Skip to main content

Large or small, every industrial, commercial, and institutional organization needs to understand how to protect their investment in their electric power systems.

The task of the electrical unit protection is to detect electrical failures and inadmissible operation of the generator, generator bus bar, excitation system, generator transformer, and another existing transformer (Station transformer, unit auxiliary transformer) and disconnect faulty circuits with speed and certainly without interference healthy circuits.

An automatic synchronizing unit is furnished for connecting the generator unit to the grid via the generator circuit breaker. It is also possible to connect via the circuit breakers in the HV substation if the generator circuit breaker is already closed.

The universal transducers allow the measurement of all electrical quantities occurring in any network in a single unit. Especially in power plants and substations, transducers are used to isolate electrical signals and further process measured values.

The following PDF is the course on Protection, synchronization, and measurement system in the generation station. This course is based on the Siemens project.

Type: PDF

Page: 120

Size: 21 MB