.”
MODULE 11 — COMPLETE PRACTICAL SUBSTATION PROJECT
This module should contain the largest number of screenshots because it becomes the main practical project of the course.
Lesson 11.1 — Project Definition
Gallery 108 — Final Project Architecture
Screenshot:
SICAM SCC
|
SICAM PAS
|
IEC 61850 / Station Bus
|
-------------------------
| | |
Incomer 1 Incomer 2 Feeder
Voice:
“We will now build a complete small substation SCADA project using the concepts introduced in the previous modules.”
Gallery 109 — Project Scope
Screenshot/table:
- 2 bus sections
- 2 incomers
- 1 outgoing feeder
- Breakers
- Disconnectors
- Measurements
- Protection alarms
- Communication alarms
Lesson 11.2 — Signal List
Gallery 110 — Signal List
Screenshot:
Engineering signal list.
Voice:
“Before building graphics, define the required process information. A clear signal list makes the engineering process much easier to control.”
Gallery 111 — Binary Signals
Screenshot:
Breaker/disconnector/status signals.
Gallery 112 — Analog Signals
Screenshot:
U/I/P/Q/frequency signals.
Gallery 113 — Commands
Screenshot:
Open/close commands.
Lesson 11.3 — Main Overview
Gallery 114 — Main SLD
Screenshot:
Complete overview.
Voice:
“This is the main operator overview. The operator should be able to understand the station topology and overall operating condition immediately.”
Gallery 115 — Bus Section 1
Screenshot:
First bus.
Gallery 116 — Bus Section 2
Screenshot:
Second bus.
Lesson 11.4 — Incomer Bay
Gallery 117 — Incomer 1
Screenshot:
Complete incomer bay.
Gallery 118 — Incomer 2
Screenshot:
Complete second incomer.
Lesson 11.5 — Feeder Bay
Gallery 119 — Outgoing Feeder
Screenshot:
Complete feeder.
Lesson 11.6 — Measurements
Gallery 120 — Complete Measurement Display
Screenshot:
All U/I/P/Q/frequency values.
Lesson 11.7 — Alarms
Gallery 121 — Protection Alarms
Screenshot:
Protection alarm list.
Gallery 122 — Communication Alarms
Screenshot:
Communication alarm list.
Gallery 123 — Combined Alarm View
Screenshot:
Complete alarm screen.
Lesson 11.8 — Control
Gallery 124 — Breaker Control
Screenshot:
Control dialog.
Gallery 125 — Command Feedback
Screenshot:
Successful feedback.
Lesson 11.9 — Users
Gallery 126 — User Configuration
Screenshot:
Users/groups.
Gallery 127 — Permission Test
Screenshot:
Restricted function.
Lesson 11.10 — Runtime Test
Gallery 128 — Runtime Overview
Screenshot:
Complete running system.
Gallery 129 — Bay Navigation
Screenshot:
Overview → bay.
Gallery 130 — Alarm Test
Screenshot:
Alarm appearing.
Gallery 131 — Control Test
Screenshot:
Breaker command.
Gallery 132 — Event History
Screenshot:
Historical events.
Lesson 11.11 — Communication Failure Test
Gallery 133 — Normal Operation
Screenshot:
Normal communication.
Gallery 134 — Communication Failure
Screenshot:
Failure condition.
Gallery 135 — SCC Response
Screenshot:
How SCC represents the problem.
Voice:
“An important part of commissioning is testing abnormal conditions. We should verify not only normal operation but also how the system behaves when communication or process information becomes unavailable.”
Gallery 136 — Recovered Communication
Screenshot:
System restored.
Voice:
“After restoring communication, verify that the system returns to the expected state and that no important information has been lost.”
MODULE 12 — COMMISSIONING AND FINAL PRACTICAL TEST
Lesson 12.1 — Commissioning Checklist
Gallery 137 — Commissioning Checklist
Screenshot:
□ Communication
□ Process data
□ Breaker status
□ Disconnector status
□ Measurements
□ Alarms
□ Events
□ Commands
□ Feedback
□ Time synchronization
□ User permissions
□ Graphics
□ Documentation
Voice:
“This checklist summarizes the main commissioning activities.”
Lesson 12.2 — Communication Test
Gallery 138 — Communication Test
Screenshot:
Communication status.
Voice:
“First verify that communication is healthy and all required process information is available.”
Lesson 12.3 — Status Test
Gallery 139 — Switchgear Status Test
Screenshot:
Breaker/disconnector states.
Voice:
“Test every important switchgear indication under normal and changing conditions.”
Lesson 12.4 — Measurement Test
Gallery 140 — Measurement Verification
Screenshot:
U/I/P/Q/frequency.
Voice:
“Verify the value, unit, scaling and quality of each important measurement.”
Lesson 12.5 — Alarm Test
Gallery 141 — Alarm Test
Screenshot:
Alarm appearing.
Voice:
“Generate the required alarm conditions and verify message text, priority, timestamp and acknowledgement.”
Lesson 12.6 — Command Test
Gallery 142 — Command Test
Screenshot:
Control dialog.
Voice:
“Test each authorized command and verify the corresponding process feedback.”
Lesson 12.7 — Time Test
Gallery 143 — Time Synchronization
Screenshot:
Time/status.
Voice:
“Verify that the SCC, PAS and relevant devices use a consistent time reference.”
Lesson 12.8 — User Permission Test
Gallery 144 — User Test
Screenshot:
Different user permissions.
Voice:
“Verify that each user group has exactly the required access.”
FINAL PRACTICAL TEST
Gallery 145 — Final Test Introduction
Screenshot:
FINAL PRACTICAL TEST
Diagnose and Correct Five SCADA Problems
Voice:
“We have now reached the final practical test. You will investigate several intentionally introduced problems in the SICAM SCC project.”
Gallery 146 — Problem 1
Screenshot:
Breaker status problem.
Task:
“Determine why the breaker status is not updating.”
Gallery 147 — Problem 2
Screenshot:
Missing measurement.
Task:
“Trace the missing measurement from the source to SCC.”
Gallery 148 — Problem 3
Screenshot:
Missing alarm.
Task:
“Determine why the expected alarm does not appear.”
Gallery 149 — Problem 4
Screenshot:
Failed command.
Task:
“Determine why the operator command is unsuccessful.”
Gallery 150 — Problem 5
Screenshot:
Timestamp problem.
Task:
“Analyze the event sequence and identify the time synchronization problem.”
COURSE SUMMARY
Gallery 151 — What We Covered
Screenshot:
SICAM SCC
↓
Engineering
↓
PAS Integration
↓
Graphics
↓
Control
↓
Alarms
↓
Measurements
↓
Security
↓
Time Synchronization
↓
Diagnostics
↓
Commissioning
Voice:
“In this course, we have moved from the fundamentals of SICAM SCC to a complete practical substation SCADA project.”
Gallery 152 — Complete Architecture
Screenshot:
Final polished architecture:
OPERATOR
|
SICAM SCC
|
SICAM PAS
|
IEC 61850 / Station Bus
|
------------------------
| | |
IED IED IED
| | |
-------- Electrical ----
Process
Voice:
“The most important concept to remember is that SCC is part of a complete system. When troubleshooting, always understand the complete path from the physical process to the operator interface.”
Gallery 153 — Practical Engineering Philosophy
Screenshot:
Don’t only configure the screen.
Understand the complete signal path.
Voice:
“Good SCADA engineering is not simply about creating attractive screens. It requires understanding process information, communication, control, alarms, timestamps and diagnostics.”
Gallery 154 — Final Message
Screenshot:
From IED Data
to PAS
to SCC
to OperatorComplete Substation SCADA Engineering
Voice:
“You should now have a practical understanding of how SICAM SCC fits into a substation automation system and how to approach engineering, testing and troubleshooting in a structured way.”
RECOMMENDED GALLERY NAMING SYSTEM
To keep your Elec-Engg course easy to maintain, I recommend naming the actual uploaded Gallery images consistently.
For example:
SCC-M01-L01-01-Course-Title
SCC-M01-L01-02-SCC-Main-Screen
SCC-M01-L01-03-Signal-Path
SCC-M01-L02-01-SA-Architecture
SCC-M01-L02-02-Bay-Level
SCC-M01-L02-03-Station-Level
SCC-M03-L01-01-PAS-SCC-Architecture
SCC-M03-L01-02-Process-Information
SCC-M03-L01-03-Breaker-Status
SCC-M04-L01-01-Graphics-Designer
SCC-M04-L01-02-New-Process-Picture
SCC-M04-L01-03-Basic-Objects
This makes it much easier to replace or update a screenshot later.
RECOMMENDED VIDEO PRODUCTION FORMAT
For each lesson, use this sequence:
1. Introduction Screenshot
Show the lesson title.
- :
- In this lesson, we will learn…”
- Before working with the software, it is important to understand…”
- Record the actual mouse operation.
- “Pay attention to this section…”
- “Now I will create/configure/test…”
- “This is the final result…”
- “Now let’s introduce a problem and see how we can diagnose it…”
- “Now it is your turn. Repeat this procedure…”
SCREENSHOT TYPES TO CAPTURE
For the actual production of the course, I would divide screenshots into five categories.
A. Concept Screenshots
Used for explaining architecture:
- SICAM SCC architecture
- PAS/SCC relationship
- Station/bay level
- Signal flow
- Troubleshooting flow
B. Engineering Screenshots
Actual configuration:
- Project creation
- WinCC Explorer
- Graphics Designer
- Alarm Logging
- User Administration
- Process information
- Communication
- Time configuration
C. Runtime Screenshots
Actual operator experience:
- Main overview
- SLD
- Bay screen
- Breaker status
- Measurements
- Alarm list
- Event list
- Control dialog
- Trends
D. Diagnostic Screenshots
Very important for your practical style:
- Communication failure
- Missing signal
- Bad quality
- Failed command
- Incorrect timestamp
- Missing alarm
- Wrong status
- User permission problem
E. Practical Exercise Screenshots
Use screenshots showing the target result, rather than giving the entire answer.
For example:
Exercise: Create the following bay screen.
Then show the target SLD.
The learner performs the configuration independently.
FINAL PRODUCTION TARGET
The complete course can therefore contain approximately:
| Module | Approx. Gallery Screenshots |
|---|---|
| 1. Fundamentals | 11 |
| 2. Engineering Environment | 8 |
| 3. PAS–SCC Integration | 11 |
| 4. Graphics & SLD | 16 |
| 5. Control | 11 |
| 6. Alarms & Events | 13 |
| 7. Measurements | 9 |
| 8. Security | 8 |
| 9. Time Synchronization | 5 |
| 10. Troubleshooting | 15 |
| 11. Complete Project | 29 |
| 12. Commissioning | 8 |
| Final Practical Test/Summary | 10 |
| Total | ~153 Gallery items |
You do not need 153 separate videos. Many Gallery images can be displayed inside the same lesson while you record one continuous narration.
The most important part is that the real SCC screens, PAS screens and practical project screenshots become the core of the course, while the conceptual diagrams are used only where they make the engineering easier to understand.