6 days of training at your place by Dr. Saeed Roostaee
- ABB relays history
- PCM and connectivity pack installation
- An overview of the PCM 600 functionality
- Establish communication between the physical IED and PCM 600
- Manage project with PCM 600
- Hardware configuration
- Application configuration tool
- Read and write the tool in the PCM 600
- IED online monitoring and signal monitoring
- Event viewer and disturbance handling
- signal matrix editor tool
- Parameter setting tool in the PCM 600
- Writing configuration into IED
- Interlocking between application configuration and signals matrix tool in PCM600
- function blocks and naming based on IEC 61850 standard, IEC symbol, and ANSI code
- Distance protection function configuration
- 67N protection function configuration
- How to test ABB relays
- How to install DIGSI 4
- Introduction to SIPROTEC Relay families
- wiring connection
- start with DIGSI 4
- Archive, import, export
- Masking I/O
- Default and Control Display
- CFC
- Power system data 1
- Setting Group
- Oscillographic Fault Recorders
- General Device Settings
- SIPROTEC 5 – Devices and Fields of Application
- The basic function of SIPROTEC 5
- Installing DIGSI 5
- DIGSI Device Drivers
- Add new device
- The online SIPROTEC 5 configurator
- DIGSI 5 User interface and general setting
- Distance relay configuration
- Display Page configuration
- CFC Configuration
- busbar configuration
- How to test SIPROTEC relays
- An introduction to IEC 61850 & how to learn it effectively
- Overview of the main features of IEC 61850
- IEC 61850 data structure and data format
- IEC 61850 station in DIGSI 5 and IEC 61850 System Configurator
- GOOSE configuration and the publisher/subscriber LNs
- GOOSE simulation via IEDScout
- GOOSE configuration and simulation between different relays
- Time synchronization settings and SNTP configuration
- IEC 61850 configuration in DIGSI 4
How do I sign up for the training?
https://elec-engg.com/payment/