- 1. Introduction
- 2. Understanding the Integration Architecture
- 3. Role of GE Multilin Relays
- 4. Role of Siemens SICAM PAS
- 5. Communication Requirements Before Integration
- 6. Preparing the GE Multilin Relay
- 7. Configuring SICAM PAS for GE Multilin Integration
- 8. Understanding Logical Devices and Logical Nodes
- 9. Configuring MMS Communication
- 10. Mapping GE Multilin Signals into SICAM PAS
- 11. Handling Quality and Timestamps
- 12. Integrating GOOSE Communication with SICAM PAS
- 13. Integrating GE Multilin with SICAM PAS and SCADA
- 14. Practical Example: Integrating a GE Multilin Feeder Relay
- 15. Testing and Commissioning
- 16. Troubleshooting GE Multilin–SICAM PAS Integration
- 17. Engineering Best Practices
- 18. Integration Documentation
- 19. Frequently Asked Questions
- Can GE Multilin relays communicate with Siemens SICAM PAS?
- Does SICAM PAS need the GE Multilin ICD file?
- Is MMS sufficient for all substation communication?
- Can SICAM PAS receive GOOSE messages directly?
- Why are measurements different in SICAM PAS and the relay?
- Can SICAM PAS control a GE Multilin relay through IEC 61850?
- Which tool can help troubleshoot MMS communication?
- 20. Training on GE Multilin and Siemens SICAM PAS Integration by Elec-Engg
- 21. Conclusion
1. Introduction
Modern substations often contain protection and control equipment from multiple manufacturers. A substation may use GE Multilin protection relays for feeder, transformer, motor or generator protection while Siemens SICAM PAS provides station-level automation, communication management and SCADA integration.
IEC 61850 provides a standardized communication framework that can facilitate integration between compatible GE Multilin IEDs and Siemens SICAM PAS.
However, successful integration requires more than connecting an Ethernet cable and entering an IP address. Engineers must understand the IEC 61850 data model, logical devices, logical nodes, MMS communication, datasets, report control blocks, data mapping, quality attributes and communication diagnostics.
This article explains a practical engineering workflow for integrating GE Multilin protection relays with Siemens SICAM PAS using IEC 61850 MMS.
The exact functions and configuration procedures depend on the GE Multilin relay model, firmware, SICAM PAS version, installed communication components and supported IEC 61850 services. Always verify compatibility before beginning a project.
2. Understanding the Integration Architecture
In a typical architecture, GE Multilin relays operate as IEC 61850 servers, while SICAM PAS acts as an IEC 61850 client.
The relay provides information such as:
- Protection operation indications.
- Circuit breaker status.
- Phase current measurements.
- Voltage measurements.
- Active and reactive power.
- Frequency.
- Device health and alarms.
- Event information.
SICAM PAS acquires the available information and makes it available to other station-level systems through the configured communication architecture.
A simplified architecture is:
GE Multilin Line Relay
IEC 61850 Server
|
|
Ethernet Station Bus
|
---------------------
| |
GE Multilin Siemens
Transformer Relay SICAM PAS
IEC 61850 Server IEC 61850 Client
|
|
Station-Level Systems
|
HMI / SCADA / Gateway
This is a conceptual architecture. The actual network may include redundant switches, separate station and process buses, firewalls, gateways and additional communication interfaces.
3. Role of GE Multilin Relays
GE Multilin relays provide protection and monitoring functions according to their product capabilities.
Examples of applications include:
| Relay application | Typical information for SICAM PAS |
|---|---|
| Feeder protection | Current, voltage, trip and breaker status |
| Transformer protection | Differential operation, REF, alarms and measurements |
| Motor protection | Thermal state, overload, start and trip information |
| Generator protection | Protection operation, electrical measurements and alarms |
| Line protection | Distance protection, line differential and trip indications |
The actual data model varies between relay families.
Before engineering begins, identify:
- Exact relay model.
- Complete order code.
- Firmware version.
- IEC 61850 implementation.
- Available logical devices.
- Supported logical nodes.
- Supported MMS services.
- Communication interface capabilities.
Do not assume that every relay in a product family exposes the same logical nodes or data objects.
4. Role of Siemens SICAM PAS
Siemens SICAM PAS is a substation automation system used for communication, data acquisition and integration with station-level systems.
Depending on the installed version and licensed components, it can support communication with compatible IEDs through protocols such as:
- IEC 61850.
- IEC 60870-5-101.
- IEC 60870-5-104.
- Modbus.
- Other supported communication interfaces.
For a GE Multilin IEC 61850 integration project, SICAM PAS is configured to communicate with the relay and acquire the required data.
Typical engineering activities include:
- Creating or opening the SICAM PAS project.
- Defining the IEC 61850 communication connection.
- Importing or using the applicable IED description.
- Establishing communication with the relay.
- Selecting the required data objects.
- Mapping the acquired data.
- Configuring reporting and update behaviour.
- Testing communication and data quality.
- Making the data available to the station-level system.
The exact menus and engineering sequence depend on the SICAM PAS version and installed communication components.
5. Communication Requirements Before Integration
Before configuring SICAM PAS, prepare a communication information sheet.
| Parameter | Example |
|---|---|
| IED name | GE_FEEDER_01 |
| Relay model | GE Multilin feeder relay |
| IP address | 192.168.10.11 |
| Subnet mask | 255.255.255.0 |
| IEC 61850 role | Server |
| Client | SICAM PAS |
| MMS TCP port | 102 |
| SCL file | Approved IED description |
| Firmware | Confirmed installed version |
The IP address is illustrative. Use the approved substation network schedule.
Also verify:
- Ethernet link status.
- Correct switch port assignment.
- VLAN configuration.
- IP address uniqueness.
- Network routing, where applicable.
- Firewall rules.
- SICAM PAS communication licensing and configuration.
- Compatibility of the selected IED description.
6. Preparing the GE Multilin Relay
The first stage is to prepare the relay for IEC 61850 communication.
6.1 Verify the Communication Interface
Check that the relay has the required Ethernet interface and that it supports the intended IEC 61850 services.
Confirm:
- Ethernet interface availability.
- IP configuration.
- IEC 61850 communication enablement.
- Supported MMS services.
- Available logical devices.
- Data model availability.
- Firmware compatibility.
6.2 Verify the Relay Data Model
The relay data model defines the information that SICAM PAS can access.
Typical categories include:
Protection information
- Overcurrent operation.
- Differential protection operation.
- Distance protection indications.
- Breaker failure initiation.
- Protection alarms.
Equipment information
- Circuit breaker position.
- Isolator status, where available.
- Relay health.
- Device alarms.
Measurements
- Phase currents.
- Phase voltages.
- Frequency.
- Active power.
- Reactive power.
- Power factor.
The actual object references must be obtained from the relay’s supported IEC 61850 data model.
6.3 Obtain the Correct ICD File
An ICD file describes the IED capabilities and can be used by compatible system configuration tools.
Verify that the ICD file matches:
- The relay model.
- The relevant firmware.
- The supported IEC 61850 implementation.
- The expected communication services.
An incorrect ICD file can create problems during engineering and data mapping.
7. Configuring SICAM PAS for GE Multilin Integration
The SICAM PAS configuration workflow should be based on the actual installed software version.
A general engineering procedure is described below.
Step 1 – Open the SICAM PAS Project
Open the relevant project in the supported SICAM PAS engineering environment.
Before modifying an existing project:
- Create a backup.
- Identify the current project revision.
- Record the installed SICAM PAS version.
- Confirm that the project is available for editing.
Step 2 – Add the GE Multilin IED
Create or import the required IEC 61850 device definition.
Assign a unique IED name.
For example:
- GE_LINE_01
- GE_TRANSFORMER_01
- GE_FEEDER_01
The IED name should match the approved SCL configuration.
Step 3 – Configure the Communication Connection
Enter the applicable connection parameters:
- IED IP address.
- Server access point.
- Communication interface.
- MMS connection parameters.
- Other settings required by the installed software.
Verify that the SICAM PAS communication interface can reach the relay.
Step 4 – Import or Reference the IED Description
Where supported by the engineering environment, use the correct ICD or other compatible SCL description.
Check:
- Logical devices.
- Logical nodes.
- Data objects.
- Data attributes.
- Datasets.
- Report control blocks.
Do not assume that importing an ICD file automatically creates every required SICAM PAS signal.
Step 5 – Establish Communication
Use the available diagnostic or online communication functions to establish an MMS association.
Check that:
- The relay is reachable.
- The MMS association is established.
- The expected logical devices are visible.
- The required data objects can be accessed.
- No compatibility errors are reported.
8. Understanding Logical Devices and Logical Nodes
IEC 61850 organizes IED information using logical devices and logical nodes.
A logical device groups related functions within an IED.
Logical nodes represent defined functional areas or information categories.
Examples of commonly used logical node classes include:
| Logical node | Typical purpose |
|---|---|
| MMXU | Measurement information |
| XCBR | Circuit breaker information |
| XSWI | Switch information |
| PTOC | Time overcurrent protection |
| PIOC | Instantaneous overcurrent protection |
| PDIF | Differential protection |
| PDIS | Distance protection |
| GGIO | General-purpose input/output information |
| LPHD | Physical device information |
| LLN0 | Logical device common information |
The availability of these logical nodes depends on the relay’s implementation.
The logical node name alone does not establish the exact data object reference or functionality. Engineers must inspect the actual data model.
8.1 Example Data Reference
An illustrative IEC 61850 data reference may have a structure similar to:
GE_FEEDER_01
/PROT
/PTOC1
/Op
/general
The exact logical device name, logical node instance and data attributes depend on the actual IED configuration.
Use the relay’s data model or approved SCL files rather than manually assuming references.
9. Configuring MMS Communication
MMS is the principal communication service commonly used for IEC 61850 client-server integration.
SICAM PAS may use MMS to acquire measurements, indications and other available data from GE Multilin relays.
9.1 MMS Association
The SICAM PAS client establishes an association with the relay’s IEC 61850 server.
The connection should be verified before attempting extensive data mapping.
Check:
- Correct IP address.
- Correct IED access point.
- Network reachability.
- MMS service availability.
- Server compatibility.
- Any applicable access-control requirements.
9.2 Data Model Browsing
Once communication is established, inspect the relay data model.
Locate the required logical devices and nodes.
For example, a feeder protection project may require:
- Phase current measurements.
- Phase voltage measurements.
- Breaker position.
- Overcurrent operation.
- Relay health.
- Trip indication.
The selected data objects should be compared with the project’s signal list.
9.3 Dataset and Report Control Block Configuration
MMS datasets group data attributes for reporting.
Report control blocks define how the server sends data to a client.
Depending on the relay implementation, available reporting functions may include:
- Data-change reporting.
- Quality-change reporting.
- Data-update reporting.
- Integrity reporting.
- General interrogation.
- Buffered reporting.
- Unbuffered reporting.
The exact supported options must be confirmed for the specific relay.
10. Mapping GE Multilin Signals into SICAM PAS
Data mapping is one of the most important engineering activities.
The objective is to associate IEC 61850 data references from the GE relay with the appropriate signals inside SICAM PAS.
10.1 Binary Indications
Examples include:
- Circuit breaker open.
- Circuit breaker closed.
- Protection trip.
- Overcurrent pickup.
- Differential protection operation.
- Relay alarm.
- Device failure.
Each signal should have:
- A unique internal point name.
- A description.
- Correct signal type.
- Correct normal state.
- Appropriate quality handling.
- Correct alarm classification.
10.2 Analog Measurements
Examples include:
- Phase current.
- Phase voltage.
- Active power.
- Reactive power.
- Frequency.
- Power factor.
For each measurement, verify:
- Data reference.
- Engineering unit.
- Scaling.
- Range.
- Sign convention.
- Quality.
- Update behaviour.
10.3 Example Signal Mapping Table
| SICAM PAS point | GE Multilin information | Type |
|---|---|---|
| FEEDER_CB_OPEN | Breaker open indication | Binary |
| FEEDER_CB_CLOSED | Breaker closed indication | Binary |
| FEEDER_OC_TRIP | Overcurrent trip indication | Binary |
| FEEDER_IA | Phase A current | Analog |
| FEEDER_IB | Phase B current | Analog |
| FEEDER_IC | Phase C current | Analog |
| FEEDER_FREQUENCY | Frequency measurement | Analog |
| FEEDER_RELAY_ALARM | Relay alarm indication | Binary |
This table is illustrative. Actual IEC 61850 references and data types must be confirmed from the relay data model.
11. Handling Quality and Timestamps
A reliable SCADA integration must preserve the meaning of data quality and time information.
11.1 Quality Attributes
IEC 61850 quality information can indicate whether a value is:
- Valid.
- Invalid.
- Questionable.
- Test.
- Operator blocked.
- Substituted.
SICAM PAS and the connected station-level system should handle these states according to the project’s operational requirements.
A numerical measurement should not automatically be considered valid merely because it is received.
11.2 Timestamps
Timestamps are important for event analysis and sequence-of-events recording.
Verify:
- Relay time source.
- SICAM PAS time synchronization.
- Time zone handling.
- Clock synchronization status.
- Timestamp propagation.
- Event ordering.
Possible time synchronization methods depend on the devices and architecture and may include SNTP, NTP, IRIG-B or IEEE 1588 PTP.
Do not assume that every GE Multilin relay supports every method.
12. Integrating GOOSE Communication with SICAM PAS
Although MMS is commonly used for SCADA data acquisition, GOOSE may be used for fast communication between IEDs.
A typical architecture can include:
- GE Multilin relay publishing GOOSE.
- Another IED subscribing to the GOOSE message.
- SICAM PAS independently acquiring relevant status information through MMS.
Some system architectures may also provide additional GOOSE-related engineering or monitoring capabilities, depending on the SICAM PAS version and installed components.
12.1 Example: Feeder Blocking
Consider a feeder relay that sends a blocking signal to an upstream relay.
The engineering tasks include:
- Define the publisher signal.
- Configure the publisher dataset.
- Configure the GOOSE control block.
- Define the subscriber reference.
- Map the signal into the receiving relay.
- Validate the SCL configuration.
- Test the communication path.
- Verify the protection logic.
SICAM PAS may monitor associated protection indications through MMS, but its role in the actual GOOSE protection scheme must be explicitly defined by the system design.
Do not assume that SICAM PAS must be part of every GOOSE protection signal path.
13. Integrating GE Multilin with SICAM PAS and SCADA
After acquiring the relay data, SICAM PAS can make the information available to station-level systems through configured communication interfaces.
Depending on the project, these may include IEC 60870-5-104, IEC 61850 or other supported protocols.
13.1 Typical Data Flow
GE Multilin Protection Relay
|
| IEC 61850 MMS
|
SICAM PAS
|
| Configured Station Protocol
|
SCADA / HMI
The exact architecture depends on the station design.
13.2 SCADA Point Engineering
When data is transferred to another system, verify:
- Point name.
- Description.
- Data type.
- Engineering unit.
- Scaling.
- Alarm class.
- Event priority.
- Quality handling.
- Timestamp handling.
- Control permissions.
Avoid using ambiguous signal descriptions such as “Trip 1” or “Alarm 2” without documenting their actual meaning.
14. Practical Example: Integrating a GE Multilin Feeder Relay
Consider a medium-voltage feeder bay with a GE Multilin protection relay.
Required information:
Binary signals
- Circuit breaker open.
- Circuit breaker closed.
- Overcurrent protection pickup.
- Overcurrent protection trip.
- Earth-fault protection trip.
- Relay alarm.
Analog signals
- Phase A current.
- Phase B current.
- Phase C current.
- Residual current, where available.
- Frequency.
Engineering workflow
Stage 1 – Relay preparation
Verify the relay model, firmware, Ethernet interface and IEC 61850 capabilities.
Stage 2 – Data model review
Identify the actual logical devices, logical nodes and data attributes.
Stage 3 – SICAM PAS engineering
Add the IED and establish the MMS communication connection.
Stage 4 – Signal mapping
Map the required binary and analog information into SICAM PAS.
Stage 5 – Reporting
Configure and verify the required datasets and report control blocks where supported and required.
Stage 6 – Station integration
Transfer the acquired information to the configured station-level HMI or SCADA system.
Stage 7 – Functional testing
Apply approved test signals and verify the complete data path.
15. Testing and Commissioning
Successful communication should be verified using a structured test procedure.
| Test | Procedure | Expected result |
|---|---|---|
| Network connectivity | Check Ethernet and IP configuration | Correct network connection |
| MMS association | Connect SICAM PAS to the relay | Association established |
| Data model | Browse the IED | Required data available |
| Binary indication | Apply approved test input | Correct status received |
| Analog measurement | Compare with relay display | Correct value and scaling |
| Quality | Inspect quality information | Correct validity indication |
| Reporting | Change a test signal | Expected update received |
| Timestamp | Compare event times | Meets project requirement |
| SCADA mapping | Verify transferred point | Correct SCADA indication |
| Communication failure | Interrupt an approved test path | Expected alarm and recovery |
| Final configuration | Compare with approved project | Correct revision installed |
15.1 Testing Binary Signals
For a protection indication:
- Identify the source data reference.
- Confirm the SICAM PAS point mapping.
- Apply an approved test condition.
- Observe the relay indication.
- Verify the received MMS data.
- Verify the SICAM PAS internal point.
- Confirm the final SCADA indication.
- Restore the original condition.
15.2 Testing Analog Measurements
Compare values displayed in:
- The GE Multilin relay.
- The IEC 61850 diagnostic client.
- SICAM PAS.
- The station HMI or SCADA.
Investigate any discrepancy in scaling, units, update rate or data reference.
15.3 Testing Communication Failure
Under an approved test procedure:
- Establish normal communication.
- Record the normal data status.
- Interrupt the designated communication path.
- Observe SICAM PAS communication diagnostics.
- Check the behaviour of affected points.
- Restore communication.
- Confirm recovery and data validity.
Do not assume that every communication failure produces the same indication or quality state.
16. Troubleshooting GE Multilin–SICAM PAS Integration
Problem 1 – SICAM PAS Cannot Connect to the GE Relay
Possible causes:
- Incorrect IP address.
- Incorrect subnet configuration.
- Ethernet link problem.
- Firewall restriction.
- MMS service unavailable.
- Incorrect IED access point.
- Incompatible firmware or engineering configuration.
Recommended actions:
- Check the relay’s Ethernet link.
- Verify its IP address.
- Test network reachability.
- Check TCP port 102 where applicable.
- Verify the IEC 61850 server configuration.
- Review SICAM PAS communication diagnostics.
- Confirm the compatibility of the relay and system configuration.
Problem 2 – MMS Communication Works but Signals Are Missing
Possible causes:
- Incorrect logical device reference.
- Wrong logical node.
- Incorrect data attribute.
- Missing dataset member.
- Incorrect point mapping.
- Unsupported data object.
Recommended actions:
- Browse the actual relay data model.
- Compare the reference with the approved SCL file.
- Verify the dataset.
- Check the SICAM PAS point configuration.
- Confirm that the data is available from the relay.
Problem 3 – Binary Indication Is Reversed
For example, the breaker is physically closed but the SCADA indication shows open.
Possible causes:
- Incorrect normal-state definition.
- Incorrect signal inversion.
- Wrong data attribute.
- Incorrect mapping.
- Different interpretation of the source signal.
Recommended actions:
- Check the actual relay data value.
- Verify the data object semantics.
- Review SICAM PAS mapping.
- Check any inversion or state conversion.
- Perform open and closed tests.
- Confirm the final HMI representation.
Never correct a reversed indication without first identifying the source of the mismatch.
Problem 4 – Analog Measurements Have Incorrect Scaling
Possible causes:
- Incorrect CT or VT ratio.
- Incorrect primary/secondary conversion.
- Incorrect engineering units.
- Wrong scaling configuration.
- Incorrect interpretation of IEC 61850 attributes.
Recommended actions:
- Verify relay CT and VT settings.
- Compare local relay measurements.
- Inspect the IEC 61850 value and associated attributes.
- Review SICAM PAS scaling.
- Confirm the station-level engineering units.
Problem 5 – Events Are Not Reported Correctly
Possible causes:
- Incorrect report control block.
- Dataset mismatch.
- Client association problem.
- Incorrect trigger options.
- Time synchronization problem.
- Client-side event processing issue.
Recommended actions:
- Inspect the report configuration.
- Verify the dataset.
- Check the client association.
- Generate a controlled event.
- Compare timestamps at each stage.
- Review SICAM PAS diagnostics.
Problem 6 – Communication Is Intermittent
Possible causes:
- Unstable Ethernet connection.
- Switch port errors.
- Network congestion.
- Incorrect VLAN.
- Network redundancy problem.
- Relay restart.
- Incompatible communication configuration.
Recommended actions:
- Inspect switch logs.
- Review interface counters.
- Capture network traffic.
- Check relay diagnostics.
- Verify redundancy configuration.
- Record the frequency and timing of interruptions.
17. Engineering Best Practices
For reliable integration, follow these recommendations:
- Verify the exact GE Multilin relay model and firmware.
- Use manufacturer-supported IED descriptions.
- Maintain a controlled SCD project where system-level SCL engineering is used.
- Maintain consistent IED names.
- Document IP addresses and network interfaces.
- Use the actual relay data model when mapping signals.
- Avoid assumptions about logical node availability.
- Configure only required datasets and reports.
- Preserve quality and timestamp information.
- Verify analog scaling and engineering units.
- Separate MMS monitoring from GOOSE protection logic.
- Test the complete path from relay to SICAM PAS and onward to SCADA.
- Document all communication failures and recovery behaviour.
- Maintain configuration backups.
- Record the final project and firmware revisions.
18. Integration Documentation
A professional integration package should contain:
- GE Multilin relay list.
- Relay model and firmware register.
- IP address schedule.
- IEC 61850 data model references.
- ICD and other applicable SCL files.
- Approved SCD file, where applicable.
- MMS dataset list.
- Report control block schedule.
- SICAM PAS signal mapping.
- SCADA point list.
- Communication architecture.
- Network configuration.
- Commissioning test reports.
- Final configuration backups.
This documentation is essential for maintenance, troubleshooting and future substation expansion.
19. Frequently Asked Questions
Can GE Multilin relays communicate with Siemens SICAM PAS?
Compatible GE Multilin relays can be integrated with SICAM PAS using IEC 61850 MMS when the required services and data models are supported by both systems.
Does SICAM PAS need the GE Multilin ICD file?
An appropriate IED description is useful for system engineering. The exact import and configuration requirements depend on the SICAM PAS version and engineering workflow.
Is MMS sufficient for all substation communication?
No. MMS is commonly used for client-server monitoring and reporting. GOOSE may be used for fast IED-to-IED communication, while other services may be required in different architectures.
Can SICAM PAS receive GOOSE messages directly?
This depends on the installed SICAM PAS version, licensed components and supported communication interfaces. Verify the applicable product documentation before designing the architecture.
Why are measurements different in SICAM PAS and the relay?
Common causes include scaling, engineering units, CT/VT ratios, data-reference selection and signal conversion.
Can SICAM PAS control a GE Multilin relay through IEC 61850?
Control may be possible where the relay and SICAM PAS support the required IEC 61850 control services and the system is configured and authorized accordingly. Verify the control model and operational interlocking requirements.
Which tool can help troubleshoot MMS communication?
IEDScout and other compatible IEC 61850 clients can help inspect the data model and MMS services. Wireshark can help analyze network traffic.
20. Training on GE Multilin and Siemens SICAM PAS Integration by Elec-Engg
Integrating protection relays from different manufacturers requires practical understanding of IEC 61850, relay data models, SCADA engineering and communication troubleshooting.
Elec-Engg provides practical technical training by Dr Saeed Roostaee (Electrical Engineering).
Relevant training subjects include:
- GE Multilin protection relay engineering.
- IEC 61850 communication fundamentals.
- MMS client-server communication.
- Logical devices and logical nodes.
- SCL engineering and IED description files.
- MMS datasets and report control blocks.
- GE Multilin integration with Siemens SICAM PAS.
- IEC 60870-5-104 communication.
- Modbus integration.
- GOOSE communication and protection interlocking.
- IEDScout and Wireshark diagnostics.
- Testing and commissioning of substation automation systems.
Training delivery options include:
- Pre-recorded video courses.
- Structured self-paced training.
- Live online training.
- Face-to-face training.
- Customized in-house training for utilities, EPC contractors and industrial organizations.
Explore the technical courses and training programs:
Website: https://elec-engg.com/
Contact: https://elec-engg.com/contact/
21. Conclusion
Integrating GE Multilin protection relays with Siemens SICAM PAS through IEC 61850 can provide a standardized approach to collecting protection indications, measurements, equipment status and event information.
Successful integration depends on correct IED identification, compatible data models, MMS configuration, dataset and report engineering, signal mapping, quality handling and end-to-end commissioning.
The most important engineering principle is to verify the complete information path: from the GE Multilin relay’s internal data model, through IEC 61850 communication, into SICAM PAS and finally to the station-level HMI or SCADA system.
A structured engineering and testing process helps ensure reliable operation and simplifies future maintenance.
GE Multilin, Siemens SICAM PAS, IEC 61850, MMS Communication, SCADA Integration, Substation Automation, IED Configuration, SCL Engineering, Data Mapping, Protection Relays, IEDScout, Wireshark, IEC 60870-5-104, Digital Substation, Relay Testing and Commissioning
