GE Multilin IEC 61850 MMS Communication: Client-Server Architecture, Datasets, Report Control Blocks, SCADA Integration and Troubleshooting

Table Of Contents
  1. 1. Introduction
  2. 2. What Is MMS in IEC 61850?
  3. 3. MMS Client-Server Architecture
  4. 4. IEC 61850 Data Model Used by MMS
  5. 5. Understanding IEC 61850 Data References
  6. 6. Measurements Through MMS
  7. 7. Data Quality and Timestamp
  8. 8. Datasets in MMS Communication
  9. 9. Report Control Blocks
  10. 10. Report Trigger Options
  11. 11. General Interrogation and Integrity Reporting
  12. 12. MMS Control Services
  13. 13. GE Multilin MMS Integration with SICAM PAS
  14. 14. GE Multilin MMS Configuration Workflow
  15. 15. Testing MMS Communication with IEDScout
  16. 16. MMS Troubleshooting with Wireshark
  17. 17. Time Synchronization and MMS Event Reporting
  18. 18. MMS Communication Performance and Network Design
  19. 19. Cybersecurity Considerations
  20. 20. MMS Commissioning Test Matrix
  21. 21. Common MMS Engineering Mistakes
  22. 22. MMS Commissioning Checklist
  23. 23. Training on GE Multilin MMS and IEC 61850 Integration by Elec-Engg
  24. 24. Conclusion
  25. 25. Frequently Asked Questions

1. Introduction

Manufacturing Message Specification (MMS) is a central communication service in IEC 61850-based substation automation systems. It enables SCADA systems, gateways, engineering tools and other IEC 61850 clients to access information provided by protection and control intelligent electronic devices (IEDs).

For engineers working with GE Multilin protection relays, MMS communication is particularly important for integrating relay measurements, protection indications, breaker status, alarms and supported control functions into a station-level automation system.

Unlike GOOSE, which is primarily used for event-based communication between IEDs, MMS follows a client-server architecture. A client establishes communication with an IED server and accesses the data and services made available by that device.

This article explains the practical engineering principles of MMS communication with GE Multilin relays, including:

  • IEC 61850 MMS architecture
  • Client-server communication
  • Logical devices and logical nodes
  • Data objects and data attributes
  • IEC 61850 data references
  • Datasets and Report Control Blocks
  • Buffered and unbuffered reporting
  • General interrogation and integrity reporting
  • SCADA integration
  • Siemens SICAM PAS integration
  • Control services
  • IEDScout testing
  • Wireshark troubleshooting
  • Commissioning and documentation

Important: MMS services and their implementation vary between GE Multilin models, firmware versions and communication options. Confirm the exact capabilities of the installed relay before engineering the system. The examples below describe general IEC 61850 principles rather than guaranteed menu paths or features in every GE Multilin device.

2. What Is MMS in IEC 61850?

MMS stands for Manufacturing Message Specification. It is an international communication protocol used in industrial automation.

IEC 61850 uses MMS for client-server communication between substation IEDs and higher-level systems.

A typical architecture may include:

  • GE Multilin protection relay acting as an IEC 61850 server
  • SICAM PAS acting as an IEC 61850 client
  • Station-level SCADA system
  • Engineering workstation
  • Gateway to a control centre

<AsyncImage query=”IEC 61850 MMS client server communication architecture protection relay SCADA gateway diagram” aspectRatio=”16:9″ width=”100%”/>

2.1 What Does MMS Allow an Engineer to Do?

Depending on the relay’s implementation, MMS can support:

  • Reading measurements
  • Accessing protection status
  • Receiving event reports
  • Monitoring circuit-breaker position
  • Accessing device information
  • Reading data quality and timestamps
  • Operating supported control objects
  • Accessing supported files or other services

The exact list of available services must be confirmed against the relay’s IEC 61850 documentation.

2.2 MMS Is Not the Same as GOOSE

MMS and GOOSE serve different purposes.

FeatureMMSGOOSE
Communication modelClient-serverPublisher-subscriber
Typical purposeSCADA monitoring and supported controlFast event exchange between IEDs
CommunicationCommonly TCP/IPEthernet multicast
Typical recipientSCADA or gateway clientOne or more IED subscribers
Typical informationMeasurements, status, reportsProtection and interlocking events
Data organizationIEC 61850 data model and servicesDataset associated with GOOSE control block

A substation may use both services simultaneously.

3. MMS Client-Server Architecture

In IEC 61850 MMS communication, one device provides information while another device accesses that information.

3.1 MMS Server

The server is the IED that exposes its IEC 61850 data model.

For example, a supported GE Multilin relay may provide:

  • Phase current measurements
  • Voltage measurements
  • Frequency
  • Protection operation status
  • Circuit-breaker status
  • Device health information

3.2 MMS Client

The client establishes communication with the server and accesses the required information.

Typical clients include:

  • SICAM PAS
  • SCADA servers
  • Substation gateways
  • Engineering tools
  • IEC 61850 test applications

3.3 Multiple Clients

Depending on the server’s supported connections and configuration, more than one client may communicate with an IED.

The engineer must consider:

  • Maximum client associations
  • Connection limits
  • Client authorization
  • Network capacity
  • Reporting configuration
  • Device processing limitations

Do not assume that every relay supports unlimited simultaneous MMS clients.

4. IEC 61850 Data Model Used by MMS

MMS communication uses the IEC 61850 data model.

The data model provides a structured representation of the IED’s information.

The general hierarchy is:

  1. Physical IED
  2. Logical device
  3. Logical node
  4. Data object
  5. Data attribute

4.1 Physical IED

The physical IED is the actual GE Multilin relay installed in the panel.

4.2 Logical Device

A logical device groups related functions within the IED.

The device may contain one or more logical devices depending on the implementation.

4.3 Logical Node

A logical node represents a standardized function or information category.

Examples include:

Logical nodeGeneral function
MMXUElectrical measurements
MMTRMetering information
PTOCTime overcurrent protection
PIOCInstantaneous overcurrent protection
PDIFDifferential protection
PDISDistance protection
XCBRCircuit-breaker information
XSWISwitch information
CSWISwitch control
PTRCProtection trip conditioning
GGIOGeneric process input/output
LPHDPhysical device information
LLN0Logical device common information

The actual logical nodes and instances available in a GE Multilin relay depend on the model and firmware.

4.4 Data Objects

Data objects represent specific information within a logical node.

For example, a measurement logical node may contain phase-current information.

A circuit-breaker logical node may contain position information.

4.5 Data Attributes

Data attributes represent the individual values and properties of a data object.

Common attribute concepts include:

  • Value
  • Quality
  • Timestamp
  • Validity
  • Functional constraint
  • Control-related information

This structure allows an IEC 61850 client to access information in a standardized way.

5. Understanding IEC 61850 Data References

A data reference identifies a particular item in the IEC 61850 data model.

A reference generally contains the IED name, logical device, logical node, data object and data attribute.

An illustrative reference may look like:

IED1LD0/MMXU1.A.phsA.cVal.mag.f

This is an example of IEC 61850 naming structure, not a guaranteed reference in any particular GE Multilin relay.

5.1 Why Data References Matter

The SCADA engineer must identify the correct data reference for every required point.

For example, an operator may need:

  • Phase A current
  • Phase B current
  • Phase C current
  • Breaker position
  • Protection trip
  • Relay health

If the wrong data attribute is selected, the SCADA point may show an incorrect value or status.

5.2 Data Reference Verification

For every required point:

  1. Identify the IED.
  2. Identify the logical device.
  3. Locate the logical node.
  4. Locate the data object.
  5. Identify the correct data attribute.
  6. Confirm the functional constraint.
  7. Check the data type.
  8. Verify the value online.

The actual reference must come from the IED’s data model or approved SCL description.

6. Measurements Through MMS

A common MMS application is transferring electrical measurements from protection relays to SCADA.

Examples include:

  • Phase currents
  • Phase voltages
  • Frequency
  • Active power
  • Reactive power
  • Apparent power
  • Power factor
  • Energy measurements, where supported

6.1 Measurement Logical Nodes

MMXU is commonly associated with electrical measurements.

MMTR may be used for metering information.

The available measurement objects depend on the relay’s IEC 61850 implementation.

6.2 Measurement Scaling

A relay may expose measurements in engineering units or in a standardized representation with scaling information.

The SCADA engineer must understand:

  • Data type
  • Unit
  • Multiplier
  • Scaling
  • Primary or secondary representation
  • Phase assignment
  • Quality

6.3 Practical Example: Feeder Current

Consider an 11 kV feeder with a CT ratio of 400/1.

The primary current is 240 A.

The CT secondary current is:

[
I_s=\frac{240}{400}=0.6\text{ A}
]

If the relay’s IEC 61850 measurement represents primary amperes, the SCADA display should be engineered to show 240 A.

If the relay exposes secondary amperes, the SCADA scaling must be configured accordingly.

Never assume the measurement scaling without checking the relay documentation and online data.

7. Data Quality and Timestamp

IEC 61850 data is not just a value.

For many data objects, quality and timestamp information are important parts of the communication.

7.1 Quality

Quality information helps the client determine whether a value is usable.

It may indicate conditions such as:

  • Validity
  • Test status
  • Operator blocking
  • Substitution
  • Other quality flags

The client should not treat every received value as valid without checking its quality.

7.2 Timestamp

Timestamp information allows the SCADA system to understand when a value or event was generated.

Accurate timestamps are important for:

  • Sequence-of-events analysis
  • Fault investigation
  • Protection operation review
  • Disturbance reconstruction

7.3 Invalid or Questionable Data

If the relay communication is interrupted or the data becomes invalid, the SCADA system should represent the condition appropriately.

The display should not silently present an old value as if it were current.

8. Datasets in MMS Communication

A dataset is a collection of IEC 61850 data attributes.

In MMS applications, datasets are commonly used with reporting services.

For example, a feeder dataset may include:

  • Phase current measurements
  • Breaker position
  • Overcurrent protection status
  • Earth-fault protection status
  • Device health

8.1 Dataset Selection

A dataset should be designed according to the SCADA requirements.

Avoid adding unnecessary data objects.

The engineer should consider:

  • Required measurements
  • Required status signals
  • Quality and timestamp requirements
  • Reporting performance
  • Client requirements
  • IED resource limitations

8.2 Dataset Consistency

The dataset used by the IED must match the configuration expected by the client.

A mismatch can cause reporting failures or incomplete point updates.

9. Report Control Blocks

Report Control Blocks (RCBs) define how data is reported from an IEC 61850 server to a client.

There are two widely used types:

  • Buffered Report Control Block (BRCB)
  • Unbuffered Report Control Block (URCB)

<AsyncImage query=”IEC 61850 buffered and unbuffered report control block BRCB URCB architecture diagram” aspectRatio=”16:9″ width=”100%”/>

9.1 Buffered Report Control Block

A BRCB can retain report events during a temporary communication interruption, subject to its buffer capacity and implementation.

When the client reconnects, buffered events may be delivered.

This is valuable when event history must be preserved.

9.2 Unbuffered Report Control Block

A URCB provides reporting without the same event-buffer retention mechanism.

Events occurring while the client is disconnected may not be available later through that report.

9.3 BRCB and URCB Comparison

FeatureBRCBURCB
Event bufferingYes, subject to implementation and capacityNo equivalent event buffer
Client disconnectionCan retain eventsEvents may be lost
Historical event recoveryPossible within buffer limitsNot generally available
Typical applicationImportant event reportingCurrent status and monitoring
Engineering considerationBuffer capacity and reservationClient connection and update behaviour

9.4 RCB Parameters

Common reporting parameters include:

  • Report ID
  • Dataset reference
  • Buffered or unbuffered mode
  • Trigger options
  • Integrity period
  • General interrogation
  • Optional fields
  • Client association

The available parameters and behaviour depend on the relay’s implementation.

10. Report Trigger Options

Reporting trigger options determine when the IED sends information to the client.

Common trigger categories include:

10.1 Data Change

A report is generated when a monitored value changes.

Examples:

  • Breaker position changes
  • Protection status changes
  • Alarm status changes

10.2 Quality Change

A report is generated when the quality of a monitored data item changes.

For example, a measurement may become invalid.

10.3 Data Update

A report can be generated when a value is updated, even if the value itself does not change, depending on the configured service and implementation.

10.4 Integrity Reporting

Integrity reporting provides periodic updates of selected data.

It helps the client refresh its view of the IED.

10.5 General Interrogation

General interrogation allows the client to request the current values of the dataset.

This is useful when a client establishes communication or needs to refresh its information.

11. General Interrogation and Integrity Reporting

Both services help maintain consistency between the IED and SCADA database.

11.1 General Interrogation

When the client requests general interrogation, the server reports the relevant dataset information.

For example, after a SCADA restart, the client may request the current:

  • Breaker positions
  • Protection status
  • Measurements
  • Alarm indications

11.2 Integrity Period

An integrity period defines the interval for periodic reporting, where supported and configured.

It helps the client refresh data even if no value changes have occurred.

11.3 Practical Engineering Considerations

The engineer should determine:

  • Which signals require event reporting
  • Which measurements require periodic updates
  • Appropriate integrity intervals
  • Network loading
  • Client database behaviour
  • Event-buffer requirements

Excessive reporting can increase communication traffic without providing meaningful operational benefits.

12. MMS Control Services

IEC 61850 can support control services in addition to monitoring and reporting.

For example, an operator may need to control a circuit breaker through the SCADA system.

Typical control-related functions include:

  • Select-before-operate
  • Direct operate
  • Enhanced security control models
  • Status and command termination information

The actual control models available depend on the IED implementation.

12.1 Circuit-Breaker Control

A typical breaker control application may involve:

  1. Operator selects a breaker.
  2. SCADA sends the required control request.
  3. IED processes the request.
  4. Interlocking and permissive conditions are evaluated.
  5. The command is accepted or rejected.
  6. The output logic operates.
  7. Breaker status is updated.
  8. SCADA receives the resulting indication.

12.2 Select-Before-Operate

In a select-before-operate scheme, the client first selects the control object and then issues the operate command.

The selection and operation stages help provide additional control security.

12.3 Interlocking

Interlocking conditions may prevent an unsafe operation.

Examples include:

  • Breaker operation blocked by an active earth switch
  • Disconnector operation blocked when the breaker is closed
  • Remote operation blocked during local control
  • Operation blocked by protection or maintenance conditions

The actual interlocking must be engineered and tested in the relay or station automation system.

12.4 Control Testing

Test:

  • Command selection
  • Command acceptance
  • Command rejection
  • Interlocking
  • Local/remote status
  • Output operation
  • Breaker feedback
  • Command termination
  • Communication failure response

Do not assume that successful MMS communication guarantees correct breaker control.

13. GE Multilin MMS Integration with SICAM PAS

SICAM PAS can be used as a station-level automation platform for integrating compatible IEC 61850 IEDs.

A supported GE Multilin relay can provide measurements, status and event information to SICAM PAS through MMS.

13.1 Typical System Architecture

A typical arrangement may include:

  • GE Multilin feeder protection relay
  • GE Multilin transformer protection relay
  • Ethernet switch
  • SICAM PAS server
  • Operator workstation
  • Control-centre gateway

13.2 Integration Procedure

Step 1 – Verify Relay Compatibility

Confirm the exact relay model, firmware and supported IEC 61850 services.

Step 2 – Obtain the Correct SCL File

Use the appropriate IED description file.

Step 3 – Import the IED

Import the GE Multilin relay into the system configuration environment.

Step 4 – Review the Data Model

Identify the required logical nodes, data objects and attributes.

Step 5 – Configure Datasets and Reports

Select the required information and configure the reporting services.

Step 6 – Configure SICAM PAS

Configure the IEC 61850 client connection and required data points.

Step 7 – Verify Measurements

Check values, units, scaling and quality.

Step 8 – Verify Events

Test protection status changes, alarms and breaker indications.

Step 9 – Test Control

Where supported and required, test the control services and interlocking.

Step 10 – Archive Configuration

Save the final SCL files, point lists, relay configuration and test records.

13.3 Typical SCADA Point List

SCADA pointTypical information
IAPhase A current
IBPhase B current
ICPhase C current
UABPhase-to-phase voltage
UBCPhase-to-phase voltage
UCAPhase-to-phase voltage
FrequencySystem frequency
Breaker positionOpen/closed status
Protection tripProtection operation
Earth faultEarth-fault status
Relay healthDevice supervision
Communication statusIED communication condition

These are illustrative point names. The actual IEC 61850 references and measurement units must be taken from the relay’s data model.

14. GE Multilin MMS Configuration Workflow

The exact software and procedure vary between GE Multilin relay families.

The following is a generic engineering sequence.

Step 1 – Identify the Relay

Record:

  • Model
  • Order code
  • Firmware
  • Communication hardware
  • IEC 61850 edition
  • Supported services

Step 2 – Confirm Network Settings

Check:

  • IP address
  • Subnet mask
  • Gateway, if required
  • Ethernet interface
  • Network connection

Step 3 – Obtain the SCL File

Obtain the correct ICD or other applicable description file.

Confirm compatibility with the installed firmware.

Step 4 – Inspect the Data Model

Review the available logical devices, logical nodes, datasets and services.

Step 5 – Define SCADA Requirements

Prepare the point list for:

  • Measurements
  • Alarms
  • Protection status
  • Breaker status
  • Device health
  • Controls

Step 6 – Configure Reporting

Create or select the required datasets and configure the appropriate RCBs.

Step 7 – Configure the Client

Configure the SCADA or gateway system to communicate with the relay.

Step 8 – Verify Data Exchange

Check online measurements, status, quality and timestamps.

Step 9 – Test Events and Controls

Test the complete application, including control interlocking where applicable.

Step 10 – Save and Archive

Back up all configurations and record the final revision.

15. Testing MMS Communication with IEDScout

IEDScout can help engineers inspect the IEC 61850 data model and test communication with supported IEDs.

15.1 Connection Procedure

  1. Connect the engineering PC to the substation network.
  2. Configure the PC’s network interface.
  3. Confirm the relay’s IP address.
  4. Verify network connectivity.
  5. Open IEDScout.
  6. Connect to the IED using the supported IEC 61850 interface.
  7. Browse the logical devices.
  8. Inspect the logical nodes.
  9. Read selected data objects.
  10. Compare online values with expected relay measurements.

15.2 Measurement Verification

For a feeder relay, check:

  • Phase currents
  • Phase voltages
  • Frequency
  • Active power
  • Reactive power
  • Power factor

Verify units, scaling, phase assignment and quality.

15.3 Reporting Verification

Where supported, inspect:

  • Dataset configuration
  • Report Control Blocks
  • General interrogation
  • Integrity reporting
  • Data-change reporting
  • Client association

A successful online read does not prove that reporting is correctly configured. Test the reporting service separately.

16. MMS Troubleshooting with Wireshark

Wireshark can help engineers investigate communication problems at the Ethernet and TCP/IP levels.

MMS communication commonly uses TCP transport.

The exact network configuration and ports must be verified from the system design and device documentation.

16.1 Common Symptoms

  • SCADA cannot connect to the relay.
  • Client connects but cannot browse the data model.
  • Measurements are not updated.
  • Reports are not received.
  • Quality information is incorrect.
  • Control commands are rejected.
  • Communication disconnects intermittently.

16.2 Troubleshooting Procedure

  1. Confirm the physical Ethernet connection.
  2. Check the relay IP address.
  3. Check the engineering PC or client network configuration.
  4. Confirm that the server is reachable.
  5. Capture traffic at a suitable network point.
  6. Inspect TCP connection establishment.
  7. Check the MMS association.
  8. Examine client requests and server responses.
  9. Review report configuration.
  10. Verify the corresponding IED data model.

16.3 Typical Problems

SymptomPossible causeRecommended action
No TCP connectionIncorrect IP or network pathVerify addressing and routing
Connection rejectedServer or association limitationCheck relay configuration and client limits
Data model unavailableIncorrect IED configuration or client requestVerify server model and SCL file
Wrong measurementIncorrect data reference or scalingCheck data attributes and units
Reports not receivedIncorrect RCB or datasetReview reporting configuration
Events lost during disconnectionUnbuffered reporting or buffer limitationsReview BRCB requirements and capacity
Control rejectedInterlocking or control-model issueReview control configuration and permissives
Intermittent connectionNetwork or device resource issueCheck switch, traffic and device diagnostics

17. Time Synchronization and MMS Event Reporting

Accurate timestamps are important for event reporting and disturbance analysis.

Common substation synchronization methods include:

  • SNTP
  • NTP
  • IRIG-B
  • IEEE 1588 PTP

The available methods depend on the relay hardware and firmware.

17.1 Why Time Synchronization Matters

Consider a fault involving several protection IEDs.

The sequence may include:

  1. Feeder protection detects a fault.
  2. Transformer protection records an alarm.
  3. Breaker failure protection initiates.
  4. A circuit breaker opens.
  5. A backup trip occurs.

Accurate timestamps help the engineer reconstruct the sequence.

17.2 Engineering Checks

Verify:

  • Time source
  • Synchronization protocol
  • Network connectivity
  • Time zone
  • Timestamp quality
  • Synchronization-loss indication
  • Event ordering

MMS reporting cannot compensate for an incorrectly synchronized relay clock.

18. MMS Communication Performance and Network Design

MMS traffic should be considered as part of the overall substation Ethernet design.

The engineer should consider:

  • Number of IEDs
  • Number of clients
  • Number of report control blocks
  • Dataset sizes
  • Integrity reporting intervals
  • Event frequency
  • Network bandwidth
  • Switch performance
  • Redundancy architecture

18.1 Reporting Strategy

A practical reporting design separates information according to operational importance.

For example:

  • Protection events: event-driven reporting
  • Breaker status: event-driven reporting
  • Electrical measurements: periodic or change-based reporting
  • Device health: event and periodic reporting

The exact strategy should be agreed between the protection and SCADA engineering teams.

18.2 Avoid Excessive Reporting

Too many report updates can increase network traffic and make the SCADA database harder to maintain.

Select the required information carefully.

19. Cybersecurity Considerations

MMS communication must be implemented within the substation cybersecurity architecture.

Important considerations include:

  • Network segmentation
  • Controlled engineering access
  • User authentication
  • Password management
  • Role-based access
  • Secure remote access
  • Firmware and configuration control
  • Logging
  • Physical security
  • Firewall rules and approved communication paths

IEC 61850 communication does not automatically make the system secure.

Where IEC 62351 security mechanisms are required, verify the actual support provided by the relay, gateway and SCADA system. Do not assume support for a particular TLS version or security feature without checking the relevant product documentation.

20. MMS Commissioning Test Matrix

The following table provides an example of a commissioning test structure.

TestTest conditionExpected result
Network connectivityConnect client to relayServer reachable
MMS associationEstablish client connectionAssociation established
Data model browsingBrowse logical devices and nodesCorrect model visible
Measurement readRead phase currentsCorrect value and unit
Quality verificationCheck measurement qualityExpected quality information
General interrogationRequest current datasetCurrent values received
Data-change reportChange a monitored signalEvent report received
Integrity reportWait for configured intervalPeriodic report received
Buffered reportInterrupt and restore communicationBuffered events handled within capacity
Control testIssue approved control commandCorrect response and feedback
Communication lossDisconnect network pathCommunication failure indicated
RecoveryRestore communicationClient reconnects and data refreshes

21. Common MMS Engineering Mistakes

Mistake 1: Using an Incorrect SCL File

An outdated or incompatible SCL file may not describe the actual IED data model.

Recommendation: Verify the model and firmware before importing the file.

Mistake 2: Incorrect Data Reference

The client may read the wrong logical node or data attribute.

Recommendation: Verify every point against the online IED data model.

Mistake 3: Ignoring Measurement Scaling

The relay may provide a value in a different representation from the one expected by SCADA.

Recommendation: Verify units, multipliers and primary/secondary representation.

Mistake 4: Incorrect Report Control Block Configuration

A dataset may exist, but the client may not receive reports.

Recommendation: Check RCB configuration, client association and trigger options.

Mistake 5: Using Unbuffered Reporting for Critical Events Without Considering Disconnection

Events may be lost during communication interruptions.

Recommendation: Evaluate whether buffered reporting is required and confirm buffer capacity.

Mistake 6: Assuming Successful Reading Means Reporting Works

Reading a data object and receiving reports are different services.

Recommendation: Test both independently.

Mistake 7: Ignoring Data Quality

A stale or invalid value may be displayed as a valid measurement.

Recommendation: Configure SCADA to process quality information correctly.

Mistake 8: Testing Control Without Interlocking Verification

A successful command may still be unsafe if interlocking is not correctly engineered.

Recommendation: Test permitted and rejected operating conditions.

22. MMS Commissioning Checklist

IED identification

  • GE Multilin model verified
  • Order code recorded
  • Firmware version recorded
  • IEC 61850 edition confirmed
  • MMS server capability confirmed
  • Supported services reviewed

Network configuration

  • IP address verified
  • Subnet mask verified
  • Gateway checked where applicable
  • Ethernet connectivity tested
  • Switch configuration reviewed
  • Network access controlled

Data model and datasets

  • Correct SCL file obtained
  • Logical devices verified
  • Logical nodes verified
  • Data references checked
  • Measurement scaling checked
  • Required datasets configured

Reporting

  • RCBs configured
  • BRCB or URCB selection reviewed
  • Trigger options checked
  • General interrogation tested
  • Integrity reporting tested
  • Event reporting tested
  • Quality information verified
  • Timestamp information verified

Control

  • Required control services verified
  • Control model confirmed
  • Interlocking tested
  • Local/remote status checked
  • Command rejection tested
  • Feedback verified

Final documentation

  • Final SCL files archived
  • SCADA point list updated
  • Relay configuration backed up
  • Communication test report completed
  • Control test report completed
  • As-built documentation updated

23. Training on GE Multilin MMS and IEC 61850 Integration by Elec-Engg

Practical MMS engineering requires knowledge of the IEC 61850 data model, client-server communication, datasets, reporting, SCADA integration and communication troubleshooting.

Elec-Engg provides practical technical training by Dr Saeed Roostaee (Electrical Engineering) for protection, commissioning, operation, maintenance and substation automation engineers.

Relevant training subjects include:

  • IEC 61850 fundamentals
  • GE Multilin IEC 61850 communication
  • MMS client-server architecture
  • Logical devices and logical nodes
  • Data objects and data attributes
  • IEC 61850 data references
  • Datasets and Report Control Blocks
  • Buffered and unbuffered reporting
  • General interrogation and integrity reporting
  • IEC 61850 control services
  • SCADA integration
  • Siemens SICAM PAS integration
  • IEDScout practical engineering
  • Wireshark MMS analysis
  • Time synchronization
  • Communication troubleshooting
  • IEC 61850 commissioning and testing

Training delivery options include:

  • Pre-recorded video courses
  • Structured self-paced training
  • Live online technical training
  • Face-to-face training
  • Customized in-house training for utilities and industrial companies

The focus is on practical engineering, helping engineers understand how relay information is structured, transferred to SCADA systems and verified during commissioning.

Explore Elec-Engg training resources:

https://elec-engg.com

For customized training and technical enquiries:

https://elec-engg.com/contact

24. Conclusion

MMS is an essential communication service in IEC 61850-based substation automation systems. It allows supported GE Multilin relays to provide measurements, protection indications, breaker status and other information to SCADA systems and gateways.

Successful MMS integration requires correct understanding of the IEC 61850 data model, data references, datasets, Report Control Blocks, communication associations, quality information and control services.

The most important engineering principle is to verify both data access and reporting. An IED that can be reached over Ethernet is not necessarily correctly integrated into SCADA.

A complete commissioning process should verify measurements, status indications, event reporting, timestamps, control functions and communication-loss behaviour.

25. Frequently Asked Questions

1. What is MMS communication in GE Multilin relays?

MMS is an IEC 61850 client-server communication service that allows supported GE Multilin relays to provide measurements, status and other information to SCADA and gateway systems.

2. Is MMS the same as GOOSE?

No. MMS uses a client-server architecture and is commonly used for monitoring, reporting and supported control. GOOSE uses publisher-subscriber communication for event-based information exchange between IEDs.

3. What is a Report Control Block?

A Report Control Block defines how selected data is reported from an IEC 61850 server to a client.

4. What is the difference between BRCB and URCB?

A BRCB supports event buffering subject to its implementation and capacity. A URCB does not provide the same event-buffer retention mechanism.

5. What is general interrogation?

General interrogation is a service through which a client requests the current information associated with a dataset.

6. Can GE Multilin relays send measurements to SICAM PAS?

Supported GE Multilin relays can provide measurements through IEC 61850 MMS when the relay and SICAM PAS versions support compatible communication services and data models.

7. How can I verify MMS communication?

Use suitable IEC 61850 engineering tools to establish an association, browse the data model, read measurements and test reporting.

8. Why are SCADA measurements incorrect?

Possible causes include incorrect data references, scaling, units, phase assignment or quality handling.

9. Can MMS be used to operate a circuit breaker?

IEC 61850 supports control services, but actual breaker control depends on the relay implementation, configured control model, interlocking and approved system design.

10. What is the role of Wireshark in MMS troubleshooting?

Wireshark can help analyse network traffic, TCP communication and MMS exchanges to identify connection and data-transfer problems.

11. Why is buffered reporting important?

Buffered reporting can retain events during temporary client disconnection, subject to the buffer capacity and implementation.

12. Where can I receive practical GE Multilin MMS training?

Elec-Engg provides practical technical training by Dr Saeed Roostaee (Electrical Engineering). Visit https://elec-engg.com/ or contact https://elec-engg.com/contact/.


Practical guide to GE Multilin MMS communication covering IEC 61850 client-server architecture, datasets, report control blocks, SCADA integration, SICAM PAS and troubleshooting.

GE Multilin MMS, GE MMS Communication, IEC 61850 MMS, MMS Client Server, IEC 61850 Reporting, Report Control Block, BRCB, URCB, Buffered Reporting, Unbuffered Reporting, IEC 61850 Dataset, General Interrogation, Integrity Reporting, Logical Nodes, IEC 61850 Data Model, SICAM PAS, SCADA Integration, IEDScout, Wireshark, GE Multilin Relay, Substation Automation, IEC 61850 Testing, Relay Commissioning