– How to calculate capacitor in mfd?
– Step by step distance quadrilateral characteristic for all zones how to draw. please give me any documents sir.
– Please suggest Which one is better for bus voltage measurement Induction VT or Capacitive VT?
– Would selecting any of these two make any difference, especially in bus voltage measurements? I don’t think so.
– Capacitive surpass Power Line Carrier (PLC) otherwise they mau consider the cost of their design.
– Cost it seems IVT is more at higher voltages.

– Hi anyone has any training materials for IEC 61850 configuration and testing. Please share. Thanks in advance.
https://elec-engg.com/iec-61850-training-course/
-Does it got configuration in IED scout?
-Yes

– Anyone has a manual of ABB aux relay model RXPSU14n?
– everyone please anyone tell me what are these feeders? 1. 11kv Substation loop feeder with fiber optic cable. 2. 11kv Substation loop feeder with pilot wire (send end supervision relay time). 3.11kv Substaion loop feeder with (receive end supervision relay type)

– Please tell me which terminals are going to be used for Carrier Send & Carrier Receive?

– this for scheme logic distance protection?
– Yes
– From highlighted portion, u can understand
– Sir, 1& 2 for Carrier send and 5&6 for Carrier receive?

– Can anyone tell me the details of these terminals, it’s an ABB make ACB, SACE PR 121/p ( SACE Emax E2), Open coil, closing coil, motor supply, then Indication ckt, Contactors ckt.

– Can anyone please name a few line auto reclosure 11kv and 11kv and 33kV fault passage indicator manufacturers based in India
– Can anyone give to the solution of board change ABB REF542+ relay
– Which type of communication cable is required for ABB to make REF542plus?
– What could be the issue that the Ready LED is not glowing?
– Ready LED of D400 is not glowing..and our SLDC ppl are not getting data of the entire substation.
– Please suggest how to rectify the problem.
– If anybody has a 220KV substation all equipment SOP for operation & Maintenance. Please share

If interested in ETAP discussion Whatsapp group, send ETAP to me on Whatsapp, (Click)

– Does anyone have an idea about the overcurrent coordination between generator and generator transformer
– pls tell me how to decide Bus coupler CT ratio in the 220 kV Double bus bar system?
– Need IEC 60623
– Pls share if any member has it
– What is the busbar current rating, quad moose
– Can anyone reshare the pdf for electrical notes
– Anyone who knows Ziv relays plz contact me
– U want Ziv relay person no?

Our other groups:

. PSCAD group
. Substation automation. Please
. SAS WhatsApp group
. ETAP WhatsApp group
. SAS WhatsApp group
. Substation Automation & SIPROTEC & DIGSI Whatsapp group
. SCADA


– please anyone has SEL 487v technical Manuel for negative sequence
– Hi, anyone knows ZIV SCADA?
– Can anyone send me the Complete Design calculation PCC/MCC with 11KV / 0.415 V Substation.
– Can anyone share the electrical notes latest version?
– Substation Automation & SIPROTEC & DIGSI Whatsapp group, please
– Hello guys I should to cables tray, 90 degrees, 60 degrees, 45 degrees, and upsets and down set formula please help me
– our generator after start display come like this why my friend’s please give solution
– I have Relay GE 369
The password is forgotten How do I open it? How do I delete the old one and make a new password and delete the old one?
– Password reset is done in GE Canada only

– Can anyone give me information on how much the Clearance for 132/33/11 kV windings and the tank for 63 or 90 MVA according to IEC? Our Company design? And if possible the description of how the oil insulation process works according to this distance?
– Mean insulation between HV winding and tank
– anyone please share the HVDC station Single Line Diagram.
– Can any one of the engineers have p632 transformer differential protection calculations.
I had calculations for p633
– P633 is for 3 winding transformer differential protection and P632 is for 2 winding ones?
– I had dealt with 642 and 643
– Relays in transformer differential
– I have No idea on 63 series
– We are using P643 as 3-winding Transformer differential protection. And P-633 as Overall differential protection comprising Generator, Generator Transformer, and Auxiliary transformer

Does anyone have a document SLD for the bay Reactor? Please share with me..thanks
– If anyone has a REM615 backup file please share.
– Plz share anyone Modbus function codes

-Astrum. anyone has software for this converter
– Type rs232 to USB converter drivers. Micom (Areva) P121 software version is 6. H relay don’t connect with the relay
– Using Micom s1 studio and Micom s1agile
– I downloaded all data models still same error present
– Change the USB port of your laptop and try again
– Go to device manager on the laptop
– Check driver settings
– Assign as per p121 communication parameters
– Is your OS Windows 10? Then it will be working without a driver. To check whether it is working go to Device manager and see the listed Com ports.
– I downloaded the software now it’s working.
– No 10
– Please share this relay terminals details.. 12 and 34 are NO/NC contacts
– 9 & 10 are current coil
– 1,2
– After coil operation. what is the status of NO contact
– 3&4 would normally be used for trip wiring as it has a trip isolator switch in series.. see the red tab on the grab handle of the relay.
– This particular model is a self-powered type. So terminals 5,6,7,8 are not used. Power is derived from CT terminals 9&10.

– Can anyone give settings for this transformer relay Areva P633?
– All that you need from this nameplate are
1. Trxm rating 20000kVA

  1. Voltage levels 66/11kV
  2. Vector group YNyno
  3. CT ratio if you are using the bushing CT?
    – no I want relay settings for Areva p633

    – Anyone has manuals for this temperature switch for the transformer
    – Please share any procedure to communicate with CSC 326 relay using CSPC software
    – Can anyone share a drive selection guide: I want to convert one dc motor drive to a VVF drive
    – Please share the Secure Premium 100-meter manual.
    – sir, Premier 100, please.
    – sorry, I don’t have premier 100 series manual.
    – I need a Secure Prodigy meter manual. Can anyone share, please?
    – What is the standard followed for 132 kV cable ampacity calculation?. ( Installation method above ground).

– Anyone please share the Operating time formula for Normal. Inverse 1.3 seconds curve.
– this is for the Normal Inverse 3 seconds curve I think
– In the case of 1.3 inverse curve instead of 0.1414 take-ups 0.0613 value should be used.
– Does the Overcurrent Highset setting for the feeder depends on the Transformer capacity in the substation?
– Suppose bus fault current 12 KA, and no of connected 3, den 4ka per tr, 400O o/ c high set. Instantaneous
– You are very correct to preserve the transformer life span
– we have 132/33 kV and 220/33 kV substations with 33 kV Feeders…one of my friends told me Overcurrent Highset depends on Transformer capacity.
– how to decide on the highest please tell me.
– The sum of all the feeder’s load must be equal to your transformer LV capacity. it depends on the load on each feeder. See bus fault current first u HV 2 calculate For both the cases then divided it by no. Of tr.
– Make it ur hv o/c high set
– Tr mva/ tr percentage impedance. Highest fault MVA for ur transformer.
– We also face difficulty with the password of this relay. YouTube videos did not help.

How can we reduce the tripping of the transformer due to inrush current?
– Transformer 10MVA,66/11KV
HV side CT ratio 125/1A
LV side CT ratio 800/1 A
Relay Micom P642
– Settings of harmonic
– If I’m not wrong, in modern transformers because of core material, the Inrush current harmonics are sometimes less than 20% of the fundamental frequency component due to which differential relay operates. So, we can keep the setting at 15%. For second harmonics we can keep this at 15%

– anyone knows passwords to change settings?
– 000000

– please tell me what is the general delay time used for Overcurrent or Earth Fault Highset protection?
-Depend on your coordination
– Zero
– 100msec
– To allow line zone 1 to clear fault first

Join 20 WhatsApp groups for protection engineers

  • WhatsApp Grp 01: Protection Relay – General
  • WhatsApp Grp 02: Substation Automation – General
  • WhatsApp Grp 03: Transmission line protection
  • WhatsApp Grp 04: Transformer protection
  • WhatsApp Grp 05: Motor protection
  • WhatsApp Grp 06: Generator protection
  • WhatsApp Grp 07: Overcurrent and Earth Fault Protection
  • WhatsApp Grp 08: Busbar protection and Bay controller
  • WhatsApp Grp 09: Breaker protection and control
  • WhatsApp Grp 10: Protection Relay Testing and commissioning
  • WhatsApp Grp 11: DIgSILENT
  • WhatsApp Grp 12: ETAP
  • WhatsApp Grp 13: PSCAD
  • WhatsApp Grp 14: IEC 61850 configuration
  • WhatsApp Grp 15: Switchgear GIS & AIS
  • WhatsApp Grp 16: GE Relay Configuration
  • WhatsApp Grp 17: SIEMENS Relay configuration
  • WhatsApp Grp 18: Schnider Relay configuration
  • WhatsApp Grp 19: SEL Relay Configuration
  • WhatsApp Grp 20: ABB Relion configuration or more services,

send a message to our WhatsApp support: https://elec-engg.com/whatsapp-group-for-protection-engineers/

– hi, anyone has a ZIV RELAY course about programming its logical control, and interlocks? I need to understand completely but is not possible only to use the manual brand, located on their website.

-Anyone faces this problem while adding a relay to the IEC station in sip5?
– If anyone has Sepam relay thermal calculation sheet please share it with me.
– if CT gets saturated .what is the solution after CT gets saturated. We want to replace CT or any other solution
– CT secondary current flow to the secondary winding
– How are confirming that CT got saturated?
– Sir for knowledge purposes if CT gets saturated in future
If we observe these types of problems in the future, how can we overcome these types of problems?
– Which purpose bypass resistor is used in Modbus communication?
– What is the burden of your CTs?
– Saturation is purely a magnetic property issue. So there is no alternative solution to do corrections in the circuit rather than core replacement.
– You need not replace your CT there are ways to demagnetize the ct
– Can you explain in detail the theory of core saturation in ct
– How can we demagnetize the CT? We had followed demagnetization in transformer ..whenever we got erroneous values while testing dc winding resistance
– The easiest way to demagnetize a CT is to apply the test current at a level that approaches its excitation ‘knee’, then slowly decrease the input current to zero. This can be done with secondary excitation or primary current injection.
– I think some testers offer this option, Like omricon ct analyzer
– Can you explain why you need to replace your ct?
– What is the solution to these types of problem
– Anyone has a method Statement for how to create logic for Sepam Relay using SFT2841

our ETAP Video training course: https://protectionrelay.com/etap-training/

PROTECTION RELAY SYSTEM ETAP
Elec-engg.com
PROTECTION RELAY SYSTEM PCM 600
Elec-engg.com

– we are getting the above error when communicating with RET650. Please tell us what could be the problem?
– Rollback package software needs to be updated using the Update manager of PCM600
– I could not find the Rollback package software. It’s in update manager, select relevant relay IED connectivity package. In that package, there is one rollup package that’s automatically installed.

– 33 kV ABB circuit breaker Trip coil and close coil have a PCB connected to them. Pls, tell me what is the use of that PCB?
– I think PCB is meant for capacitive tripping device CTD. CTD separate unit is present sir
– black color portion in the above image
– Check the drawing, While Exporting, Icd from Abb relay -PCM 600 the ICD file in Browser, showing TEMPLATE
– In scheme ..no drawing of PCB…the electronic ckt PCB meant for coil protection purpose / to safeguard coil.
As the coil is designed for a short time not for continuous.
– what kind of protection is used, sir?
– what are the steps to be followed when synchronizing a new 220 kV Transmission Line to an existing 220 kV Bus?
– Anyone has a WINCC script for the addition of tags and displays on the HMI screen.
– This is a 220 kV ABB make LTB245E1 type circuit breaker. Please tell what is the use of S7-A circled in the above figure
– Did you look up S7 in legends?
– I think you could find working philosophy in the breaker manual
– It is mentioned Blocking switch but the function of it is not mentioned anywhere?
– For emf voltage discharge
– They are opposite
– I think they are for an anti-pumping system, isn’t it?
– Anti-pumping will come only in the Closing path. This is an AC motor (Spring charge) circuit I think.
– Spring charge also needs to be cut off, so I thought the Motor Cut off will be via Q1 contacts in series. S7 contact is, like AN said, for discharging stored EM energy in the motor winding.

– Anyone knows how to download cid file from Sepam relays and how to do goose configuration?
– Hello guys, please how do I program the LED of ABB REF615. My main challenge is to change the parameter setting from false to true.

– Hello colleagues, I have a question, in case there is a fault on the 33kv or 11 kV side is there any impact on 132kv side protection equipment? Mean did the protection will sense the fault?
– overcurrent relays on 33kv from TP, maybe send a trigger From application configuration
– Yes 132 side will sense the downstream faults but it will work as backup protection for downstream protection
– Dear all, in abb REM 615 RELAY, HOW WE CHANGE NO OF HOT START FROM 1 TO 2, WHICH PARAMETERS OF STPPMSU HAVE TO CHANG?

– How to calculate phase sequence angle in cable
– Anyone pls explain how to set the power calculation for the reverse power relay…
-How to calculate the size of earthing cable for DCS or PLC?
– SQL SERVER MAKE MANUAL START, Then open PCM Again
– Please reply to this expert
-1.press windows +R
2. type services. MSc and enter
3. right-click on SQL server (PCMSERVER) AND THEN START
– when do I start services?
– Reinstall the SQL server 2014
– Please can anyone help me with the primary impedance R1 + jx1/ km and R0 +jx0/km value of a Bear conductor ASCAR 250mm² with a diameter of 23.45mm
– Hello guys! Anyone working with GE Multilin D30? I have a relay that seems to be unconfigured on distance. Backup OC and EF are enabled but seems no contact is assigned for tripping though it shows indication during testing. 50/51, 50N/51N


– Power Swing Block is used and activated in Distance Relay to block its operation in case of Swing period disturbance
– It’s not about definition. I want ABC concerning enervista.
– Emanuel starts reading the D30 manual.
– What should be OLTC AVR relay PT Lower and raise voltage settings.

– Secure Premium 300 energy meter is showing like this in the parameters..please tell me what is its means?
– CT low means very fewer amps detected by ct
– What is the meaning of VT polarity?
-VT polarity means instant of increasing live terminal to positive is the same instant of increasing live terminal in secondary to positive in this case polarity is good and this secondary terminal is x1 and x2 is grounded. But if vice versa x2 become life and x1 is grounded For VT polarity Test the same ways of CT polarity Test
– Is it affect relay operation
– Of course, if this relay is Directional or Distance or Reverse power Relays and also if powering measuring device as kwh meter

By joining our WhatsApp and Telegram groups, Discuss with international electrical engineers and solve your problems about electricity. You can also take benefit of our free files and see our training packages at the link below:
https://elec-engg.com/category/training-course/
For more services, send a message to our WhatsApp support number
, (Click)

– What do we have to check if the transformer tripped in?
– DGA, Insulation, Ratio, Magnetic balance and Winding Resistance
– Hi guys, do you know where I could find a bibliography for protection for photovoltaic systems connected on the grid? I need to know a siemens V4 relay can work as a time source for Micom relays
– Magnetising current, Short circuit impedance tests of the transformer are also important to check for any deformation of windings. Turns ratio test and DC resistance test of winding.
– SFRA test is also one of the diagnostic tests but it’s not done in most the companies
– Do you mean the bandwidth (this determine when the tap shift up/down)?
– Yes


– Please tell the ‘distance’ below which ‘Line Differential Relay’ should be used for protection of 220 kV or 132 kV Transmission line?
– Line differential use mostly for underground cable not over a headline for e.g RED670 Abb line differential and OHL REL670 will be used
-In addition, RED670 can protect distance too
– sir, why is it that Differential is used for cable and not a line?
– Because with differential you are normally using fiber Optic, laying parallel with feeder. It is common to use line differential for underground cable and distance relays for overhead feeders
– Cant we have line diff if we have OPGW with the line?
– As much I know there is no distance length specified for Line differential relays. Line differential protection is also being used in overhead lines especially short lines and for high voltage lines that have redundant protection such as 400 kv
– Yes I think it is possible, the line can be used with opgw too, but I never face that actually in our system

– anyone has 2 phase transmission line with ‘line Differential protection’?
Line differential protection is being used for very short lines say less than 1 km. We are using it on 550 meters 220kv line.
– will anyone please the type of curve used by Indian railways for Overcurrent protection of the traction feeders?
– Very inverse characteristics
– why is it used and not Normal Inverse or Extremely Inverse?
– Main protection is overcurrent protection for railways. they adopt very inversely in the downstream network. so for relay coordination, we use the same curve

– Anyone knows how to configure goose signal at abb PCM software.pls share documents if u have
– How to check I/O Status in sepam80 relay
– In HMI, Or Software
– I have used this once before, now I am not getting it
– Once Relay is Connected with ur Lap, There is Spanner Symbol Available in Icons, Open it, Directly it will go to I/O Monitoring In HMI, Press Main Menu, U ll Get IO page Directly, Press Enter then Side Arrow for Next page
– Does the main menu mean this one?
– Press 13, then Options will come as I
– If I am using this protection output in logipam, then where I want to enable it and give settings
-For 50/51N_1_3, I enabled unit 1. Then where I have to give set. In groups A 3 or 1
– Anyone please share the Power Swing testing file for Omicron CMC356?
– Anyone has EMCO AVR relay service engineer contact no in india
– How to calculate transmission line loss from line length
– i^2 * (unit R/km*line length) will give for one

– Dears how to activate the help file “about” in digsi4 software
– Anybody has a manual for ETL 41 ABB PLCC equipment?
Kindly share.
– In EMCO AVR relay at the parallel of PT supply component used which is burnt is capacitor or resistor
– To test directional earth fault relay, voltage I’m giving is healthy and how much current to give and its the angle In earth, fault make voltage less in one phase
– Your test will fail because you inject a healthy phases voltage, that’s mean there is no zero-sequence voltage needed to operate the relay. You should simulate a real fault, if an earth fault happens to phase A the voltage of this phase will drop to a low value

– I’m trying to press the about button but the help doesn’t open the specific tab explain ‘ although I reinstall the device drivers
– Install the Device driver with help from the siemens site
– Already installed but it appears as a total manual in pdf, not an individual parameter
– Anyone has logic for soft on manual close command in p444 micom

Anybody having Pre-commissioning and Commission procedure or MOS for Substation Upgrade projects

– What is the Siprotec 5 Relay Password??
– 6 times 0
– Tried, not Working
– 222222

To join our protection relay WhatsApp group, please send interest on Whatsapp: https://elec-engg.com/whatsapp-group-for-protection-engineers/

– I am facing a problem with the SFT2841 authorization code/registration.

-Register with ur mail ID, code link will come
– U can give any mail ID, and number. It will get registered.
– I got it registered. But still can not log into the Sepam, any ideas
– Do you use a USB to serial adapter or do you have a built-in serial port?
– What’s the relay model
-S42
– Is this cable fit for Front port communication?
– Yup

– Hello everyone I had a problem with the siemens Siprotec 7vk61 relay it is not measuring injected current and the relay is not showing measurements could anyone please help me out with this
– Relay showing measurements in

is there any Error led?
– No led
-Try to initialize the

To join our protection relay WhatsApp group, please send interest on Whatsapp (Click)

– MLFB file with the same version, Then configure as per your system Then check
– For what purpose was this relay used?
– Breaker Management
– Eg, like TIE bays
-Auto reclose
– AR for a tie, and all
– Inside the software, you checked the measurements?
– It is showing this on measurements
– Error in IED
– Yes also it is not showing in Digsi software
– Check the Control options in Relay

– Anyone having Areva P521 pilot wire Relay Technical Manual.

Need Areva, not Schneider.
– How to find the slope for low impedance REF in Sepam T81
– Please tell me What value of Contact Resistance is acceptable for 33 /132/220/400 kV Circuit breakers?
– ABB de 30 a 40 micro ohm
– The contact resistance value depends on the current of the circuit and not on the voltage.
– You should evaluate the manufacturer’s tests also evaluate the dissipated power in the resistance found. Then compare with the short circuit power of the circuit breaker
– If I install the 7sr100 RK all template then I got the 7sr100 r4h-1a. Is it’s crt?
U install Rk range

– H series will come In a minimum of all templates. the 7vk61 is not showing measurements do anyone have a solution for it?
– Anyone with guide notes for using sverker 780 relay tester On vamp relay?
– What is this infuse failure relay?
– Looks like selenium rectifier 3 phase. Also called a metal rectifier

can anyone help me with how to test overexcitation on the generator by CMC? V/f =1.2

– Voltage KV rating how much?
– 11kV
– There are two methods to check, one is increasing voltage and the second decreasing frequency method.

  1. Keep frequency constant and raise the voltage.

2. Keep voltage constant and decrease frequency. In both cases, plz continue to monitor the v/f meter on display.

– Do anyone has a solution for this relay it is not showing measurements
– Kindly check the logs once. I was assuming that there is a configuration issue. Because device healthy condition.
Apart from that, this is a sync relay so there is no ct connection and this window is for current measurement.
– Sorry not Sync it is auto recolse relay
– Trigger the check syn Input, Manual, or Give all measurements properly.
– What is the best method to find zero sequence impedance of line?
– U have to take it from the conductor manufacturer he provides you with R0 and X0 and you can calculate.
– Ct are connected

Generator Protection Training Package

– How can I synchronize the relay time and date with the laptop time and date in Siprotec 5 Siemens relays
– How to check this curve 2 in Sepam m87 relay?

– anyone has ideas for loss off comm on SIEMENS 7SR1811? we checked the fiber comm is ok but the commlink still failed.
– How do you check fiber communication?
– by applying laser light end to end.

– when we read this error coming to any solution to read ABB Rec670
– Kindly provide auto reclose logic for ABB bcu. For one and a half scheme 400kv.
– There are two SEL relays for the same line prot. have different order numbers while one comm. the channel used for direct fiber and one used with media converter. Still found a comm. Fail can you help
– can I use PCM 600 for version 2.8 in the relay?
– Yes. But must have the connectivity package of the relay you are communicating.

To join our protection relay WhatsApp group, please send interest on Whatsapp: https://elec-engg.com/whatsapp-group-for-protection-engineers/

– Does anyone know how to communicate Double F6150e with the F6300?
– Use the network for communication using pc.

– Can I change power disconnectors or isolator’s control in substations from working by classic control to working by PLC (programmable logic controller)?
– Same generators on parallel connection but one either not taking load or shedding of load at 50%. What can be the coz?

– Anyone knows the cable testing IEC formula for both ac and dc?
– We have a 7SJ62 Siemens relay protection. In the event log, the time and date have a question mark. The source protocol of our device is Ethernet NTP. Why do we have a question mark on the time and date of the event?
– Your device time is not Sync with GPS Clock

– Pls guide anyone on how to check the spring charge motor trip test using the B10E megger kit
– I need advice on protection on a 132kV transmission line to connect to a solar PV plant producing 92MW.
– This is the first generating plant like this proposed in the country.

– Does anyone know how to make logic equations in Areva P921?
– Exact solution for this?

– This problem is coming in Digsi while communicating via USB.
– In the taskbar, there is comtask32 close that first then close DIGSI and restart with run as administrator or restart the laptop
– Apart from this?
– Means I don’t know
– This happens whenever you disconnect the device in online mode. If this is happening only one or two times while communicating the device then you have to follow the same procedure as mentioned.
– However, if the same thing happens after doing this then you have to repair your DIGSI.
– DIGSI repair also tried the Same problem arising, Random at some periods Some Times.

– devices connected? After repairing
– Different devices only, Then try to connect in another project don’t connect on the same file,
– I’m, using DIGSI for a while.

– Randomly I have got this error, Once this error came almost all times same error repeat while communicating, Still, I could get the Proper solution for this, and also cause for this error, I have searched In DIGSI manual
But nothing was mentioned regarding Comtask32. All the minor checks – All seems okay
– Problem in Siprotec 4. I’m using software 4.93
– then you have to reinstall your windows as well DIGSI.
– I’ve faced this issue in different laptops / different os too.

– How could we check trip log and event log in IED Scout in siemens Siprotech Relays
– What is the type of this FO port, please?
– LC/SC/ST like this?
– LC
– these two, please?
– LC
– SC
– The above relay has FO LC-type rear ethernet port and its protocol is IEC60870-5-103. Will it support time synchronization with SANDS make GPS?
– Abb rec670 relay restarting again after double point status included. Does anyone know how to solve this restarting issue please send me a message
– This change is in the 61850?
– No just changed binary input status
– What will be the default password for GE L90?
– It is showing local access denied while changing settings from HMI. I am getting this error when I send application configuration to the relay REF 615
– I can able to read but am not able to write what will be the reason!? please anyone who knows how to solve this issue message me.
– Can someone help me to configure this relay ABB REF 541?
– Breaker feeding primary of 6.6/.415 kv transformer is tripping on earth fault during inrush
– 6.6kv is grounded through 50 Amps NGR
– 51n is set at 10 amps idmt at 200 Msec
– 50n is set at 20amps dt at 50 msec

– Please guide for the 68 settings in ABB ref 615 relay
– It’s tripping on Earth fault Highest function?
– Earth fault’s highest setting may be less. We keep it as 8-10 times of idmt setting. For example, if CT is 600/1A, then earth fault highest function is kept at 2A(10 times of 0.2A)
– anyone having a thermal overload calculation sheet for the transformer kindly shares
– Transformer testing

– Please tell me What is the use of the rings in the above Voltage Transformer?
– Any sip5 engineer who knows to change the phase current name for DR?
– Hi everyone I am facing this problem for ABB615. Whenever I gave the read from IED that time showed this error.. – — How can I solve those errors and read relay files from the relay?

-Anyone pls send me the ABB REF615 Relay version 5.0.13 relay connectivity package
– Use and update manager or go to their website
– The updated manager has no option for searching
– Kindly update the license by right click on the relay and using the license updation tool.
– Please, can anyone help. CB always trips back after single-phase Auto reclose. The PD is the 60s
– Kindly make it clear?
– After the relay give AR command to the CB it will close and trip back immediately and after that, the CB will trip other phases on PD. I’m doing commissioning the line, not charge
– Here shows option 5.0.1. But I need 5.0.13. how can I download the package
– Did you check for any trip signal presented to the single-pole trip relays?
– Yes. The feedback is on the relay to test set.
– Breaker should be in a close position for AR
– In the open condition, AR should block
– It was in a close position and I trip the CB with the relay on 21Z1 Ph-G fault. Then CB open and the relay send a reclose command

– Did you check the outputs which are getting high on single-phase trips?
– I have checked it very well because the test kit shows the duration of the trip. About 0.038s
– No other outputs are getting high?
– Yes
– Disable TOR function and then check
– TOR?
– Trip on reclose function which is there in every numerical relay
– Disable this function and then check the auto reclose
– Correct CB state must be provided for the AR relay/21 for AR to work. As I understand AR will work if the CB is open, not when it is closed, along with other interlock conditions.
– The problem is that the CB is reclosing and tripping back immediately, Which means some trip signal is tripping it. it’s not the ar logic which is at fault.
– You need to remove the particular phase’s trip input to the single-phase trip relay and then try a reclosing function test.
– If it works, you are going to find out which relay keeps issuing the trip positive to the 1 phase trip relay.
– If you reclose the CB from the AR function of the relay, the CB close and remains. If there is a high output it should not stay
– That’s the logic.
– The problem happens only when I trip the CB from Close to open and back to close?
– You can check also a timer on CB for pole discrepancy. sometimes you need to delay more for reclosing test.
– That s a basic check. make sure that the dead time is not more than the reclaim time & PD time. Even though as per your description it’s not what trips the CB on reclosing.
– Adjust the timer on CB after that reclose successfully signal to come.
– If it’s a new CB, after conducting the CB closing timing test, set the deadtime above the closing time of CB too.
– it’s a new CB
– Normally, the closing time is 100msec and the dead time is set as 1sec. Remove other 2 phases trip relays and then apply single-phase fault with one trip relay. Check if AR works
– Keep one trip relay in circuit with other trip relays drawn out
– Suppose you apply Red phase fault, keep the red phase trip relay in the circuit
– If others are there it will trip the CB on 3Ph
– That’s what we are doing
– you apply Red phase to the earth fault using the testing kit and keep Red phase trip relay in the circuit
– Have you checked that Breaker is closing on Single phase fault AR and then tripping? If others are active the relay will show TrpA, TrpB, and TrpC
– it’s closing on ar, but again tripping on single-phase trip relay, And later due to PD timer, remaining phases trip too
– You said that it’s again tripping on the Trip relay. Check the Auxiliary contact 52A of the circuit breaker which is in series with the trip coil. This contact can malfunction. This contact is meant to break the DC circuit of the Trip relay
– If the trip relay remains in the energized state it can again trip the breaker

Join 20 WhatsApp groups for protection engineers

20 WhatsApp Groups for protection engineers

  • WhatsApp Grp 01: Protection Relay – General
  • WhatsApp Grp 02: Substation Automation – General
  • WhatsApp Grp 03: Transmission line protection
  • WhatsApp Grp 04: Transformer protection
  • WhatsApp Grp 05: Motor protection
  • WhatsApp Grp 06: Generator protection
  • WhatsApp Grp 07: Overcurrent and Earth Fault Protection
  • WhatsApp Grp 08: Busbar protection and Bay controller
  • WhatsApp Grp 09: Breaker protection and control
  • WhatsApp Grp 10: Protection Relay Testing and commissioning
  • WhatsApp Grp 11: DIgSILENT
  • WhatsApp Grp 12: ETAP
  • WhatsApp Grp 13: PSCAD
  • WhatsApp Grp 14: IEC 61850 configuration
  • WhatsApp Grp 15: Switchgear GIS & AIS
  • WhatsApp Grp 16: GE Relay Configuration
  • WhatsApp Grp 17: SIEMENS Relay configuration
  • WhatsApp Grp 18: Schnider Relay configuration
  • WhatsApp Grp 19: SEL Relay Configuration
  • WhatsApp Grp 20: ABB Relion configuration or more services,
  • send a message to our WhatsApp: https://elec-engg.com/whatsapp-group-for-protection-engineers/


– Electric duct heater 240 volts, 3500 w what are meggar valves
– This would not lead to a successful Autorecloser.
– If the CB aux switch s faulty and a trip signal persists, the TC will get burned out.
– Yes, the trip coil can burn
– But I don’t find any other reason. I think they need to check trip coil resistance too,
– As the coil has not burned, it’s not the CB aux switch that s causing the issue.
– Can we extract fault waveform, I mean one more thing needs to be checked: the testing kit needs to stop injecting fault after the first trip, is it being ensured.
– Correct! And if the kit feedback point of the trip is correct.
– Yes I confirmed it. It shows 0.038s
– If you remove feedback the test kit continues
– Check the Programming logic of the relay, maybe Autoreclose digital output signal may have been connected to the trip output contact of Relay
– Check the PSL or configuration of the Distance relay. I have only a three-phase supply without neutral, in my system newly 1 phase loads are being added. how can I provide neutral wire to these loads, without implementing any Trafo (Delta-Wye)?

– Hi guys. How Can I reset these ledes?
-Reset, then reset indication LEDs, Check the BB switch if it’s on or off.
– I did it but it doesn’t work.
– Where can I find BB switch?
– On the same panel
– This is the Sepam Relay s configuration,

– Why we are using () In not gate function. is it mandatory to use the set brackets?
– Not Required
– If u Want to Invert an Input, U Can use it NOT directly. So set brackets Were not important, right?


– What is the meaning of this error code, please? p343
– This error code means that analog input module serial E2ROM Failure.
– We advise replacing analog input modules through an authorized repair center.

– Anyone knows how to trigger DR in sip 4 either online or manually?
– Open relay online and go to test then double click on test waveform, DR will be triggered.

– HMI in LabView with IEC 61850 (MMS) Communication
-It’s just a simulation or HILT (LOOP IN TESTING)?
– First I configure the SEL 751 in QuickSet software, then I use the SEL Architect software for IEC 61850 configuration, in the end, I use the RELAB OPC SERVER software to read the reports I created and the software transforms them into OPC signals and the LabView can read that data in real-time. You can also use Kepserverx to transform MMS or GOOSE data to OPC
– Value under switch on condition means in case of differential

– I have good knowledge of digsi4 but no knowledge of digsi5 software. Anyone has any guidelines to access digsi5. I need to see how the signal is configured for SAS OR GOOSING.
– Actually in 5 no need to assign any signal for IEC all are pre-configured
– In the file, there is the option of IEC structure on that, you can see

– Anybody Simulating signals from IED SCOUT?
– This block “MVGAPC1” is used for SAS in the REF615, but I don’t need it to appear on the events

– can anybody tell me the difference between short-term overcurrent trips and long-term overcurrent trips?
-What is the password of SEL 551?
-Try TAIL Or OTTER
– Sometimes the password for FTP might be FTPUSER too. If you have quickset settings, you will get the information in it

To join our protection relay WhatsApp group, please send interest on WhatsApp: https://elec-engg.com/whatsapp-group-for-protection-engineers/

-Does anyone face time inaccuracy in OMICRON CMC256 only if trip time < 1-second?

-What are you testing?
-Phase Overcurrent.

– What are you using? Quick CMC, state sequence, or auto?

– We use a 125V DC system for our substations. The string consists of 93 NiCad cells. The charger is SENS. The only settings available on the charger are FLOAT, set at 1.37VpC 122V, and EQUALIZE, set at 1.57Vpc 138V. These values appear to be assuming the string consists of 88 cells.

– Should I just adjust the FLOAT to 130V?
-I don’t see any way to set the number of cells in the string.
-How separate furreol in canon mk2600 printer?
-Anyone worked on Micom 546 relay. Line differential relay? I am facing one problem that the tx of differential communication getting on-off frequently in back relay tx is getting
on-off, or in your mux, In HMI of relay
– Value is getting 1 and 0.
– maybe you can check in measurement 4 in display relay, same or not with tx on HMI.
– What is the password of this relay SR-489?

-The factory default passcode is zero (0)

– Also, you can try state sequence.

– just an update Was able to find in the setting where there is the number of cells for the string but was not allowed to change the value which was found to be 93.
– we Will try to contact the manufacturer to address this.

– What’s the difference between WCDM11 type relay and WCD type? Both are reverse power protection relays but can we interchange them?
– how do I install DIGSI 4 in windows 8 or windows 10?
-Hi the above relay SIEMENS show the error LED and monitor SMS.

– can you help me to solve this issue? Busbar relay 7ss52?

– Actually, it falls back in monitor mode, go down there will be one option of reset. do that.

-Yes. Otherwise, nothing will show in time

-hi, could anyone shares PDF standard library “IEC 60255-6 ELECTRICAL RELAYS -PART6:MEASURING RELAYS AND PROTECTION EQUIPMENT”?

– Does anyone have a manual for this relay or how to read the settings for this relay?
– Which relay?
– Micom p444
– Once switch off auxiliary supply And switch on


– I have a question about inrush on the Transmission line:

– Is it inrush current created during energizing of under-ground transmission line? On voltage levels of 132kV and 6.5KM
– No, inrush current produces during charging of transformer.
– Anyone has Rio file for field failure and pole slip?
What is the default password of this Siemens Relay?

– 000000

To join our protection relay WhatsApp group, please send interest on WhatsApp: https://elec-engg.com/whatsapp-group-for-protection-engineers/

– Why u need To communicate and see Fault Recorder
– I think It can be used HMI only And Modbus communication ports only available
– Ok. That is also ok. I can use that only as long as I have the respective firmware.

– Guys anyone has this book?! Can anyone upload it?
– Transformer Inspection and Testing (Electrical Power Plant Maintenance Book 1) pdf

– Hello anyone works this type of MDB?
– This is not MDB. looks likes the control panel.
– Sir Are you working on this panel?
– Looks like if SC and Rtu panel
– Please send a link goes to download TDMS software for DRTS 64 testing kit

– Hi does anyone have MComp suite software of L& t relays?

To join our protection relay WhatsApp group, please send interest on WhatsApp: https://elec-engg.com/whatsapp-group-for-protection-engineers/

Our completed Courses:

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top