GE Multilin Autoreclosing Protection (ANSI 79): Dead Time, Reclose Sequences, Reclaim Time, Synchronism Check and Testing

Table Of Contents
  1. 1. Introduction
  2. 2. What Is Autoreclosing Protection?
  3. 3. Temporary and Permanent Faults
  4. 4. Single-Shot and Multi-Shot Autoreclosing
  5. 5. Single-Pole and Three-Pole Autoreclosing
  6. 6. Autoreclosing Initiation Signals
  7. 7. Dead Time in Autoreclosing
  8. 8. Reclaim Time
  9. 9. Reclose Shot Sequences
  10. 10. Synchronism Check Protection (ANSI 25)
  11. 11. Circuit-Breaker Conditions Before Reclosing
  12. 12. Autoreclosing Blocking Conditions
  13. 13. Coordination with Distance Protection (ANSI 21)
  14. 14. Coordination with Breaker Failure Protection (ANSI 50BF)
  15. 15. Practical Engineering Example: 132 kV Transmission-Line Autoreclosing
  16. 16. GE Multilin Autoreclosing Configuration
  17. 17. Autoreclosing Testing and Commissioning
  18. 18. Common Autoreclosing Problems and Troubleshooting
  19. 19. Practical Commissioning Checklist
  20. 20. Best Engineering Practices
  21. 21. Training on GE Multilin Protection Relays by Elec-Engg
  22. 22. Frequently Asked Questions
  23. 23. Related Articles
  24. Conclusion

1. Introduction

Autoreclosing protection (ANSI 79) is an important function in overhead transmission and distribution networks. It automatically recloses a circuit breaker after it has been tripped by protection, allowing the power system to recover from temporary faults without requiring manual intervention.

Many overhead-line faults are temporary. Lightning, wind-driven conductor contact, pollution flashover, and transient insulation breakdown can cause a fault that disappears after the circuit breaker interrupts the current. In these situations, automatic reclosing can restore the line and improve system availability.

GE Multilin protection relays may provide autoreclosing functionality as an integrated protection feature or as part of a wider protection and control scheme, depending on the relay family, model, firmware, and application. The actual implementation must always be verified against the applicable product documentation.

This article explains ANSI 79 autoreclosing principles, practical engineering considerations, typical settings, breaker interlocking, synchronism check, and commissioning procedures.

2. What Is Autoreclosing Protection?

Autoreclosing is an automatic control function that issues a circuit-breaker closing command after a protection trip, provided that the required operating conditions are satisfied.

A typical sequence is:

  1. A fault occurs on an overhead line.
  2. The protection relay detects the fault.
  3. The relay issues a trip command.
  4. The circuit breaker opens and interrupts the fault current.
  5. The autoreclosing function starts its dead-time timer.
  6. The fault is allowed to deionize or disappear.
  7. The relay checks the conditions for reclosing.
  8. If all permissive conditions are satisfied, a close command is issued.
  9. The relay monitors the breaker and the reclose sequence.

If the fault has disappeared, the line returns to service. If the fault remains, the protection relay trips the breaker again and the autoreclosing function follows the configured sequence.

3. Temporary and Permanent Faults

Understanding the difference between temporary and permanent faults is essential when designing an autoreclosing scheme.

3.1 Temporary faults

Temporary faults may disappear after the circuit breaker interrupts the fault current.

Examples include:

  • Lightning-induced flashover.
  • Insulator flashover caused by temporary overvoltage.
  • Conductors momentarily contacting each other.
  • Tree branches temporarily touching overhead conductors.
  • Transient contamination or pollution flashover.

Autoreclosing can restore service after these faults without requiring a maintenance crew.

3.2 Permanent faults

Permanent faults remain present after the circuit breaker opens.

Examples include:

  • Broken conductors.
  • Damaged cable sections.
  • Failed insulators.
  • Permanent phase-to-phase faults.
  • Equipment insulation failure.
  • Physical damage to overhead-line conductors.

If the breaker recloses onto a permanent fault, the protection system should trip it again. Depending on the configured scheme, the relay may block further attempts and enter a lockout condition.

Important: Autoreclosing is generally more beneficial on overhead lines than on underground cable circuits. Reclosing onto a permanent cable fault can increase equipment damage and system stress. The application must be determined by the network operator’s protection philosophy.

4. Single-Shot and Multi-Shot Autoreclosing

Autoreclosing schemes can be configured with one or multiple closing attempts.

4.1 Single-shot autoreclosing

A single-shot scheme permits one automatic closing attempt after the initial trip.

Typical sequence:

  1. Fault detection.
  2. Breaker trip.
  3. Dead time.
  4. One automatic closing command.
  5. If the fault persists, protection trips again.
  6. Further automatic reclosing is blocked.

Advantages include:

  • Simple logic.
  • Reduced breaker operating duty.
  • Suitable for many distribution and transmission applications.
  • Easier coordination and testing.

4.2 Multi-shot autoreclosing

A multi-shot scheme permits more than one automatic closing attempt.

A typical example is:

OperationAction
Initial tripBreaker opens due to protection
First dead timeFirst automatic close attempt
Second tripBreaker trips again if fault persists
Second dead timeSecond automatic close attempt
Final tripBreaker opens again
LockoutFurther automatic closing is blocked

The number of shots and the time intervals depend on the system design and breaker operating requirements.

Repeated reclosing increases mechanical and electrical stress. It must therefore be engineered carefully.

5. Single-Pole and Three-Pole Autoreclosing

The selected autoreclosing philosophy depends on the line voltage, fault type, circuit-breaker design, and stability requirements.

5.1 Three-pole autoreclosing

In a three-pole autoreclosing scheme, all three circuit-breaker poles open following a qualifying protection trip.

After the configured dead time, all three poles receive a closing command.

This approach is commonly used in distribution networks and many transmission applications.

Typical sequence:

  • Phase or earth fault detected.
  • Three-pole trip issued.
  • All three poles open.
  • Dead time expires.
  • Three-pole closing command issued.

5.2 Single-pole autoreclosing

Single-pole autoreclosing is used in selected transmission-line applications, particularly where single-phase-to-earth faults are common and system stability benefits from keeping the healthy phases energized.

For a single-phase-to-earth fault:

  1. The protection identifies the faulted phase.
  2. Only the corresponding breaker pole is tripped.
  3. The other two phases remain connected.
  4. The autoreclosing function waits for the configured dead time.
  5. The faulted phase is reclosed if the required conditions are satisfied.

If the fault is permanent or the sequence fails, the scheme may initiate a three-pole trip or lockout according to the protection design.

Single-pole autoreclosing requires suitable circuit breakers, pole-discrepancy supervision, protection logic, and system-level stability assessment.

6. Autoreclosing Initiation Signals

The autoreclosing function does not necessarily respond to every protection trip.

It should receive initiation signals only from protection functions approved for automatic reclosing.

Typical initiating protection functions may include:

  • Distance protection (ANSI 21).
  • Phase overcurrent protection (ANSI 50/51).
  • Earth-fault protection (ANSI 50N/51N).
  • Directional overcurrent protection (ANSI 67/67N).
  • Line differential protection (ANSI 87L), where the scheme permits autoreclosing.
  • Other approved line protection functions.

The protection engineer must distinguish between trips that permit autoreclosing and trips that require permanent blocking.

For example, a transmission-line distance-zone trip may be permitted to initiate autoreclosing, while a transformer differential trip should normally not initiate a line autoreclosing sequence.

The exact logic depends on the station protection philosophy and relay application.

7. Dead Time in Autoreclosing

Dead time is the interval between the opening of the circuit breaker and the automatic closing command.

Its purpose is to provide sufficient time for the fault arc to extinguish and the insulation path to recover.

7.1 Factors affecting dead-time selection

Dead time depends on:

  • System voltage.
  • Line length.
  • Fault type.
  • Arc deionization characteristics.
  • Circuit-breaker operating time.
  • Single-pole or three-pole reclosing philosophy.
  • Power-system stability.
  • Communication and protection scheme requirements.
  • Utility standards.

The dead time must not be selected simply because a particular value is commonly used elsewhere.

7.2 Illustrative dead-time settings

The following values are examples for explaining the concept only. They are not universal GE Multilin recommendations.

ApplicationIllustrative dead time
Distribution overhead feeder0.5–5 seconds
Transmission line, three-pole0.3–1.5 seconds
Transmission line, single-pole0.5–1.5 seconds

Actual settings must be calculated and approved for the specific network.

7.3 Dead time versus breaker operating time

The protection engineer must establish exactly how the relay or control scheme defines the timer.

Depending on the implementation, the dead-time interval may be measured from the trip initiation, breaker-open confirmation, or another defined event.

The actual breaker opening and closing times must be considered when evaluating the total interruption interval.

8. Reclaim Time

Reclaim time is the period during which the autoreclosing scheme must remain stable after a successful closing operation before it considers the previous sequence completed.

If another qualifying trip occurs before the reclaim timer expires, the relay may treat it as another operation within the same reclose sequence.

If no further trip occurs during the reclaim period, the sequence resets and the autoreclosing function becomes ready for a new event.

Example

Assume:

  • Dead time: 0.8 seconds.
  • Reclaim time: 20 seconds.
  • Number of permitted shots: 2.

If the first automatic closing succeeds and the line remains healthy for 20 seconds, the sequence resets.

If the protection trips again after 5 seconds, the autoreclosing logic may proceed to the next configured shot, depending on its sequence design.

Reclaim time should be coordinated with the protection philosophy and the expected operating conditions.

9. Reclose Shot Sequences

A multi-shot scheme may use different dead times for successive attempts.

For example:

ParameterFirst shotSecond shot
Dead time0.5 s15 s
Reclose attemptYesYes
Further attemptDepends on schemeNo
Final state after unsuccessful attemptContinue sequenceLockout

This is an illustrative sequence, not a standard GE setting.

The first shot may be high-speed, while a later shot may use a longer delay. The appropriate sequence depends on the line application, breaker duty, protection coordination, and utility operating rules.

10. Synchronism Check Protection (ANSI 25)

Before reclosing two energized parts of a power system, it may be necessary to verify that their voltage magnitudes, phase angles, and frequencies are within acceptable limits.

Synchronism check protection (ANSI 25) supervises the closing operation.

It is particularly important for:

  • Transmission lines connected to two energized systems.
  • Interconnected substations.
  • Generator circuit breakers.
  • Bus couplers.
  • Parallel transformer connections.
  • Systems where both sides of a breaker may remain energized.

10.1 Typical synchronism-check quantities

The synchronism-check function may evaluate:

  • Voltage difference.
  • Phase-angle difference.
  • Frequency difference.
  • Slip frequency.
  • Voltage availability on both sides.
  • Permissive time window.

The function may issue a closing permissive when the measured conditions are within the configured limits.

10.2 Live-line and dead-line conditions

Some autoreclosing schemes use live-line/dead-line or live-bus/dead-bus supervision.

Typical conditions include:

Line sideBus sidePossible closing philosophy
DeadLiveDead-line/live-bus permissive
LiveDeadLive-line/dead-bus permissive
LiveLiveSynchronism-check permissive
DeadDeadScheme-dependent permissive or block

These conditions must be defined by the approved station and system operating philosophy.

A dead-line/live-bus permissive is not equivalent to a synchronism-check permissive. The relay must correctly identify the voltage conditions and apply the intended logic.

10.3 ANSI 25 integration

The synchronism-check function may be integrated into a protection relay, a dedicated synchronism-check relay, or a bay control system.

Where the autoreclosing function requires ANSI 25 supervision, the closing output must be interlocked with the synchronism-check permissive.

The engineer must verify the actual implementation and signal interfaces.

11. Circuit-Breaker Conditions Before Reclosing

A reclose command should not be issued merely because the dead-time timer has expired.

The breaker and its associated control circuit must be ready.

Typical permissive conditions include:

  • Breaker available for operation.
  • Spring charged, where applicable.
  • Adequate SF6 gas pressure or acceptable operating medium condition.
  • Hydraulic or pneumatic pressure within limits, where applicable.
  • No active breaker lockout.
  • No active trip-circuit or closing-circuit failure.
  • No pole-discrepancy condition.
  • Valid breaker position feedback.
  • No external blocking signal.
  • Required synchronism-check permissive available.

The exact signals depend on the breaker design and substation control scheme.

12. Autoreclosing Blocking Conditions

Not every trip should result in an automatic reclose.

Typical blocking conditions include:

ConditionTypical action
Manual tripBlock autoreclosing
Transformer differential trip (87T)Block
Busbar differential trip (87B)Block
Breaker failure operation (50BF)Block
Lockout relay operated (86)Block
Circuit-breaker mechanism failureBlock
Low SF6 pressure or unsafe breaker conditionBlock
Protection trip classified as non-recloseBlock
VT failure affecting required voltage supervisionScheme-dependent block
External substation interlockBlock

The final logic must be developed from the utility’s protection and control philosophy.

13. Coordination with Distance Protection (ANSI 21)

Distance protection and autoreclosing are often coordinated in transmission-line protection schemes.

A typical arrangement may use:

  • Zone 1 high-speed tripping.
  • Zone 2 time-delayed tripping.
  • Communication-assisted tripping.
  • Autoreclosing initiation from selected line protection trips.
  • Reclose blocking for selected protection operations.

The protection engineer must ensure that the autoreclosing scheme does not interfere with protection selectivity.

For example, a line fault cleared by a communication-assisted protection scheme may be permitted to initiate autoreclosing, whereas a trip caused by a breaker failure or busbar protection operation should normally block it.

14. Coordination with Breaker Failure Protection (ANSI 50BF)

Breaker failure protection detects a situation in which a breaker fails to interrupt current after receiving a trip command.

If breaker failure protection operates, autoreclosing must normally be blocked.

The reason is straightforward: issuing a closing command to a breaker that has failed to operate correctly may worsen the fault condition.

The coordination should ensure that:

  1. The protection relay issues the initial trip.
  2. Breaker failure supervision starts when required.
  3. The breaker fails to open within the approved time.
  4. Breaker failure protection operates.
  5. Backup breakers are tripped.
  6. The autoreclosing function is blocked.

The exact timing and signal exchange must be verified during commissioning.

15. Practical Engineering Example: 132 kV Transmission-Line Autoreclosing

Consider a 132 kV overhead transmission line protected by a numerical line protection relay.

Assume the following illustrative scheme:

ParameterExample value
System voltage132 kV
ProtectionDistance protection
Autoreclosing modeThree-pole
Number of shots1
Dead time0.8 seconds
Reclaim time20 seconds
Synchronism checkEnabled where required
Breaker failure blockingEnabled
Manual trip blockingEnabled

Operating sequence

Step 1 – Fault occurrence

A temporary phase-to-earth fault occurs on the transmission line.

Step 2 – Protection operation

The distance protection detects the fault and issues a three-pole trip command.

Step 3 – Breaker opening

The circuit breaker opens all three poles.

Step 4 – Autoreclosing initiation

The approved protection trip signal initiates the autoreclosing sequence.

Step 5 – Dead time

The relay waits for the configured 0.8-second dead time, according to the scheme’s timer-start definition.

Step 6 – Closing permissive checks

The logic checks:

  • Breaker availability.
  • Valid breaker position.
  • No lockout.
  • No breaker failure signal.
  • No external blocking.
  • Required voltage or synchronism-check permissive.

Step 7 – Automatic closing

If all conditions are satisfied, the relay or associated control system issues the closing command.

Step 8 – Successful reclose

If the fault has disappeared, the line remains energized and the reclaim timer starts.

Step 9 – Permanent fault scenario

If the fault remains, the protection trips the breaker again. Because this is a single-shot scheme, further automatic reclosing is blocked and the system enters the configured final state.

16. GE Multilin Autoreclosing Configuration

The engineering procedure for configuring ANSI 79 depends on the GE Multilin relay family and its supported firmware.

Not every GE Multilin relay includes an integrated autoreclosing function. In some applications, the function is implemented in a separate bay controller, dedicated relay, or external control logic.

A general engineering workflow is as follows.

16.1 Confirm relay capability

Before configuring the function:

  1. Identify the exact relay model.
  2. Verify the firmware version.
  3. Check whether ANSI 79 is supported.
  4. Review the available protection and control functions.
  5. Confirm the required binary inputs and outputs.
  6. Review the applicable product manual.

16.2 Configure the autoreclosing philosophy

Define:

  • Single-pole or three-pole operation.
  • Single-shot or multi-shot operation.
  • Permitted initiating protection functions.
  • Dead-time values.
  • Reclaim-time values.
  • Breaker position supervision.
  • Synchronism-check requirements.
  • Blocking conditions.
  • Final lockout behavior.

16.3 Configure signal logic

Typical signals include:

  • Protection trip.
  • Autoreclosing initiation.
  • Breaker open status.
  • Breaker closed status.
  • Breaker ready.
  • Synchronism-check permissive.
  • Manual trip.
  • External block.
  • Breaker failure.
  • Lockout.
  • Close command.
  • Autoreclosing active.
  • Autoreclosing successful.
  • Autoreclosing unsuccessful.

The engineer should document the complete signal path from protection initiation to the physical circuit-breaker closing coil.

16.4 Verify the logic before downloading

Check:

  • All initiating signals.
  • All blocking signals.
  • Timer operation.
  • Number of permitted shots.
  • Breaker feedback logic.
  • Close-command output.
  • Synchronism-check interlocking.
  • Reset and lockout conditions.

Use the model-specific engineering software and documentation. Do not assume that menu names, logic elements, or configuration methods are identical across GE Multilin relay families.

17. Autoreclosing Testing and Commissioning

Autoreclosing must be tested as a complete protection and control sequence.

Testing only the timer is insufficient. The engineer must verify protection initiation, breaker feedback, permissive conditions, closing outputs, blocking logic, and final sequence behavior.

17.1 Pre-commissioning checks

Before testing:

  • Confirm the approved protection settings.
  • Verify the relay model and firmware.
  • Check the CT and VT configuration.
  • Verify binary input and output wiring.
  • Confirm breaker auxiliary contacts.
  • Check the closing circuit.
  • Verify trip and close circuit supervision.
  • Confirm synchronism-check connections.
  • Check the breaker operating mechanism.
  • Review the station interlocking logic.

17.2 Dead-time test

  1. Initiate a qualifying protection trip.
  2. Confirm that the breaker-open condition is detected.
  3. Monitor the autoreclosing timer.
  4. Measure the interval before the closing command.
  5. Compare the measured time with the configured setting.
  6. Record the result.

The timer-start definition must be understood before comparing measured values.

17.3 Reclaim-time test

  1. Complete a successful reclose.
  2. Monitor the reclaim timer.
  3. Verify that the sequence resets after the configured interval.
  4. Initiate another qualifying trip before the reclaim time expires.
  5. Confirm the expected sequence behavior.
  6. Repeat after the reclaim time has expired.

17.4 Synchronism-check test

Where ANSI 25 supervision is used:

  • Simulate acceptable voltage conditions.
  • Simulate excessive voltage difference.
  • Simulate excessive phase-angle difference.
  • Simulate unacceptable frequency difference.
  • Verify the closing permissive.
  • Confirm that an unacceptable condition blocks closing.

Use the approved test limits and the exact logic implemented in the project.

17.5 Blocking-condition test

Test the effect of:

  • Manual trip.
  • Breaker failure.
  • Lockout.
  • External blocking.
  • Breaker not ready.
  • Invalid breaker position.
  • Required voltage supervision failure.

Confirm that the automatic closing command is blocked whenever the scheme requires it.

17.6 Complete functional test

The final test should reproduce the complete operating sequence:

  1. Protection trip initiation.
  2. Breaker opening.
  3. Dead-time operation.
  4. Permissive evaluation.
  5. Closing command.
  6. Breaker closing feedback.
  7. Reclaim timer operation.
  8. Sequence reset.

If the scheme includes multiple shots, test every permitted shot and the final lockout condition.

18. Common Autoreclosing Problems and Troubleshooting

Problem 1 – Autoreclosing does not initiate

Possible causes:

  • The protection trip is not configured as an initiating signal.
  • Autoreclosing is disabled.
  • A blocking signal is active.
  • Breaker status is invalid.
  • The relay does not support the required function.

Recommended checks:

  • Review the initiating logic.
  • Monitor protection trip signals.
  • Check active blocking signals.
  • Verify the relay model and firmware.

Problem 2 – Autoreclosing initiates but does not issue a close command

Possible causes:

  • Dead time has not expired.
  • Synchronism-check permissive is unavailable.
  • Breaker-ready input is not healthy.
  • External closing interlock is active.
  • Lockout is present.

Recommended checks:

  • Monitor timer status.
  • Check ANSI 25 status.
  • Verify breaker-ready signals.
  • Inspect the closing logic and output matrix.

Problem 3 – Breaker closes and immediately trips again

Possible causes:

  • Permanent fault.
  • Incorrect protection settings.
  • Incorrect CT/VT configuration.
  • Faulty wiring.
  • Incorrect protection trip logic.

Recommended checks:

  • Retrieve event records.
  • Examine oscillography.
  • Identify the protection function that initiated the second trip.
  • Verify the fault location and network condition.

Problem 4 – Reclaim timer does not reset

Possible causes:

  • Incorrect timer configuration.
  • Repeated protection initiation.
  • Breaker position feedback instability.
  • Incorrect sequence-reset logic.

Recommended checks:

  • Monitor the reclaim timer.
  • Inspect event records and sequence status.
  • Verify breaker auxiliary contacts.
  • Review the reset conditions.

Problem 5 – Autoreclosing is unexpectedly blocked

Possible causes:

  • Manual trip input remains active.
  • Breaker failure signal is latched.
  • Lockout relay is operated.
  • External blocking is present.
  • Breaker-ready signal is missing.

Recommended checks:

  • Review all blocking inputs.
  • Confirm reset requirements.
  • Check the physical status of the breaker and associated control circuits.

19. Practical Commissioning Checklist

No.Inspection or testResult
1Confirm ANSI 79 availability☐
2Verify relay model and firmware☐
3Confirm approved autoreclosing philosophy☐
4Check initiating protection signals☐
5Verify single-pole or three-pole logic☐
6Verify number of shots☐
7Test dead time☐
8Test reclaim time☐
9Verify breaker-open feedback☐
10Verify breaker-closed feedback☐
11Check breaker-ready conditions☐
12Test synchronism-check supervision☐
13Test manual-trip blocking☐
14Test breaker-failure blocking☐
15Test lockout blocking☐
16Verify close output and interlocking☐
17Test unsuccessful reclose behavior☐
18Test final lockout☐
19Verify event records and indications☐
20Save settings and test reports☐

20. Best Engineering Practices

For reliable autoreclosing protection:

  1. Develop the autoreclosing philosophy before configuring the relay.
  2. Verify the exact capabilities of the selected GE Multilin model.
  3. Do not permit every protection trip to initiate autoreclosing.
  4. Coordinate dead time with the network and circuit-breaker characteristics.
  5. Use reclaim time appropriate to the selected shot sequence.
  6. Integrate synchronism check where required.
  7. Ensure breaker failure and lockout conditions block reclosing.
  8. Verify the complete closing circuit, not only the relay output.
  9. Test all permissive and blocking conditions.
  10. Record the final settings and functional test results.

Autoreclosing is a protection and control function, not simply a timer. Its reliability depends on correct protection coordination, breaker supervision, signal logic, and system-level engineering.

21. Training on GE Multilin Protection Relays by Elec-Engg

Understanding autoreclosing requires more than knowing the ANSI 79 function. Protection engineers must understand how the function interacts with distance protection, overcurrent protection, circuit-breaker control, synchronism check, breaker failure protection, and substation automation.

Elec-Engg provides practical technical training by Dr Saeed Roostaee (Electrical Engineering) for engineers involved in power-system protection, relay engineering, commissioning, operation, and maintenance.

Relevant training subjects include:

  • GE Multilin relay families and protection applications.
  • GE Multilin relay configuration and settings.
  • EnerVista software and engineering workflow.
  • Overcurrent and directional protection.
  • Distance protection and autoreclosing coordination.
  • Circuit-breaker failure protection.
  • Synchronism-check protection.
  • Secondary injection and functional testing.
  • Protection logic, binary inputs, outputs, and trip circuits.
  • IEC 61850 communication and substation automation.

Training delivery options include:

  • Pre-recorded technical video courses.
  • Structured self-paced training.
  • Live online training.
  • Face-to-face technical training.
  • Customized in-house training for companies and utilities.

Visit Elec-Engg to explore the available training programs or contact us to discuss a customized training requirement.

22. Frequently Asked Questions

What is ANSI 79 in a GE Multilin relay?

ANSI 79 identifies the autoreclosing function. It controls automatic circuit-breaker reclosing after a qualifying protection trip, subject to configured timers, permissives, and blocking conditions. Availability depends on the exact relay model and application.

What is the difference between dead time and reclaim time?

Dead time is the interval between breaker opening and the automatic closing attempt. Reclaim time is the period after a successful reclose during which the scheme remains associated with the previous sequence before resetting.

Can every GE Multilin relay perform autoreclosing?

No. The supported functions vary across relay families and models. The applicable product manual and firmware documentation must be checked.

What is the purpose of synchronism check during autoreclosing?

Synchronism check (ANSI 25) supervises closing when both sides of a breaker may be energized. It helps prevent closing under unacceptable voltage, frequency, or phase-angle differences.

Does autoreclosing work for permanent faults?

It may attempt to reclose, depending on the scheme. If the fault remains, protection should trip the breaker again. The configured shot limit and lockout logic determine what happens next.

Why is autoreclosing often used on overhead lines?

Many overhead-line faults are temporary and disappear after the circuit breaker interrupts the fault current. Autoreclosing can therefore restore service without manual intervention.

Should autoreclosing be used on transformer differential trips?

Normally, transformer differential trips are treated as non-reclose events because they may indicate an internal transformer fault. The approved protection philosophy should define the required blocking logic.

What should be tested during autoreclosing commissioning?

Testing should cover initiation, breaker feedback, dead time, reclaim time, synchronism check, closing outputs, blocking conditions, unsuccessful reclose behavior, and final lockout.

23. Related Articles

For a complete understanding of GE Multilin protection engineering, this article should be studied together with:

  • GE Multilin Protection Functions and ANSI Device Numbers.
  • GE Multilin Distance Protection (ANSI 21).
  • GE Multilin Directional Overcurrent Protection (ANSI 67).
  • GE Multilin Circuit Breaker Failure Protection (ANSI 50BF).
  • GE Multilin Protection Relay Testing and Commissioning.
  • GE Multilin IEC 61850 Communication and Substation Automation.
  • GE Multilin EnerVista Software: Configuration and Troubleshooting.

Conclusion

Autoreclosing protection (ANSI 79) improves power-system availability by automatically restoring overhead-line circuits after temporary faults. Reliable implementation requires correct initiation logic, suitable dead-time and reclaim-time settings, breaker supervision, synchronism-check integration, and coordination with protection functions such as distance protection and breaker failure protection.

For GE Multilin applications, engineers must confirm the exact functionality available in the selected relay model and firmware rather than assuming that all models support identical autoreclosing features.

A complete engineering and commissioning approach should verify the entire sequence—from protection trip initiation to successful breaker closing or final lockout.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top