Config and testing of the generator, transformer, line, and motor protection functions

Course Title & Dates

  • Config and testing of the generator, transformer, line, and motor protection functions
  • 4 days

Trainer Profile

Registration

email: saeed61850@gmail.com

Tentative Course Schedule

Day 1
  TIME 

TRAINING SCHEDULE & TOPICS

9.00am – 10.30amABB relays, PCM 600 installation, Connectivity pack installation, Hardware configuration, Application configuration, Signal matrix Parameter setting, IED read and write IED online monitoring and signal monitoring Disturbance, and event viewer
10.30 am – 10.45 amTEA BREAK
10.45am –1.00pm  SIPROTEC 5 relay families and applications DIGSI 5 and device driver installation SIPROTEC 5 configurator Relay configuration
1.00pm – 2.00pmLUNCH
2.00pm –3.30pm    SIPROTEC 4 Relay families DIGSI 4 installation Masking I/O CFC Fault Recorder
3.30pm – 3.45pmTEA BREAK
3.45pm – 5.00pm    MiCOM relays range, naming, and application Easergy Software Configuration and PSL Event and disturbance recorder

Day 2

  TIME 

TRAINING SCHEDULE & TOPICS

9.00am – 10.30am    OMICRON CMC Test universe softwareAMT105  AMPro software signal view, impedance view, vector view different types of test modulesRIO, XRIO, and PTL
10.30 am10.45 amTEA BREAK
10.45am – 1.00pm        Principle of Differential Protection87G Generator Differential Protection87T Trans. Differential Protection87M Motor Differential Protection87L Line Differential Protection
1.00pm – 2.00pmLUNCH
 2.00pm – 3.30pm    Testing of the Differential protection function (87G, 87T, 87M, 87L) Operating CharacteristicDifferential ConfigurationDifferential trip time-harmonic
3.30pm – 3.45pmTEA BREAK
3.45pm – 5.00pm    81O Over frequency Protection81U Under frequency Protection59 Overvoltage Protection27 Under voltage ProtectionTesting of the Over/under frequency (81O/ 81U)Testing of the Over/Under voltage (59, 27)
contact us to reserve your seat

Day 3

  TIME 
TRAINING SCHEDULE & TOPICS

    9.00am – 10.30am    50/51 Overcurrent protection50N/51N earth fault protection 67/67N Directional/ directional earth fault protectionRelay coordination
10.30 am – 10.45 amTEA BREAK
    10.45am – 1.00pm        Overcurrent test moduleOvercurrent RIO block settings of the Overcurrent test module testing of the Overcurrent and Directional Overcurrent Functions (67, 67N, 50, 51, 50N, 51N)
1.00pm – 2.00pmLUNCH
2.00pm – 3.30pm    46 Negative Phase Sequence Protection51V Voltage-Dependent O/C Protection49S Stator Overload Protection49R Overload Protection48 Motor starting time supervision51L lock rotor
3.30pm – 3.45pmTEA BREAK
 3.45pm – 5.00pm    Testing of the Negative Phase Sequence ProtectionTesting of the ANSI 51V Voltage-Dependent O/C ProtectionTesting of the ANSI 49 Overload Protection


Day 4

  TIME 
TRAINING SCHEDULE & TOPICS

9.00am – 10.30am  Distance protection line simulation in PSCADTesting of the fault location function
10.30 am – 10.45 amTEA BREAK
10.45am – 1.00pm      21 Line distance protection40G Field Failure Protection21G Generator Under impedance Protection78 Pole Slipping Protection
1.00pm – 2.00pmLUNCH
 2.00pm – 3.30pm    Distance RIO block shot Test, Check Test, Search Test, Z\t Diagram, Zone SettingsTesting of the Distance function (21)Testing of the 40G Field Failure Protection
3.30pm – 3.45pmTEA BREAK
 3.45pm – 5.00pm    64S Generator, 95% &100% Stator Earth Fault Protection, 51/27 Generator, Dead Machine Protection, 24G Generator, Over flux Protection, 47G Generator, Fuse Failure Supervision, 32R Generator, Reverse Power Protection

Leave a Comment

Your email address will not be published. Required fields are marked *

5 thoughts on “Config and testing of the generator, transformer, line, and motor protection functions”

Scroll to Top