- 1. Introduction
- 2. GE Multilin 850 Relay Overview
- 3. Feeder Protection Philosophy
- 4. GE Multilin 850 Architecture
- 5. CT Configuration and Engineering
- 6. VT Configuration
- 7. Phase Overcurrent Protection – ANSI 50/51
- 8. Practical Overcurrent Setting Example
- 9. Earth-Fault Protection – ANSI 50N/51N and 50G/51G
- 10. Directional Overcurrent Protection – ANSI 67 and 67N
- 11. Voltage Protection – ANSI 27 and 59
- 12. Frequency Protection – ANSI 81
- 13. Breaker Failure Protection – ANSI 50BF
- 14. Autoreclosing – ANSI 79
- 15. Feeder Protection Coordination
- 16. Programmable Logic and Trip Matrix
- 17. GE Multilin 850 Configuration Workflow
- 18. IEC 61850 and Substation Automation
- 19. Testing and Commissioning of the GE Multilin 850
- 19.1 Initial Inspection
- 19.2 Current Measurement Test
- 19.3 Voltage Measurement Test
- 19.4 Overcurrent Protection Testing
- 19.5 Earth-Fault Protection Testing
- 19.6 Directional Protection Testing
- 19.7 Breaker Failure Testing
- 19.8 Autoreclosing Testing
- 19.9 Binary I/O Testing
- 19.10 Communication Testing
- 19.11 Complete Trip Circuit Test
- 20. Common GE Multilin 850 Troubleshooting Problems
- 21. GE Multilin 850 Commissioning Checklist
- 22. GE Multilin 850 Compared with Other Feeder Protection Relays
- 23. Training on GE Multilin Feeder Protection Relays by Elec-Engg
- 24. Conclusion
- 25. Frequently Asked Questions
- 1. What is the GE Multilin 850 used for?
- 2. What is the difference between GE Multilin 350 and 850?
- 3. What is ANSI 50/51 protection?
- 4. When is ANSI 67 directional protection required?
- 5. What is the purpose of earth-fault protection?
- 6. Does the GE Multilin 850 support IEC 61850?
- 7. What is GOOSE used for?
- 8. How is the GE Multilin 850 tested?
- 9. What software is used to configure the GE Multilin 850?
- 10. Where can engineers receive GE Multilin feeder protection training?
1. Introduction
The GE Multilin 850 Feeder Protection Relay is a numerical protection platform designed for feeder protection and control applications in utility and industrial electrical distribution systems.
Feeder circuits connect substations, transformers, distribution networks and industrial loads. Their protection systems must detect short circuits and earth faults, isolate the affected circuit and coordinate with other protection devices to maintain continuity of supply.
Modern feeder protection also requires accurate measurement, event recording, programmable logic, communication and integration with substation automation systems.
The GE Multilin 850 is intended for applications requiring a combination of feeder protection, monitoring and control capabilities. The exact available functions depend on the installed hardware, firmware and product configuration.
This article explains the practical engineering considerations for applying the GE Multilin 850, including:
- Relay architecture and application
- CT and VT configuration
- Phase overcurrent protection (ANSI 50/51)
- Earth-fault protection
- Directional overcurrent protection (ANSI 67/67N)
- Voltage and frequency protection
- Breaker failure protection
- Autoreclosing
- Protection coordination
- Programmable logic
- IEC 61850 and SCADA integration
- Configuration and settings management
- Secondary injection testing
- Commissioning and troubleshooting
2. GE Multilin 850 Relay Overview
The GE Multilin 850 belongs to the feeder protection relay family.
It is designed for feeder applications where protection, measurement, monitoring and control are required in a numerical IED.
Typical applications include:
- Medium-voltage distribution feeders
- Industrial power distribution
- Utility substations
- Transformer outgoing feeders
- Industrial plant incomers
- Radial distribution systems
- Ring distribution networks, where the required directional scheme is supported
- Critical industrial feeder circuits
The relay receives electrical measurements from CTs and, where required, VTs. It processes these signals and evaluates the configured protection functions.
When a protection element operates, the relay can initiate an alarm or trip through the configured logic and output circuits.
A complete feeder protection installation may include:
- Current transformers.
- Voltage transformers.
- Numerical protection relay.
- Circuit breaker.
- Breaker auxiliary contacts.
- Trip and close circuits.
- DC auxiliary supply.
- Communication network.
- SCADA or substation automation system.
The protection relay must be engineered as part of this complete system.
3. Feeder Protection Philosophy
The primary objective of feeder protection is to detect faults and isolate the affected feeder without unnecessarily disconnecting healthy parts of the electrical network.
The protection design must account for:
- Maximum normal load current
- Emergency loading
- Minimum and maximum short-circuit current
- Phase-to-phase faults
- Three-phase faults
- Single-phase earth faults
- Double-phase earth faults
- Transformer inrush
- Motor starting
- Neutral-earthing arrangement
- Cable and overhead-line thermal limits
- Upstream and downstream protection
- Circuit-breaker clearing time
A radial feeder often uses non-directional overcurrent protection. However, ring networks, parallel feeders and multiple-source systems may require directional protection to achieve selectivity.
The final protection philosophy should be based on a short-circuit study, load-flow information and a protection coordination study.
4. GE Multilin 850 Architecture
A numerical feeder relay combines measurement, protection processing, logic, inputs, outputs and communication.
4.1 Current Measurement
Current transformers provide scaled current signals to the relay.
The relay uses these signals to calculate:
- Phase currents
- Residual or ground current, depending on the measurement arrangement
- Overcurrent operating quantities
- Directional operating quantities, where supported
- Other current-derived measurements
The CT ratio and input rating must be configured correctly.
4.2 Voltage Measurement
Where voltage inputs are installed and used, the relay can measure voltage quantities for applicable protection and monitoring functions.
These may include:
- Phase voltage
- Phase-to-phase voltage
- Frequency
- Directional polarizing quantities
- Voltage supervision
The actual measurements depend on the installed hardware and configuration.
4.3 Protection Processing
The protection algorithms evaluate the measured quantities against configured thresholds and characteristics.
Typical feeder functions include phase overcurrent and earth fault. Additional functions depend on the installed configuration.
4.4 Binary Inputs and Outputs
Binary inputs can receive external status and control signals, such as:
- Breaker open
- Breaker closed
- External trip
- External blocking
- Local/remote selection
- Protection permissive
Binary outputs can be assigned to:
- Breaker trip
- Alarm
- Lockout
- External control
- Other configured functions
The actual I/O quantity and electrical ratings must be verified from the order code and hardware documentation.
4.5 Event and Disturbance Records
Event and disturbance information can support fault analysis and maintenance.
Depending on the relay configuration, useful records may include:
- Protection operation events
- Breaker status changes
- Measurements
- Disturbance waveforms
- Relay alarms
- Sequence-of-events information
Correct time synchronization is important when comparing records from multiple IEDs.
5. CT Configuration and Engineering
Correct CT configuration is essential for accurate protection.
Consider an illustrative 11 kV feeder with a maximum operating current of 320 A.
Assume a CT ratio of:
[
400/1\ A
]
The secondary current at maximum load is:
[
I_s=\frac{320}{400}
]
[
I_s=0.8\ A
]
The relay should measure approximately 0.8 A at rated primary load, assuming an ideal CT and compatible 1 A input.
5.1 CT Selection
The CT should be selected considering:
- Primary rated current
- Secondary rated current
- Accuracy class
- Burden
- Short-time thermal withstand
- Dynamic withstand
- Fault current
- Saturation performance
- Secondary cable resistance
5.2 CT Polarity
Correct polarity is particularly important for:
- Directional overcurrent protection
- Residual current calculation
- Power measurement
- Differential schemes in associated equipment
The engineer should verify polarity against approved drawings and actual CT terminal markings.
5.3 CT Saturation
CT saturation can distort the secondary current waveform during high fault currents.
The impact depends on:
- Fault magnitude
- Fault X/R ratio
- CT core characteristics
- Secondary burden
- Cable resistance
- Remanent flux
- Protection operating time
CT saturation should be considered when designing fast protection schemes and when high fault levels are expected.
6. VT Configuration
Voltage transformers may be required for directional protection, voltage protection, frequency measurement and other functions.
Verify:
- Primary voltage
- Secondary voltage
- VT ratio
- Phase sequence
- Phase assignment
- Secondary earthing
- Fuse supervision
- Voltage input configuration
6.1 Example of VT Ratio
For an 11 kV system with a 110 V phase-to-phase secondary:
[
K_V=\frac{11000}{110}=100
]
The configured ratio and measurement reference must correspond to the actual VT connection.
Incorrect VT configuration can affect voltage measurements and directional protection decisions.
7. Phase Overcurrent Protection – ANSI 50/51
Phase overcurrent protection detects excessive current resulting from short circuits or overload conditions.
7.1 Instantaneous Overcurrent – ANSI 50
ANSI 50 is used for high-current fault detection.
The pickup setting must be selected to avoid unwanted operation during:
- Motor starting
- Transformer energization
- Load switching
- Downstream faults that should be cleared by another device
The engineer must verify that the setting provides sufficient sensitivity for faults within the intended protection zone.
7.2 Time Overcurrent – ANSI 51
ANSI 51 operates when current exceeds a configured pickup for a defined time.
Possible characteristics include:
- Definite time
- Standard inverse
- Very inverse
- Extremely inverse
The available characteristics must be confirmed for the exact relay configuration.
7.3 IEC Standard Inverse Equation
A commonly used IEC standard inverse equation is:
[
t=TMS\times\frac{0.14}{(I/I_s)^{0.02}-1}
]
Where:
- (t) = operating time
- (TMS) = time multiplier setting
- (I) = measured current
- (I_s) = pickup current
This equation is an illustrative standard characteristic. The actual relay curve implementation must be checked against manufacturer documentation.
8. Practical Overcurrent Setting Example
Consider the following feeder:
| Parameter | Value |
|---|---|
| System voltage | 11 kV |
| Maximum load current | 320 A |
| CT ratio | 400/1 A |
| Assumed pickup | 380 A |
| Maximum fault current | 7,000 A |
The secondary pickup is:
[
I_s=\frac{380}{400}
]
[
I_s=0.95\ A
]
At a primary fault current of 7,000 A:
[
I_{\text{fault,secondary}}=\frac{7000}{400}
]
[
I_{\text{fault,secondary}}=17.5\ A
]
These are ideal values before considering CT saturation and measurement limitations.
The assumed 380 A pickup is not a recommended universal setting. Final settings must be based on the maximum operating load, emergency conditions, minimum fault level and coordination requirements.
9. Earth-Fault Protection – ANSI 50N/51N and 50G/51G
Earth-fault protection detects current associated with an unintended connection between a phase conductor and earth.
Common causes include:
- Cable insulation failure
- Switchgear insulation breakdown
- Moisture ingress
- Damaged conductors
- Contaminated insulation
- Winding insulation failure
9.1 Residual Current Calculation
Where three phase CT measurements are used:
[
I_{\text{res}}=I_A+I_B+I_C
]
Under balanced conditions:
[
I_{\text{res}}\approx0
]
An earth fault can produce a non-zero residual current.
9.2 Dedicated Earth-Fault CT
A core-balance CT can be installed around all three phase conductors.
It measures the residual current directly and may provide sensitive earth-fault detection.
9.3 Neutral-Earthing Arrangement
The earth-fault protection philosophy depends on whether the network is:
- Solidly earthed
- Resistance-earthed
- Reactance-earthed
- Isolated
- Resonant-earthed
For resistance-earthed systems, the neutral resistor often limits the earth-fault current. The pickup must be selected with reference to the available fault current and required sensitivity.
9.4 Setting Considerations
Consider:
- Minimum earth-fault current
- Maximum residual current during normal operation
- CT accuracy
- Cable charging current
- Neutral-earthing impedance
- Downstream protection
- Upstream protection
- Required operating time
Do not select sensitive earth-fault settings without evaluating normal residual current and the network’s earthing method.
10. Directional Overcurrent Protection – ANSI 67 and 67N
Directional overcurrent protection is important where the direction of fault current is required for selectivity.
Typical applications include:
- Ring networks
- Parallel feeders
- Multiple-source systems
- Industrial networks with embedded generation
- Interconnected distribution systems
10.1 Operating Principle
Directional overcurrent protection evaluates current magnitude and its relationship with a polarizing reference.
The relay determines whether the fault is in the defined forward or reverse direction.
10.2 Phase Directional Protection
ANSI 67 combines phase overcurrent pickup with directional supervision.
Both the current threshold and directional criteria must be satisfied.
10.3 Directional Earth-Fault Protection
ANSI 67N evaluates residual or neutral current against an appropriate polarizing quantity.
Possible methods depend on the relay design and the system’s neutral-earthing arrangement.
10.4 Commissioning Directional Elements
Verify:
- CT polarity
- VT polarity
- Phase sequence
- Phase assignment
- Voltage reference
- Current reference
- Forward direction
- Reverse direction
- Characteristic angle
- Operating and blocking conditions
The directional method and available polarizing options must be confirmed for the installed 850 version.
11. Voltage Protection – ANSI 27 and 59
Voltage protection may be required to detect abnormal supply conditions.
11.1 Undervoltage – ANSI 27
Undervoltage protection can be applied to:
- Industrial feeder supervision
- Motor load protection
- Load shedding
- Abnormal network conditions
11.2 Overvoltage – ANSI 59
Overvoltage protection detects excessive voltage that may stress connected equipment.
11.3 Voltage Protection Engineering
Consider:
- Normal system voltage range
- Emergency operating conditions
- VT accuracy
- VT fuse failure
- Voltage transformer supervision
- Downstream equipment requirements
- Coordination with upstream protection
Verify that the required voltage functions and input configuration are supported by the installed relay.
12. Frequency Protection – ANSI 81
Frequency protection can be used to detect abnormal network frequency.
Typical functions include:
- Underfrequency (81U)
- Overfrequency (81O)
Applications may include:
- Automatic load shedding
- Industrial islanding schemes
- Generator-connected distribution systems
- Abnormal supply supervision
The engineer must verify the available frequency elements and required voltage measurement configuration.
13. Breaker Failure Protection – ANSI 50BF
Breaker failure protection detects failure of a circuit breaker to interrupt fault current following a trip command.
A typical scheme includes:
- Protection trip initiation.
- Breaker trip command.
- Current supervision.
- Breaker auxiliary contact supervision.
- Breaker failure timer.
- Retrip or backup trip logic.
13.1 Timer Selection
The breaker failure timer must account for:
- Relay output delay
- Breaker opening time
- Current interruption
- Auxiliary contact response
- Safety margin
- Backup protection coordination
The availability and implementation of ANSI 50BF must be confirmed in the exact 850 configuration. External logic may be required in some schemes.
14. Autoreclosing – ANSI 79
Autoreclosing is used mainly on overhead-line feeders where temporary faults are common.
A typical sequence includes:
- Protection trip
- Dead time
- Reclose command
- Reclaim time
- Shot counter
- Reclose blocking
- Lockout
14.1 Dead Time
Dead time is the interval between breaker opening and the next close attempt.
It allows temporary faults, such as those caused by lightning or transient contact, to disappear.
14.2 Reclaim Time
Reclaim time defines the period during which a successful reclose must remain stable before the sequence is considered reset.
14.3 Reclose Blocking
Reclosing may be blocked for conditions such as:
- Manual trip
- Transformer protection operation
- Busbar protection operation
- Breaker failure
- Lockout
- Breaker not ready
- Other project-defined conditions
Autoreclosing should not be applied indiscriminately to every feeder. Verify the function’s availability and suitability for the actual circuit.
15. Feeder Protection Coordination
Protection coordination ensures that the device closest to a fault operates first.
For a radial distribution system, downstream protection normally clears faults before upstream protection.
15.1 Coordination Time Interval
A simplified coordination relationship is:
[
t_{\text{upstream}}\geq t_{\text{downstream}}+CTI
]
The required coordination margin depends on:
- Relay operating time
- Circuit-breaker clearing time
- Relay overshoot
- CT performance
- Protection philosophy
- Project standards
15.2 Time-Current Curve Assessment
A coordination study should plot the operating curves of:
- Downstream feeder relay
- GE Multilin 850
- Upstream transformer relay
- Fuse links, where applicable
- Motor protection relays
- Reclosers, where applicable
The curves should be checked at minimum and maximum fault current.
15.3 Protection Sensitivity
A setting must be sensitive enough to detect the minimum fault current within the intended zone.
At the same time, it must remain stable during normal load, motor starting and permissible transient conditions.
16. Programmable Logic and Trip Matrix
Programmable logic allows protection elements and external signals to be combined into application-specific operating logic.
A simplified feeder trip expression is:
[
TRIP=50\ OR\ 51\ OR\ 50N\ OR\ 51N
]
This is an illustrative logic expression, not a universal F650 or 850 configuration.
A practical trip matrix may include:
- Phase overcurrent
- Earth fault
- Directional protection
- External trip
- Breaker failure initiation
- Lockout
- Blocking
- Remote trip
- Interlocking conditions
The final logic must be documented and tested against the approved protection and control drawings.
17. GE Multilin 850 Configuration Workflow
The applicable engineering software depends on the exact relay model and firmware.
The following is a general engineering process.
Step 1 – Identify the Relay
Record:
- Exact model
- Order code
- Serial number
- Firmware version
- Hardware options
- CT and VT input configuration
- Communication options
Step 2 – Retrieve Existing Settings
Connect through a supported communication interface.
Retrieve the existing settings where possible and save an original backup.
Step 3 – Configure CT and VT Inputs
Enter the correct ratios and input references.
Verify phase assignment, polarity and measurement scaling.
Step 4 – Configure Protection Elements
Apply the approved settings for the required protection functions.
These may include:
- Phase overcurrent
- Earth fault
- Directional protection
- Voltage protection
- Frequency protection
- Other application-specific functions
Step 5 – Configure Time-Current Curves
Select the required characteristic and time multiplier according to the approved coordination study.
Step 6 – Configure Logic and Outputs
Map protection operations to alarm and trip outputs.
Verify external blocking, permissive, breaker status and interlocking signals.
Step 7 – Configure Communication
Where required, configure:
- Network interface
- Protocol
- IP address
- Communication parameters
- SCADA point mapping
- Time synchronization
- IEC 61850 services, where supported
Step 8 – Validate and Save
Compare the final configuration with the approved settings schedule and project drawings.
Save the final settings file with a clear revision identifier.
18. IEC 61850 and Substation Automation
IEC 61850 provides a standardized approach to communication and data modelling in substation automation systems.
Where supported by the installed GE Multilin 850 configuration, IEC 61850 can support communication between the relay and other substation devices.
18.1 MMS Communication
Manufacturing Message Specification (MMS) is commonly used for client-server communication.
Typical information includes:
- Measurements
- Protection status
- Breaker status
- Alarms
- Events
- Reports
- Control operations
The actual supported services depend on the relay implementation.
18.2 GOOSE Communication
Generic Object Oriented Substation Event (GOOSE) communication provides fast event-based data exchange between compatible IEDs.
Potential applications include:
- Interlocking
- Blocking
- Trip transfer
- Permissive signals
- Breaker status exchange
GOOSE engineering requires correct configuration of:
- Publisher and subscriber
- Dataset
- GOOSE control block
- APPID
- VLAN ID
- Multicast MAC address
- Network settings
18.3 SCL Files
IEC 61850 engineering may use:
- ICD
- CID
- IID
- SCD
The engineering process depends on the manufacturer’s tools and the project’s system configuration workflow.
Do not assume that all IEC 61850 services are supported in every relay version. Verify the conformance information for the exact installed product.
18.4 Testing IEC 61850
Useful engineering tools include IEDScout and Wireshark.
They can help engineers inspect:
- Device communication
- Data attributes
- Reports
- GOOSE messages
- Dataset mapping
- Network traffic
- Communication errors
Use these tools in accordance with site cybersecurity and network-access procedures.
19. Testing and Commissioning of the GE Multilin 850
A complete commissioning process should verify the protection functions, measurement circuits, logic, outputs and communication.
19.1 Initial Inspection
Check:
- Relay identity
- Auxiliary supply
- CT wiring
- VT wiring
- Binary inputs
- Binary outputs
- Communication connections
- Earthing
- Approved settings
19.2 Current Measurement Test
Inject balanced three-phase currents.
Verify:
- Phase A measurement
- Phase B measurement
- Phase C measurement
- Current scaling
- Phase sequence
- Residual current
19.3 Voltage Measurement Test
Where voltage inputs are used, inject the appropriate voltage quantities.
Verify:
- Phase-to-phase voltage
- Phase-to-neutral voltage, where applicable
- Phase sequence
- Phase angles
- Frequency measurement
19.4 Overcurrent Protection Testing
Test ANSI 50 and 51 elements.
Verify:
- Pickup current
- Operating time
- Characteristic curve
- Reset behaviour
- Trip logic
- Alarm indication
- Event recording
19.5 Earth-Fault Protection Testing
Test the actual residual or dedicated ground-current measurement arrangement.
Verify:
- Pickup
- Operating time
- Reset
- Alarm and trip outputs
- Measurement scaling
19.6 Directional Protection Testing
Where directional protection is installed, test forward and reverse operating conditions.
Verify the current-voltage phase relationship and the selected directional characteristic.
19.7 Breaker Failure Testing
Where 50BF is implemented, test:
- Initiation
- Current supervision
- Timer
- Retrip
- Backup trip
- Breaker status supervision
19.8 Autoreclosing Testing
Where ANSI 79 is implemented, test:
- Initiation
- Dead time
- Reclose command
- Breaker-ready supervision
- Reclose blocking
- Reclaim time
- Shot counter
- Lockout
19.9 Binary I/O Testing
Verify all configured inputs and outputs.
Check the physical wiring and logic response against the approved drawings.
19.10 Communication Testing
Verify SCADA and IEC 61850 communication, where applicable.
Test:
- Measurements
- Status indications
- Events
- Reports
- GOOSE signals
- Control operations
- Time synchronization
- Communication-loss alarms
19.11 Complete Trip Circuit Test
Confirm the complete physical trip path:
- Protection element operation.
- Relay trip logic.
- Output contact operation.
- Interposing relay, where installed.
- Breaker trip coil energization.
- Breaker opening.
- Auxiliary contact change.
- Alarm and event recording.
All tests must follow approved isolation, switching and electrical safety procedures.
20. Common GE Multilin 850 Troubleshooting Problems
| Problem | Possible cause | Recommended engineering check |
|---|---|---|
| Incorrect current measurement | CT ratio or wiring error | Verify CT ratio, polarity and phase assignment |
| Unwanted overcurrent trip | Incorrect pickup or coordination | Review load current and fault study |
| Earth-fault alarm | Residual current or wiring issue | Inspect CT circuits and neutral earthing |
| Directional operation incorrect | CT/VT polarity or reference error | Verify phase sequence and directional reference |
| Incorrect operating time | Wrong curve or time multiplier | Compare settings with coordination study |
| Breaker does not trip | Output mapping or trip circuit fault | Trace the complete trip chain |
| Autoreclose unsuccessful | Blocking condition or breaker not ready | Review sequence logic and breaker feedback |
| GOOSE signal missing | Dataset or network configuration | Verify publisher, subscriber and VLAN |
| SCADA values incorrect | Scaling or point mapping issue | Check communication configuration |
| Communication unavailable | Interface or network problem | Verify physical connection and settings |
Always investigate the actual cause before changing protection settings.
21. GE Multilin 850 Commissioning Checklist
Hardware and measurement
- Correct relay model and order code
- Firmware version recorded
- Auxiliary supply verified
- CT ratios checked
- CT polarity checked
- VT configuration checked, where applicable
- Binary inputs and outputs verified
Protection functions
- ANSI 50/51 tested
- Earth-fault protection tested
- Directional protection tested, where installed
- Voltage protection tested, where installed
- Frequency protection tested, where installed
- Breaker failure logic tested, where implemented
- Autoreclosing tested, where implemented
Logic and communication
- Trip matrix verified
- External blocking checked
- Breaker status verified
- SCADA point mapping checked
- IEC 61850 MMS tested, where applicable
- GOOSE tested, where applicable
- Time synchronization verified
Documentation
- Final settings saved
- Original settings backed up
- Test report completed
- Drawings updated
- Commissioning approval recorded
22. GE Multilin 850 Compared with Other Feeder Protection Relays
| Relay | General application |
|---|---|
| GE Multilin 350 | Feeder protection |
| GE Multilin 850 | Advanced feeder protection |
| GE Multilin F650 | Feeder protection and bay control applications |
| GE Multilin UR family | Application-specific protection platforms |
The correct relay selection depends on:
- Required protection functions
- Number and type of measurement inputs
- Binary I/O requirements
- Communication protocols
- IEC 61850 requirements
- Control and interlocking requirements
- Project specifications
- Lifecycle support
A detailed comparison should use the actual order codes and manufacturer documentation.
23. Training on GE Multilin Feeder Protection Relays by Elec-Engg
Practical feeder protection engineering requires knowledge of network fault calculations, CT and VT configuration, protection settings, time-current coordination, communication and commissioning.
Elec-Engg provides practical technical training by Dr Saeed Roostaee (Electrical Engineering) for engineers working in power system protection, commissioning, operation, maintenance and substation automation.
Relevant training subjects include:
- GE Multilin 350 and 850 feeder protection
- GE Multilin F650 protection and control
- ANSI 50/51 phase overcurrent protection
- Earth-fault protection
- Directional overcurrent protection
- CT and VT configuration
- Protection coordination
- Breaker failure protection
- Autoreclosing principles
- EnerVista configuration
- IEC 61850 MMS and GOOSE
- IEDScout and Wireshark
- Secondary injection testing
- Troubleshooting and commissioning
Training delivery options include:
- Pre-recorded video courses
- Structured self-paced training
- Live online training
- Face-to-face technical training
- Customized in-house training for companies and utilities
The training focuses on practical engineering applications, helping engineers understand how to configure, test and troubleshoot protection systems used in real industrial and utility installations.
Explore the training resources:
Elec-Engg website: https://elec-engg.com/
Contact and training enquiries: https://elec-engg.com/contact/
24. Conclusion
The GE Multilin 850 is a feeder protection relay platform intended for industrial and utility distribution applications.
Reliable application requires accurate CT and VT configuration, suitable protection settings and careful coordination with other protection devices.
The engineer must evaluate phase overcurrent, earth fault and directional protection requirements based on the network topology and neutral-earthing arrangement.
Additional functions such as voltage, frequency, breaker failure and autoreclosing should only be included after confirming their availability and suitability for the installed configuration.
Communication and IEC 61850 integration must be engineered and tested carefully, particularly when GOOSE signals are used for interlocking or protection-related functions.
Finally, commissioning should verify the complete protection chain, including measurements, logic, outputs, circuit-breaker operation and SCADA communication.
25. Frequently Asked Questions
1. What is the GE Multilin 850 used for?
The GE Multilin 850 is used in feeder protection applications in utility and industrial distribution systems. Its available functions depend on the exact configuration.
2. What is the difference between GE Multilin 350 and 850?
Both belong to the feeder protection family, but their available functions, hardware and application capabilities should be compared using the exact product documentation and order codes.
3. What is ANSI 50/51 protection?
ANSI 50 is instantaneous overcurrent protection, while ANSI 51 is time overcurrent protection.
4. When is ANSI 67 directional protection required?
Directional overcurrent protection is useful in ring networks, parallel feeders and multiple-source systems where fault-current direction is important for selectivity.
5. What is the purpose of earth-fault protection?
Earth-fault protection detects current associated with insulation failure or an unintended connection between a phase conductor and earth.
6. Does the GE Multilin 850 support IEC 61850?
The available IEC 61850 services depend on the installed relay version and communication options. Verify the exact supported services from the product documentation.
7. What is GOOSE used for?
GOOSE provides fast event-based communication between compatible IEDs. It can be used for applications such as interlocking, blocking and signal exchange.
8. How is the GE Multilin 850 tested?
Testing generally includes current and voltage measurement checks, protection pickup and timing, binary I/O, directional tests where applicable, communication tests and complete trip circuit verification.
9. What software is used to configure the GE Multilin 850?
Use the manufacturer engineering software compatible with the installed relay model and firmware. Confirm the correct software version and procedure in the applicable documentation.
10. Where can engineers receive GE Multilin feeder protection training?
Elec-Engg provides practical technical training by Dr Saeed Roostaee (Electrical Engineering). Visit https://elec-engg.com/ or contact https://elec-engg.com/contact/.
Complete GE Multilin 850 guide covering feeder protection, ANSI 50/51, earth fault, directional protection, autoreclosing, IEC 61850, configuration and commissioning.
GE Multilin 850, GE 850 Relay, GE Feeder Protection Relay, Feeder Protection, Advanced Feeder Protection, ANSI 50, ANSI 51, ANSI 50N, ANSI 51N, ANSI 67, Directional Overcurrent, Earth Fault Protection, CT Configuration, VT Configuration, Protection Coordination, Autoreclosing, Breaker Failure Protection, IEC 61850, MMS, GOOSE, EnerVista, Relay Testing, Power System Protection