- Introduction
- 1. What Is a Substation Automation System?
- 2. Typical GE-Based SAS Architecture
- 3. Main Components of a GE-Based Substation Automation System
- 4. IEC 61850 in GE Substation Automation Systems
- 5. Communication Architecture
- 6. Protection and Control Integration
- 7. Interlocking in Substation Automation
- 8. Time Synchronization
- 9. Engineering Workflow for a GE-Based SAS
- 10. Testing and Commissioning of GE SAS
- 11. Common SAS Problems and Troubleshooting
- 12. Cybersecurity Considerations
- 13. Training on GE Substation Automation Systems by Elec-Engg
- Conclusion
- Frequently Asked Questions
- 1. What is GE SAS?
- 2. What are the main levels of SAS architecture?
- 3. Which GE relays can be used in SAS?
- 4. Does GE SAS support IEC 61850?
- 5. What is the difference between MMS and GOOSE?
- 6. What is the function of a bay controller?
- 7. What is the role of the SCADA gateway?
- 8. Which protocols are commonly used in SAS?
- 9. What software is used for GE relay engineering?
- 10. What is the most important part of SAS commissioning?
Introduction
A Substation Automation System (SAS) is an integrated combination of protection, control, monitoring, communication and supervisory functions designed to operate and manage an electrical substation.
Modern substations use intelligent electronic devices (IEDs), communication networks, bay controllers, protection relays, operator workstations and station-level automation equipment to perform functions that were traditionally implemented through extensive hardwired circuits.
General Electric (GE), now operating its energy businesses under GE Vernova, has supplied protection, control, monitoring and substation automation technologies for utility and industrial applications. GE equipment can be integrated into conventional and IEC 61850-based substation architectures, depending on the selected product families and project design.
For protection and substation automation engineers, understanding the complete SAS architecture is essential. An engineer must understand not only individual protection relays but also how the relays communicate, exchange signals, control circuit breakers, report alarms and integrate with the control centre.
This article introduces the main engineering concepts of a GE-based Substation Automation System and establishes the foundation for a detailed technical article series.
1. What Is a Substation Automation System?
A Substation Automation System is an integrated system that performs monitoring, protection, control, interlocking, measurement, event recording and communication functions.
A typical SAS provides:
- Remote and local control of circuit breakers and disconnectors.
- Protection relay operation and coordination.
- Measurement of voltage, current, power and energy.
- Alarm and event monitoring.
- Sequence of events (SOE) recording.
- Disturbance and fault recording.
- Communication with the control centre.
- Interlocking between bays.
- Time synchronization.
- Engineering and maintenance access.
- System diagnostics and supervision.
The objective is to improve substation operational reliability, reduce extensive hardwiring, simplify maintenance and provide operators with accurate information about the electrical network.
2. Typical GE-Based SAS Architecture
A modern substation automation architecture is commonly divided into three functional levels.
2.1 Process Level
The process level interfaces with primary electrical equipment.
Typical equipment includes:
- Current transformers (CTs).
- Voltage transformers (VTs).
- Circuit breakers.
- Disconnectors.
- Earthing switches.
- Transformers.
- Other primary plant equipment.
Process-level information may be transferred to protection and control IEDs through conventional copper wiring or, where supported and engineered, digital process-bus technologies.
The process level provides the electrical measurements and equipment status information required by protection and control functions.
2.2 Bay Level
The bay level contains the protection and control equipment associated with individual bays.
Typical equipment includes:
- Feeder protection relays.
- Transformer protection relays.
- Generator protection relays.
- Motor protection relays.
- Busbar protection systems.
- Bay control units.
- Metering and monitoring devices.
GE Multilin protection relays may be used for applications such as feeder, transformer, motor and generator protection, depending on the selected product family.
A bay-level IED can perform protection functions, collect equipment status, exchange signals with other IEDs and communicate with station-level equipment.
2.3 Station Level
The station level provides centralized monitoring, operation and coordination.
Typical components include:
- Station HMI.
- SCADA gateway.
- Station computer.
- Engineering workstation.
- Time synchronization equipment.
- Communication network equipment.
- Historian or event database, where required.
The station-level system collects information from bay-level IEDs and presents it to local operators and, through the appropriate gateway, the remote control centre.
The exact GE products used at each level depend on the project, product availability and system architecture.
3. Main Components of a GE-Based Substation Automation System
3.1 Protection Relays
Protection relays detect abnormal electrical conditions and initiate appropriate circuit-breaker tripping.
Examples of protection applications include:
- Feeder overcurrent and earth-fault protection.
- Transformer differential protection.
- Line differential protection.
- Distance protection.
- Generator protection.
- Motor protection.
- Busbar protection.
- Breaker failure protection.
GE Multilin relays can provide protection, measurement, monitoring and communication functions according to their individual capabilities.
3.2 Bay Control Units
Bay control units provide monitoring and control functions for individual substation bays.
Typical functions include:
- Circuit-breaker control.
- Disconnector control.
- Earthing switch control.
- Equipment position monitoring.
- Local and remote control selection.
- Interlocking.
- Alarm generation.
- Communication with station-level systems.
A protection relay may also provide bay-control functionality in some applications. Whether a separate bay controller is required depends on the system design and device capabilities.
3.3 Station HMI
The Human-Machine Interface allows operators to monitor and control the substation.
A typical HMI provides:
- Single-line diagrams.
- Breaker and disconnector positions.
- Voltage and current measurements.
- Active and reactive power.
- Alarm lists.
- Event lists.
- Protection indications.
- Communication status.
- Equipment control interfaces.
The HMI must present a consistent representation of the actual substation state.
Control commands should be subject to the project’s authority, selection, interlocking and confirmation requirements.
3.4 SCADA Gateway
The SCADA gateway provides communication between the substation automation system and the remote control centre.
Depending on the project, it may support protocols such as:
- IEC 60870-5-104.
- IEC 60870-5-101.
- DNP3.
- Modbus.
- IEC 61850 MMS.
The protocol selection depends on the utility’s control-centre requirements and the capabilities of the gateway.
3.5 Ethernet Communication Network
The station communication network connects protection relays, bay controllers, gateways, HMIs and other IEDs.
Network components may include:
- Managed Ethernet switches.
- Fibre-optic connections.
- Copper Ethernet connections.
- Redundant network paths.
- VLAN configuration.
- Network monitoring equipment.
The network must be engineered to support the required communication services, availability and performance.
4. IEC 61850 in GE Substation Automation Systems
IEC 61850 is an international standard for communication networks and systems for power utility automation.
It provides a structured approach to IED data modelling, communication services and engineering information.
Its main concepts include:
- Logical devices.
- Logical nodes.
- Data objects.
- Data attributes.
- Abstract Communication Service Interface (ACSI).
- Manufacturing Message Specification (MMS).
- Generic Object-Oriented Substation Event (GOOSE).
- Sampled Values (SV), where supported.
- Substation Configuration Language (SCL).
4.1 MMS Communication
Manufacturing Message Specification is commonly used for client-server communication between IEDs and station-level systems.
Typical applications include:
- Reading measurements.
- Monitoring equipment status.
- Receiving alarms.
- Retrieving event information.
- Reporting protection indications.
- Operating supported control points.
A station-level client may communicate with a GE IED acting as an IEC 61850 server, provided the particular device supports the required services.
4.2 GOOSE Communication
GOOSE enables fast exchange of event-based information between IEDs using multicast Ethernet messages.
Typical applications include:
- Protection blocking.
- Interlocking.
- Breaker failure initiation.
- Intertrip signals.
- Breaker status distribution.
- Distributed protection logic.
GOOSE implementation must be verified for the specific relay model, firmware and communication hardware.
4.3 Sampled Values
Sampled Values communication is used to transmit digitized current and voltage measurements over Ethernet.
It can support process-bus architectures, where merging units publish sampled measurements to compatible protection IEDs.
Do not assume that every GE Multilin relay supports Sampled Values. Confirm the actual device capability and project requirements before selecting a process-bus architecture.
4.4 Substation Configuration Language
SCL is the standardized configuration language used in IEC 61850 engineering.
Important SCL file types include:
- ICD – IED Capability Description.
- IID – Instantiated IED Description.
- CID – Configured IED Description.
- SCD – Substation Configuration Description.
- SSD – System Specification Description.
SCL supports structured system engineering, including IED descriptions, communication configuration, datasets and GOOSE subscriptions.
The actual workflow depends on the engineering tools used by the different manufacturers.
5. Communication Architecture
A GE-based SAS may use several communication protocols at different system levels.
| Communication service | Typical application |
|---|---|
| IEC 61850 MMS | IED monitoring and control |
| IEC 61850 GOOSE | Fast IED-to-IED signal exchange |
| IEC 60870-5-104 | Remote SCADA communication |
| DNP3 | Utility SCADA integration |
| Modbus TCP | Equipment monitoring and integration |
| SNTP or NTP | Time synchronization |
| PTP | Precision time synchronization where supported |
Protocol support must be checked against the selected device and firmware documentation.
Example communication arrangement
A GE feeder protection relay communicates with a station-level IEC 61850 client using MMS.
The same relay publishes a GOOSE message containing a protection-start signal to another IED.
The station gateway collects selected information and forwards it to the remote control centre using IEC 60870-5-104.
This creates three distinct communication paths:
- Protection relay to station-level client.
- Protection relay to another protection or control IED.
- Station gateway to remote control centre.
Each path must be configured and tested independently.
6. Protection and Control Integration
One of the main purposes of SAS is to integrate protection and control functions into a coordinated system.
Consider a typical 132 kV feeder bay.
The bay may include:
- Circuit breaker.
- Two disconnectors.
- Earthing switch.
- Current transformers.
- Voltage transformers.
- Feeder protection relay.
- Bay control unit.
- Local control facilities.
The protection relay detects electrical faults and initiates tripping.
The bay control system monitors the breaker and disconnector positions and manages permitted switching operations.
The station HMI displays the equipment status and provides authorized operators with control facilities.
Example breaker control sequence
A typical breaker control operation may include:
- Operator selects the required breaker.
- Control authority and operating mode are checked.
- The system verifies the required interlocking conditions.
- A close command is issued.
- The control output operates the breaker closing circuit.
- The breaker auxiliary contacts update the position indication.
- The new position is reported to the HMI and SCADA system.
- The operation is recorded in the event log.
The exact sequence and permissive logic must follow the approved substation control philosophy.
7. Interlocking in Substation Automation
Interlocking prevents unsafe or prohibited switching operations.
Typical interlocking conditions include:
- A disconnector cannot be operated under load unless the equipment design explicitly permits it.
- An earthing switch cannot close while the associated circuit is energized.
- A circuit breaker may need to be open before a disconnector operation is permitted.
- A busbar selection operation must satisfy the approved switching sequence.
Interlocking can be implemented using:
- Hardwired electrical interlocks.
- IED logic.
- GOOSE communication.
- Bay control logic.
- Mechanical interlocks.
A robust SAS design must define the authority and priority of each interlocking layer.
Communication-based interlocking requires appropriate communication supervision and a defined response to communication failure.
8. Time Synchronization
Accurate time synchronization is important for event analysis and disturbance investigation.
A substation may use:
- SNTP.
- NTP.
- PTP.
- IRIG-B.
- GPS-based time sources.
The selected synchronization method depends on the accuracy requirements and device capabilities.
For example, sequence-of-events analysis requires sufficiently synchronized timestamps across the relevant IEDs.
Protection engineers should verify:
- Time source availability.
- Synchronization status.
- Time zone and daylight-saving configuration.
- Timestamp accuracy.
- Behavior after time-source failure.
- Consistency between IED, HMI and gateway timestamps.
9. Engineering Workflow for a GE-Based SAS
A structured engineering workflow is essential for successful SAS implementation.
Step 1: Review the substation design
Collect and review:
- Single-line diagrams.
- Protection and control schematics.
- AC and DC auxiliary supply diagrams.
- Equipment lists.
- IED schedules.
- Communication architecture.
- Control philosophy.
- Interlocking diagrams.
- SCADA point lists.
Step 2: Define the IED architecture
Identify each protection relay, bay controller, gateway, station computer and communication device.
Record the model, firmware, communication interfaces and required functions.
Step 3: Develop the communication architecture
Define:
- Network topology.
- IP addressing.
- VLAN assignments.
- GOOSE communication requirements.
- MMS client-server relationships.
- SCADA gateway interfaces.
- Time synchronization.
- Redundancy requirements.
Step 4: Configure individual IEDs
Configure the required protection, control, measurement and communication functions using the supported manufacturer engineering tools.
For GE Multilin devices, the appropriate EnerVista software and device-specific configuration facilities depend on the relay family.
Step 5: Perform IEC 61850 engineering
Where IEC 61850 is used:
- Obtain the appropriate SCL files.
- Configure logical devices and datasets.
- Define GOOSE publishers and subscribers.
- Configure reporting.
- Assign communication parameters.
- Validate external references.
- Archive the final configuration.
Step 6: Configure station-level systems
Configure the station HMI, gateway, alarms, measurements, events, control points and communication interfaces.
Step 7: Perform testing
Carry out:
- IED functional testing.
- Protection secondary injection.
- Binary input and output testing.
- GOOSE testing.
- MMS communication testing.
- HMI testing.
- Gateway and SCADA testing.
- Interlocking testing.
- End-to-end control testing.
Step 8: Commission the system
Verify the complete system under approved commissioning procedures.
Record test results, configuration versions, outstanding issues and final acceptance status.
10. Testing and Commissioning of GE SAS
Commissioning should be performed at individual device level, bay level and station level.
| Test | Purpose |
|---|---|
| Protection relay testing | Verify protection functions and trip logic |
| Binary I/O testing | Verify wiring and signal mapping |
| Breaker control testing | Confirm open and close commands |
| Interlocking testing | Verify permitted and prohibited operations |
| GOOSE testing | Verify publisher and subscriber communication |
| MMS testing | Verify monitoring and control communication |
| HMI testing | Verify indications, alarms and controls |
| Gateway testing | Verify remote SCADA communication |
| SOE testing | Verify event recording and timestamps |
| Time synchronization testing | Confirm synchronization performance |
| Network redundancy testing | Verify recovery and availability, where applicable |
The final commissioning test must demonstrate that the protection, control and communication functions operate together as intended.
11. Common SAS Problems and Troubleshooting
| Problem | Possible cause | Investigation |
|---|---|---|
| IED communication failure | Network, addressing or configuration issue | Check physical links, IP settings and switch configuration |
| Incorrect breaker indication | Wiring or signal mapping problem | Verify auxiliary contacts and IED input mapping |
| HMI shows stale data | Reporting or communication problem | Inspect MMS association and reporting configuration |
| GOOSE signal unavailable | Publisher or subscriber configuration error | Check dataset, control block and network traffic |
| Incorrect event timestamps | Time synchronization issue | Check time source and IED synchronization status |
| Remote control unavailable | Control authority or gateway configuration issue | Review local/remote mode and control permissions |
| Interlocking prevents operation | Incorrect status or logic condition | Review interlocking equations and actual equipment state |
| SCADA point mismatch | Incorrect point mapping | Compare gateway database with approved point list |
| Intermittent network failure | Switch, fibre or redundancy issue | Review switch diagnostics and network logs |
12. Cybersecurity Considerations
Modern SAS installations are operational technology (OT) systems and require appropriate cybersecurity controls.
Important measures include:
- Network segmentation.
- Controlled engineering access.
- Role-based access management.
- Secure configuration management.
- Strong authentication where supported.
- Controlled remote access.
- Firmware and software management.
- Event logging and monitoring.
- Backup and recovery procedures.
- IEC 62351-related security measures where applicable and supported.
Cybersecurity design must consider the capabilities of each IED, gateway, workstation and communication device.
13. Training on GE Substation Automation Systems by Elec-Engg
Understanding a substation automation system requires practical knowledge of protection relays, bay control, IEC 61850 communication, SCADA integration, network engineering and commissioning.
Elec-Engg provides practical technical training by Dr Saeed Roostaee (Electrical Engineering).
Relevant training subjects include:
- GE Multilin protection relay engineering.
- Substation automation architecture.
- IEC 61850 engineering and configuration.
- GOOSE publisher and subscriber configuration.
- MMS communication and reporting.
- SCL engineering.
- Protection and control integration.
- SCADA and gateway communication.
- IEDScout and Wireshark diagnostics.
- SAS testing and commissioning.
Training delivery options include:
- Pre-recorded video courses.
- Structured self-paced training.
- Live online training.
- Face-to-face training.
- Customized in-house training for utilities and industrial companies.
Explore the technical training resources at https://elec-engg.com/ or contact us through https://elec-engg.com/contact/.
Conclusion
A GE-based Substation Automation System integrates protection, control, monitoring and communication into a coordinated architecture.
Understanding its process, bay and station levels is fundamental for engineers responsible for designing, configuring, operating and maintaining modern substations.
IEC 61850 provides important communication and engineering capabilities, while protection relays, bay controllers, gateways, HMIs and Ethernet networks work together to deliver the required functionality.
Successful implementation depends on a clear system architecture, correct device configuration, consistent signal mapping, reliable communication and comprehensive end-to-end testing.
Frequently Asked Questions
1. What is GE SAS?
GE SAS refers here to a substation automation system implemented using GE protection, control, communication and related automation equipment. It is not necessarily the name of one universal GE software or hardware product.
2. What are the main levels of SAS architecture?
The commonly used architecture has three levels: process level, bay level and station level.
3. Which GE relays can be used in SAS?
GE Multilin relays from suitable product families can be integrated into SAS applications. Their functions and communication capabilities depend on the model, order code, firmware and installed communication hardware.
4. Does GE SAS support IEC 61850?
GE devices with the appropriate IEC 61850 implementation can participate in IEC 61850-based substation automation systems. Specific MMS, GOOSE and other capabilities must be checked for each device.
5. What is the difference between MMS and GOOSE?
MMS is commonly used for client-server monitoring and control. GOOSE is used for fast event-based communication between IEDs.
6. What is the function of a bay controller?
A bay controller provides monitoring, control and interlocking functions for the equipment within an individual substation bay.
7. What is the role of the SCADA gateway?
The gateway collects information from the substation automation system and communicates selected data and control commands to the remote control centre using the required protocols.
8. Which protocols are commonly used in SAS?
Common protocols include IEC 61850 MMS, GOOSE, IEC 60870-5-104, DNP3 and Modbus. The actual protocol selection depends on the project.
9. What software is used for GE relay engineering?
The appropriate GE EnerVista software depends on the specific Multilin relay family and model.
10. What is the most important part of SAS commissioning?
End-to-end verification is essential. Engineers must demonstrate that protection, control, interlocking, communication, HMI and SCADA functions operate together correctly.
GE SAS, GE Substation Automation, GE Multilin, Substation Automation System, IEC 61850, GOOSE, MMS, SCADA, Protection and Control, Bay Control Unit, Substation Engineering, SAS Commissioning, Elec-Engg