Sampled Values in SEL Relays | IEC 61850 Process Bus Guide

Sampled Values (SV) is a fundamental technology in IEC 61850 digital substations. It allows current and voltage measurements from instrument transformers or merging units to be transmitted digitally over Ethernet instead of using conventional copper secondary wiring between the substation yard and protection relays.

SEL (Schweitzer Engineering Laboratories) provides protection relays, merging units and process bus solutions that support IEC 61850 Sampled Values. These technologies allow utilities and engineering companies to develop digital protection systems with reduced secondary wiring, improved monitoring and flexible protection architectures.

In this article, we explain how IEC 61850 Sampled Values work in SEL protection relays, including process bus architecture, merging units, SV publishers and subscribers, time synchronization, network design, configuration software, troubleshooting and commissioning tests.

This guide is intended for protection engineers, substation automation engineers, commissioning engineers and professionals working with digital substations.

Sampled Values (SV) in SEL Relays: Complete Guide to IEC 61850 Process Bus, Merging Units, Configuration and Testing

Table Of Contents
  1. 1. What are Sampled Values in IEC 61850?
  2. 2. Conventional substation versus digital process bus
  3. 3. What is a Merging Unit?
  4. 4. What is an SV publisher and subscriber?
  5. 5. IEC 61850-9-2 and IEC 61869-9
  6. 6. Sampling rate and Sampled Values messages
  7. 7. Important Sampled Values parameters
  8. 8. Time synchronization in an SV process bus
  9. 9. SEL Sampled Values process bus architecture
  10. 10. SEL relay models supporting Sampled Values
  11. 11. Software used for SEL SV configuration
  12. 12. Step-by-step SV engineering workflow
  13. 13. Practical example: Feeder protection using Sampled Values
  14. 14. Testing and commissioning of Sampled Values
  15. 15. Testing SV with Wireshark
  16. 16. Ethernet network design for SV
  17. 17. Common Sampled Values problems and troubleshooting
  18. 18. Sampled Values versus GOOSE
  19. 19. Frequently asked questions about Sampled Values
  20. 20. Practical training in digital substations and SEL relays
  21. Official references and technical documents

1. What are Sampled Values in IEC 61850?

In a conventional substation, current transformers (CTs) and voltage transformers (VTs) provide analog secondary signals to protection relays.

For example:

  • CT secondary current: 1 A or 5 A.
  • VT secondary voltage: typically 100 V or 110 V, depending on the system.
  • Analog signals are transmitted through copper cables.
  • Protection relays measure these signals through their analog input circuits.

In an IEC 61850 process bus architecture, the measurement signals can be digitized close to the primary equipment.

A device called a Merging Unit (MU) receives analog current and voltage signals, converts them into digital samples and publishes these measurements over an Ethernet network.

Protection relays subscribe to the Sampled Values streams and use the received measurements to perform protection functions.

The basic process is:

  1. CTs and VTs provide analog measurements.
  2. The merging unit receives the analog signals.
  3. The merging unit samples and digitizes the measurements.
  4. The merging unit publishes Sampled Values messages.
  5. Protection relays receive the SV streams.
  6. Protection algorithms process the digital measurements.
  7. The relay issues trip or control commands when required.

This architecture is known as an IEC 61850 process bus system.

2. Conventional substation versus digital process bus

Conventional protection architecture

In a conventional substation, CT and VT secondary circuits are connected directly to the protection relay through copper cables.

For example:

  • CT phase A → relay current input IA.
  • CT phase B → relay current input IB.
  • CT phase C → relay current input IC.
  • VT phase A → relay voltage input VA.
  • VT phase B → relay voltage input VB.
  • VT phase C → relay voltage input VC.

This architecture is well established, but large substations can require extensive secondary cabling.

Digital substation architecture

In a digital substation, the merging unit converts analog signals into digital Sampled Values.

The protection relay receives the measurements through an Ethernet process bus interface.

<escape> </escape>

Conventional systemSV-based process bus
Analog CT/VT secondary circuitsDigital measurement streams
Extensive copper cablingFiber-optic Ethernet infrastructure
Direct analog relay inputsSV subscriber interface
Traditional test terminalsDigital test and simulation methods
Conventional wiring diagnosticsNetwork and message diagnostics
Physical point-to-point measurement circuitsNetworked or direct digital connections

The two architectures can also coexist in a hybrid substation.

3. What is a Merging Unit?

A Merging Unit (MU) is an intelligent electronic device that receives analog measurements from instrument transformers and converts them into digital Sampled Values messages.

Merging units are commonly installed near primary equipment, such as:

  • Circuit breaker control cabinets.
  • Transformer bays.
  • Line bays.
  • Busbar protection zones.
  • Outdoor switchgear.
  • Digital instrument transformer installations.

Main functions of a merging unit

A merging unit can perform the following functions:

1. Analog signal acquisition

The merging unit receives current and voltage measurements from CTs and VTs or compatible sensors.

2. Analog-to-digital conversion

It samples the incoming analog waveforms and converts them into numerical measurement values.

3. Sampled Values publication

The digital measurements are transmitted through IEC 61850-9-2 or IEC 61869-9 communication.

4. Time synchronization

The merging unit synchronizes its sampling process with a common time reference, typically using Precision Time Protocol (PTP) in networked process bus applications.

5. Additional signal communication

Depending on the device, a merging unit may also publish GOOSE messages for binary signals, such as circuit breaker status.

6. Diagnostics and supervision

It can provide information about measurement quality, synchronization, communication and device health.

SEL-401 Merging Unit

<escape> </escape>

The <escape> </escape> SEL-401 Protection, Automation, and Control Merging Unit is an example of an SEL device designed for digital secondary systems.

It can be used to acquire and publish digital measurements and integrate with compatible protection and automation equipment.

SEL also offers process bus solutions using other purpose-configured devices, including SEL-451-6 and SEL-487E-5 variants.

The exact functions, number of channels, publication capabilities and protection features depend on the selected device configuration.

4. What is an SV publisher and subscriber?

Sampled Values communication uses a publisher-subscriber architecture.

SV publisher

The publisher is the device that generates and transmits Sampled Values messages.

For example:

  • SEL-401 merging unit.
  • SEL-451-6P Sampled Values publisher.
  • SEL-421-7P Sampled Values publisher.
  • SEL-487E-5P Sampled Values publisher.

The publisher receives analog measurements and transmits the corresponding digital values.

SV subscriber

The subscriber is the device that receives the Sampled Values stream and processes the digital measurements.

Examples include:

  • SEL-451-6S.
  • SEL-411L-2S.
  • SEL-421-7S.
  • SEL-487B-2S.
  • SEL-487E-5S.

The subscriber uses the incoming measurements for protection, monitoring and control functions supported by the device.

Example: SEL-401 and SEL-451

Consider a digital feeder protection system.

<escape> </escape>

Publisher: SEL-401

  • Receives three-phase current measurements.
  • Receives three-phase voltage measurements.
  • Converts the measurements into digital samples.
  • Publishes the SV stream.

Subscriber: SEL-451-6S

  • Receives the SV stream.
  • Checks the configured stream and its validity.
  • Processes the digital current and voltage values.
  • Performs the required protection functions.

This arrangement replaces the conventional analog CT/VT connection between the merging unit and the protection relay.

5. IEC 61850-9-2 and IEC 61869-9

Two important standards for Sampled Values engineering are:

  • IEC 61850-9-2.
  • IEC 61869-9.

IEC 61850-9-2

IEC 61850-9-2 defines the communication mapping for transmitting sampled measurement values over Ethernet.

It is widely associated with digital substation process bus applications.

The earlier UCA International Users Group implementation guideline, commonly called 9-2LE, introduced a constrained implementation profile to improve interoperability between equipment from different manufacturers.

IEC 61869-9

IEC 61869-9 specifies a digital interface for instrument transformers and provides a standardized framework for digital measurement transmission.

It supports more flexible measurement stream structures and is important for modern digital instrument transformer applications.

Why should engineers understand the difference?

Not all SV devices use identical message structures or sampling configurations.

Before integrating equipment from different manufacturers, verify:

  • Applicable standard and edition.
  • SV message structure.
  • Sampling rate.
  • Number of channels.
  • Data representation.
  • SVID.
  • APPID.
  • Multicast address.
  • VLAN configuration.
  • Time synchronization requirements.

A device supporting IEC 61850 communication does not automatically support every Sampled Values profile.

6. Sampling rate and Sampled Values messages

A merging unit continuously samples the analog current and voltage waveforms.

The number of samples depends on the applicable profile and system frequency.

For example, the traditional 9-2LE profile uses 80 samples per power-frequency cycle.

Power frequencySamples per cycleSamples per second
50 Hz804,000
60 Hz804,800

For a 50 Hz system:

[
80 \times 50 = 4000 \text{ samples/s}
]

For a 60 Hz system:

[
80 \times 60 = 4800 \text{ samples/s}
]

The interval between consecutive samples is:

[
T_s = \frac{1}{f_s}
]

For the 4,000 samples/s example:

[
T_s = \frac{1}{4000}=250\ \mu s
]

For the 4,800 samples/s example:

[
T_s = \frac{1}{4800}\approx208.33\ \mu s
]

These values are examples for the specified 80-samples-per-cycle profile, not universal rates for every IEC 61850 SV implementation. Other profiles and configurable stream structures may use different rates.

Why is the sampling rate important?

The protection relay must receive measurements at the expected rate and with sufficient accuracy.

Missing, duplicated, delayed or out-of-sequence samples can affect measurement reconstruction and protection performance.

For this reason, merging unit testing and subscriber supervision are essential parts of process bus commissioning.

7. Important Sampled Values parameters

Engineers should understand the main parameters used to identify, configure and supervise an SV stream.

ParameterDescription
SVIDIdentifies the Sampled Values stream
APPIDIdentifies the SV application
Multicast MACEthernet destination address
VLAN IDIdentifies the virtual LAN
VLAN priorityDefines Ethernet traffic priority
SmpCntSample counter
SmpSynchIndicates sample synchronization status
ConfRevConfiguration revision
ASDUApplication Service Data Unit
QualityIndicates measurement quality and validity
smpRateSampling rate information, where included in the profile

SmpCnt — Sample Counter

The sample counter identifies the sequence of samples in the stream.

For a traditional 9-2LE 4,800 samples/s stream, the counter normally advances through 0 to 4,799 and then rolls over.

For a 4,000 samples/s stream, the corresponding sequence is typically 0 to 3,999.

This allows the subscriber or diagnostic software to identify missing or out-of-sequence samples.

SmpSynch — Sample Synchronization

SmpSynch provides information about the synchronization status associated with the SV message.

The subscriber uses synchronization information to determine whether the measurements are suitable for applications requiring synchronized samples.

Protection applications that compare measurements from multiple merging units must pay particular attention to the synchronization status.

Quality

Measurement quality information is important because receiving a numerical measurement does not automatically mean that the measurement is valid.

Engineers should consider:

  • Invalid measurements.
  • Questionable measurements.
  • Failure indications.
  • Old data.
  • Inaccurate data.
  • Test or substituted values.

The subscriber’s response to invalid or questionable data must be defined and tested as part of the protection design.

8. Time synchronization in an SV process bus

Time synchronization is one of the most important aspects of Sampled Values engineering.

Imagine a substation with two merging units:

  • MU1 measures current on one side of a protected zone.
  • MU2 measures current on the other side.

A differential protection relay receives both streams.

For accurate differential protection, the corresponding measurements must be aligned in time.

If the samples are not synchronized, the relay may calculate an incorrect differential current.

Precision Time Protocol (PTP)

PTP is widely used to synchronize devices in digital substations.

It is defined in IEEE 1588 and supported by substation-specific profiles, including:

  • IEEE C37.238 power profile.
  • IEC/IEEE 61850-9-3 power utility profile.

A typical process bus synchronization architecture includes:

  1. Satellite-synchronized clock or other suitable reference.
  2. PTP grandmaster clock.
  3. Ethernet switches supporting the required PTP functions.
  4. Merging units acting as PTP clients.
  5. Protection relays receiving synchronized SV streams.

The selected PTP profile, clock accuracy, network design and device compatibility must be checked for the actual project.

What happens if PTP synchronization is lost?

A merging unit or subscriber may detect loss or degradation of synchronization.

The actual behaviour depends on device implementation and configured supervision.

The protection design must define:

  • Synchronization failure detection.
  • Alarm generation.
  • SV validity handling.
  • Protection element response.
  • Recovery after synchronization returns.

Do not assume that every protection relay responds to synchronization loss in the same way.

9. SEL Sampled Values process bus architecture

SEL offers SV-based process bus solutions that combine merging units, protection relays, Ethernet networks, GOOSE communication and PTP synchronization.

A typical architecture consists of the following components.

Primary equipment

  • Circuit breakers.
  • Current transformers.
  • Voltage transformers.
  • Instrument transformer sensors.

Merging units

  • SEL-401.
  • Other supported SEL SV publishing devices.

Protection relays

  • SEL-451-6S.
  • SEL-421-7S.
  • SEL-411L-2S.
  • SEL-487B-2S.
  • SEL-487E-5S.

Communication network

  • Managed Ethernet switches.
  • Fiber-optic connections.
  • VLAN configuration.
  • PRP or other supported redundancy architecture.

Time synchronization

  • PTP grandmaster.
  • PTP-capable switches.
  • PTP-capable merging units and protection relays.

The actual design depends on the number of bays, protection functions, required redundancy and the selected SEL product variants.

10. SEL relay models supporting Sampled Values

SEL has several product variants designed for digital process bus applications.

Examples include:

SEL deviceSV role or application
SEL-401Protection, automation and control merging unit
SEL-451-6PSV publisher variant
SEL-451-6SSV subscriber variant
SEL-421-7PSV publisher variant
SEL-421-7SSV subscriber variant
SEL-411L-2SSV subscriber variant
SEL-487B-2SBus differential SV subscriber variant
SEL-487E-5PTransformer protection SV publisher variant
SEL-487E-5STransformer protection SV subscriber variant

The suffixes and product configurations matter. For example, an SV publisher variant and an SV subscriber variant are not interchangeable simply because they belong to the same relay family.

Always verify the exact device ordering information, firmware, hardware and instruction manual before preparing an engineering design.

11. Software used for SEL SV configuration

Two important SEL engineering tools are:

acSELerator Architect SEL-5032

Architect is used to configure and document IEC 61850 systems.

Its functions include:

  • SCL project engineering.
  • IED integration.
  • GOOSE configuration.
  • Sampled Values configuration.
  • MMS communication configuration.
  • Dataset and control block engineering.
  • SCL validation and documentation.

It is useful for developing the communication architecture and integrating compatible devices.

SEL Grid Configurator SEL-5037

SEL Grid Configurator is used to create, manage and deploy settings for supported SEL devices.

For supported SV and TiDL products, it is part of the device configuration workflow.

The precise division of work between Grid Configurator, Architect and device-specific settings software should be confirmed from the applicable product documentation.

acSELerator QuickSet SEL-5030

QuickSet is used for configuring many SEL protection relays, including protection settings and supported programmable logic.

Not every digital process bus product uses the same configuration workflow. Check the current software requirements for the exact device.

12. Step-by-step SV engineering workflow

The following is a general engineering workflow for a process bus system using SEL devices. It is not a substitute for the device-specific configuration manual.

Step 1: Define the protection architecture

Prepare the single-line diagram and identify:

  • Protected equipment.
  • CT and VT locations.
  • Required protection functions.
  • Number of merging units.
  • Number of protection relays.
  • Required redundancy.
  • Communication and time synchronization architecture.

Step 2: Select the merging units and subscriber relays

Identify which devices will publish the measurements and which devices will subscribe to them.

Check the supported channel count, stream count, sampling rate, standards and network interfaces.

Step 3: Define the SV signal structure

Prepare the measurement signal list.

For example:

  • IA.
  • IB.
  • IC.
  • IN.
  • VA.
  • VB.
  • VC.
  • VN.

Confirm the scaling, polarity, phase sequence and measurement references.

Step 4: Configure the publisher

Configure the merging unit or publisher variant.

The engineering information normally includes:

  • SV stream identification.
  • Dataset or stream structure.
  • APPID.
  • Multicast MAC address.
  • VLAN ID.
  • VLAN priority.
  • Sampling configuration.
  • Synchronization settings.

The actual configurable fields depend on the applicable device and SV profile.

Step 5: Configure the subscriber

Configure the protection relay to receive the correct SV stream.

Verify:

  • Source publisher.
  • SVID.
  • APPID.
  • Multicast MAC.
  • VLAN.
  • Measurement channel mapping.
  • Expected sampling rate.
  • Configuration revision.

Step 6: Configure protection functions

Configure the protection elements to use the digital measurements.

Examples include:

  • Overcurrent protection.
  • Distance protection.
  • Differential protection.
  • Transformer differential protection.
  • Bus differential protection.
  • Voltage protection.
  • Frequency protection.

The relay must support the required SV application and protection function combination.

Step 7: Configure PTP

Confirm that all relevant devices use the intended synchronization architecture and compatible PTP profiles.

Check the synchronization status and ensure that the protection application has an appropriate response to loss of synchronization.

Step 8: Validate the complete project

Review the SCL files and device settings.

Check for:

  • Incorrect SV stream references.
  • Missing measurement channels.
  • Incorrect APPID.
  • Incorrect multicast address.
  • VLAN mismatch.
  • Unsupported data structure.
  • Configuration revision mismatch.
  • Incorrect time synchronization settings.

Step 9: Deploy and verify

Deploy the approved configuration using the applicable SEL software and device procedure.

Verify the relay accepts the configuration and receives valid measurement data before enabling the associated protection application.

13. Practical example: Feeder protection using Sampled Values

Consider a feeder protection application using:

  • SEL-401 as the merging unit.
  • SEL-451-6S as the protection relay.

The merging unit receives current and voltage signals from the feeder bay.

It publishes an SV stream containing the required measurement channels.

The SEL-451-6S subscribes to the stream and uses the received measurements for its configured protection functions.

The engineering and commissioning process should verify:

  1. Correct CT and VT secondary connections.
  2. Correct phase identification.
  3. Correct measurement scaling.
  4. Correct publisher configuration.
  5. Correct subscriber configuration.
  6. Correct SV stream identification.
  7. Correct time synchronization.
  8. Valid measurement quality.
  9. Correct relay metering values.
  10. Correct protection operation during secondary injection or an approved digital test.

The most important point is that the protection relay must receive the correct measurements, not merely a stream of Ethernet packets.

14. Testing and commissioning of Sampled Values

SV testing is more complex than checking whether a communication link is active.

The engineer must verify measurement accuracy, stream integrity, synchronization, network performance and protection response.

14.1 Merging unit testing

Verify:

  • Correct current and voltage inputs.
  • Correct channel assignment.
  • Correct polarity.
  • Correct scaling.
  • Correct phase sequence.
  • Measurement accuracy.
  • SV publication rate.
  • Correct sample counter sequence.
  • Correct synchronization status.
  • Correct response to synchronization loss.

14.2 SV stream testing

Check the Ethernet messages using suitable diagnostic software.

Verify:

  • SVID.
  • APPID.
  • Multicast MAC.
  • VLAN ID.
  • VLAN priority.
  • ConfRev.
  • SmpCnt.
  • SmpSynch.
  • Measurement values.
  • Measurement quality.

14.3 Subscriber testing

Verify that the protection relay:

  • Receives the correct stream.
  • Recognizes the correct publisher.
  • Processes the measurement channels.
  • Displays the expected current and voltage values.
  • Detects missing or invalid messages.
  • Reports synchronization problems.
  • Responds correctly to abnormal measurement quality.

14.4 End-to-end protection testing

The final stage is to test the protection application.

For example, in a feeder overcurrent protection scheme:

  1. Verify the merging unit receives the test current.
  2. Confirm that the SV publisher transmits the corresponding measurement.
  3. Verify that the protection relay receives the correct current.
  4. Check the relay metering values.
  5. Inject or simulate the required fault condition using an approved test arrangement.
  6. Verify the protection element operates.
  7. Verify the trip logic and output path.
  8. Record the operating time and results.

The test method must be suitable for the device and application. Use approved test equipment and isolation procedures.

15. Testing SV with Wireshark

Wireshark can help engineers analyse Sampled Values Ethernet traffic.

A common display filter is:

sv

The exact protocol decoding depends on the Wireshark version and installed protocol support.

Engineers should inspect:

ParameterTest objective
Source MACIdentify the publisher
Destination MACVerify the multicast address
EtherTypeConfirm the SV Ethernet protocol
APPIDConfirm the application identifier
VLAN IDVerify network segmentation
SVIDIdentify the stream
SmpCntCheck sample sequence
SmpSynchCheck synchronization status
Measurement valuesCheck transmitted measurements
QualityCheck measurement validity

Detecting missing samples

One of the most useful checks is to monitor SmpCnt.

For a traditional 9-2LE stream operating at 4,800 samples/s, the counter normally increments consecutively from 0 to 4,799 and then rolls over.

If the counter skips a value, this may indicate a missing message, capture loss or another issue requiring investigation.

However, a missing packet in a laptop capture does not automatically prove that the subscriber relay also lost the packet. Check the capture point, network path and subscriber diagnostics before concluding that the protection system experienced a data loss.

Measuring packet intervals

For a 4,800 samples/s stream, the expected nominal interval is approximately 208.33 microseconds.

For a 4,000 samples/s stream, it is 250 microseconds.

Analyse packet timing over a sufficient period to identify:

  • Unexpected delays.
  • Excessive jitter.
  • Missing messages.
  • Out-of-sequence samples.
  • Network congestion.

16. Ethernet network design for SV

Sampled Values generate continuous Ethernet traffic. Therefore, process bus networks must be engineered carefully.

Important design considerations include:

  • Network bandwidth.
  • Number of SV streams.
  • Ethernet port speed.
  • Multicast traffic handling.
  • VLAN segmentation.
  • Traffic priority.
  • Switch buffering.
  • Network redundancy.
  • Time synchronization.
  • Cybersecurity.

Why bandwidth matters

Unlike GOOSE, which is primarily event-driven, SV streams are transmitted continuously.

A process bus may contain multiple merging units publishing thousands of Ethernet messages per second.

As the number of streams increases, network traffic can become significant.

Engineers must calculate the expected bandwidth and account for Ethernet overhead, network topology, traffic duplication and design margin.

Do not design a process bus by simply adding the nominal bit rates of the streams without considering the actual packet format and network behaviour.

PRP redundancy

Parallel Redundancy Protocol (PRP) is one method used to improve network availability.

In a typical PRP architecture, devices send duplicate frames through two independent LANs.

The receiving device accepts the first valid copy and discards the duplicate.

SEL also describes enhancements to detect certain communication failures that conventional redundancy mechanisms may not independently alarm.

VLAN configuration

VLANs can separate process bus traffic from station bus traffic and other communication services.

For example:

  • SV traffic.
  • GOOSE traffic.
  • MMS traffic.
  • Engineering access.

The VLAN design must be coordinated between merging units, protection relays and Ethernet switches.

17. Common Sampled Values problems and troubleshooting

Problem 1: SV stream is not received

Possible causes:

  • Incorrect multicast address.
  • Incorrect APPID.
  • Incorrect SVID.
  • VLAN mismatch.
  • Incorrect publisher configuration.
  • Subscriber configuration error.
  • Network switch filtering.

Solution: Compare the publisher and subscriber configurations and inspect the Ethernet traffic.

Problem 2: Incorrect current or voltage measurements

Possible causes:

  • Incorrect CT or VT wiring.
  • Incorrect polarity.
  • Incorrect scaling.
  • Wrong channel mapping.
  • Incorrect phase assignment.
  • Incorrect measurement reference.

Solution: Check the analog input circuit, merging unit configuration and subscriber channel mapping.

Problem 3: Missing or out-of-sequence samples

Possible causes:

  • Network congestion.
  • Switch buffer problems.
  • Incorrect network design.
  • Physical fiber problems.
  • Publisher performance issues.
  • Capture tool limitations.

Solution: Analyse SmpCnt, packet intervals and subscriber diagnostics. Use a suitable capture point to distinguish actual network loss from capture loss.

Problem 4: PTP synchronization failure

Possible causes:

  • Grandmaster failure.
  • Incorrect PTP profile.
  • Incorrect switch configuration.
  • Network delay or asymmetry.
  • Incompatible synchronization settings.
  • Loss of the time reference.

Solution: Check the grandmaster, PTP status, clock quality and synchronization indications across the process bus.

Problem 5: Protection relay reports invalid SV data

Possible causes:

  • Incorrect stream configuration.
  • Unsupported message structure.
  • Configuration revision mismatch.
  • Invalid quality information.
  • Synchronization problems.
  • Missing or corrupted messages.

Solution: Verify the device-specific SV configuration and compare the actual stream with the approved engineering files.

18. Sampled Values versus GOOSE

Both SV and GOOSE are important IEC 61850 communication services, but they perform different functions.

FeatureSampled ValuesGOOSE
Main purposeTransmit sampled analog measurementsTransmit event and status information
Typical dataCurrent and voltage samplesTrip, block, interlock and status
TransmissionContinuousEvent-driven with retransmission
CommunicationEthernet multicastEthernet multicast
Typical publisherMerging unitProtection relay or control IED
Typical subscriberProtection relayProtection relay or control IED
Key supervisionSample sequence, quality and synchronizationMessage validity and communication supervision

In a digital substation, SV and GOOSE often operate together.

For example:

  1. A merging unit publishes current and voltage measurements using SV.
  2. A protection relay subscribes to the SV stream.
  3. The protection relay detects a fault.
  4. The relay publishes a trip signal using GOOSE.
  5. The circuit breaker control device receives the trip command.

This is a typical example of a fully digital protection and control application.

19. Frequently asked questions about Sampled Values

What are Sampled Values in IEC 61850?

Sampled Values are digital representations of analog measurements, such as current and voltage, transmitted over Ethernet according to IEC 61850 communication specifications.

What is the difference between a merging unit and a protection relay?

A merging unit primarily acquires and digitizes measurement signals and publishes SV data. A protection relay processes measurements and performs protection functions. Some intelligent merging units can also provide protection and control functions.

What is the difference between SV publisher and SV subscriber?

The publisher generates and transmits digital measurement streams. The subscriber receives and processes these streams.

What is the sampling rate of IEC 61850 Sampled Values?

It depends on the applicable SV profile and configuration. A traditional 9-2LE profile uses 80 samples per power-frequency cycle, corresponding to 4,000 samples/s at 50 Hz and 4,800 samples/s at 60 Hz.

Why is PTP important in a digital substation?

PTP synchronizes the measurement sampling of different merging units. This is particularly important for protection functions that compare measurements from different locations, such as line differential and busbar differential protection.

Can SEL relays receive Sampled Values from other manufacturers?

Interoperability is possible when the devices support compatible IEC 61850 SV standards, message structures, sampling configurations and synchronization requirements. Always verify the specific device documentation and test the complete application.

Can Sampled Values replace conventional CT and VT wiring?

SV can replace many secondary measurement cable connections between yard equipment and protection relays. However, the primary-to-merging-unit measurement connections and other necessary auxiliary wiring remain part of the installation.

Which SEL software is used for SV configuration?

SEL acSELerator Architect SEL-5032 supports IEC 61850 engineering, including Sampled Values. SEL Grid Configurator SEL-5037 and other device-specific tools are also used in the configuration workflow for supported products.

How can engineers test Sampled Values?

Testing includes verifying merging unit measurement accuracy, stream configuration, packet timing, sample counter continuity, synchronization, measurement quality and protection relay response. Wireshark and suitable SV test equipment can support these activities.

20. Practical training in digital substations and SEL relays

Understanding Sampled Values requires knowledge of protection systems, instrument transformers, IEC 61850 communication, Ethernet networks and digital relay configuration.

Elec-Engg provides practical training and engineering education in:

  • Power system protection.
  • SEL protection relays.
  • IEC 61850 substation automation.
  • GOOSE communication.
  • Sampled Values and process bus.
  • Merging unit configuration.
  • acSELerator Architect.
  • SEL Grid Configurator.
  • Wireshark-based communication analysis.
  • Relay testing and commissioning.

Online and customized training can be arranged according to the requirements of individual engineers and companies.

For further information, visit https://elec-engg.com/.


Official references and technical documents

  1. SEL Sampled Values Process Bus Solutions
    https://selinc.com/solutions/digital-secondary-systems/sampled-values/
  2. SEL Digital Secondary Systems
    https://selinc.com/solutions/digital-secondary-systems/
  3. SEL-401 Protection, Automation, and Control Merging Unit
    https://selinc.com/products/401/
  4. SEL-451 Protection, Automation, and Bay Control System
    https://selinc.com/products/451/
  5. SEL-451 Specifications — SV publisher and subscriber capabilities
    https://selinc.com/products/451/specs/
  6. SEL-5032 Supported Products
    https://selinc.com/products/software/5032-supported-products/
  7. SEL Technical Paper: Testing IEC 61850 Merging Units
    https://selinc.com/api/download/121664/
  8. SEL Technical Paper: Performance of IEC 61850 Sampled Values
    https://selinc.com/api/download/137357/

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top