  1. Introduction
  2. 1. Understanding GOOSE Communication
  3. 2. Multi-Vendor GOOSE Architecture
  4. 3. GOOSE Publisher Configuration in GE Multilin Relays
  5. 4. GOOSE Subscriber Configuration in GE Multilin Relays
  6. 5. Practical Application: GOOSE-Based Protection Interlocking
  7. 6. Practical Application: GOOSE Blocking Between Feeder Relays
  8. 7. Practical Application: GOOSE-Based Breaker Failure Initiation
  9. 8. SCL Engineering for Multi-Vendor GOOSE Integration
  10. 9. Ethernet Network Design for Multi-Vendor GOOSE
  11. 10. GOOSE Supervision and Communication Failure Handling
  12. 11. Testing and Commissioning of Multi-Vendor GOOSE
  13. 12. Using IEDScout and Wireshark for GOOSE Diagnostics
  14. 13. Common Multi-Vendor GOOSE Problems
  15. 14. Practical Engineering Checklist
  16. 15. Training on GE Multilin IEC 61850 GOOSE Integration by Elec-Engg
  17. Conclusion
  18. Frequently Asked Questions

Introduction

Modern substations increasingly use Intelligent Electronic Devices (IEDs) from different manufacturers within the same protection and control system. A typical installation may include GE Multilin protection relays, Siemens SIPROTEC 5 IEDs, ABB Relion relays, Schneider Electric MiCOM devices and bay controllers connected through an IEC 61850 station bus.

One of the most important communication services supporting this architecture is Generic Object-Oriented Substation Event (GOOSE) messaging. GOOSE allows IEDs to exchange time-critical binary information over Ethernet without relying on conventional hardwired contacts for every signal.

For protection engineers, GOOSE is particularly useful for:

  • Protection interlocking between bays.
  • Blocking and permissive protection schemes.
  • Breaker failure initiation and intertripping.
  • Busbar protection signal exchange.
  • Circuit-breaker status distribution.
  • Transfer trip and direct intertrip applications.
  • Distributed bay control and automation logic.

Integrating GE Multilin relays with multi-vendor IEDs requires more than establishing Ethernet connectivity. Engineers must understand the GOOSE data model, publisher and subscriber configuration, SCL engineering, network design, signal quality, application logic and end-to-end testing.

This article explains the engineering workflow for implementing and commissioning GOOSE communication between GE Multilin relays and other manufacturers’ IEC 61850-compatible IEDs.

1. Understanding GOOSE Communication

GOOSE is an IEC 61850 communication service designed for fast exchange of event-based information between IEDs.

Unlike conventional client-server MMS communication, GOOSE uses a publisher-subscriber mechanism.

The publisher sends a GOOSE message containing a dataset. One or more subscribers receive the message and use the relevant dataset members in their application logic.

For example, a GE Multilin feeder relay may publish a protection-start signal. A Siemens SIPROTEC 5 relay subscribes to that signal and uses it to initiate a blocking function.

The communication path is:

  1. The publisher detects a change in an internal signal.
  2. The publisher updates its GOOSE dataset state.
  3. The GOOSE message is transmitted over the Ethernet network.
  4. The subscriber receives and validates the message.
  5. The subscriber maps the received dataset member to an internal application signal.
  6. Protection or control logic processes the received signal.

GOOSE is event-driven but also periodically retransmitted. This retransmission mechanism allows subscribers to recognize communication loss when expected messages are no longer received.

2. Multi-Vendor GOOSE Architecture

A multi-vendor GOOSE system may contain several protection relays and bay controllers connected through managed Ethernet switches.

Consider a substation with the following devices:

  • GE Multilin feeder protection relay.
  • Siemens SIPROTEC 5 transformer protection relay.
  • ABB Relion busbar protection IED.
  • Schneider Electric protection relay.
  • Station-level SCADA system.
  • Managed Ethernet switches.

A simplified application could involve a GE feeder relay publishing an overcurrent start signal to a Siemens transformer relay. The transformer relay subscribes to the signal and uses it as part of a coordinated blocking scheme.

The same network may carry other GOOSE messages, including breaker positions, interlocking signals and trip commands.

Important architectural distinction

GOOSE communication does not automatically provide interoperability merely because two devices support IEC 61850.

The engineering team must verify:

  • Supported IEC 61850 edition and applicable services.
  • GOOSE publisher and subscriber capabilities.
  • Supported dataset data types.
  • Configuration-tool compatibility.
  • SCL import and export compatibility.
  • Network configuration requirements.
  • Firmware and hardware limitations.

The exact capabilities of each GE Multilin relay depend on its model, order code, firmware and communication hardware.

3. GOOSE Publisher Configuration in GE Multilin Relays

The publisher is the IED that transmits information to other devices.

In a GE Multilin application, the published signals may include:

  • Phase overcurrent start.
  • Earth-fault start.
  • Differential protection operate.
  • Breaker failure initiation.
  • Circuit-breaker open and closed status.
  • Protection trip.
  • Interlocking conditions.
  • General alarm.
  • User-defined logic outputs.

The first engineering task is to identify which internal signals need to be transmitted.

3.1 Select the signals

Suppose a GE Multilin feeder relay must transmit the following information:

SignalDescription
OC_STARTOvercurrent protection pickup
EF_STARTEarth-fault protection pickup
TRIPProtection trip output
CB_OPENCircuit-breaker open indication
CB_CLOSEDCircuit-breaker closed indication

The selected signals must be available in the relay’s IEC 61850 data model or through supported configurable logic and mapping facilities.

3.2 Create the GOOSE dataset

A GOOSE dataset contains the data objects transmitted by the publisher.

For example, a dataset may contain:

  • Protection-start indication.
  • Protection-trip indication.
  • Circuit-breaker position.
  • Breaker failure status.

The actual logical node and data object references must be taken from the relay’s implemented IEC 61850 model. Do not assume that every GE Multilin relay uses identical logical node names or data object structures.

3.3 Configure the GOOSE control block

The GOOSE control block defines communication parameters associated with the published dataset.

Typical parameters include:

  • GOOSE control block reference.
  • Dataset reference.
  • Application ID (APPID).
  • Destination multicast MAC address.
  • VLAN ID, where used.
  • VLAN priority, where used.
  • Minimum retransmission interval.
  • Maximum retransmission interval.
  • Configuration revision.

The values must be coordinated with the substation network design and subscriber configuration.

3.4 Verify publisher operation

After transferring the configuration to the relay, verify that:

  • The GOOSE control block is enabled.
  • The expected dataset is associated with it.
  • The destination multicast address is correct.
  • The configuration revision is consistent with the engineering design.
  • The relay transmits the expected dataset members.
  • GOOSE retransmission occurs as specified by the configuration.

Use the relay’s supported diagnostic facilities and an appropriate network analyzer to confirm actual message transmission.

4. GOOSE Subscriber Configuration in GE Multilin Relays

A subscriber receives GOOSE information from another IED.

For example, a GE Multilin relay may subscribe to a breaker status signal published by a Siemens SIPROTEC 5 bay controller.

The engineering process includes:

  1. Importing or referencing the publisher’s SCL description.
  2. Identifying the required GOOSE control block.
  3. Selecting the required dataset member.
  4. Assigning the received value to an available internal signal.
  5. Connecting the signal to configurable logic or protection functions.
  6. Configuring and verifying communication supervision.
  7. Testing the received signal under normal and abnormal conditions.

The exact configuration procedure depends on the GE Multilin relay model and its engineering software.

4.1 Identify the publisher

The subscriber configuration must identify the correct publisher and GOOSE control block.

Relevant information includes:

  • Publisher IED name.
  • Logical device and logical node references.
  • GOOSE control block reference.
  • Dataset reference.
  • APPID.
  • Destination multicast MAC address.
  • VLAN parameters.
  • Configuration revision.

4.2 Map dataset members

Each dataset member must be mapped to the correct internal signal.

For example:

Publisher signalSubscriber internal signal
Feeder protection startEXT_OC_BLOCK
Breaker closed statusREMOTE_CB_CLOSED
Breaker failure statusREMOTE_50BF
Transformer tripREMOTE_TRIP

These are illustrative engineering labels, not guaranteed manufacturer signal names.

4.3 Connect received signals to application logic

Receiving a GOOSE message does not necessarily mean that a protection function will act on it.

The engineer must explicitly connect the received signal to the appropriate logic or function.

For example:

  • A remote blocking signal may be connected to an overcurrent blocking input.
  • A remote breaker position may be used in an interlocking equation.
  • A remote trip signal may be connected to a dedicated trip logic path.

The application must also define what happens when communication is invalid or lost.

5. Practical Application: GOOSE-Based Protection Interlocking

GOOSE can replace selected hardwired interlocking signals between bays, provided the design, reliability and applicable project requirements permit it.

Consider two adjacent feeder bays in a substation.

The operation of a disconnecting switch may depend on the position of a circuit breaker and an earthing switch.

A simplified interlocking condition could be:

DISCONNECTOR_OPEN_PERMISSION = BREAKER_OPEN AND EARTHING_SWITCH_OPEN AND NO_CONFLICTING_INTERLOCK

The actual interlocking equation must follow the approved switching philosophy and electrical design.

Engineering steps

  1. Identify the required interlocking conditions.
  2. Determine which IED publishes each status.
  3. Create the relevant GOOSE datasets.
  4. Configure subscriber mappings in the receiving IEDs.
  5. Implement the interlocking logic.
  6. Define communication-failure behavior.
  7. Test every permitted and prohibited switching condition.
  8. Verify that the physical outputs and mimic indications agree with the logic.

Critical safety consideration

GOOSE-based interlocking must not be treated as inherently fail-safe. The design must consider stale data, invalid quality, communication loss, configuration mismatch, incorrect signal mapping and network failures.

Where required by the project’s safety philosophy, independent hardwired interlocks or other independent protection measures should be retained.

6. Practical Application: GOOSE Blocking Between Feeder Relays

One common protection application is directional or non-directional overcurrent blocking between adjacent protection zones.

Consider a distribution system with two series-connected feeders.

The downstream relay detects a fault and sends a blocking signal to the upstream relay. The upstream relay delays or blocks its selected element according to the approved coordination scheme, allowing the downstream protection to clear the fault.

A simplified logic representation is:

UPSTREAM_TRIP = UPSTREAM_OC_PICKUP AND NOT DOWNSTREAM_BLOCK

This is only an illustrative expression. Actual coordination logic must include the intended protection stages, timers, fault directions, signal supervision and failure modes.

Example sequence

  1. A downstream feeder fault occurs.
  2. The downstream GE Multilin relay detects overcurrent.
  3. The relay publishes its blocking signal through GOOSE.
  4. The upstream relay receives the signal.
  5. The upstream relay blocks or delays the designated protection stage.
  6. The downstream circuit breaker trips.
  7. The blocking condition resets after the fault is cleared.

Important design considerations

  • The blocking signal must be associated with the correct protection stage.
  • The upstream relay must not block unrelated protection functions.
  • Communication loss must be considered in the protection coordination study.
  • The scheme must remain selective under the specified network failure conditions.
  • A backup protection path must remain available.

Engineers should verify whether the selected GE Multilin model supports the required logic inputs, GOOSE subscriptions and supervision functions.

7. Practical Application: GOOSE-Based Breaker Failure Initiation

Breaker failure protection (ANSI 50BF) may require information from multiple IEDs.

A breaker failure scheme can include:

  • Protection trip initiation.
  • Breaker current supervision.
  • Breaker position monitoring.
  • Retrip logic.
  • Adjacent breaker trip commands.
  • Busbar or upstream protection initiation.

In a multi-vendor architecture, selected initiation or status signals may be exchanged using GOOSE.

For example, a feeder relay may publish breaker failure initiation to a busbar protection IED.

The receiving IED processes the signal within its configured breaker failure or backup trip logic.

However, the engineering team must carefully evaluate:

  • End-to-end signal transfer time.
  • Total breaker failure operating time.
  • GOOSE supervision.
  • Redundant communication paths, if required.
  • Behavior during network interruption.
  • The availability of independent backup tripping.

A communication-based breaker failure scheme must be validated against the required protection clearing time and the system stability requirements.

8. SCL Engineering for Multi-Vendor GOOSE Integration

Substation Configuration Language (SCL) is central to structured IEC 61850 engineering.

The relevant file types include:

  • ICD: IED Capability Description.
  • IID: Instantiated IED Description.
  • CID: Configured IED Description.
  • SCD: Substation Configuration Description.

Not every engineering tool uses all file types in exactly the same workflow.

8.1 Obtain the IED capability descriptions

Obtain the appropriate ICD or other manufacturer-provided SCL description for each IED.

The files must correspond to the actual relay model, firmware and supported IEC 61850 implementation.

8.2 Import IED descriptions

Import the relevant IED descriptions into the system configuration environment.

Depending on the engineering tool, this may involve Siemens IEC 61850 System Configurator, GE Multilin configuration software or another supported system engineering application.

8.3 Configure publisher datasets and GOOSE control blocks

Select the required data objects and create the publisher datasets.

Then configure the GOOSE control blocks and communication parameters.

8.4 Configure subscribers

Assign the required publisher dataset members to the receiving IEDs.

Check that the data types, functional constraints and signal semantics are compatible.

8.5 Validate the SCL configuration

Before downloading the configuration, check:

  • IED names and references.
  • Logical device and logical node references.
  • Dataset membership.
  • GOOSE control block references.
  • APPID assignments.
  • Multicast MAC addresses.
  • VLAN parameters.
  • External references.
  • Configuration revisions.
  • Subscriber mappings.

8.6 Transfer configurations

Download the required configurations to the IEDs using the supported manufacturer tools and procedures.

After configuration transfer, verify that the running device configuration matches the approved engineering baseline.

A syntactically valid SCL file does not, by itself, prove that the protection application is correct or that all IEDs have accepted the intended configuration.

9. Ethernet Network Design for Multi-Vendor GOOSE

GOOSE messages are transmitted using Ethernet multicast communication.

The station bus must be designed to handle the expected traffic and required performance.

Important network considerations include:

9.1 Managed Ethernet switches

Use industrial managed switches suitable for substation environments and the project’s availability requirements.

Verify support for the required Ethernet features and the manufacturer’s environmental and reliability specifications.

9.2 VLAN configuration

VLANs can separate traffic into logical network segments.

A project may use separate VLANs for protection GOOSE, station-level communication, engineering access and other services.

The VLAN design must be consistent across publishers, subscribers and network switches.

9.3 Quality of Service

IEEE 802.1Q priority tagging may be used to prioritize time-critical GOOSE traffic.

The configured priority must be supported and correctly handled throughout the network path.

9.4 Multicast handling

GOOSE uses multicast Ethernet frames.

Network engineers should evaluate multicast forwarding, VLAN membership and switch filtering behavior.

Where applicable, configure multicast filtering carefully so that subscribers receive the required traffic without unnecessary flooding.

9.5 Network redundancy

Some substations use PRP or HSR architectures to improve communication availability.

The suitability of PRP or HSR depends on IED interfaces, switch architecture, network design and project requirements.

Do not assume that every GE Multilin relay or communication module supports both protocols.

9.6 Network loading

Calculate expected network loading from:

  • Number of GOOSE publishers.
  • Number of datasets.
  • Dataset size.
  • Event frequency.
  • Retransmission behavior.
  • Background MMS traffic.
  • Engineering and maintenance traffic.

A network that works during normal operation may still experience problems during simultaneous events, configuration changes or network recovery.

10. GOOSE Supervision and Communication Failure Handling

Protection engineers must define the response to invalid or lost GOOSE communication.

Possible conditions include:

  • Publisher failure.
  • Ethernet link failure.
  • Switch failure.
  • Incorrect VLAN configuration.
  • Multicast filtering errors.
  • Invalid configuration revision.
  • Subscriber configuration mismatch.
  • Excessive message delay.
  • Stale data.
  • Incorrect dataset mapping.

The receiving IED should use the supervision and quality information supported by its IEC 61850 implementation.

The application must distinguish between a valid received state and a communication condition that makes the state unreliable.

Example failure philosophy

For a blocking scheme, loss of the blocking signal may require the upstream protection to operate without the remote blocking condition. This can preserve backup protection but may reduce selectivity.

For an interlocking scheme, loss of a required status signal may need to inhibit the switching operation.

These are different application philosophies. The correct response must be established by the protection and control design, not selected automatically by the communication configuration.

11. Testing and Commissioning of Multi-Vendor GOOSE

GOOSE commissioning must include both communication testing and functional protection testing.

Testing only the Ethernet connection is insufficient.

11.1 Publisher testing

Verify that:

  • The publisher is transmitting the expected GOOSE message.
  • The destination MAC address is correct.
  • APPID and VLAN parameters are correct.
  • The expected dataset members are present.
  • State changes are transmitted.
  • Retransmission behavior is consistent with the configured parameters.

11.2 Subscriber testing

Verify that:

  • The subscriber receives the correct GOOSE message.
  • The correct dataset member is mapped.
  • Signal values change as expected.
  • Quality information is processed correctly.
  • Communication-loss supervision works.
  • Invalid or stale information is handled according to the design.

11.3 Functional testing

Test the complete protection or control function.

For example, in an overcurrent blocking scheme:

  1. Apply the required current to the downstream relay.
  2. Verify downstream pickup.
  3. Confirm publication of the blocking signal.
  4. Confirm reception at the upstream relay.
  5. Verify the intended blocking action.
  6. Verify downstream tripping.
  7. Remove the fault condition.
  8. Confirm signal reset and restoration of normal protection behavior.

11.4 Communication-loss testing

Simulate the relevant failure conditions, where permitted by the approved test procedure.

Examples include:

  • Disconnecting the publisher network link.
  • Disabling the relevant switch port.
  • Interrupting the communication path.
  • Blocking the relevant multicast traffic in a controlled test environment.

Verify the subscriber’s supervision indication and application response.

11.5 End-to-end testing

An end-to-end test should include:

  • Signal generation at the publisher.
  • GOOSE transmission.
  • Network delivery.
  • Subscriber reception.
  • Internal signal mapping.
  • Application logic.
  • Physical output, if applicable.
  • Final equipment response or simulated response.

The test should be performed without compromising an energized protection system.

12. Using IEDScout and Wireshark for GOOSE Diagnostics

Two useful engineering tools for IEC 61850 troubleshooting are IEDScout and Wireshark.

Their availability and compatibility depend on the software version, license and engineering environment.

IEDScout

IEDScout can assist engineers with IEC 61850 device discovery and data-model inspection.

Depending on the supported functions and connection method, it can help with:

  • Inspecting logical devices and logical nodes.
  • Browsing data objects and attributes.
  • Checking MMS communication.
  • Monitoring supported IEC 61850 data.
  • Investigating IED communication behavior.

Wireshark

Wireshark is useful for packet-level diagnostics.

Engineers can inspect:

  • GOOSE Ethernet frames.
  • Source and destination MAC addresses.
  • APPID.
  • VLAN ID and priority.
  • GOOSE control block references.
  • Dataset references.
  • State number (stNum).
  • Sequence number (sqNum).
  • Configuration revision (confRev).
  • Time allowed to live (timeAllowedToLive).
  • Dataset values and quality information.

The packet capture must be taken at a suitable network point. A switch mirror port or network TAP may be required.

A packet capture showing a GOOSE frame does not prove that the subscriber has accepted or correctly processed it. Always combine packet-level inspection with IED diagnostics and functional testing.

13. Common Multi-Vendor GOOSE Problems

ProblemPossible causeRecommended investigation
Subscriber does not receive GOOSEVLAN or multicast configuration errorCheck switch configuration and packet capture
GOOSE message is visible but signal does not changeIncorrect subscriber mappingVerify dataset member and internal mapping
Signal remains invalidQuality or configuration mismatchCheck publisher state and subscriber diagnostics
Communication works with one IED but not anotherData-model or implementation differencesCompare SCL files and supported services
Blocking signal operates incorrectlyWrong logic assignment or polarityReview application logic and test signal states
Interlocking remains inhibitedMissing or invalid status informationCheck quality, supervision and interlocking logic
GOOSE communication fails after configuration changeConfiguration revision mismatch or incomplete downloadCompare approved SCL and running IED configurations
Intermittent communicationNetwork congestion, link issues or multicast filteringInspect switch counters and packet captures
Protection operation is delayedExcessive application or network processing timeMeasure end-to-end response time

14. Practical Engineering Checklist

Before commissioning a multi-vendor GOOSE application, confirm the following.

Design and compatibility

  • The selected IEDs support the required GOOSE functions.
  • The correct model, firmware and hardware versions have been verified.
  • The intended protection or control application is documented.
  • The communication-failure philosophy is approved.
  • The required backup protection remains available.

SCL engineering

  • Correct IED capability files are available.
  • Dataset membership is correct.
  • GOOSE control blocks are configured.
  • Publisher and subscriber references match.
  • APPID and multicast MAC addresses are coordinated.
  • VLAN and priority settings are consistent.
  • Configuration revisions are checked.
  • The final SCL configuration is archived.

Network engineering

  • Ethernet switches are configured correctly.
  • Multicast forwarding is verified.
  • VLAN membership is correct.
  • Network loading is assessed.
  • Redundancy is tested where applicable.
  • Network monitoring and diagnostics are available.

Testing and commissioning

  • Publisher operation is verified.
  • Subscriber reception is verified.
  • Signal mapping is tested.
  • Quality and supervision are checked.
  • Communication failure is tested.
  • Protection logic is tested.
  • End-to-end response time is measured.
  • Test results are documented and approved.

15. Training on GE Multilin IEC 61850 GOOSE Integration by Elec-Engg

Understanding GOOSE at protocol level is only one part of practical IEC 61850 engineering. Protection engineers must also be able to configure real IEDs, develop signal mappings, troubleshoot communication problems and validate protection applications.

Elec-Engg provides practical technical training by Dr Saeed Roostaee (Electrical Engineering).

Relevant training subjects include:

  • GE Multilin protection relay engineering.
  • IEC 61850 fundamentals and practical applications.
  • GOOSE publisher and subscriber configuration.
  • Multi-vendor IED integration.
  • SCL engineering using ICD, IID, CID and SCD files.
  • GOOSE-based protection interlocking and blocking.
  • Siemens SIPROTEC 5 and DIGSI 5 engineering.
  • IEC 61850 integration with SICAM PAS.
  • IEDScout and Wireshark for communication diagnostics.
  • Protection testing and commissioning.

Training is available through:

  • Pre-recorded technical video courses.
  • Structured self-paced training.
  • Live online training.
  • Face-to-face training.
  • Customized in-house training for utilities, EPC contractors and industrial companies.

Explore the technical courses and training resources at https://elec-engg.com/ or contact us through https://elec-engg.com/contact/ for customized training arrangements.

Conclusion

GOOSE communication provides an effective way to exchange protection and control signals between GE Multilin relays and other IEC 61850-compatible IEDs.

Its successful implementation requires coordinated engineering across the protection application, IEC 61850 data model, SCL configuration, Ethernet network and commissioning process.

The most important principle is that successful message transmission does not automatically guarantee correct protection operation. Every GOOSE signal must be mapped, supervised and tested within its complete application context.

For multi-vendor substations, a structured engineering process and comprehensive end-to-end testing are essential to achieve reliable, selective and maintainable protection and control systems.

Frequently Asked Questions

1. Can GE Multilin relays communicate with Siemens SIPROTEC 5 using GOOSE?

Yes, where the specific GE Multilin and SIPROTEC 5 models support compatible IEC 61850 GOOSE services and data structures. The exact capabilities must be verified against the relevant model, firmware and configuration tools.

2. Can GOOSE replace hardwired interlocking signals?

GOOSE can replace selected hardwired signals when the application design, project requirements and reliability assessment permit it. Critical safety requirements and independent interlocking provisions must be considered.

3. Does GOOSE use MMS communication?

No. GOOSE is a separate IEC 61850 communication service using multicast Ethernet messaging. MMS is generally used for client-server communication such as data access and reporting.

4. Can multiple IEDs subscribe to one GOOSE publisher?

Yes. A publisher can transmit multicast GOOSE messages that are received by multiple configured subscribers, provided the network and device configurations support the arrangement.

5. What is the purpose of APPID in GOOSE?

APPID identifies the GOOSE application communication stream within the Ethernet message. It is one of the parameters used to identify and configure GOOSE communication.

6. What is the difference between stNum and sqNum?

stNum identifies a change in the published dataset state, while sqNum identifies successive transmissions associated with that state. These fields help subscribers monitor message changes and retransmission behavior.

7. What happens if the GOOSE communication is lost?

The subscriber can detect communication loss using the applicable supervision mechanisms, including timeAllowedToLive. The resulting application response depends on the configured logic and approved protection philosophy.

8. Can GOOSE be tested using Wireshark?

Wireshark can inspect GOOSE packets and their communication parameters. However, packet inspection alone does not prove that the receiving relay has correctly mapped and processed the signal. Functional testing is also necessary.

9. Is a complete SCD file required for every GOOSE application?

The required SCL workflow depends on the engineering environment and project methodology. An SCD file is commonly used for system-level configuration, but individual tools may use different supported import and export workflows.

10. Does every GE Multilin relay support GOOSE?

No. IEC 61850 support and specific GOOSE capabilities vary by product family, model, order code, firmware and communication hardware. Always consult the applicable manufacturer documentation before designing the application.


  • GE Multilin GOOSE configuration
  • IEC 61850 GOOSE publisher and subscriber
  • Multi-vendor GOOSE integration
  • Siemens SIPROTEC 5 GOOSE communication
  • GOOSE protection interlocking
  • GOOSE blocking scheme
  • IEC 61850 SCL engineering
  • GOOSE testing and troubleshooting
  • GE Multilin protection relay communication
  • GE Multilin, IEC 61850, GOOSE, GOOSE Publisher, GOOSE Subscriber, Multi-Vendor IED Integration, Protection Interlocking, Protection Blocking, Siemens SIPROTEC 5, ABB Relion, SCL Engineering, IEDScout, Wireshark, Substation Automation, Protection and Control, Relay Testing, Elec-Engg
  1. IEC 61850 GOOSE publisher-subscriber architecture in a multi-vendor substation.
  2. GE Multilin and Siemens SIPROTEC 5 IEDs connected through an Ethernet station bus.
  3. GOOSE protection interlocking and blocking logic diagram.
  4. IEC 61850 SCL engineering workflow showing ICD, IID, CID and SCD files.
  5. Wireshark GOOSE packet analysis showing APPID, stNum and sqNum.
  6. Multi-vendor substation protection and control network architecture.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top