- 1. Introduction
- 2. What Is MMS in IEC 61850?
- 3. MMS Client-Server Architecture
- 4. IEC 61850 Data Model Used by MMS
- 5. Understanding IEC 61850 Data References
- 6. Measurements Through MMS
- 7. Data Quality and Timestamp
- 8. Datasets in MMS Communication
- 9. Report Control Blocks
- 10. Report Trigger Options
- 11. General Interrogation and Integrity Reporting
- 12. MMS Control Services
- 13. GE Multilin MMS Integration with SICAM PAS
- 14. GE Multilin MMS Configuration Workflow
- 15. Testing MMS Communication with IEDScout
- 16. MMS Troubleshooting with Wireshark
- 17. Time Synchronization and MMS Event Reporting
- 18. MMS Communication Performance and Network Design
- 19. Cybersecurity Considerations
- 20. MMS Commissioning Test Matrix
- 21. Common MMS Engineering Mistakes
- Mistake 1: Using an Incorrect SCL File
- Mistake 2: Incorrect Data Reference
- Mistake 3: Ignoring Measurement Scaling
- Mistake 4: Incorrect Report Control Block Configuration
- Mistake 5: Using Unbuffered Reporting for Critical Events Without Considering Disconnection
- Mistake 6: Assuming Successful Reading Means Reporting Works
- Mistake 7: Ignoring Data Quality
- Mistake 8: Testing Control Without Interlocking Verification
- 22. MMS Commissioning Checklist
- 23. Training on GE Multilin MMS and IEC 61850 Integration by Elec-Engg
- 24. Conclusion
- 25. Frequently Asked Questions
- 1. What is MMS communication in GE Multilin relays?
- 2. Is MMS the same as GOOSE?
- 3. What is a Report Control Block?
- 4. What is the difference between BRCB and URCB?
- 5. What is general interrogation?
- 6. Can GE Multilin relays send measurements to SICAM PAS?
- 7. How can I verify MMS communication?
- 8. Why are SCADA measurements incorrect?
- 9. Can MMS be used to operate a circuit breaker?
- 10. What is the role of Wireshark in MMS troubleshooting?
- 11. Why is buffered reporting important?
- 12. Where can I receive practical GE Multilin MMS training?
1. Introduction
Manufacturing Message Specification (MMS) is a central communication service in IEC 61850-based substation automation systems. It enables SCADA systems, gateways, engineering tools and other IEC 61850 clients to access information provided by protection and control intelligent electronic devices (IEDs).
For engineers working with GE Multilin protection relays, MMS communication is particularly important for integrating relay measurements, protection indications, breaker status, alarms and supported control functions into a station-level automation system.
Unlike GOOSE, which is primarily used for event-based communication between IEDs, MMS follows a client-server architecture. A client establishes communication with an IED server and accesses the data and services made available by that device.
This article explains the practical engineering principles of MMS communication with GE Multilin relays, including:
- IEC 61850 MMS architecture
- Client-server communication
- Logical devices and logical nodes
- Data objects and data attributes
- IEC 61850 data references
- Datasets and Report Control Blocks
- Buffered and unbuffered reporting
- General interrogation and integrity reporting
- SCADA integration
- Siemens SICAM PAS integration
- Control services
- IEDScout testing
- Wireshark troubleshooting
- Commissioning and documentation
Important: MMS services and their implementation vary between GE Multilin models, firmware versions and communication options. Confirm the exact capabilities of the installed relay before engineering the system. The examples below describe general IEC 61850 principles rather than guaranteed menu paths or features in every GE Multilin device.
2. What Is MMS in IEC 61850?
MMS stands for Manufacturing Message Specification. It is an international communication protocol used in industrial automation.
IEC 61850 uses MMS for client-server communication between substation IEDs and higher-level systems.
A typical architecture may include:
- GE Multilin protection relay acting as an IEC 61850 server
- SICAM PAS acting as an IEC 61850 client
- Station-level SCADA system
- Engineering workstation
- Gateway to a control centre
<AsyncImage query=”IEC 61850 MMS client server communication architecture protection relay SCADA gateway diagram” aspectRatio=”16:9″ width=”100%”/>
2.1 What Does MMS Allow an Engineer to Do?
Depending on the relay’s implementation, MMS can support:
- Reading measurements
- Accessing protection status
- Receiving event reports
- Monitoring circuit-breaker position
- Accessing device information
- Reading data quality and timestamps
- Operating supported control objects
- Accessing supported files or other services
The exact list of available services must be confirmed against the relay’s IEC 61850 documentation.
2.2 MMS Is Not the Same as GOOSE
MMS and GOOSE serve different purposes.
| Feature | MMS | GOOSE |
|---|---|---|
| Communication model | Client-server | Publisher-subscriber |
| Typical purpose | SCADA monitoring and supported control | Fast event exchange between IEDs |
| Communication | Commonly TCP/IP | Ethernet multicast |
| Typical recipient | SCADA or gateway client | One or more IED subscribers |
| Typical information | Measurements, status, reports | Protection and interlocking events |
| Data organization | IEC 61850 data model and services | Dataset associated with GOOSE control block |
A substation may use both services simultaneously.
3. MMS Client-Server Architecture
In IEC 61850 MMS communication, one device provides information while another device accesses that information.
3.1 MMS Server
The server is the IED that exposes its IEC 61850 data model.
For example, a supported GE Multilin relay may provide:
- Phase current measurements
- Voltage measurements
- Frequency
- Protection operation status
- Circuit-breaker status
- Device health information
3.2 MMS Client
The client establishes communication with the server and accesses the required information.
Typical clients include:
- SICAM PAS
- SCADA servers
- Substation gateways
- Engineering tools
- IEC 61850 test applications
3.3 Multiple Clients
Depending on the server’s supported connections and configuration, more than one client may communicate with an IED.
The engineer must consider:
- Maximum client associations
- Connection limits
- Client authorization
- Network capacity
- Reporting configuration
- Device processing limitations
Do not assume that every relay supports unlimited simultaneous MMS clients.
4. IEC 61850 Data Model Used by MMS
MMS communication uses the IEC 61850 data model.
The data model provides a structured representation of the IED’s information.
The general hierarchy is:
- Physical IED
- Logical device
- Logical node
- Data object
- Data attribute
4.1 Physical IED
The physical IED is the actual GE Multilin relay installed in the panel.
4.2 Logical Device
A logical device groups related functions within the IED.
The device may contain one or more logical devices depending on the implementation.
4.3 Logical Node
A logical node represents a standardized function or information category.
Examples include:
| Logical node | General function |
|---|---|
| MMXU | Electrical measurements |
| MMTR | Metering information |
| PTOC | Time overcurrent protection |
| PIOC | Instantaneous overcurrent protection |
| PDIF | Differential protection |
| PDIS | Distance protection |
| XCBR | Circuit-breaker information |
| XSWI | Switch information |
| CSWI | Switch control |
| PTRC | Protection trip conditioning |
| GGIO | Generic process input/output |
| LPHD | Physical device information |
| LLN0 | Logical device common information |
The actual logical nodes and instances available in a GE Multilin relay depend on the model and firmware.
4.4 Data Objects
Data objects represent specific information within a logical node.
For example, a measurement logical node may contain phase-current information.
A circuit-breaker logical node may contain position information.
4.5 Data Attributes
Data attributes represent the individual values and properties of a data object.
Common attribute concepts include:
- Value
- Quality
- Timestamp
- Validity
- Functional constraint
- Control-related information
This structure allows an IEC 61850 client to access information in a standardized way.
5. Understanding IEC 61850 Data References
A data reference identifies a particular item in the IEC 61850 data model.
A reference generally contains the IED name, logical device, logical node, data object and data attribute.
An illustrative reference may look like:
IED1LD0/MMXU1.A.phsA.cVal.mag.f
This is an example of IEC 61850 naming structure, not a guaranteed reference in any particular GE Multilin relay.
5.1 Why Data References Matter
The SCADA engineer must identify the correct data reference for every required point.
For example, an operator may need:
- Phase A current
- Phase B current
- Phase C current
- Breaker position
- Protection trip
- Relay health
If the wrong data attribute is selected, the SCADA point may show an incorrect value or status.
5.2 Data Reference Verification
For every required point:
- Identify the IED.
- Identify the logical device.
- Locate the logical node.
- Locate the data object.
- Identify the correct data attribute.
- Confirm the functional constraint.
- Check the data type.
- Verify the value online.
The actual reference must come from the IED’s data model or approved SCL description.
6. Measurements Through MMS
A common MMS application is transferring electrical measurements from protection relays to SCADA.
Examples include:
- Phase currents
- Phase voltages
- Frequency
- Active power
- Reactive power
- Apparent power
- Power factor
- Energy measurements, where supported
6.1 Measurement Logical Nodes
MMXU is commonly associated with electrical measurements.
MMTR may be used for metering information.
The available measurement objects depend on the relay’s IEC 61850 implementation.
6.2 Measurement Scaling
A relay may expose measurements in engineering units or in a standardized representation with scaling information.
The SCADA engineer must understand:
- Data type
- Unit
- Multiplier
- Scaling
- Primary or secondary representation
- Phase assignment
- Quality
6.3 Practical Example: Feeder Current
Consider an 11 kV feeder with a CT ratio of 400/1.
The primary current is 240 A.
The CT secondary current is:
[
I_s=\frac{240}{400}=0.6\text{ A}
]
If the relay’s IEC 61850 measurement represents primary amperes, the SCADA display should be engineered to show 240 A.
If the relay exposes secondary amperes, the SCADA scaling must be configured accordingly.
Never assume the measurement scaling without checking the relay documentation and online data.
7. Data Quality and Timestamp
IEC 61850 data is not just a value.
For many data objects, quality and timestamp information are important parts of the communication.
7.1 Quality
Quality information helps the client determine whether a value is usable.
It may indicate conditions such as:
- Validity
- Test status
- Operator blocking
- Substitution
- Other quality flags
The client should not treat every received value as valid without checking its quality.
7.2 Timestamp
Timestamp information allows the SCADA system to understand when a value or event was generated.
Accurate timestamps are important for:
- Sequence-of-events analysis
- Fault investigation
- Protection operation review
- Disturbance reconstruction
7.3 Invalid or Questionable Data
If the relay communication is interrupted or the data becomes invalid, the SCADA system should represent the condition appropriately.
The display should not silently present an old value as if it were current.
8. Datasets in MMS Communication
A dataset is a collection of IEC 61850 data attributes.
In MMS applications, datasets are commonly used with reporting services.
For example, a feeder dataset may include:
- Phase current measurements
- Breaker position
- Overcurrent protection status
- Earth-fault protection status
- Device health
8.1 Dataset Selection
A dataset should be designed according to the SCADA requirements.
Avoid adding unnecessary data objects.
The engineer should consider:
- Required measurements
- Required status signals
- Quality and timestamp requirements
- Reporting performance
- Client requirements
- IED resource limitations
8.2 Dataset Consistency
The dataset used by the IED must match the configuration expected by the client.
A mismatch can cause reporting failures or incomplete point updates.
9. Report Control Blocks
Report Control Blocks (RCBs) define how data is reported from an IEC 61850 server to a client.
There are two widely used types:
- Buffered Report Control Block (BRCB)
- Unbuffered Report Control Block (URCB)
<AsyncImage query=”IEC 61850 buffered and unbuffered report control block BRCB URCB architecture diagram” aspectRatio=”16:9″ width=”100%”/>
9.1 Buffered Report Control Block
A BRCB can retain report events during a temporary communication interruption, subject to its buffer capacity and implementation.
When the client reconnects, buffered events may be delivered.
This is valuable when event history must be preserved.
9.2 Unbuffered Report Control Block
A URCB provides reporting without the same event-buffer retention mechanism.
Events occurring while the client is disconnected may not be available later through that report.
9.3 BRCB and URCB Comparison
| Feature | BRCB | URCB |
|---|---|---|
| Event buffering | Yes, subject to implementation and capacity | No equivalent event buffer |
| Client disconnection | Can retain events | Events may be lost |
| Historical event recovery | Possible within buffer limits | Not generally available |
| Typical application | Important event reporting | Current status and monitoring |
| Engineering consideration | Buffer capacity and reservation | Client connection and update behaviour |
9.4 RCB Parameters
Common reporting parameters include:
- Report ID
- Dataset reference
- Buffered or unbuffered mode
- Trigger options
- Integrity period
- General interrogation
- Optional fields
- Client association
The available parameters and behaviour depend on the relay’s implementation.
10. Report Trigger Options
Reporting trigger options determine when the IED sends information to the client.
Common trigger categories include:
10.1 Data Change
A report is generated when a monitored value changes.
Examples:
- Breaker position changes
- Protection status changes
- Alarm status changes
10.2 Quality Change
A report is generated when the quality of a monitored data item changes.
For example, a measurement may become invalid.
10.3 Data Update
A report can be generated when a value is updated, even if the value itself does not change, depending on the configured service and implementation.
10.4 Integrity Reporting
Integrity reporting provides periodic updates of selected data.
It helps the client refresh its view of the IED.
10.5 General Interrogation
General interrogation allows the client to request the current values of the dataset.
This is useful when a client establishes communication or needs to refresh its information.
11. General Interrogation and Integrity Reporting
Both services help maintain consistency between the IED and SCADA database.
11.1 General Interrogation
When the client requests general interrogation, the server reports the relevant dataset information.
For example, after a SCADA restart, the client may request the current:
- Breaker positions
- Protection status
- Measurements
- Alarm indications
11.2 Integrity Period
An integrity period defines the interval for periodic reporting, where supported and configured.
It helps the client refresh data even if no value changes have occurred.
11.3 Practical Engineering Considerations
The engineer should determine:
- Which signals require event reporting
- Which measurements require periodic updates
- Appropriate integrity intervals
- Network loading
- Client database behaviour
- Event-buffer requirements
Excessive reporting can increase communication traffic without providing meaningful operational benefits.
12. MMS Control Services
IEC 61850 can support control services in addition to monitoring and reporting.
For example, an operator may need to control a circuit breaker through the SCADA system.
Typical control-related functions include:
- Select-before-operate
- Direct operate
- Enhanced security control models
- Status and command termination information
The actual control models available depend on the IED implementation.
12.1 Circuit-Breaker Control
A typical breaker control application may involve:
- Operator selects a breaker.
- SCADA sends the required control request.
- IED processes the request.
- Interlocking and permissive conditions are evaluated.
- The command is accepted or rejected.
- The output logic operates.
- Breaker status is updated.
- SCADA receives the resulting indication.
12.2 Select-Before-Operate
In a select-before-operate scheme, the client first selects the control object and then issues the operate command.
The selection and operation stages help provide additional control security.
12.3 Interlocking
Interlocking conditions may prevent an unsafe operation.
Examples include:
- Breaker operation blocked by an active earth switch
- Disconnector operation blocked when the breaker is closed
- Remote operation blocked during local control
- Operation blocked by protection or maintenance conditions
The actual interlocking must be engineered and tested in the relay or station automation system.
12.4 Control Testing
Test:
- Command selection
- Command acceptance
- Command rejection
- Interlocking
- Local/remote status
- Output operation
- Breaker feedback
- Command termination
- Communication failure response
Do not assume that successful MMS communication guarantees correct breaker control.
13. GE Multilin MMS Integration with SICAM PAS
SICAM PAS can be used as a station-level automation platform for integrating compatible IEC 61850 IEDs.
A supported GE Multilin relay can provide measurements, status and event information to SICAM PAS through MMS.
13.1 Typical System Architecture
A typical arrangement may include:
- GE Multilin feeder protection relay
- GE Multilin transformer protection relay
- Ethernet switch
- SICAM PAS server
- Operator workstation
- Control-centre gateway
13.2 Integration Procedure
Step 1 – Verify Relay Compatibility
Confirm the exact relay model, firmware and supported IEC 61850 services.
Step 2 – Obtain the Correct SCL File
Use the appropriate IED description file.
Step 3 – Import the IED
Import the GE Multilin relay into the system configuration environment.
Step 4 – Review the Data Model
Identify the required logical nodes, data objects and attributes.
Step 5 – Configure Datasets and Reports
Select the required information and configure the reporting services.
Step 6 – Configure SICAM PAS
Configure the IEC 61850 client connection and required data points.
Step 7 – Verify Measurements
Check values, units, scaling and quality.
Step 8 – Verify Events
Test protection status changes, alarms and breaker indications.
Step 9 – Test Control
Where supported and required, test the control services and interlocking.
Step 10 – Archive Configuration
Save the final SCL files, point lists, relay configuration and test records.
13.3 Typical SCADA Point List
| SCADA point | Typical information |
|---|---|
| IA | Phase A current |
| IB | Phase B current |
| IC | Phase C current |
| UAB | Phase-to-phase voltage |
| UBC | Phase-to-phase voltage |
| UCA | Phase-to-phase voltage |
| Frequency | System frequency |
| Breaker position | Open/closed status |
| Protection trip | Protection operation |
| Earth fault | Earth-fault status |
| Relay health | Device supervision |
| Communication status | IED communication condition |
These are illustrative point names. The actual IEC 61850 references and measurement units must be taken from the relay’s data model.
14. GE Multilin MMS Configuration Workflow
The exact software and procedure vary between GE Multilin relay families.
The following is a generic engineering sequence.
Step 1 – Identify the Relay
Record:
- Model
- Order code
- Firmware
- Communication hardware
- IEC 61850 edition
- Supported services
Step 2 – Confirm Network Settings
Check:
- IP address
- Subnet mask
- Gateway, if required
- Ethernet interface
- Network connection
Step 3 – Obtain the SCL File
Obtain the correct ICD or other applicable description file.
Confirm compatibility with the installed firmware.
Step 4 – Inspect the Data Model
Review the available logical devices, logical nodes, datasets and services.
Step 5 – Define SCADA Requirements
Prepare the point list for:
- Measurements
- Alarms
- Protection status
- Breaker status
- Device health
- Controls
Step 6 – Configure Reporting
Create or select the required datasets and configure the appropriate RCBs.
Step 7 – Configure the Client
Configure the SCADA or gateway system to communicate with the relay.
Step 8 – Verify Data Exchange
Check online measurements, status, quality and timestamps.
Step 9 – Test Events and Controls
Test the complete application, including control interlocking where applicable.
Step 10 – Save and Archive
Back up all configurations and record the final revision.
15. Testing MMS Communication with IEDScout
IEDScout can help engineers inspect the IEC 61850 data model and test communication with supported IEDs.
15.1 Connection Procedure
- Connect the engineering PC to the substation network.
- Configure the PC’s network interface.
- Confirm the relay’s IP address.
- Verify network connectivity.
- Open IEDScout.
- Connect to the IED using the supported IEC 61850 interface.
- Browse the logical devices.
- Inspect the logical nodes.
- Read selected data objects.
- Compare online values with expected relay measurements.
15.2 Measurement Verification
For a feeder relay, check:
- Phase currents
- Phase voltages
- Frequency
- Active power
- Reactive power
- Power factor
Verify units, scaling, phase assignment and quality.
15.3 Reporting Verification
Where supported, inspect:
- Dataset configuration
- Report Control Blocks
- General interrogation
- Integrity reporting
- Data-change reporting
- Client association
A successful online read does not prove that reporting is correctly configured. Test the reporting service separately.
16. MMS Troubleshooting with Wireshark
Wireshark can help engineers investigate communication problems at the Ethernet and TCP/IP levels.
MMS communication commonly uses TCP transport.
The exact network configuration and ports must be verified from the system design and device documentation.
16.1 Common Symptoms
- SCADA cannot connect to the relay.
- Client connects but cannot browse the data model.
- Measurements are not updated.
- Reports are not received.
- Quality information is incorrect.
- Control commands are rejected.
- Communication disconnects intermittently.
16.2 Troubleshooting Procedure
- Confirm the physical Ethernet connection.
- Check the relay IP address.
- Check the engineering PC or client network configuration.
- Confirm that the server is reachable.
- Capture traffic at a suitable network point.
- Inspect TCP connection establishment.
- Check the MMS association.
- Examine client requests and server responses.
- Review report configuration.
- Verify the corresponding IED data model.
16.3 Typical Problems
| Symptom | Possible cause | Recommended action |
|---|---|---|
| No TCP connection | Incorrect IP or network path | Verify addressing and routing |
| Connection rejected | Server or association limitation | Check relay configuration and client limits |
| Data model unavailable | Incorrect IED configuration or client request | Verify server model and SCL file |
| Wrong measurement | Incorrect data reference or scaling | Check data attributes and units |
| Reports not received | Incorrect RCB or dataset | Review reporting configuration |
| Events lost during disconnection | Unbuffered reporting or buffer limitations | Review BRCB requirements and capacity |
| Control rejected | Interlocking or control-model issue | Review control configuration and permissives |
| Intermittent connection | Network or device resource issue | Check switch, traffic and device diagnostics |
17. Time Synchronization and MMS Event Reporting
Accurate timestamps are important for event reporting and disturbance analysis.
Common substation synchronization methods include:
- SNTP
- NTP
- IRIG-B
- IEEE 1588 PTP
The available methods depend on the relay hardware and firmware.
17.1 Why Time Synchronization Matters
Consider a fault involving several protection IEDs.
The sequence may include:
- Feeder protection detects a fault.
- Transformer protection records an alarm.
- Breaker failure protection initiates.
- A circuit breaker opens.
- A backup trip occurs.
Accurate timestamps help the engineer reconstruct the sequence.
17.2 Engineering Checks
Verify:
- Time source
- Synchronization protocol
- Network connectivity
- Time zone
- Timestamp quality
- Synchronization-loss indication
- Event ordering
MMS reporting cannot compensate for an incorrectly synchronized relay clock.
18. MMS Communication Performance and Network Design
MMS traffic should be considered as part of the overall substation Ethernet design.
The engineer should consider:
- Number of IEDs
- Number of clients
- Number of report control blocks
- Dataset sizes
- Integrity reporting intervals
- Event frequency
- Network bandwidth
- Switch performance
- Redundancy architecture
18.1 Reporting Strategy
A practical reporting design separates information according to operational importance.
For example:
- Protection events: event-driven reporting
- Breaker status: event-driven reporting
- Electrical measurements: periodic or change-based reporting
- Device health: event and periodic reporting
The exact strategy should be agreed between the protection and SCADA engineering teams.
18.2 Avoid Excessive Reporting
Too many report updates can increase network traffic and make the SCADA database harder to maintain.
Select the required information carefully.
19. Cybersecurity Considerations
MMS communication must be implemented within the substation cybersecurity architecture.
Important considerations include:
- Network segmentation
- Controlled engineering access
- User authentication
- Password management
- Role-based access
- Secure remote access
- Firmware and configuration control
- Logging
- Physical security
- Firewall rules and approved communication paths
IEC 61850 communication does not automatically make the system secure.
Where IEC 62351 security mechanisms are required, verify the actual support provided by the relay, gateway and SCADA system. Do not assume support for a particular TLS version or security feature without checking the relevant product documentation.
20. MMS Commissioning Test Matrix
The following table provides an example of a commissioning test structure.
| Test | Test condition | Expected result |
|---|---|---|
| Network connectivity | Connect client to relay | Server reachable |
| MMS association | Establish client connection | Association established |
| Data model browsing | Browse logical devices and nodes | Correct model visible |
| Measurement read | Read phase currents | Correct value and unit |
| Quality verification | Check measurement quality | Expected quality information |
| General interrogation | Request current dataset | Current values received |
| Data-change report | Change a monitored signal | Event report received |
| Integrity report | Wait for configured interval | Periodic report received |
| Buffered report | Interrupt and restore communication | Buffered events handled within capacity |
| Control test | Issue approved control command | Correct response and feedback |
| Communication loss | Disconnect network path | Communication failure indicated |
| Recovery | Restore communication | Client reconnects and data refreshes |
21. Common MMS Engineering Mistakes
Mistake 1: Using an Incorrect SCL File
An outdated or incompatible SCL file may not describe the actual IED data model.
Recommendation: Verify the model and firmware before importing the file.
Mistake 2: Incorrect Data Reference
The client may read the wrong logical node or data attribute.
Recommendation: Verify every point against the online IED data model.
Mistake 3: Ignoring Measurement Scaling
The relay may provide a value in a different representation from the one expected by SCADA.
Recommendation: Verify units, multipliers and primary/secondary representation.
Mistake 4: Incorrect Report Control Block Configuration
A dataset may exist, but the client may not receive reports.
Recommendation: Check RCB configuration, client association and trigger options.
Mistake 5: Using Unbuffered Reporting for Critical Events Without Considering Disconnection
Events may be lost during communication interruptions.
Recommendation: Evaluate whether buffered reporting is required and confirm buffer capacity.
Mistake 6: Assuming Successful Reading Means Reporting Works
Reading a data object and receiving reports are different services.
Recommendation: Test both independently.
Mistake 7: Ignoring Data Quality
A stale or invalid value may be displayed as a valid measurement.
Recommendation: Configure SCADA to process quality information correctly.
Mistake 8: Testing Control Without Interlocking Verification
A successful command may still be unsafe if interlocking is not correctly engineered.
Recommendation: Test permitted and rejected operating conditions.
22. MMS Commissioning Checklist
IED identification
- GE Multilin model verified
- Order code recorded
- Firmware version recorded
- IEC 61850 edition confirmed
- MMS server capability confirmed
- Supported services reviewed
Network configuration
- IP address verified
- Subnet mask verified
- Gateway checked where applicable
- Ethernet connectivity tested
- Switch configuration reviewed
- Network access controlled
Data model and datasets
- Correct SCL file obtained
- Logical devices verified
- Logical nodes verified
- Data references checked
- Measurement scaling checked
- Required datasets configured
Reporting
- RCBs configured
- BRCB or URCB selection reviewed
- Trigger options checked
- General interrogation tested
- Integrity reporting tested
- Event reporting tested
- Quality information verified
- Timestamp information verified
Control
- Required control services verified
- Control model confirmed
- Interlocking tested
- Local/remote status checked
- Command rejection tested
- Feedback verified
Final documentation
- Final SCL files archived
- SCADA point list updated
- Relay configuration backed up
- Communication test report completed
- Control test report completed
- As-built documentation updated
23. Training on GE Multilin MMS and IEC 61850 Integration by Elec-Engg
Practical MMS engineering requires knowledge of the IEC 61850 data model, client-server communication, datasets, reporting, SCADA integration and communication troubleshooting.
Elec-Engg provides practical technical training by Dr Saeed Roostaee (Electrical Engineering) for protection, commissioning, operation, maintenance and substation automation engineers.
Relevant training subjects include:
- IEC 61850 fundamentals
- GE Multilin IEC 61850 communication
- MMS client-server architecture
- Logical devices and logical nodes
- Data objects and data attributes
- IEC 61850 data references
- Datasets and Report Control Blocks
- Buffered and unbuffered reporting
- General interrogation and integrity reporting
- IEC 61850 control services
- SCADA integration
- Siemens SICAM PAS integration
- IEDScout practical engineering
- Wireshark MMS analysis
- Time synchronization
- Communication troubleshooting
- IEC 61850 commissioning and testing
Training delivery options include:
- Pre-recorded video courses
- Structured self-paced training
- Live online technical training
- Face-to-face training
- Customized in-house training for utilities and industrial companies
The focus is on practical engineering, helping engineers understand how relay information is structured, transferred to SCADA systems and verified during commissioning.
Explore Elec-Engg training resources:
For customized training and technical enquiries:
24. Conclusion
MMS is an essential communication service in IEC 61850-based substation automation systems. It allows supported GE Multilin relays to provide measurements, protection indications, breaker status and other information to SCADA systems and gateways.
Successful MMS integration requires correct understanding of the IEC 61850 data model, data references, datasets, Report Control Blocks, communication associations, quality information and control services.
The most important engineering principle is to verify both data access and reporting. An IED that can be reached over Ethernet is not necessarily correctly integrated into SCADA.
A complete commissioning process should verify measurements, status indications, event reporting, timestamps, control functions and communication-loss behaviour.
25. Frequently Asked Questions
1. What is MMS communication in GE Multilin relays?
MMS is an IEC 61850 client-server communication service that allows supported GE Multilin relays to provide measurements, status and other information to SCADA and gateway systems.
2. Is MMS the same as GOOSE?
No. MMS uses a client-server architecture and is commonly used for monitoring, reporting and supported control. GOOSE uses publisher-subscriber communication for event-based information exchange between IEDs.
3. What is a Report Control Block?
A Report Control Block defines how selected data is reported from an IEC 61850 server to a client.
4. What is the difference between BRCB and URCB?
A BRCB supports event buffering subject to its implementation and capacity. A URCB does not provide the same event-buffer retention mechanism.
5. What is general interrogation?
General interrogation is a service through which a client requests the current information associated with a dataset.
6. Can GE Multilin relays send measurements to SICAM PAS?
Supported GE Multilin relays can provide measurements through IEC 61850 MMS when the relay and SICAM PAS versions support compatible communication services and data models.
7. How can I verify MMS communication?
Use suitable IEC 61850 engineering tools to establish an association, browse the data model, read measurements and test reporting.
8. Why are SCADA measurements incorrect?
Possible causes include incorrect data references, scaling, units, phase assignment or quality handling.
9. Can MMS be used to operate a circuit breaker?
IEC 61850 supports control services, but actual breaker control depends on the relay implementation, configured control model, interlocking and approved system design.
10. What is the role of Wireshark in MMS troubleshooting?
Wireshark can help analyse network traffic, TCP communication and MMS exchanges to identify connection and data-transfer problems.
11. Why is buffered reporting important?
Buffered reporting can retain events during temporary client disconnection, subject to the buffer capacity and implementation.
12. Where can I receive practical GE Multilin MMS training?
Elec-Engg provides practical technical training by Dr Saeed Roostaee (Electrical Engineering). Visit https://elec-engg.com/ or contact https://elec-engg.com/contact/.
Practical guide to GE Multilin MMS communication covering IEC 61850 client-server architecture, datasets, report control blocks, SCADA integration, SICAM PAS and troubleshooting.
GE Multilin MMS, GE MMS Communication, IEC 61850 MMS, MMS Client Server, IEC 61850 Reporting, Report Control Block, BRCB, URCB, Buffered Reporting, Unbuffered Reporting, IEC 61850 Dataset, General Interrogation, Integrity Reporting, Logical Nodes, IEC 61850 Data Model, SICAM PAS, SCADA Integration, IEDScout, Wireshark, GE Multilin Relay, Substation Automation, IEC 61850 Testing, Relay Commissioning