Course Title & Dates
- Config and testing of the generator, transformer, line, and motor protection functions
- 4 days
Trainer Profile
- Dr. Saeed Roostaee, technical trainer in protection relay IEDs, IEC 61850, and Substation Automation
- https://elec-engg.com/saeed-roostaee/
Registration
email: saeed61850@gmail.com
Tentative Course Schedule
Day 1 |
TIME | TRAINING SCHEDULE & TOPICS |
9.00am – 10.30am | ABB relays, PCM 600 installation, Connectivity pack installation, Hardware configuration, Application configuration, Signal matrix Parameter setting, IED read and write IED online monitoring and signal monitoring Disturbance, and event viewer |
10.30 am – 10.45 am | TEA BREAK |
10.45am –1.00pm | SIPROTEC 5 relay families and applications DIGSI 5 and device driver installation SIPROTEC 5 configurator Relay configuration |
1.00pm – 2.00pm | LUNCH |
2.00pm –3.30pm | SIPROTEC 4 Relay families DIGSI 4 installation Masking I/O CFC Fault Recorder |
3.30pm – 3.45pm | TEA BREAK |
3.45pm – 5.00pm | MiCOM relays range, naming, and application Easergy Software Configuration and PSL Event and disturbance recorder |
Day 2
TIME | TRAINING SCHEDULE & TOPICS |
9.00am – 10.30am | OMICRON CMC Test universe softwareAMT105 AMPro software signal view, impedance view, vector view different types of test modulesRIO, XRIO, and PTL |
10.30 am – 10.45 am | TEA BREAK |
10.45am – 1.00pm | Principle of Differential Protection87G Generator Differential Protection87T Trans. Differential Protection87M Motor Differential Protection87L Line Differential Protection |
1.00pm – 2.00pm | LUNCH |
2.00pm – 3.30pm | Testing of the Differential protection function (87G, 87T, 87M, 87L) Operating CharacteristicDifferential ConfigurationDifferential trip time-harmonic |
3.30pm – 3.45pm | TEA BREAK |
3.45pm – 5.00pm | 81O Over frequency Protection81U Under frequency Protection59 Overvoltage Protection27 Under voltage ProtectionTesting of the Over/under frequency (81O/ 81U)Testing of the Over/Under voltage (59, 27) |
contact us to reserve your seat |
Day 3
TIME | TRAINING SCHEDULE & TOPICS |
9.00am – 10.30am | 50/51 Overcurrent protection50N/51N earth fault protection 67/67N Directional/ directional earth fault protectionRelay coordination |
10.30 am – 10.45 am | TEA BREAK |
10.45am – 1.00pm | Overcurrent test moduleOvercurrent RIO block settings of the Overcurrent test module testing of the Overcurrent and Directional Overcurrent Functions (67, 67N, 50, 51, 50N, 51N) |
1.00pm – 2.00pm | LUNCH |
2.00pm – 3.30pm | 46 Negative Phase Sequence Protection51V Voltage-Dependent O/C Protection49S Stator Overload Protection49R Overload Protection48 Motor starting time supervision51L lock rotor |
3.30pm – 3.45pm | TEA BREAK |
3.45pm – 5.00pm | Testing of the Negative Phase Sequence ProtectionTesting of the ANSI 51V Voltage-Dependent O/C ProtectionTesting of the ANSI 49 Overload Protection |
Day 4
TIME | TRAINING SCHEDULE & TOPICS |
9.00am – 10.30am | Distance protection line simulation in PSCADTesting of the fault location function |
10.30 am – 10.45 am | TEA BREAK |
10.45am – 1.00pm | 21 Line distance protection40G Field Failure Protection21G Generator Under impedance Protection78 Pole Slipping Protection |
1.00pm – 2.00pm | LUNCH |
2.00pm – 3.30pm | Distance RIO block shot Test, Check Test, Search Test, Z\t Diagram, Zone SettingsTesting of the Distance function (21)Testing of the 40G Field Failure Protection |
3.30pm – 3.45pm | TEA BREAK |
3.45pm – 5.00pm | 64S Generator, 95% &100% Stator Earth Fault Protection, 51/27 Generator, Dead Machine Protection, 24G Generator, Over flux Protection, 47G Generator, Fuse Failure Supervision, 32R Generator, Reverse Power Protection |