https://elec-engg.com/whatsapp-group-for-protection-engineers/

To join our protection relay WhatsApp group, please send interest on Whatsapp +989129613659

Protection Relay 4


Elec-Engg provides the whatsapp group platform to large number of professionals all over the world to meet up, discuss and share updates related to protection relay, protection relay testing, and IEC 61850 only. Please read the below rules carefully.
– Elec Engg: I, Saeed Roostaee, a team member and e-commerce manager at www.Elec-Engg.com, interested in protection relay and testing, substation automation and IEC 61850 standards. Feel free to contact me at ant time🌸
+989129613659
🌟Follow the group rules and objectives of the group
🌟This is an international group, just text in English
🌟Actively participate in the group.
🌟Don’t make any personal message to the group members
🌟 Post your message in one single chunk of text, don’t post every word or sentence in a new message.
🌟No changing of group name or group DP
🌟Advertisements, announcement of event of other groups needs approval from Admin before circulation (+917303437524 ).
🌟If any member is not following the rules, we have authority to remove from the group
🙏Feedback and suggestions are always welcome


08/abb, 10:55 – Elec Engg: Living in Delhi, India
08/abb, 10:56 -abb: Thanks very much indeed 🙏
08/abb, 10:56 – abb: M.Saeed khan from Pakistan working at NordexAcciona as a wind turbine specialist…
08/abb, 10:57 – Elec Engg: Now please only introduce yourself completely,
08/abb, 10:57 – abb”: Wasif Akmal ,working at NESPAK.
National engineering services of pakistan.
08/abb, 11:00 – abb: Ali Raza, working at XERVON SA as Testing & Commissioning Engineer. From Pakistan working in Saudi Arabia.
08/abb, 11:00 – abb: Mohamed Eissa ..working in Sudanese Electricity Transmission Co (SETCO) ..Protection Engineer
08/abb, 11:01 – abb*: Monem Tariq. From Sultanate of Oman
Electrical Engineer. Aspiring to become Testing/Commissioning Engineer. Working as Project Engineer for Utility Network Extension in Dhofar State.
08/abb, 11:02 – abb: 9 contacts.vcf (file attached)
08/abb, 11:02 – abb: Please add these no in this group
08/abb, 11:02 – abb: Hi Admin
08/abb, 11:03 – abb: Hi admin please add this no in this group
08/abb, 11:04 -abb: Vaithiyanathan .Schneider.vcf (file attached)
08/abb, 11:04 -abb: Hi please add this number
08/abb, 11:05 -abb: Nithin Gorthi, Production & Maintenance Engineer, Pan Africa Enterprises Limited, Arusha, Tanzania
08/abb, 11:05 -abb: Muhammad Osama working as Deputy Manager in Generation Dept. of K-Electric Department. Involved in Grid Commissioning at Power Plants sites and Electrical Maintenance.
08/abb, 11:06 – abb: 2 contacts.vcf (file attached)
08/abb, 11:07 -abb: Myself Vadivelan working in KEC INTERNATIONAL LTD in laos. Am specialized in testing and Commissioning of Electrical equipment and protection devices
08/abb, 11:07 – abb: Please add this no
08/abb, 11:13 -abb: Gokul, Siemens ltd , interested in substation concepts and design , Automation
08/abb, 11:14 – abb :shantareddy iindia: Shantareddy ,kirloskar Ltd ,interested in protection relay
08/abb, 11:16 – abb: Devang shah ABB INDIA LTD Commissioning Engineer
08/abb, 11:16 – abb: From India
08/abb, 11:16 – abb: Sachin, from Reliance industries iindia interested in protection system
08/abb, 11:17 – abb: Yukkeshwar – Alfanar Testing and Commissioning – Saudi Arabia
08/abb, 11:18abb: Nagaraj- Testing and Protection Engineer ALFALGI

08/abb, 11:18 – abb: Nisar Ahmad Waqar from Diversey Pakistan
08/abb, 11:18 – Elec Engg: To add your friends into this group, forward the following message to them.
08/abb, 11:18 – Elec Engg: To join the Protection Engineers WhatsApp Group:
Save +917303437524 as ” Ele-Engg ” in your contacts
Send a WhatsApp message as : Join Prtection Relay 4 ” Your Name
08/abb, 11:20 – abb: Nityam Shah…Testing & Comm Engg…UAE
08/abb, 11:22 -abb: Zubair .. Testing & Commissioning Engineer
08/abb, 11:23 – abb”: I’m Sridev- Substation Automation engineer at Voltech Engineers in India
08/abb, 11:23 -abb: Gnanavel,, Testing and Commissioning Engineer,, India
08/abb, 11:24 -abb: I’m Numaan secondary design engineer in Schneider Electric chennai
08/abb, 11:24 – abb: Sagar shah
Protection Engineer at Gujarat Energy Transmission Corporation (GETCO)
Gujarat state, India.
08/abb, 11:28 – abb: Shoaib hussaini from india
P.E @saudi eletricity company.
08/abb, 11:28 -abb: Ahmed Khalifa SAS Commissioning Engineer ABB KSA
08/abb, 11:29 – abb: Arul Raj-India.
ABB Global Industries & Services Pvt LTD.
R&D Associate Engineer.
Part of Relion 670,650,SAM600,SAM600_IO and REB500 product Testing Team.
08/abb, 11:30 – abb: Aehtesham Rana ,,India,,, Protection Engineer….6yrs… DEWA approved … looking for job .
08/abb, 11:30 – abb: Thanks
08/abb, 11:30 – abb: SRIKANTH T
400kV Maintenance KPTCL, Karnataka
08/abb, 11:31 -abb: This plant location
08/abb, 11:32 – abb: Doni Cross,Gadag
08/abb, 11:32 -abb: Ok
08/abb, 11:32 – abb: Wael atiyah from iraq
08/abb, 11:34 -abb: Any job vacancy please inform
08/abb, 11:39 -abb: Prabhagaran from Tamil NADU India working at IL&FS Tamil NADU power company ltd
08/abb, 11:39 -abb: As deputy manager electrical maintenance
08/abb, 11:44 – Elec Engg: Dear all members,
🌟Follow the group rules and objectives of the group
🌟This is an international group, just text in English
🌟Actively participate in the group.
🌟Don’t make any personal message to the group members
🌟 Post your message in one single chunk of text, don’t post every word or sentence in a new message.
🌟No changing of group name or group DP
🌟Advertisements, announcement of event of other groups needs approval from Admin before circulation (+917303437524 ).
🌟If any member is not following the rules, we have authority to remove from the group
🙏Feedback and suggestions are always welcome
Don’t start any discussion, just introduce!🙏🏻
08/abb, 11:44 – Elec Engg: Pls follow the rules
08/abb, 11:45 – Elec Engg: 🙏🙏🙏
08/abb, 11:45 – abb: Sakthivel testing and commissioning engineer with 5+year experience looking job now
08/abb, 11:46 – abb: Okays Sir
08/abb, 11:51 -abb: Mohamed Rifay. Working in SEL (Dubai) as Automation Engineer. 12+ Experience.
08/abb, 11:53 -abb: Thanks for having me here.
08/abb, 11:54 – Elec Engg: Dear all members, please take a moment and introduce yourself completely. Don’t start any discussion, just introduce!🙏🏻 Post your message in one single chunk of text, don’t post every word or sentence in a new message
08/abb, 11:55 -abb: Mostsfa helal
Quality engineer in Schneider Electric KSA
08/abb, 12:00 abb: Manoj Kumar maharana
Dy mgr Electrical (power plant)
Feedback power o&m service ltd
08/abb, 12:03 -abb: Dear all,
I’m Ramprakash from India working as electrical engineer in power line distribution and commissioning company,muscat – oman.
Company:- Alfalahy co llc, muscat.
08/abb, 12:17 -abb: Abubaker.Protection Engineer in national grids saudi arabia.
08/abb, 12:19 -abb: This is Ramesh kolanchi working as a Testing and Commissioning engineer electrical substation and power plants more than 10years
08/abb, 12:19 – abb: Khalid Mustafa
Maintenance & operation engineer at sudanese electricity distribution company (SEDC)LTD
08/abb, 12:39 abb: Pradip Desai
Power Systems Engineer at SYSTEM PROTECTION, Vadodara, Gujarat, India.
08/abb, 12:41 – abb: Ho I ask a question?
08/abb, 13:01 – Elec Engg: Dear all members, please take a moment and introduce yourself completely. Don’t start any discussion, just introduce!🙏🏻 Post your message in one single chunk of text, don’t post every word or sentence in a new message
08/abb, 13:02 abb: Engr. Zaigham Munir
Testing Engineer
ZGL Pakistan
08/abb, 13:02 – abb: Jameer Basha, Schweitzer Engineering Laboratories Pvt Ltd, Bangalore India
08/abb, 13:04 – abb: Manadi Med, commissioning eng Algeria public company sonelgaz power transmission
08/abb, 13:04 – abb: Iam HARIHARAN
Technician(maintenance and operation)
Bangalore international airport Ltd,
Bangalore
08/abb, 13:04 -abb”: Mohamed elmuntasir jalal protection engineer @SEDC Sudanese Electricity Distribution Company
08/abb, 13:25 – abb: I am V.Karpagalingam working as electrical commissioning supervisor in Saudi Arabia
08/abb, 13:27 – abb: Murali Manohar, Sr.Engineer, Indorama Petrochemicals, Nigeria
08/abb, 13:43 – abb: Horaira Azam Distribution Engineer Kuwait
08/abb, 13:54 – abb: K.Vivek
Protection Engineer
winstar Electro Mechanical Works, Qatar
Interested in Testing and commissioning ,protection
08/abb, 13:55 -abb: Gokul
Planning Manager
Siemens ltd
Chennai
08/abb, 14:08 – abb: Karthik Donepudi
Jr.Project Manager
08/abb, 14:08 – abb: Sterlite power
08/abb, 14:08 – abb: Indore India
08/abb, 14:21 -abb: 7 contacts.vcf (file attached)
08/abb, 14:21 -abb: Please add
08/abb, 14:27 – Elec Engg: Add your friends 🌸
08/abb, 14:28 – Elec Engg: Dear all members, please take a moment and introduce yourself completely. Don’t start any discussion, just introduce!🙏🏻 Post your message in one single chunk of text, don’t post every word or sentence in a new message
08/abb, 14:40 -abb: EL-KSABI OSSAMA
Foreman in Protection and control of electrical network distribution. Morocco
08/abb, 14:43 -abb: 7 contacts.vcf (file attached)
08/abb, 14:44 -abb: Dilshad electrical service engineer working in UAE
08/abb, 14:44 -abb: Please add this list
08/abb, 14:51 – abb”: Yar add e karna bus koi kam ki bat nai tou group leave kar dien
08/abb, 14:54 -abb”: HAMED SANOSY
Electrical Engineer
Working at Petro Energy E&P Ltd,co. (cnpc sudan branch) as power plant opeartion & maintenance technician
08/abb, 14:57 – Elec Engg: Gerd Einsidler, Head of Technical Marketing for Energy Automation Products, Siemens, Germany.
08/abb, 14:57 – Elec Engg: Welcome Sir,
08/abb, 14:58 -abb: Thank you for your warm welcome
08/abb, 14:58 – Elec Engg: 🙏🙏🌸
08/abb, 14:59 -abb: Dears I really do not know what is the real objective of this group… It is not good to have another group with 1000 massages a day.
08/abb, 15:01 – Elec Engg: It is just started
08/abb, 15:01 – Elec Engg: Dear all members, please take a moment and introduce yourself completely. Don’t start any discussion, just introduce!🙏🏻 Post your message in one single chunk of text, don’t post every word or sentence in a new message
08/abb, 15:02 -abb: So imagine more thane 100 person introducing them self.
08/abb, 15:02 – Elec Engg: Please be patient and follow the rules, we can start discussion later
08/abb, 15:02 -abb: And no one will remember even
08/abb, 15:02 -abb: Dats true
08/abb, 15:02 -abb: Could you please tell me what is the benfit
08/abb, 15:03 -abb: Ok
08/abb, 15:03 -abb: I will be patient
08/abb, 15:03 – Elec Engg: Thanks 🙏🌸
08/abb, 15:04 – Elec Engg: It is recommended to save the numbers for future references and discussions
08/abb, 15:13 – Elec Engg: Dear all members,

Don’t start any discussion, just introduce!🙏🏻
08/abb, 15:48 – abb: Add expert in power protection relay world just to exchange informations thanks ADMIN
08/abb, 15:49 -abb “: Mohammad Ramadan, Jordanian, Schneider Electric, Automation Engineer ( Substation Automation System, Oil&GAS System)
08/abb, 15:50 -abb: Name : Basim
Country : Saudi Arabia (Pakistani)
Company: XERVON SA
Speciality : Protection relays ( ABB, Siemens siprotec 4,5 , Sinamics G180 , MiCOM , Allen Bradley ) and protection Schemes
08/abb, 15:53 -abb”: Rike Silinda 🇿🇦 RSA @ Harmonious Technical #Technician Protection:SEL/Micon/Sepam/Bender RCM/Janitza
*:switchgear *
08/abb, 15:58 – abb: Thank you Dr Saeed Roostaee
08/abb, 15:59 -abb: Name : Bhavin patel
Country : Vadodara,gujarat,india
Company: Expel prosys siemens system house
Speciality : testing & commisioning of electrical switchgear & electrical machines like generator ,motor , protection relay testing & programming ( siemens, micom, sel,abb,ge)
08/abb, 16:04 -abb: Name: Himanshu Amrutiya
Country: India
Company: Popular switchgear Pvt Ltd
Speciality: testing and commissioning of relays.
08/abb, 16:08 – abb: Name: David Edward Francis
Country: India
Company: Etricals Engineers Pvt LTD
And the contactor drops off
08/abb, 16:33 – Elec Engg: Dear all members, please take a moment and introduce yourself completely. Don’t start any discussion, just introduce!🙏🏻 We will start discussion later. Post your message in one single chunk of text, don’t post every word or sentence in a new message.
08/abb, 16:38 – abb: -Mohamed Elshafey
-Senior testing and commissioning engineer
-from Egypt 🇪🇬

  • PSP elsewedy
    08/abb, 16:39 – abb: HI EVERYONE I’M ALI BEH FROM MOROCCO I’M ELECTRICAL ENGINEER
    08/abb, 16:41 – abb: You need to configure binary inputs,
    08/abb, 16:46 – abb “: Name: Maruthu Pandian
    Location: Kuwait
    08/abb, 17:16 – You added abb
    08/abb, 17:18 – abb: Mr.Yazid Bentayeb
    Fresh electrical engineer.
    Algeria
    08/abb, 17:34 -abb”: Name: Shahryar Haji
    Country: Iran
    Power Electrical M.sc student in tabriz university
    08/abb, 17:35 – abb: I am Anandababu , Senior commisioning engineer at PDCS
    Speciality: Protection Settings and Investigations
    08/abb, 20:51 -abb”: Name: Anil Patel
    Present Country: USA
    Native :Gujarat state, INDIA
    Education: Batchelor degree in Electrical Engineering
    Company : Previously I worked at MGVCL- Vadodara, Gujarat, India as Power Distribution Engineer
    In USA work as Electrical Distribution Design Engineer at TRC companies Inc , RockyHill, CT
    Interest field: Power Transmission & Distribution Engineering
    08/abb, 20:53 – abb: Joel Portes.vcf (file attached)
    08/abb, 20:53 – abb: Add My boss please
    08/abb, 21:24 -abb”: This message was deleted
    08/abb, 21:25 -abb”: Kashif khan,
    BE (Electrical), working in Middle East (Oman) since last 9+Years
    My Journey towards Project Management of

●Electrical Power Distribution and Utility Network Extension to develope electrical infrastructure of cities/towns

●132 / 33kV Substation Automaion Systems
09/abb, 00:16 – My Irancell Saeed Roostaee added abbs
08/abb, 22:23 -abb: I also interested in transmission side
08/abb, 22:27 -abb: Name: Inzamam
Present Country: Qatar
Designation: Electrical Project Engineer
Company: Faisal Bin Jassim Al Thani Group, Qatar.
Native :Telangana state, INDIA
08/abb, 22:56 – abb: Jonathan Jean
Dominican Republic, center América.
electric transmission company.
15 years in the department of controls and protections.
Electronic Engineer
09/abb, 00:17 – My Irancell Saeed Roostaee: Done
09/abb, 00:18 – abb: Thnks
09/abb, 00:30 – abbs: Hi
09/abb, 00:30 – abbs: Thanks
09/abb, 00:30 – abb: Hi
09/abb, 04:26 – abb: 19:00 in Dominican Republic ?
09/abb, 04:27 – abb: What time is it in the India ?
09/abb, 04:28 – abb: Greeting !
09/abb, 04:55 – abb: This message was deleted
09/abb, 04:59 – abb: Hello dear engineers;
I am working on sel 451 relay. And i faced a problem.dou you know what is 59V_2 In relay logic? all what i know is that it is related to overvoltage logic settings
09/abb, 07:19 – abb: It’s rltd over voltage ,u have conform it’s element 1/ element2
09/abb, 07:21 – abb: What does it mean
09/abb, 07:25 – abb: In logic we using 2 elements like 591V1 means over voltage element 1level 1 pickup
592V2 over voltage elemente level 2 pickup
09/abb, 07:25 – abb: What is the exact code u r using???
09/abb, 07:55 – abb: 59V_2
09/abb, 09:17 -abb: stage 2 of overvolage setting.
09/abb, 09:17 -abb: NAME : BHAVESH PANCHAL
Compney name : ERDA , VADODARA
I am looking after relay full type testing. intrested in IEC 61850 Protocol
09/abb, 09:53 – abb “: Hi… can anybody explain plz… in a electromechanical directional relay, how the direction is taken during a line- line fault….??
09/abb, 10:35 -abb: As a matter of fact this relay is a watt meter. in posetive watt close contact in negative watt open contact.
09/abb, 10:37 -abb:
09/abb, 11:36 – abb “: I agree… but during L-L fault, how will you get the correct polarizing voltage…??
09/abb, 11:57 -abb: I have tested in micom p143
09/abb, 11:59 -abb: It uses the cross polariztion and its will draw characteristic for each phase even it is L-L fault
09/abb, 12:08 – abb “: Ok
09/abb, 12:11 -abb: Unaffected/healthy phase will be used for polarization.
AB fault….C Phase voltage will be used.
BC fault…A phase voltage will be used etc
09/abb, 12:46 – abb “: Thank you sir
09/abb, 12:49 -abb: Sir , Do u have any study material for substation automation ?
09/abb, 12:52 – abb: Any materials regarding SAS kindly share here
09/abb, 14:20 – abb: What is back up protection for Generator Rotor Earth Fault
09/abb, 14:26 – abb: may be viberation sensor
09/abb, 14:33 – abb “: First stage is Rotor earth fault alarm.. if earth fault is at single point. Normally single point earth fault is not dangerous. Second earth fault on the same rotor, which is already having an earth fault, will bypass some portion of winding. It will lead to high exciter current and other mechanical instability problems. Then it’s dangerous and needs to be tripped very fast. Exciter will have rotor earth fault alarm and then trip. This may be routed to generator lock out protection.
09/abb, 14:49 – abb: If there is no change in Exciter Current then what can be the cause
09/abb, 14:50 – abb: We are having MRR1 CSPC make relay which is giving trip but there is no change in Exciter Current and Generator Vibration
09/abb, 14:57 – abb “: For single point earth leakage, there will be no visible changes in exciter current or high vibration.
09/abb, 15:03 – abb “: Change in exciter current and vibration comes when a part of rotor winding is bypassed and magnetic balance is affected. In your scheme I think stage 1 is trip, not alarm.
09/abb, 15:04 – abb: Ok..Can we keep it bypass…with making some other protection
09/abb, 15:04 – abb: No stage- 1 is alarm…both stages are actuating..
09/abb, 15:06 – abb: Ok..Can we keep it bypass…with making some other protection more prominent*
09/abb, 15:11 – abb “: Bypassing of rotor earth fault is not advisable… better to find out actual reason… Just megger the winding. You can assess whether there is actual fault or it’s a false alarm. Chances of earth leak in the brush area.
09/abb, 15:14 – abb: We are also suspecting the same..as after changing the relay there is no any alarm or trip
09/abb, 15:15 – abb: Megger is normal and the resistance from slip ring to earth is also infinity
09/abb, 16:10 – abb: can any one share some document related to dfig rotor excitation in synchronous sub synchronous and super synchrous mode?
09/abb, 16:37 – abb “: Can any one explain me about the motor Reaccelaration process…
09/abb, 17:37 – abb: Any one tell me all problems finding in GE RELAYS ?
09/abb, 17:38 – abb: Which one
09/abb, 17:38 – abb: Which type of problem are you facing?
09/abb, 17:41 – abb: Any type I can answer you
09/abb, 17:46 – abb: Echo and current reversal in DEF in L90
09/abb, 17:48 – abb: More details about your question!!
09/abb, 17:53 – abb: What I mean is that each type has some unique problems. So the troubleshooting manual are different
09/abb, 17:59 – abb: I’m facing firmware bad operation in T60 main Differential
09/abb, 18:00 – abb: I’m unable to reset as display is stuck
09/abb, 20:36 – You changed this group’s settings to allow only admins to edit this group’s info
09/abb, 20:37 – You added AA 3173 Gg Iran join “mostafa darba monazzah”thanks
09/abb, 20:38 – Elec Engg: Invite your friends too, forward the following message to them
09/abb, 20:38 – Elec Engg: To join the Protection Engineers WhatsApp Group:
Save +917303437524 as ” Elec-Engg ” in your contacts
Send a WhatsApp message as: join protection relay 4 ” Your Name “
09/abb, 20:40 – abb: Hello everyone,, my dear group members
09/abb, 20:40 – abb: My name is Buddha jagan,, I’m completed diploma EEE,, 2013 pass out
09/abb, 20:41 – abb: I have 5 years of experience in 132kv /11kvsubstation
09/abb, 20:42 – abb: Please understand my request,,present I’m unemployed
09/abb, 20:43 – abb: Please one opportunity give me,, my dear group members
09/abb, 23:54 – You added abb and AA 3193 Gg Join protection relay 4
09/abb, 23:56 – You added abb “
10/abb, 02:26 – abb:
10/abb, 02:40 – abb:
10/abb, 02:48 – abb: Is 59V_2 same as 59VS2?
10/abb, 03:22 – abb: Thnks !!!
10/abb, 11:11 -abb: Hi everyone. May I know anybody working in Saudi Services for electro mechanic works company in Saudi Arabia?
10/abb, 11:18 -abb: Yes
10/abb, 11:18 -abb: I know many”
10/abb, 12:50 -abb: Thanks
10/abb, 12:59 – abb: Thanks for sharing👍👍👍
11/abb, 00:09 – abb: Hello every one.
I am Mohammad from Iran .protection and control engineer.I would be happy to learn more from all of you
11/abb, 20:37 – abb: Hi;
Can anyone of you provide us with selogic basics in format of pdf or doc files. Thanks in advance
12/abb, 01:27 -abb: This message was deleted
12/abb, 08:37 – abb: hi can anynone say how to extract rio filr from Red670 Abb relay
12/abb, 11:13 – abb “: Kindly tell about goosing
12/abb, 14:55 -abb: Hello guys,
Can anyone help me to test ABB make RVC power factor controller. It’s not operating.
12/abb, 14:59 – abb: https://youtu.be/zEyeLOLkBbM
12/abb, 22:05 – abb: Open prameters then go to file and import parameter then select rio file
12/abb, 23:29 – abb “: Anybody has done partial discharge using omicron MPD600….??
12/abb, 23:31 – abb: I know a good engineer if you have a open job?
12/abb, 23:40 – abb: https://www.omicronenergy.com/en/events/training/detail/%D9%81%D8%AD%D8%B5-%D9%85%D8%B1%D8%AD%D9%84%D8%A7%D8%AA-%D8%A7%D9%84%D9%88%D9%82%D8%A7%D9%8A%D9%87-%D8%B6%D8%AF-%D8%B2%D9%8A%D8%A7%D8%AF%D8%A9-%D8%A7%D9%84%D8%AA%D9%8A%D8%A7%D8%B1-%D8%A7%D9%84%D8%BA%D9%8A%D8%B1-%D8%A3%D8%AA%D8%AC%D8%A7%D9%87%D9%8A/488/?fbclid=IwAR2YX2G_mn7LabWptTcIUzX7vIBYYeM5WNDM2axDbtCKXhBums8Qbckj-fU
12/abb, 23:45 -abb”:
12/abb, 23:45 – abb: Is closed
12/abb, 23:49 abb: CT Secondary open circuit
13/abb, 00:07 – abb “: Which differential protection…?? TX, BB, …?? High or low…??
13/abb, 00:07 -abb:
13/abb, 00:20 -abb”: It a recently refurbished panel not less than 6 month and has been operating without any problems.
13/abb, 00:21 -abb”: Trfr Protection
13/abb, 00:41 – abb: Lose connection.
13/abb, 00:45 – abb:
13/abb, 00:45 – abb: IEC 61850 intro !
13/abb, 01:09 -abb”: Could be, the terminal blocks were so old ,if you put a screwdriver in, they would break easily
13/abb, 01:18 -abb: hello everyone. iam looking for name of logical node in 61850 protocol (conversion BCD TO INT32)
13/abb, 01:19 -abb: i need to convert Binary input to decad variable in INT32
13/abb, 01:19 -abb: thanks
13/abb, 01:35 – abb: Do you have complete presentation or videos of this intro
13/abb, 03:04 – abb: Now , is finish
13/abb, 03:05 – abb: Means what?
13/abb, 03:44 – abb:
13/abb, 03:45 – abb:
13/abb, 03:45 – abb:
13/abb, 03:45 – abb: From Megger
13/abb, 03:47 – abb: Can you post the videos if possible ?
13/abb, 06:40 – abb: Yes, we have done PD using MPD
13/abb, 07:18 – abb “:
13/abb, 10:35 – abb “: Any one can tell me how to perform goosing between Siemens relay and Abb relay
13/abb, 10:52 – abb: The voltage of test depends upon the signal shape. Like if you test via VLF. The test voltage is like 1,7 times Uo.
13/abb, 11:06 -abb”: ‎2 contacts.vcf (file attached)
13/abb, 11:06 -abb”: 👆🏻Please Add my Electrical Power Engineer friend
above contact in group
13/abb, 11:15 – Elec Engg: Invite your friends too, forward the following message to them
13/abb, 11:15 – Elec Engg: To join the Protection Engineers WhatsApp Group:
Save +917303437524 as ” Elec-Engg ” in your contacts
Send a WhatsApp message as: join protection relay 4 ” Your Name “
13/abb, 12:14 -abb: Do u know any device make connection between different line differenital protection (siemens7Sd6101/micom P543)
13/abb, 12:27 – abb: With fibre optic
13/abb, 12:29 abb: I think this will never happened, since both should be identical
13/abb, 12:32 -abb: Yes
13/abb, 13:41 – abb “: Both should be same make and same MLFB
🌟Follow the group rules and objectives of the group
🌟This is an international group, just text in English
🌟Actively participate in the group.
🌟Don’t make any personal message to the group members
🌟 Post your message in one single chunk of text, don’t post every word or sentence in a new message.
🌟No changing of group name or group DP
🌟Advertisements, announcement of event of other groups needs approval from Admin before circulation (+917303437524 ).
🌟If any member is not following the rules, we have authority to remove from the group
🌟 No greeting and other personal discussion. Do not say good morning, good night, thanks etc.

Everyone must respect the group.
🙏Feedback and suggestions are always welcome

The group discussions are open 24/7. hit “Mute” on your Whatsapp group. You will still receive all the messages, but your phone won’t buzz or make a noise for every one of them
Now, please take a moment and introduce yourself completely : Your Name, Country, Company, specialty
14/abb, 11:16 -abb: K SRIHARI, INDIA, POWERGRID CORPORATION OF INDIA LTD
14/abb, 11:18 -abb: Hello Team,
Name -Yogesh Sonawane
Country- India
Company – Siemens LTD(Third party)
Specialty- experience in Substation Automation,RTU and protection relay(Ashida Relay) configuration.
Looking for better opportunity in Gulf countries
14/abb, 11:20 – abb: S.ANBUKUMARAN,TESTING AND COMMISSIONING ENGG,
GK POWER,OMAN (ND) QATAR.
14/abb, 11:22 -abb: Name: Viswateja from India
Company:ASHOMCo (Saudi Arabia)
Specialty: Electric engineer at Cogen power plant for Saudi Aramco
14/abb, 11:29 -abb: Muhammad Ali Imran
Company:SGS Pakistan Pvt Limited
14abb, 11:29 – abb: Ritesh Bamania
14/abb, 12:31 – abb: Nagarajan
14/abb, 12:41 abb”: Mahmoud shaker
14/abb, 12:43 – abb: Nagender
14/abb, 12:44 – abb: Naga
14/abb, 13:23 -abb: Name: Hassan Ahmed Najmi
Company: Siemens Pakistan Eng, Co.
Profile: Energy Management Digital Grid (Telecom

14/abb, 14:52 -abb: This message was deleted
14/abb, 14:53 -abb: Please i need doc about 101 and dnp3 ptotocols ? thanks
14/abb, 17:05 – You added AA 3101 Gg Add join protection relay 4 ” IBRAHIM OSMAN “
15/abb, 03:17 – abbs: Six times 3 or six times 2
15/abb, 03:17 – abbs: 222222
15/abb, 03:17 – abbs: 333333
15/abb, 03:18 – abbs: In siprotec 4 is 000000 default password
15/abb, 03:21 – abb: This message was deleted
15/abb, 03:24 – abb: El Link te da varios pass
15/abb, 16:34 abb: Hello friends anyone know how to recover siemens relay 7sJ801 from monitor mode?
15/abb, 16:35 – abb”: Jst turn off DC supply and turn on
15/abb, 16:39 – abb: Just In Monitor Mode, you can see reset option in drop down list, please reset the relay and it will recover to original.
15/abb, 17:00 – abb:
15/abb, 20:01 -abb: If happen after FW update . You have to initialize device
15/abb, 23:52 abb: Thanks alot..m issue resolved
15/abb, 23:55 – abb: Please let us know, how problem solved???
16/abb, 01:09 -abb: plz tell about PSB protection operated in brief.
16/abb, 09:01 -abb: Psd fanction avoid a hug load of fault.as a matter of fact metering dz/dt.since a fault is hi speed but a load is low speed or dz/dt
16/abb, 10:54 – abb “:
16/abb, 18:28 – abb: Excelente
17/abb, 11:40 – abb: Performance monitoring reporting system
17/abb, 11:42 – abb:
17/abb, 12:26 -abb: In MICOM Transformer relay manual it is mentioned that 41% of winding ( Say 20% setting of In if CT secondary is 1 Amp ) will be covered under differential protection and balance 59% will be covered in REF protection for star winding connection transformer. My Query is how much winding will be covered in differential protection if transformer windings are delta connected Dd1.
17/abb, 12:29 -abb: Is there any document available to understand how the current flows inside each branches of delta winding during healthy condition, during Phase to Phase fault and during Phase to Earth faults.
17/abb, 12:31 – abb: Please can you help out by briefly explaining, how problem resolved?
17/abb, 13:09 – abb: Brahim for Algeria working at grte, Manager of electricity transportation networks, I search the licence for ied scout software. Thanks friends
17/abb, 13:18 abb: if it is Dd Conection then REF can not be applied unless yuo use zigzag transformer as a grounding transformer.. if so then you will use the same persentage
17/abb, 13:19 -abb:
17/abb, 13:33 – abb: Hope License is the problem, please try with Genuine License Number.
17/abb, 13:33 -abb: but i did put a genuine key when asked during digsi installation
17/abb, 13:36 – abb: Hope, License might be utilized before and it might not be multiple user License. Please check with Siemens….
17/abb, 13:44 – abb: Am getting error while installing digsi 4.91 in Windows 8.1 saying operating system is not supported
17/abb, 15:12 – abb:
17/abb, 15:13 – abb: Thank you
17/abb, 15:15 – abb:
17/abb, 16:18 – abb: C&S make MRR1 rotor Earth fault relay is not giving any alarm when output is not connected…but it’s giving alarm as soon as output wire is connected
17/abb, 16:18 – abb: What can be the cause
17/abb, 16:23 -abb: is it a dry contact?
17/abb, 16:24 – abb: Yes
17/abb, 17:00 -abb: maybe the internal relay is power by the control voltage itself.
17/abb, 17:01 -abb: does it happen in other relays also?
17/abb, 18:50 – abb: No
17/abb, 19:10 – abb:
17/abb, 19:10 – abb:
17/abb, 20:32 -abb: What type of relay this? Try to avoid this type of msgs
17/abb, 20:34 – abb: It came unfortunately
17/abb, 20:35 -abb: Is it a jock…
17/abb, 20:35 -abb: Admin plz remove this person
17/abb, 20:36 -abb: It’s not a jocking group
17/abb, 20:37 – abb: I think this is by mistake. May be mobile is in child hand.
17/abb, 20:37 -abb: Then he has to forgive….for make another chance
17/abb, 20:38 – abb: 🤔
17/abb, 20:39 -abb: Wht?????
17/abb, 20:44 -abb: Leave it guys….
17/abb, 22:03 – You removed abb
17/abb, 22:09 – abb: 🤭🤣
17/abb, 22:11 – You removed abb
17/abb, 23:51 – abb “:
17/abb, 23:51 – abb “: Output relay testing procedure is here in this manual
17/abb, 23:53 – abb: can anyone share the document related to dfig excitation?
18/abb, 07:07 – abb: Thanks
18/abb, 17:14 – abb “: Anyone experienced in MPD 600 for PD measurement…???
20/abb, 07:04 -abb: Hi, how pilot advance transformer (PAT) works? How its connections will be? These transformers are used in rural agricultural feeders to ensure 3 phase power during non peak hours and single phase supply during peak hours..( single phase supply for rural houses and three phase for agricultural motors in farms ).
20/abb, 12:53 – abb: This message was deleted
20/abb, 14:12 -abb: Can you share a picture of such transformer please?
20/abb, 14:19 -abb:
20/abb, 14:20 -abb: Not having pictures.. Got the information about PAT transformer from this document only👆
20/abb, 14:21 -abb: This message was deleted
20/abb, 14:22 -abb: Yeah thanks, I read that. I actually have my own transformer related workshop, that’s why wanted to know more. Thanks a lot
21/abb, 22:10 – abb: Dear, someone Will have the IEC 60480 standart
21/abb, 22:22 – abb: https://www.sis.se/api/document/preview/566910/
22/abb, 12:21 – abb: PSL in micom relay, areva ,Siemens, Abb, and SEL?!
22/abb, 15:39 -abb: Micom
22/abb, 15:40 – abb: And for others brands?
22/abb, 15:50 – abb: 1.Areva, Schneider, Alstom,GE – are using Micom products-PSL-Programmable scheme logic
2.Siemens-CFC- Continuous function chart
3.Abb-ACT- Application configuration tool
22/abb, 15:55 – You addedabb”
22/abb, 16:06 – abb: And SEL?
22/abb, 16:06 – abb: Psv
22/abb, 16:10 – abb: Please sir do you have a procedures how to commissioning RPH3 ?
23/abb, 01:26 – abb: Hi
23/abb, 15:01 – abb: Any working in low voltage switchgear stream
23/abb, 15:01 – abb: Power system
23/abb, 15:07 – abb “: S
23/abb, 15:18 – abb”: Yes
23/abb, 20:09 – abb: Yes,
23/abb, 21:18 -abb”: Hi all
could you share about SOTF function in distance Relays?
23/abb, 21:25 – abbs: Switch on to Fault
23/abb, 21:27 – abb: Elaborate plz
23/abb, 22:11 -abb: If ur going energise one feeder in that feeder have fault is existing and we gave a closing command to Breaker, then in that case SOTF protection will immediately trip the Breker.
23/abb, 22:18 -abb: Super mr. Govardanan
23/abb, 22:20 -abb: Please explain timesynch process in simens relay using SNTP.
23/abb, 22:48 – abb: Anti-pump relay
23/abb, 22:49 -abb: Anti pumping to protect the closing coil
23/abb, 22:49 – abb: cierre, interrumpir el comando

  • https://elec-engg.com/whatsapp-group-for-protection-engineers/

https://elec-engg.com/whatsapp-group-for-protection-engineers/


23/abb, 22:53 – abb: Some switches come from the factory but you can also design logic.
23/abb, 22:55 -abb: Some switches mean?
23/abb, 22:55 -abb: Communication switches?
23/abb, 23:00 – abb: excuse me power switches
23/abb, 23:40 – abb: please anyone, how to read icd file for abb relay
24/abb, 01:21 – abb: Go to parameter settings then click on file from menu bar after that select export parameters and select which type of file you want to export
24/abb, 14:05 – abb:
24/abb, 15:18 abb: Siemens 7sj8011, how can we change it?
24/abb, 15:18 abb:
24/abb, 15:18 abb:
24/abb, 15:19 -abb: Through Digsi Software
24/abb, 15:19 -abb: Use digsi
24/abb, 15:26 abb: Always or we can change setting to manually
24/abb, 15:36 – abb “: No you can’t
24/abb, 15:55 abb: Oh ok thanks
24/abb, 19:03 – abbs: Only by software DIGDI
24/abb, 19:05 – abb: Oook
25/abb, 08:05 -abb: Any one from GE Chen nai?
25/abb, 19:15 – abb: What is pre close and post close in trip circuit supervision , can anyone explain ?
25/abb, 19:26 – abb: This is for trip circuit supervisor relay concept. Pre close before closing the breaker trip circuit healthy condition. Post close mean after closing the breaker trip circuit healthy condition. This this trip circuit supervisor relay check the trip circuit coil must be healthy in pre close & post close condition. If trip circuit fail protection relay give any trip commend it will not operate. That why protection scheme have two numbers of trip circuit scheme. This is called pre close & post close.
25/abb, 19:28 – abb: Thanks
25/abb, 19:28 – abb: Welcome
25/abb, 19:30 -abb”: We learn every day🙏
25/abb, 19:30 – abb: 👍
25/abb, 23:51 – abb: Please I looking the abb red 615 file setting for comparaison.
26/abb, 13:10 abb: How to set Directional over current protection?
26/abb, 16:47 -abb:
26/abb, 17:37 -abb: 👍 well explained
26/abb, 19:32 – abb: Very nice, also when mechanical protection operates .. it will send trip command directly to lock out without going through main relay.
27/abb, 15:17 -abb: Breaker is not working automatic..we need to press it manually for the operation of the pump..can anybody help me out in this
27/abb, 15:17 -abb:
27/abb, 15:17 -abb:
27/abb, 15:19 – abb”: Breaker or contactor?
27/abb, 15:21 -abb: Contactor
27/abb, 15:21 – abb”: Plz share control schematics
27/abb, 15:30 – abb “: S we need the schematic diagram for the rectification
27/abb, 15:32 – abb: Quick check the float switch by force, if supply is not reaching upto contactor coil, then there may be problem in loop or float switch itself.
27/abb, 16:28 – abb: Vous avez trouver le ficher ou pas encore?
27/abb, 21:49 – abb: Non hamoudi. Introuvable
27/abb, 22:02 – abb:
27/abb, 22:04 – abb: Je cherche la configuration fichier pcmi pour faire la comparaison entre les deux relais
27/abb, 22:06 abb: Which language is this?
27/abb, 22:08 – abb: French
27/abb, 22:08 – abb: French
27/abb, 23:54 -abb:
28/abb, 12:21 – abb:
28/abb, 12:21 – abb: Can any one Help
28/abb, 12:21 – abb: ?
28/abb, 12:35 -abb: Download S1 studio password hash genetor
28/abb, 12:35 -abb: And set a password
28/abb, 13:46 – abb”: AAAA
28/abb, 13:51 -abb:
28/abb, 13:52 -abb: Please explain function of resistor connected series in tripping coil
28/abb, 13:59 – abb “: It’s the trip circuit supervision circuit. It limits the current through the trip coil below the pick up value.
28/abb, 14:04 -abb: Ok thank you sir
28/abb, 14:56 – abb: A diagram is nor clear!!!
28/abb, 17:18 – abb: 👍👍👍
29/abb, 11:23 – abb:
29/abb, 11:54 – abb: Can we use single pole ac mcb in DC Circuit in negative polarity where positive polarity is grounded, dc system voltage is -48V,
If ans is yes then why??
29/abb, 14:17 -abb: Brother MCB has nothing to do with voltage. In your specific circuit, whatever the voltage is, doesn’t affect MCB.
Any kind of circuit breaker works on Current and it will work fine unless your circuit is designed ok. Even then it wouldn’t be circuit breaker that would be an issue but design of circuit.
29/abb, 14:20 – abb: But I am asking about dc and ac mcb difference. Whether the can be used interchangeably
29/abb, 14:55 -abb: Yes they can, I have used them.
But it depends in sensitivity of your circuit as well.
if an MCB designed for AC, it will trip sooner if used on DC, in case if fault.
29/abb, 14:55 -abb: In normal condition, it works fine
29/abb, 14:56 – abb: What I think is all breakers are rated to work with all type of voltages in ac and dc
29/abb, 14:57 – abb: Only the short circuit capacity will change according to the voltage
29/abb, 14:57 -abb: Some dedicated for DC, their coil don’t get heated as fast as AC…
29/abb, 14:57 -abb: Exactly
29/abb, 14:57 – abb: Yes those are special breakers
29/abb, 15:59 – abb: Thanks to all🙏🙏🙏
29/abb, 19:29abb: Friends anybody having red670 distance protection schemetic diagram..if u have pls forward to nagarajhifi@gmail.com
29/abb, 22:16 – abb: send here plz
30/abb, 01:16 -abb: This message was deleted
30/abb, 01:16 – abbs:
30/abb, 01:16 – abbs:
30/abb, 01:16 – abbs:
30/abb, 01:17 – abbs:
30/abb, 01:17 – abbs:
30/abb, 01:17 – abbs:
30/abb, 01:17 – abbs: Where,s protecction system in these case?
30/abb, 01:19 – abb: Where is that?
30/abb, 01:20 – abb: Guess protection engineer has not configured output contacts of relay 🤪
30/abb, 01:20 – abbs: I don’t now
30/abb, 01:20 – abbs: May be
30/abb, 01:23 -abb: New york
30/abb, 01:24 -abb: Usa
People in the fist thought it might be an alien attack
30/abb, 01:26 – abb: Lol its scary
30/abb, 01:27 -abb: Search new york blue sky on utube. It’s hilarious
30/abb, 01:29 – abbs: 😨
30/abb, 09:00 – abb: https://www.google.com/amp/s/www.theverge.com/platform/amp/2018/12/28/18158660/blue-glow-new-york-city-exploding-transformers
31/abb, 15:06 -abb: Hi. Is there anybody who has tested abb SwitchSync relay L183?
31/abb, 15:08 -abb: Or anyother SwitchSync relay from other manufactures like SIEMENS?
31/abb, 15:15 – abb: Synchro-check relay SPAU 140 C
31/abb, 15:29 -abb: Thank you very much but SPAU 140 C is synchrocheck relay not a syncswitch relay
31/abb, 15:32 – abb: Switchsync PWC600 is ABB
31/abb, 15:32 – abb: RPH3 ALSTOM
31/abb, 15:33 – abb: Controlled Switching with the Siemens Phase Synchronizing Device (PSD)
31/abb, 15:34 – abb: the MCS025 Sync-Check Module Schneider
31/abb, 15:36 -abb: Thank you very much. So you have tested these relay?
31/abb, 15:36 -abb: Have you used omicron?
31/abb, 15:37 -abb: Would you please give me test procedure or settings that have worked for testing these relays
31/abb, 18:33 – abb: GREETINGS FROM TRANSCEND HR CONSULTANCY!!!
01/abb, 00:35 – abb: Wish You Happy New Year 2019 With Bright Future & Enjoy Life For You & Your Family
01/abb, 02:43 – abbs: 👍🏾
01/abb, 03:15 -abb:
01/abb, 09:53 – abb:
01/abb, 10:29 – abb:
01/abb, 11:15 -abb: Happy new year to all 💥⚡✨💐
01/abb, 19:51 – abb: Any one have good document to understand ABTS and TOP.
01/abb, 19:56 – abb: Procedure SAT RPH3 ALSTOM please!?
01/abb, 21:06 -abb: Can we find amp to rpm ?
01/abb, 21:26 – abb: ???
01/abb, 21:42 -abb: Can we find amp from RPM?
01/abb, 21:43 -abb: Motor rpm
02/abb, 00:03 – abb: 🙄no
02/abb, 00:06 – abb: Engine with a power of 250 kW 1500 rpm and a 1500 kW 1500 rpm engine
02/abb, 16:06 -abb: Any one working or heard abt company called valmet?
02/abb, 18:04 -abb: Hi, There is opening in Schneider Electric, Chennai, India for Commissioning engineer with 5 to 7 Years’ experience..
Candidate must have knowledge on
1.) Commissioning of Numerical protection relays ( Distance, Differential, Busbar, Overcurrent & E/f )
2.) Hands on experience in configuration and testing different make protection relays with Omicron 356 / Double testing kits.
3.) Provided setting calculations for above said protections including CT & VT sizing..
Candidate may need to travel Global sites if required for commissioning & Training customers ..

To join our protection relay WhatsApp group, please send interest on Whatsapp +989129613659

Qualifying and Interested candidates can send your CV to ramachandran.vaithiyanathan@se.com
02/abb, 19:14 -abb”: Could you share any data about DCS system in substations?
03/abb, 00:21 -abb: What kind of dcs do.you want?
03/abb, 00:21 -abb: Or type
03/abb, 00:22 -abb: Siemens ,Arefa
,Abb,Vatec
03/abb, 02:20 -abb”: This message was deleted
03/abb, 02:21 -abb”: Siemens please.🙏
03/abb, 04:41 -abb: Wincc or sicampas
03/abb, 13:49abb:
03/abb, 16:57 -abb”: SICAM PAS
03/abb, 17:00 -abb”: thanks
03/abb, 19:10 – abbs: User: zivercom
03/abb, 19:10 – abbs: Password: 0000
03/abb, 19:10 – abbs: Other password: ziv
03/abb, 19:35 – abb: 👍🏾👍🏾👍🏾👍🏾
03/abb, 21:10 – abb: CGL uses this software
04/abb, 16:46 – abb “: Anybody have vedios for transformer differential testing
04/abb, 16:47 – abb “: Especially regarding the slope points
09/abb, 17:55 -abb: Join Prtection Relay 4 ” Zaigham ali changed their phone number to a new number. Tap to message or add the new number.
09/abb, 17:57 -abb: Join Prtection Relay 4 ” Zaigham ali changed their phone number to a new number. Tap to message or add the new number.
10/abb, 09:54 – abb: Hi All
What is the equivalent model of RED670 in SIEMENS ??
10/abb, 10:16 – abb: 7SA52
10/abb, 10:17 – abb: Ok Noted
10/abb, 10:51 – abb: 7SD52
10/abb, 10:55 – abb: Is not 7sa52,
10/abb, 10:56 – abb: 7sd52
10/abb, 11:05 – abbs: 7SL87 version 5
10/abb, 11:06 – abbs: 21 87L 67 79 25….
10/abb, 17:31 – abb: 👍🏾👍🏾👍🏾👍🏾
11/abb, 00:59 -abb: For Siemens relays 7SD…. means Line Differential Protection.
7SA… Distance Protection as main protection function. Depending on the device type distance or line diff is available as main 2 function.
7SL … Line and Distance Protection. (SIPROTEC 5)
11/abb, 02:30 – abb: 👍👍
11/abb, 05:45 -abb: In micom relays can I upload the revised PSL while the relay is in service ?
11/abb, 05:45 -abb: Will there be any maloperation..?
11/abb, 07:00 abb: PSL uploading may result in Pick up of BI/BO and then output contact.
12/abb, 13:05 abb: Check the connection
Or disconnect the DC from relay for a while and try again
12/abb, 13:18 -abb: Ok thank-you
13/abb, 16:09 – abb:
13/abb, 16:12 – abb: Nice
14/abb, 16:10 -abb”:
15/abb, 20:28 – abb”: Has anyone distance and diffrential realy calculation in excel ؟؟!
15/abb, 20:29 – abb”: Plz share if anyonw have
16/abb, 01:57 – abb:
16/abb, 01:58 – abb:
16/abb, 07:59 – abb: Hi
16/abb, 08:00 – abb: Anybody have calculation sheet in excel for voltage drop and current carrying capacity of cables
16/abb, 08:17 -abb: Hi…
Is it password protected??
17/abb, 00:33 – abb”: Hi you can download it from https://electrical-engineering-portal.com/download-center/electrical-ms-excel-spreadsheets
17/abb, 00:37 -abb: Any body knows how to protect three phase to ground earth fault?
For MV network.
For single phase there are many ways but for three phase we have problem.
17/abb, 00:38 – abb: Thank u very much
17/abb, 01:35 -abb: Hi
I want to config distance relay model VAMP 259 but there is no option to enable fault locator. i can see the related option under distance menu but nothing is submitted (in KM or Ohm), is there any way to enable fault locator?
17/abb, 02:19 abb: What problems yuo have ?
Three phase to ground it will not detect as earth fault because no zero sequence or no current will flow in the neutral. It is just an over current.
17/abb, 12:19 -abb: Good morning. A 132 kV SF6 circuit breaker rated for 220 volts aux. Voltage is to be used in a substation where 110 volts DC voltage is available. Please advise which changes are necessarily to be made in Circuit breaker.
17/abb, 12:45 – abb “: If you want to modify the equipments in the circuit breaker for 110v you need to change more equipments. Better try to connect the two 110v supply in series
17/abb, 16:49 -abb: When the available voltage is 110VDC
Change the following parts
1-closing coil one unit
2-tripping coil two units
3-all the dc contact relay.
Otherwise wise Manage 220VDC
17/abb, 16:51 -abb: Indication Lamp
17/abb, 18:11 – abb”: I am trying to export micom 442 set file into xrio format by using schnider s1 studio, but imI cannot find xrio option in the export menu. Any body can help?
17/abb, 18:12 – abb”: “but I cannot find”**
17/abb, 18:22 abb: You can go to setting file in right side of software , and press right click by mouse , and go to export setting , Rio
17/abb, 18:29 – abb”: I did it like this way, but xrio option was not available. I think software version does not has this option. But I am not sure.
17/abb, 19:01 -abb: Thanks boss. Relevant option.
17/abb, 19:01 -abb: Thanks boss.
17/abb, 19:01 -abb: Thank you all. Allah bless..
17/abb, 20:54 – abb: Any one have good document to understand ABTS and TOP.
18/abb, 04:49 – abb: Any one have Method of statement For Transformer stability and Generator stability?

Kindly reply m19/abb, 19:25 -abb”: anyone has SICAM PAS complete training for download?
20/abb, 12:21 – abb: Anyone having Protection in HVDC Systems related data. Plz share
22/abb, 10:38 – abb”: Does any body have IEC standards pertaining to SF6 gas please share?
22/abb, 10:50 -abb: Any one , Can you give me transformer testing IEC standard ?? Plz
22/abb, 11:36 abb: Hello,
If the SF6 in HV CBs become very low. What is the standard action in this case .. does the CB trip ?or it must locked out?
If it is locked out does any breaker failure must be initiated
22/abb, 11:36 abb: ?
22/abb, 11:47 -abb: Stage 1 alarm , stage 2 block . Block gas pressure <•5 Mpa
Block is no more operation ,open or close .
If fault then if it is line Tele protection will activate if trafo feedder or normal feeder BF will operate.
22/abb, 12:04 abb: In 500 KV if stage 2 appear the breaker immediately trip! Is it correct or need discussion??
22/abb, 12:07 abb: In our scheme in 500 kV level, if stage 2 appear the breaker immediately trip .. in my opinion cb lock out must take plase rather than trip! .. Am I write??
22/abb, 12:08 -abb: I have only experience up to 400 kv Siemens CB , second stage not trip from cb scheme. But PSB functions can make trip . I have no knowledge about PSB
22/abb, 12:08 -abb: PSD
22/abb, 12:11 abb: Sorry, what is PSD
22/abb, 12:12 -abb: Phase Synchronizing Device (PSD)
22/abb, 12:17 – abb: Please need test procedure RPH3 synchronizing device please?!
22/abb, 12:20 abb: Thanks
22/abb, 12:21 – abb: Please need test procedure RPH3 synchronizing device please?!
22/abb, 12:22 -abb: Can I get testing IEC standard file @249123496701
22/abb, 12:23 -abb: All substation equipment and transformers.
22/abb, 12:23 – abb: Please need test procedure RPH3 synchronizing device please?!
22/abb, 12:24 – abb: We are getting Generator Rotor Earth Fault in Relay…How can we ensure that it is a false alarm
22/abb, 12:27 abb: I don’t have my friend.. I am operating engineer
22/abb, 12:43 -abb: Brother this is dangerous to trip the cb in case of stage 2 appears.it may not be able to quench the arc properly as sf6 pressure is low.so its advised to block tripping in case stage 2 operates.
22/abb, 12:55 – abb: Tell me SEL relay password
22/abb, 12:57 – abb: 👍
22/abb, 13:29 – abb “: If sf6 gas content reduced breaker trip
22/abb, 15:27 -abb: Level 1 OTTER TAIL
22/abb, 15:49 – abb: 👍🏼
22/abb, 16:56 -abb: Stage 2 trip must be lockout, means Breaker will trip and shouldn’t Close until SF6 Gas is refilled to specified pressure.

Lockout means one needs to reset Lockout relay before closing Breaker.
But don’t reset until gas is refilled to required pressure.

Nominal pressure for 132kV is 5.6 bars absolute.
I have protocols of IEC Standard for Gas testing, if you nees I can send you tomorrow
22/abb, 17:25 -abb: Hi
Does Micom P741 and P742 need seperate software for PSL editin?
22/abb, 17:38 – abb”: No, s1 studio can do it.
22/abb, 17:39 -abb: thank you very much, but if i want to edit single line map of substation?
22/abb, 17:47 -abb: does anybody have P740 Scheme Editor?
22/abb, 17:48 – abb”: Please do send tomorrow
22/abb, 17:50 -abb: Sure, I would send you as soon as I open my laptop
22/abb, 17:50 – abb”: Thanks 👍
22/abb, 17:57 -abb: does anybody have P740 Scheme Editor?
22/abb, 18:06 – abb “: Could you please send me the Same.
22/abb, 21:49 -abb: Sure I will send it here
22/abb, 22:19 – abb”: Im this case you must use topolgy editor for micom
22/abb, 22:42 -abb: Do you have applicaton for that?
22/abb, 22:51 – abb: Iec 60076
22/abb, 22:54 – abb: If you want to go with diagnostic testing for transformer please refer C37.152
22/abb, 23:02 – abb: Can any tell me about IEC standard for GIS, MV switchgear, transformer, protection schemes and IED testing and commissioning
22/abb, 23:02 – abb: Needed IEC standard Codes
22/abb, 23:13 – abb”: Yes i have. but i do not have it’s serial number, unfortunately. You have to buy the application from schnider directly.
22/abb, 23:18 -abb: Would you please give me the link to download software?
22/abb, 23:19 -abb: Then i will buy serial numbrr
23/abb, 01:37 – abb: NIC NO RESPONSE in micom p142 and p143
What to do to solve this problem and what the cause for it
23/abb, 07:05 – abb: Problem with the hardware.
Temporary solution: restart the IED, alarm will disappear and after some days alarm will come again.
Permanent solution:Need to change network interface card and update the respective nic file to that board.
23/abb, 10:24 – abb: Thanks for reply
24/abb, 21:47 -abb: Plz share Rio/PTL file for P44T relay Alstom make,,
24/abb, 22:00 abb: Anyone having Sepan M40 Series motor relay testing file?
24/abb, 22:01 – abb: Hi, hope u need relay file ????
24/abb, 22:02 abb: Yes
24/abb, 22:02 abb: Please
24/abb, 22:03 – abb:
24/abb, 22:12 abb: Which format is this?
24/abb, 22:13 abb: Sir this is not supported. Is it Pdf or excel?
25/abb, 00:33 – abb: Password ? Sure
29/abb, 19:17 – abb: Hi ..

To join our protection relay WhatsApp group, please send interest on Whatsapp +989129613659

Anybody having idea about Siemens OPC server communication
29/abb, 21:01 -abb: anybody has serial number for micom topology editor ?
29/abb, 21:01 -abb: or can edit sdl for micom p741?
30/abb, 10:59 -abb: In Micom S1 studio, while uploading psl file to relay, we get three options, First is Enhanced logic only, second Logic only, third Full form .. My question is what is the difference between these three options.
30/abb, 11:30 – abb: The difference is in the settings updated with the psl update.
30/abb, 20:18 – abb “: Hi…. Anybody has the sample test report of Partial Discharge test on Distribution Transformers….??
31/abb, 14:03 abb:
01/abb, 22:07 -abb: In below attachment, Generator Stator earth fault is detected by connecting Neutral side NGT secondary voltage in series with Phase side open delta voltage which derived through external IVT. Query is how this works and what will be output voltage of this combination which is measured by MICOMP345 relay ..
01/abb, 22:08 -abb:
01/abb, 22:09 -abb:
01/abb, 23:35 – abb: Hello everyone
01/abb, 23:36 – abb: Who is the best version windows to install all software digsi, agil, pcm….. Without bug?!!! Thanks
01/abb, 23:39 – abb: Leonardo Dicarprio
01/abb, 23:39 – abb: 🤝
02/abb, 02:42 -abb”: 10
02/abb, 03:51 – abb: Without bug or dysfunction??!
02/abb, 08:24 -abb”: Yet
02/abb, 13:15 – abb: https://www.gegridsolutions.com/app/Resources.aspx?prod=RPH3&type=1
03/abb, 14:03 – abb: https://www.gegridsolutions.com/app/Resources.aspx?prod=RPH3&type=1
03/abb, 14:04 – abb: commissioning Manuel please 🙏
03/abb, 17:46 – abb: Someone had omicron test templates cmc356, for overcurrents, differential, etc, and also some good bibliography for generator protections.
05/abb, 17:12 – abb: Test
05/abb, 17:20 – abb: This your book
05/abb, 17:20 – abb: This is your book
05/abb, 17:29 – abb:
05/abb, 19:23 -abb: Did anybody have protection relay testing handbook
05/abb, 19:23 -abb:
05/abb, 19:35 -abb: 👍🏻👍🏻👍🏻👍🏻
Thank you so much
05/abb, 19:36 – abb: Excellent thank u👍👍👍
05/abb, 19:36 – abbs: 🤗👍🏾
05/abb, 20:02 abb: Thank you very much🤗🌸🤗🌸
As you notice this book is volume 4 in the series . . I would appreciate it if you send volumes 1-3
05/abb, 20:03 – abb: Thank you dear it’s very helpful
05/abb, 20:24 -abb: 👍🏻
05/abb, 20:59 – abb: Your are welcome.
I wiil trh to find the other volumes
05/abb, 21:01 abb: Thanks Yazid … 🌸🤗❤👍🏻
05/abb, 21:01 – abb: You are welcome
05/abb, 21:20 -abb: Wonderful and helpful.. Allah bless..
05/abb, 21:20 – abb: You’re welcome
05/abb, 21:22 – abb:
05/abb, 21:28 – abb:
05/abb, 21:32 – abb:
05/abb, 21:32 abb: ❤
05/abb, 21:33 – abb: Volume
05/abb, 21:33 – abb: Thnx
05/abb, 21:59 – abb: Please share volume 4
05/abb, 22:01 abb:
05/abb, 22:01 – abb: OK thanks
05/abb, 22:02 abb: YAZID : Thanks .. very much ❤
05/abb, 22:16 – abb: You are welcome
06/abb, 00:44 -abb: My dear good friends
I have problem with the earth fault.
We have used Siemens o/c relay which is functioning very good for o/c ,e/f and s/c
For the earh fault whenever it’s happened either one or two phases it’s working ,but whenever it’s 3phase .the relay is not working.
Please help me in this issue
06/abb, 00:46 – abbs: Always trips with 3phase faults?
06/abb, 00:49 -abb: For other fault it’s ok but the 3 phase Eearth fault is not detecting.
By primary current injections each phase individually functioning.
06/abb, 00:54 – abbs: 🤔
06/abb, 00:54 – abb”: What are the magnitudes and angles of 3 phase currents you injected for test?
06/abb, 00:55 – abbs: What SIEMENS OC relay model?
06/abb, 01:01 -abb: 7SJ601
06/abb, 01:01 – abbs: Version 3
06/abb, 01:01 -abb: Yes 3
06/abb, 01:04 -abb: The earth fault setting for the stage one I> 15A
If faults is even 20A no functioning
06/abb, 01:37 abb: Dear friend .. 3 phase fault it is not an earth fault .. even if 3 phase to earth it will not detect by earth fault protection
06/abb, 01:41 abb: If you inject three equal magnitudes with 0,120,-120.. earth fault will not function even if it is more than earth fault setting .
06/abb, 01:46 – abb”: While you are injecting current, check relay measurments and make sure that neutral current exceeds the setting value (15A)
06/abb, 01:46 – abb”: If current exceeds setting then you have to check whether directional fuction is enabled or not. Also somtimes you need to check the earth fault calculation method if its measured or calculated.
06/abb, 01:47 – abb”: Finally check the current connection to relay. Make sure that current circuit loop is closed
06/abb, 01:49 – abb”: Thats totally right. balance values will not initiate earth fault fuction.
06/abb, 01:55 – abb “: I agree with that the balance magnitude will not result in earth fault. Check the neutral current flow
06/abb, 02:08 -abb”: The 3phase fault is consider balance three phase fault so no earth fault will detect, you need to active o/c protection.
Even if E/F operate with three phase fault it will be due to unbalance not a real earth fault.
06/abb, 02:25 – abb “: Just reduce the setting for testing purpose and inject the current in all three phase monitor the neutral current flow now increase the current value in only one phase until the neutral current value reaches your setting value definitely it will trip according to the curve. Check the setting whether it is non directional.
06/abb, 06:43 -abb: Hope you are testing directional earthfault.. Check the voltage magnitude which you are injecting to the relay.. it shouldn’t be zero.. mostly relays require minium of 3Volt for sensing the right direction.. suggest give 10V in Y and B phase and 5V in R phase and injecting the fault current above the setting..
06/abb, 15:45 -abb: if the three currents are not shifted between them by 120 degrees, even if they have the same amplitude, it will trip because the vector sum of the three phases becomes different from zero. (Io # 0A)
06/abb, 16:50 -abb: Admin… Please add Mr. Sajimon to group
06/abb, 16:50 -abb: Sajimon Bro India No.vcf (file attached)
07/abb, 16:44 abb: Dear i am facing a problem in Siemens 7SJ8041
When Relay Trips on Under Volatge and Voltage comes back to normal and i try to reset the Relay Binary outputs and Leds then relay does not resets… i have to go into Test and diagnostic menu and have to reset whole relay from there… any solution?
07/abb, 16:51 – abb: Please check drop out ratio of relay….
07/abb, 16:52 – abb: normal drop out is 1.2 for under voltage
07/abb, 16:53 abb: Secondly in 7s8041 Relay does not trips on Reverse Power
07/abb, 16:54 – abb: Please check additional functions available or not
07/abb, 16:58 abb: Yes available
07/abb, 16:59 abb: And setting at 166.5W
07/abb, 17:02 abb: From where we can check it?
07/abb, 17:14 – abb: This message was deleted
07/abb, 17:15 – abb: It is available in u/v settings.
But you need Laptop and active additional settings
07/abb, 17:18 abb: Okk brothet
07/abb, 21:35 – abb: Plz Add Aimal Khushal Assistant Manager Maintenance NTDC
03008560046
07/abb, 21:53 – abb: If any one this relay manual English electric, CDG31FF8051JL(M), electromagnetic relay kindly reply me
08/abb, 16:48 – Elec Engg: Invite your friends too, forward the following message to them
08/abb, 16:48 – Elec Engg: To join the Protection Engineers WhatsApp Group:
Save +917303437524 as ” Elec-Engg ” in your contacts
Send a WhatsApp message as: join protection relay 4 ” Your Name “
08/abb, 20:21 – You addedabb and A1 5422
08/abb, 20:28 abb: If a transformer is protected with both REF (64REF) and Differential (87).. as we know REF is more sensitive than 87 and operate for the unprotected winding near to the neutral side.
My question: is any 87 trip means also REF trip in same time ???
08/abb, 22:50 – abb”: No, REF only responds for earth faults inside zone.. if the fault is not related to earth.. then only differential will operate.. in the case of earth faults both can trip the transformer( the faster will trip first).
09/abb, 00:55 abb: Thsnks Mohammed. got it
09/abb, 01:03 abb: and if the transformer has high impedance grounding.. the earth fault near star point ( less than 40% of winding) may not initiate 87 ( when you apply slope and operation and restraint)… in this case only REF will operate.. Right???
09/abb, 01:09 abb: What is the difference between high impedance and low imedance when dealing wih Differential and REF protections?
09/abb, 03:02 – abb”: Yes, this is right. And this is why we use REF together with Diff protection.
09/abb, 03:09 – abb”: The high imoedance method uses an impedance in series with operationg coil of the relay. The impedance value is chooen to damp the current of the relay under setting current in the case of worst fault (a fault near cts with one ct saturated). The low impedance method uses restraint coil to damp the current of the operating coil in the case of worst fault. The relay will trip when the operating coil current is maximum than the restraint coil current.
10/abb, 14:51 – Elec Engg:
10/abb, 14:51 – Elec Engg: Welcome Eng Abdur Rahman Siddiq
10/abb, 14:54 – abb: Welcome abdur rahman siddiq💐💐💐
10/abb, 14:56 -abb: Thank you everyone. Its a pleasure to be a part of this group
10/abb, 14:57 abb: Welcome bro 🌹
10/abb, 14:57 -abb: Thanks for the suggestion 🙂
10/abb, 15:07 – abb: Welcome my friend
10/abb, 15:15 -abb: 👍🏼
10/abb, 15:55 – abb “: Welcome my friend
10/abb, 18:36 abb: 👍🏻
12/abb, 03:59 -abb: This message was deleted
12/abb, 04:05 -abb: Hello ,any one have any idea about (Space2000) dcs from Arefa easbisally unix redhat 2.4.7-10
12/abb, 04:06 -abb:
12/abb, 04:06 -abb:
12/abb, 04:06 -abb: I have this problem when the unix startup
14/abb, 21:06 – abb changed their phone number to a new number. Tap to message or add the new number.
14/abb, 21:11 – abb changed their phone number to a new number. Tap to message or add the new number.
14/abb, 21:06 – abb changed their phone number to a new number. Tap to message or add the new number.
14/abb, 21:11 – abb changed their phone number to a new number. Tap to message or add the new number.
15/abb, 21:16 – abb:
16/abb, 00:01 – abb changed their phone number to a new number. Tap to message or add the new number.
16/abb, 00:12 – abb changed their phone number to a new number. Tap to message or add the new number.
16/abb, 00:01 – abb changed their phone number to a new number. Tap to message or add the new number.
16/abb, 00:12 – abb changed their phone number to a new number. Tap to message or add the new number.
16/abb, 02:48 -abb”: Hi all
in which case the operation of 52PD, pole discordance protection will be block?
16/abb, 03:05 – abb: By logic
16/abb, 03:06 -abb”: Excuse me in which conditions?
16/abb, 03:22 – abb: the pole discrepancy is an arrangement of controls, typical of the power switch
16/abb, 12:51 abb: It is already blocked by time .. if PD happen it must operate after 2.5 second.
16/abb, 12:56 abb: In which cases and configuration I must installed and program “inter trip signal protection “in case of transformer protection???
18/abb, 21:33 – abb: Anyone please share 4 volumes of books shared earlier Actually I got format my mobile so all data lost
18/abb, 21:41 – abb: Witch ones ?
18/abb, 21:42 – abb: [Power Systems Handbook Volume 3] J. C. Das – Power System Protective Relayi
18/abb, 21:43 – abb: I have volumes 1 and 4
18/abb, 21:43 – abb: Please share volumes 2 and 3
18/abb, 21:50 – abb: You can download it with Google all is available
18/abb, 21:59 abb: Can you share me volume 1 and 4
18/abb, 22:03 -abb:
19/abb, 11:37 -abb: Hi, PD trip function is normally blocked by any pre-scheduled single pole operation of CB like single pole auto reclosing or manual opening of a single pole of CB.
19/abb, 12:11 -abb: Y?
19/abb, 12:11 -abb: Does anybody have serial number for topology editor software or can edit SLD for Micom P741 rela
19/abb, 15:20 -abb”: Thanks It is true.
19/abb, 17:47 – abb: in the monopolar switch the discrepancy time must exceed the reclosing time.
19/abb, 20:05 abb: Dear friends/,
I have 7sj62 Siemens relay and it’s went to monitor mode then i tried to initialize the Dex file not succeed and activated device reset from the HMI after that it’s went again monitor mode and relay restarting automatically when power on
19/abb, 20:09 – abb: Hopefully by upgrading Firmware Version, it may work fine, kindly contact Siemens and ask for updated firmware version.
19/abb, 20:26 – abb: you must initialize the device with the digsi
20/abb, 12:47 -abb changed their phone number to a new number. Tap to message or add the new number.
20/abb, 12:47 -abb changed their phone number to a new number. Tap to message or add the new number.
20/abb, 12:47 -abb changed their phone number to a new number. Tap to message or add the new number.
20/abb, 13:55 abb: ؟
20/abb, 13:58 abb: Please share experiences and knowledge about “power swing blocking” in distance protection
21/abb, 13:08 -abb”: Hi guys, I need help setting up auto recloser on the sepam series 20 relay
21/abb, 18:11 -abb: In double bus bar protection what is the difference between single CT and Double CT method for bus coupler
21/abb, 19:46 – abb: This message was deleted
21/abb, 19:47 – abb:
26/abb, 18:57 – Elec Engg: https://elec-engg.com/whatsapp-group-for-protection-engineers/
🌟Follow the group rules and objectives of the group
🌟This is an international group, just text in English
🌟Actively participate in the group.
🌟Don’t make any personal message to the group members
🌟 Post your message in one single chunk of text, don’t post every word or sentence in a new message.
🌟Advertisements, announcement of event of other groups needs approval from Admin before circulation (+917303437524 ).
🌟If any member is not following the rules, we have authority to remove from the group
🌟 No greeting and other personal discussion. Do not say good morning, good night, thanks etc.

To join our protection relay WhatsApp group, please send interest on Whatsapphttps://elec-engg.com/whatsapp-group-for-protection-engineers/

27/abb, 17:07 -abb: Hello,

What is the use of Line CVT in relays?? Help please..
27/abb, 17:14 – abb: Synchro Checj
27/abb, 17:14 – abb: Check
27/abb, 17:17 – abb”: Distance relay
27/abb, 17:17 – abb”: Metering
27/abb, 17:30 – abb: 67
27/abb, 17:47 – abb: How you test relay GE SR3 ,Thermal Overload fonction with alarm and trip ?
02/abb, 11:25 -abb”: Hi all
In DIGSI4 4.92, when i wanted to archive a file, this window was displayed and required a password.
02/abb, 12:29 -abb:
02/abb, 12:30 -abb:
02/abb, 12:30 -abb: And got this log file
03/abb, 17:43 -abb: There are some requirements for installing digsi like c++ ,have you installed them?
11/abb, 00:26 -abb: I need 12 units of above relay Fro where to get it?
11/abb, 00:36 -abb: REF615 FEEDER PROTECTION RELAY You can directly contact abb ltd.vadodara factory
11/abb, 00:46 -abb: Is there any address in India?
11/abb, 01:04 -abb: Narendra Sir.vcf (file attached)
11/abb, 01:05 -abb: @93700078728 please contact that person Mr. Narendra from Mumbai, India. for your requirement…
11/abb, 01:15 -abb: Ok thanks I contact tomorrow
14/abb, 18:27 – abb “: Hi
14/abb, 18:28 – abb “: Any members having experience in HV cable systems….???
14/abb, 19:12 – abb: ☝🏻
14/abb, 19:20 -abb: yes
14/abb, 20:17 -abb: How distance protection is functioning in HVDC transmission
14/abb, 20:29 – abb “: Transposing is required in long distance HV cables …? Or cross bonding is enough…??
14/abb, 21:51 – abb “: Both will be required
14/abb, 21:52 – abb “: Conventional distance protection is not applicable in HVDC system as the reactive part of impedance is absent due to zero frequency
14/abb, 21:54 – abb “: Thanks…. please share if you have any data on this
14/abb, 21:55 – abb: 👍
14/abb, 22:39 – abb “: Cross bonding is required to reduce the induced voltage and transposing is required to make C mutual equal between three phases… This job shall be done each 400meter and cross bonding shall be connected with earth by spicail box or with SVL + earth
14/abb, 22:39 – abb “: SVL mean shield voltage limiter
14/abb, 23:04 – abb “: Ok…. good description
14/abb, 23:05 – abb “: Thanks 👍
14/abb, 23:23 – abb: Thank you Eng. Ahmed
14/abb, 23:27 – abb “: Welcome 🤗
15/abb, 18:59 -abb: Any experience in testing siemens sync switch relay?
17/abb, 23:28 – abb:
17/abb, 23:29 – abb: When i tried to extract xml file from digsi, this error came. Kindly advise
17/abb, 23:30 – abb: It depends on how u extracted
17/abb, 23:30 – abb: There are 2 ways to extract
17/abb, 23:30 – abb: Which one was yours
17/abb, 23:30 – abb: How did you do it?
17/abb, 23:38 – abb: Both ways same error
18/abb, 11:25 -abb: Can anyone provide manual for Bus Bar protection Alstom MiCom Relay P741 ??
18/abb, 11:25 -abb: Thanks in advance
18/abb, 16:16 – abb: Any one know how test Startup Supevisn in REM 601 ?
19/abb, 15:47 – abb: How to tackle DC link over Voltage faults…. In VFD

Need simple solution….

Application HVAC chilled pumps
19/abb, 16:22 -abb: siemens VFD?
19/abb, 16:23 – abb: Yes
19/abb, 16:23 -abb: G180?
19/abb, 16:24 – abb: G120
19/abb, 16:24 – abb: No problem if in this case then
19/abb, 16:26 -abb: okay

  1. increase the DC overvoltage fault limit to 130%. default is 125%. but this solution may lead to stress VFD which may lead to some future issue.
  2. Update ur firmware to latest. It will work right away
    19/abb, 16:27 – abb: Hmmm
    19/abb, 16:28 -abb: old versions are not prone to motor oscillatations which incase u free run a motor may oscillate.
    in which frequency band u r facing over voltage?
    19/abb, 16:30 – abb: Really I just retrieved data from customer..
    But from where i can find it
    19/abb, 16:30 -abb: find firmware?
    19/abb, 16:30 -abb: siemens website.
    19/abb, 16:31 – abb: No , frequency band
    19/abb, 16:33 -abb: run the motor. increase speed slowly. ull start hearing hizzling sound in a particular band
    19/abb, 16:34 – abb: Okay
    19/abb, 16:34 – abb: Will update
    19/abb, 21:47 – abb”: Help pleaese

I cannot modify protection setting on ABB REF 542 plus manually or online through cable. I always got “setting not saved properly”. Can any one help?
20/abb, 09:36 -abb:
20/abb, 09:36 -abb: Protection key 🔑
20/abb, 12:50 – abb”: Hi. I used the key to change protection mode to SET. Is this enough? Should it be used also to change setting?
22/abb, 01:15 – abb: Please anyone can help me about password viewer for ABB Red 615
23/abb, 11:00 – abb: We are facing one error while installing ABB PCM 600…Can anyone help???
23/abb, 11:00 – abb:
23/abb, 12:18 -abb: Try to Separately download and install sql server and then install pcm
25/abb, 16:24 -abb:
25/abb, 16:24 -abb:
25/abb, 16:24 -abb: anyone knows about this error while exporting in. xml extension?
25/abb, 18:28 -abb:
25/abb, 18:28 -abb:
25/abb, 18:29 -abb: This is the 1600A breaker feeding the Chillar. Could anyone please tell me what would be the setting of this Breaker for Long, Short, Inst. & Ground?
25/abb, 18:36 -abb: DLL file is missing. Copy DLL file from another working laptop(C drive) or reinstall software.
25/abb, 18:40 -abb: For long char. Settings are 1.0 and time is 3.0.
25/abb, 18:42 – abb: Switch not clear but for L =1 and T=144s ;S=1.8;I=8;G=.4
25/abb, 19:13 -abb: Pl s help
25/abb, 19:13 -abb:
25/abb, 19:13 -abb:
25/abb, 19:46 -abb: Thanks alot!
25/abb, 20:44 – abb: Can anybody tell whats the max current in which we can use mccb only for load break
25/abb, 20:49 – abb:
25/abb, 20:51 – abb: Cable size 300sq mm
25/abb, 20:56 -abb: This message was deleted
25/abb, 21:26 – abb: Omg
25/abb, 22:34 – abb: That’s due to thermal effects. The thermal tripping point would go down after each tripping and if tripping takes place at 370 A after 2 hours, the MCCB might trip at 350 or even below (may) after every one and a half hour or even more earlier
26/abb, 06:45 – abb: Then whats the solutions shall we change this mccb if yes what would be the rating.any other solution instead of mccb because its placed in between transformer secondary side and LT panel.
26/abb, 10:02 – abb: Check your tightness of each bolt…. Properly torque it …
26/abb, 11:27 – abb: Phase sequence is ok my site is running fine load is 240 kw ..
26/abb, 11:33 – abb: 240 kw? rate amp is 408 amp
26/abb, 11:33 – abb: This is connected load but running is 225 kw
26/abb, 11:34 – abb: Can you test the MCCB
26/abb, 11:34 – abb: By primary injection
26/abb, 11:38 – abb: 383 amp
26/abb, 15:54 -abb:
26/abb, 15:56 -abb: There is over load, short circuit, instantaneous and ground fault
26/abb, 15:56 -abb: Ground fault its okay for me
26/abb, 15:59 – abb: Any party for Transformer repair in eastern region of India/Kolkata and near by
26/abb, 16:06 -abb: Srinivas Trafo Tech.vcf (file attached)
26/abb, 16:06 -abb: He is from Andhra Pradesh. But work wise he is senior most and purely technical person.
26/abb, 16:18 – abb: Ashok Hyd Sie.vcf (file attached)
26/abb, 16:19 -abb: By doing the method of primary injection
26/abb, 16:22 -abb: Yes I am doing by primary injection only
26/abb, 16:23 -abb: Can u tell me which combinations for overload test in primary injection
26/abb, 16:26 -abb: Single phase or phase to phase ???
26/abb, 21:48 -abb: You can use Phase to phase and phase to neutral for overload, instantaneous and short circuit. And phase to neutral for ground fault.
30/abb, 20:56 -abb: I can’t open IEC61850 staion in digsi 4.88
30/abb, 21:00 -abb:
30/abb, 21:02 – abb: Its okay. Dont open then
30/abb, 21:02 – abb: Close
30/abb, 21:04 – abb: May be target digsi file version differs
30/abb, 21:06 -abb: What should i do ?
30/abb, 21:06 – abb: Install Digsi 4.91 n try
30/abb, 21:10 -abb: Anyone who have Digsi 4.88 update?
30/abb, 21:13 -abb: It user Siemens-Configurator-Version 04.88.08.995
30/abb, 21:13 -abb: It use Siemens-Configurator-Version”>04.88.08.995
30/abb, 21:16 – abb: Create Siemens User ID & u can download on Siemens webpage
30/abb, 21:21 -abb: I already have siemens ID. But i can found only 4.93
30/abb, 21:21 -abb: 4.88 service pack 1
30/abb, 21:22 -abb: I don’t found 4.88 service pack 1 or any 4.88 update.
30/abb, 22:17 – abbs: To Old version
30/abb, 22:57 – abb: ☺
31/abb, 02:15 -abb: what is the maxium length for line can use Teleproection in distance relay?
31/abb, 02:16 – abb: This message was deleted
31/abb, 02:16 – abb: Which relay? All relays have different limits
31/abb, 02:16 -abb: I know,
31/abb, 02:16 -abb: Siemens
31/abb, 02:18 -abb: 400km, 300km, 200km,100km,I talking about distane I can use Teleproection in dustance relay?
31/abb, 21:08 -abb”: Hi every body … does ABB REL 541 have an under frequency and over frequency protection???
31/abb, 21:13 -abb”: Sorry I meant ABB REL 511
31/abb, 21:47 – abb: No…
31/abb, 22:56 -abb”: Is there any way to activate this feature in this relay, Thanks 🙏
31/abb, 22:58 – abb: Anyone having working experience on tolon or edro laundry machines?
01/abb, 19:26 abb:
01/abb, 19:28 -abb: What is the default password for easergy studio 7.1.0?
01/abb, 19:29 -abb: In easergy studio 8.0.0 the procedure to connect to relay is different, has anyone been able to use that?
01/abb, 19:30 – abb: This message was deleted
01/abb, 19:31 – abb: AAAA
01/abb, 19:37 -abb: Thanks but it does not accept
01/abb, 19:37 -abb:
01/abb, 20:00 -abb: Use micom studio hashtag for crack.
01/abb, 20:30 – Elec Engg: https://elec-engg.com/whatsapp-group-for-protection-engineers/
The group discussions are open 24/7. hit “Mute” on your Whatsapp group. You will still receive all the messages, but your phone won’t buzz or make a noise for every one of them
Now, please take a moment and introduce yourself completely : Your Name, Country, Company, specialty
01/abb, 20:37 -abb “: I am an hafiz saad mudassir from pakistan, me an electrical engineer specialization in power from UET lahore i got 3.7 CGPA my fyp is related to power system protection
01/abb, 20:41 -abb “: Dear all group members ; can u guide me about how to learn ETAP 16.0.0 software
01/abb, 20:53 – abb’: Hi Friends I am RAFFI from INDIA RELAY ENGINEER PDCS PROJECTS INDIA PVT LTD..
01/abb, 20:53 – abb: Abdiya😊😊😊
01/abb, 21:01 – abb: Welcome !!
01/abb, 21:16 – abb: Welcome 🙏🙏🙏all new members
02/abb, 21:00 -abb: Hiiii friends
02/abb, 21:02 – abb: Welcome 😊🙏🏻
02/abb, 21:32 – abb: Welcome !!!!
02/abb, 23:34 – abbs: Welcome friends!!!
03/abb, 06:45 -abb: How to calculate maximum through fault current to set the relay stable in bus bar protections ? Say voltage is 400kV.
03/abb, 08:05 – abb “: It was based upon your load
03/abb, 08:06 -abb: If exact load details are not available?
03/abb, 08:10 – abb “: I don’t have a clear idea, but have a suggestion u can decide with reference to your CT primary
03/abb, 08:13 – abb “: But normal load current may be more less than the CT rating
03/abb, 08:20 -abb: Ok
03/abb, 10:01 -abb: How to create CID & ICD files to ZIV 87T(CGL make) relay for integrate with SAS.
03/abb, 10:10 -abb:
03/abb, 10:41 -abb: You can get a rough idea by the maximum CTR of all the CT’s connected to the bus.
04/abb, 17:05 – abb: Please I need to communicate with argus 1 relay over current reyrolle by rs 485
04/abb, 17:16 -abb: Sorry i dont have any ldea
04/abb, 17:19 -abb:
04/abb, 17:19 – abb: Shoot your questions
04/abb, 17:22 -abb:
04/abb, 17:24 – abb: You can not extract. Only vendor can give you
04/abb, 17:25 – abb: You can edit in ziver cid
04/abb, 17:26 -abb: Sir I dont have CID, then how can i edit please tell mee
04/abb, 17:28 – abb: Arrange to take from vendor
04/abb, 17:28 – abb: If you dont have cid then get it from ziver cid soft
04/abb, 17:28 – abb: You can
04/abb, 17:29 – abb: Extract the CID via ZiverCid software. It will create the file
04/abb, 17:30 – abb: And btw you should not be touching ZIV relay if you do not have a basic idea of Ziv software
04/abb, 17:30 – abb: Because there are chances you will make the firmware corrupt
04/abb, 17:30 – abb: For which you have to make it hard reset, which is also not an easy process, short but risky
04/abb, 17:30 – abb: So please contact your senior on site & inform him about the situation
04/abb, 17:31 – abb: Otherwise once the relay is gone into dead mode, it wont be even hard reset by calendar method
04/abb, 17:34 -abb: Sir I have ZiverCID software then how can i extract there is any option???
04/abb, 17:37 – abb: I think go to zivercomplus and then setting and then edit. This file will automatically open in ziver cid
04/abb, 17:39 – abb: Ill tell you after going home. Don’t remember by heart. Ill check in the eve & update you..
04/abb, 17:40 – abb: Thats true. If he has cid module installed
04/abb, 17:42 -abb: Thank you sir.
04/abb, 17:42 -abb: I will try sir,
04/abb, 17:43 -abb: This message was deleted
04/abb, 17:44 -abb: Hi , Is anybody familiar with F650 ge relay?
04/abb, 17:46 – abb: What do you want to know?
04/abb, 17:46 – abb: Issue?
04/abb, 17:46 -abb: About Plc logic configuration
04/abb, 17:46 -abb: I couldn’t find any doc
04/abb, 17:47 – abb: Do you have filezilla?
04/abb, 17:47 -abb: Can we write logic for transformers changeover
04/abb, 17:50 – abb: Yessss… you can
04/abb, 17:50 – abb: How do you want to make it work as changeover?
04/abb, 17:51 -abb: No sir
04/abb, 17:51 – abb: You must have that
04/abb, 17:51 – abb: Download it
04/abb, 17:51 – abb: Use filezilla to extract CID
04/abb, 17:52 – abb: For extract you dont need any credentials
04/abb, 17:52 -abb: With definition of CB status and timer, ….
04/abb, 17:52 – abb: For download usename: ziv
And password: *ziv#
04/abb, 17:52 -abb: Okay sir ,
04/abb, 17:52 -abb: Thank you sir .
04/abb, 18:05 – abb: Welcome my friend
04/abb, 18:05 – abb: Where do you work
04/abb, 18:12 -abb: Siemens
04/abb, 18:16 -abb “: Which campus…
04/abb, 18:17 -abb: Gurgaon,India
04/abb, 21:43 – abb”: Hello! Please I have a problem with me fault recorder
04/abb, 21:43 – abb”: 7ke85 siemens
04/abb, 21:43 – abb”: In the Disgi5 software show fault in port E
04/abb, 21:43 – abb”: En front panel is active run (green) and error(red) Led
04/abb, 21:43 – abb”:
04/abb, 21:45 – abb”: I can’t communicate
04/abb, 21:46 – abb: This fault locator is not functional.
04/abb, 21:46 – abb: As long as the error led is glowing.
04/abb, 21:48 – abb”: Is correct
04/abb, 21:48 – abb”: But what is the solution?
04/abb, 21:49 – abb”: This problem have any solution
04/abb, 21:50 – abb: Yes… in CFC, the ladder is having a signal which is not masked
04/abb, 21:50 – abb: Remove that
04/abb, 21:51 – abb”: I can not inspect the relay, I can not communicate
04/abb, 21:51 – abb: Then WHAT ARE YOU DOING THERE? If you can’t even communicate with the relay you are having problem with?
04/abb, 21:52 – abb”: This message was deleted
04/abb, 21:53 – abb: You went there only to see the relay face? Relay is in error mode means the software is having inconsistency between source & destination
04/abb, 21:53 – abb: And you are saying
04/abb, 21:53 – abb: That you CANT INSPECT THE RELAY.
04/abb, 21:53 – abb: Where are you working?
04/abb, 21:54 – abb”: I can not communicate with the relay on the front panel does not allow me, and I can not communicate with the sicam
04/abb, 21:56 – abb”: I have knowledge communicating with the relays, but this is a case in which I can not review it because I do not allow any communication
04/abb, 21:58 -abb: If you have backup check cfc and send to the relay
And if you are new to siemens relay, better do as I say, right away
04/abb, 22:03 – abb”: When I want comunicate with the relay for local or remote but in two situation does not allow any communication the relay
04/abb, 22:04 – abb”: Thanks Mr
04/abb, 22:05 – abb: Thats because of ERROR in relay’s file. This relay requires Re-Flashing of firmware
04/abb, 22:07 – abb”: I am 20 year, but I want to learn electrical protections well
04/abb, 22:07 – abb: 20years old?
04/abb, 22:07 – abb”: Yes
04/abb, 22:07 – abb: Where do you work
04/abb, 22:08 – abb”: I am a practicing electrician in a generation company in America and I wanted to support my bosses if you know a lot about this topic.
04/abb, 22:43 – abb: I have an ocean of knowledge about this topic. Your bosses can always seek my technical support if they want..
07/abb, 16:04 -abb: hi, i was wondering if anyone could please tell me how to check the measurement of 2nd harmonic content in 7UT85 siprotec 5 device ?
08/abb, 15:57 – abb”: In RET 670 transformer differential relay.. I want to check the diff and bias current.. I found
11/abb, 10:49 – abb’:
11/abb, 11:28 -abb: Please solve my problem related to NR relay.
When AR has been operated in 400kv line then one end AR successful while other end line became trip while both end have AR enabled.then why?
11/abb, 11:34 – abb’: In other end it is operating in Pole discrepancy or AR lockout?
11/abb, 11:34 -abb: No
11/abb, 11:34 -abb: Direct trip
11/abb, 11:35 – abb’: Check all conditions for AR in other end
11/abb, 11:36 -abb: Checked but not found any reason
11/abb, 11:36 – abb’: In other end it is operated in Zone 1 or Zone 2?
11/abb, 11:36 -abb: Zone -1
11/abb, 11:36 – abb’: CB healthy status is ok ?
11/abb, 11:36 -abb: Yes
11/abb, 11:37 – abb’: It means ?
11/abb, 11:38 -abb: No PD and AR lockout operated .trip command goes to breaker
11/abb, 11:38 -abb: If suppose u assinged any DT send signal to remote end ?????? While AR From local end
11/abb, 11:38 -abb: Check the time setting at both ends
11/abb, 11:38 -abb: Of AR
11/abb, 11:39 – abb’: How it is possible ?
11/abb, 11:39 -abb: Yes
11/abb, 11:39 – abb’: 86 Operated ?
11/abb, 11:40 -abb: At one end it may be 1sec n other end 350ms
11/abb, 11:40 -abb: Checked
11/abb, 11:40 -abb: So by the time at one end AR operated it sent DT signal to other end
11/abb, 11:41 – abb’: Then you check the logic for 86 .
86 should not operate for zone 1 single phase fault
11/abb, 11:41 -abb: Due to which 86 operated
11/abb, 11:41 – abb’: DT received in remote end ?
11/abb, 11:41 -abb: Yes pls check
11/abb, 11:45 -abb: Carrier received at other end
11/abb, 11:47 -abb: And carrier send by our end
11/abb, 11:47 -abb: No DT received and send by both end
11/abb, 11:48 -abb: Carrier aided tripping sent from your end
11/abb, 11:49 -abb: No this is not correct .86 operated for single phase fault
11/abb, 11:49 – abb’: Ok. In remote end 86 is operated or not?
11/abb, 11:49 -abb: Yes
11/abb, 11:50 – abb’: Yes. Then check the logic for 86 in remote end.
11/abb, 11:50 – abb’: I think in remote end 86 is assigned for all faults
11/abb, 11:59 -abb: Yes
11/abb, 12:01 -abb: Check the time setting at both ends for AR
11/abb, 12:02 – abb’: Both end Fault in Zone 1 then ZCOM Trip will not happen. That is not necessary.
16/abb, 10:43 – abb: Sir, Anybody having 500MVA 400kV/220kV/33kV T&R Make Autotransformer 8 Channels FO based Tempr Hotspot details ?
16/abb, 10:50 – abb: Based on FBG?
16/abb, 10:50 – abb: Ya
16/abb, 11:30 -abb: Hi everyone
24/abb, 14:24 – abb: Please help, what type of fault its showing
24/abb, 14:24 – abb: This relay connected with 3 phase motor
24/abb, 14:26 – abb: STS light blinking
24/abb, 14:26 – abb: The motor run for a while and the stopped
25/abb, 06:51 -abb: Resistors are rated in ohms and wattage.. How to identify the short time withstanding wattage of resistor which is available in hand?. Generally how much ( thumb rule ) will be the short time withstanding capacity of resistor with respect to rated capacity?
The group discussions are open 24/7. hit “Mute” on your Whatsapp group. You will still receive all the messages, but your phone won’t buzz or make a noise for every one of them
27/abb, 12:02 – Elec Engg: Now, please take a moment and introduce yourself completely : Your Name, Country, Company, specialt
27/abb, 12:28 -abb: Hi good morning everyone , my self harish kumar chadalawada basically I m From india ,present working at Dubai as Transformer Testing engineer in Alfanar Company .
27/abb, 12:36 – abb: Great Sir
27/abb, 12:37 -abb: Thank you so much
27/abb, 13:11 – abb: Hi my name is amresh kumar pandit. I am from India and I am a diplomate student
27/abb, 13:15 – abb: Hi, my name is sami alahmadi. I am from saudia Arabia
27/abb, 13:16 – abb: HI
27/abb, 13:17 -abb: This message was deleted
27/abb, 13:20 – abb”: I am wasif from Pakistan, working at NESPAK
27/abb, 16:14 – abb: In which city
27/abb, 16:17 – abb: Hi, my name is sami alahmadi. I am from saudia Arabia, electrical supervisor in Afag Alkhadra est.
27/abb, 16:25 – abb”: Belongs from Gujra
27/abb, 17:01 – abb “: I’m Vikram Parekh
Working in System Protection as Manager – Power System Engineering.
We are providing all the testing and commissioning services in Electrical switchgears.
28/abb, 19:06 – abb: How this one become big day
28/abb, 19:07 – abb: We have to think before using electricity. Go green . Think before use
29/abb, 18:02 – abb: What is FPFM and FPSM in protection relay
29/abb, 18:04 – abb’: In which Protection?
29/abb, 18:04 – abb: Line
29/abb, 18:21 – abb: FPFM This is meaning feeder protection first main
FPSM This is meaning
Feeder protection second main
29/abb, 18:22 – abb: Set-1 and Set-2 right ?
29/abb, 19:00 – abb: Yes
29/abb, 19:15 – abb: Hi, we need support for setting calculations for transformer feeder which fed from 13.8 kv :
29/abb, 19:29 – abb: You are welcome, here in Saudi Arabia we used in feeder protection (Line) 2 relays, both make same function, have same setting
29/abb, 19:30 – abb’: Oh I got it.
29/abb, 19:31 – abb’: In India We will say Just Main 1 (21M1) and Main 2 (21M2)
29/abb, 19:31 – abb: Yes
29/abb, 19:34 – abb’: 👍🏻
30/abb, 19:56 – abb:
30/abb, 21:01 – abb”: This message was deleted
30/abb, 22:00 – abb: Can anyone give contact details of cast resin CT and PT suppliers in India
30/abb, 22:19 -abb: Narendra Sir.vcf (file attached)
30/abb, 23:26 – abb: Which make???
30/abb, 23:28 -abb: As per your requirement, he is having more contacts regarding purchase. So you I thought you can contact him.
30/abb, 23:38 – abb: Thanks
30/abb, 23:38 -abb: You are welcome.
04/abb, 14:54 -abb”: Hi all
Could you share
AEG PQ720 differential relay manual?
04/abb, 15:15 – abb: U can download it from internet
04/abb, 15:17 – abb: I want synchronize my server with a meinberg GPS in SICAM PAS .anybody can help me??
04/abb, 15:21 – abb: Are you facing any problem?
04/abb, 15:22 – abb: Share the problem. I might be of some help
04/abb, 15:22 – abb: Which model of GPS are you using for time sync?
04/abb, 15:23 – abb: M300
04/abb, 15:24 – abb: Yes I can not start NTP in my server
04/abb, 15:24 – abb: Wy dont u try SNTP?
04/abb, 15:25 – abb: Whats the networking protocol you are working on?
04/abb, 15:25 – abb: Asfar as i remember M300 is compatible with NTP & SNTP both
04/abb, 15:26 – abb: Firmware MUST be updated
04/abb, 15:26 – abb: NO
04/abb, 15:26 – abb: NTP
04/abb, 15:26 – abb: What? NTP is NOT A NETWORKING PROTOCOL MY FRIEND
04/abb, 15:27 – abb: Oh, my network protocol is Ethernet
04/abb, 15:29 – abb: Shall I do specific setting in SICAM PAS for time sync?
04/abb, 15:29 – abb: Ipv4 or v6?
04/abb, 15:29 – abb: Yes ulll have to
04/abb, 15:29 – abb: Which country are you in?
04/abb, 15:30 – abb: IPV4
04/abb, 15:30 – abb: IRAN
04/abb, 15:30 – abb: Give me ur system with time viewer
04/abb, 15:30 – abb: If u have
04/abb, 15:31 – abb: Now I,m in home.
04/abb, 15:32 – abb: Can you send me a helpful manual?
04/abb, 15:33 – abb: You can download from net please
04/abb, 15:34 – abb: Ok thanks
05/abb, 08:34 – abb: Sir,

Siemens Siprotec 7SS52 Busbar Bay Unit in error & alarm mode, after removing & Connecting Aux., DC supply, it will comes in Run mode & after 30min again the BBU goes to error mode.

What is the solution for this problem
05/abb, 13:27 -abb”: Initialize main unit and bay unit from software or menu.
05/abb, 13:59 – abb: Reseted MCU still having same problem
07/abb, 13:54 -abb:
07/abb, 13:55 -abb: Hello need some help on this error. Relay P643 Alstom make
07/abb, 13:55 – abb’: Communication error
07/abb, 13:56 -abb: How to solve it
07/abb, 13:56 – abb’: First check Test Connection and then proceed
07/abb, 13:57 – abb’: In test connection select the correct port in which your serial cable is connected.
07/abb, 13:58 -abb: Port is verified but still error shows while communication.
07/abb, 13:58 -abb: We had used 2-3 converters but same error observed
07/abb, 13:59 – abb’: Then change the port and try once
07/abb, 13:59 -abb: Ok will try that
07/abb, 13:59 – abb’: Which converter you are using ?
07/abb, 13:59 -abb: BAFO
07/abb, 13:59 -abb: And another is local make
07/abb, 13:59 – abb’: Ok
07/abb, 14:00 – abb’: Try with different port once
07/abb, 14:00 – abb’: You are from ?
07/abb, 14:00 -abb: This error comes only when you are sending right?
07/abb, 14:01 -abb: Popular switchgear Pvt Ltd Vadodara
07/abb, 14:01 -abb: Yes
07/abb, 14:01 – abb’: Ok Fine
07/abb, 14:01 -abb: Select only settings and not psl then send
07/abb, 14:01 -abb: Tried but not working.
07/abb, 14:02 -abb: Sir, port changed but same error occurred.
07/abb, 14:02 -abb: Try to use different converter other than you have
07/abb, 14:04 -abb: We have 2 converter same error for both the converter
07/abb, 14:04 -abb: If it has ethernet on back side of relay you can use that also
07/abb, 14:04 -abb: Okk
07/abb, 14:04 – abb “: Which software you are using…??
07/abb, 14:05 -abb: Agile v1.3.1
07/abb, 14:05 – abb “: New relay or old one..??
07/abb, 14:05 -abb: New relay
07/abb, 14:06 – abb “: Try with easergy
07/abb, 14:10 -abb: Ok sir
07/abb, 23:49 – abb “: Problem solved…??
07/abb, 23:50 -abb: Changed port advance settings. Solved now
07/abb, 23:50 – abb “: Ok
08/abb, 05:08 – abb’: 👍🏻
08/abb, 15:35 – abb:
09/abb, 09:49 – abb’: Anybody Having Settings Calculation Sheet for GE Make D60 Distance Relay ?
09/abb, 12:47 -abb: What have you changed
09/abb, 13:47 -abb:
09/abb, 13:47 -abb: Advance settings
09/abb, 14:41 -abb: 👍🏻
11/abb, 10:33 – abb: Can any one inform that in Schneider which software is available for checking Goose(IEC-61850) Signal ?
11/abb, 12:04 – abb:
11/abb, 12:38 – abb: The password of protection relay type p143 has been modified is there any way to restore the dafault password back again.
11/abb, 13:10 – abb:
11/abb, 13:29 – abb: Thanks
11/abb, 15:10 -abb: Hello
11/abb, 15:10 -abb: why when the change between some tabs in kvgc relay is blocked
12/abb, 16:05 – abb:
12/abb, 16:07 – abb:
12/abb, 16:07 – abb:
12/abb, 16:36 – abb’: NIC Card faulty
12/abb, 16:36 – abb’: Replace with new one
12/abb, 17:20 – abb: Reason for this problem is IEC61850 Support configuration file is not available in relay at the moment.
13/abb, 13:42 – abb: I want to start NTP in my server but system shows erorr.
anybody can help me?
13/abb, 13:42 – abb:
13/abb, 13:42 – abb:
18/abb, 18:10 – abb: Can anyone define “breaker abnormal alarm” in signal list
18/abb, 18:11 – abb: Cb abnormal can be given by spring not charges, or Sf6 pressure or TC not healthy
18/abb, 18:11 – abb: Make or gate & give final op as cb abnormal
18/abb, 18:14 – abb: 👍
18/abb, 18:17 – abb: +Local sector
18/abb, 18:17 – abb: Selector
18/abb, 18:18 – abb: 👌
18/abb, 18:18 – abb: Polo discrement
19/abb, 16:20 -abb: When programming Non directional over current test in Omicron .. getting Out of rancge error. How do correct it..
19/abb, 16:20 -abb:
19/abb, 16:21 -abb:
19/abb, 16:22 -abb:
19/abb, 16:23 -abb: CT Secondary 5 Amps..
19/abb, 16:26 -abb”: I guess you write wrong number to CT primary/secondary ratio at device settings. Check again pls.
19/abb, 16:37 – abb “: This message was deleted
19/abb, 16:42 – abb “: Use CMC 356….
19/abb, 16:44 – abb “: I think 256+ will not deliver this much.
19/abb, 17:50 -abb: Check the max amps settings in test object details.
20/abb, 02:14 -abb: use 3x25A setting. Parallel three current injectors with other 3. This would provide 25A per phase. Ur requirement is 12.88A thats why its showing out of range.
21/abb, 15:21 – abb’:
21/abb, 15:23 -abb: Please check connection setting….and select proper port number and baud rate by looking in to device manager
21/abb, 15:26 – abb’: Everything is correct only
21/abb, 15:30 -abb: Check test correction once or use another serial cable
21/abb, 17:23 -abb: Check earthing of relay as well as your laptop charger.
21/abb, 18:13 – abb: Check the communication port configuration from communication menu usually this error appear due to wrong port selection and configuration
21/abb, 19:39 – abb’: Ok ok
21/abb, 19:39 – abb’: Ok
21/abb, 21:00 -abb: This message was deleted
23/abb, 16:35 – abb’:
23/abb, 17:49 – abb: Yes,you uploaded the wrong menu text file to the IED.
To make it normal you need to send the right default menu text file via parallel port again or updating the same firmware will make the IED to go default settings and menu text.
If you are planning for firmware update make sure that ied is not in service.
23/abb, 18:02 – abb’: Ok bro. After uploading default menu text now it is normal.
23/abb, 23:57 -abb”: Hi all
24/abb, 00:01 – abb: You need to use Micom S1 Agile by Alstom (latest version 1.3.1 by GE) for Micom P443 Agile make relay
24/abb, 00:03 -abb”: I installed the version1.2 but it’s not be updated data model from the web?
24/abb, 00:09 – abb: I do not know why you are not able to download the data model using data model manager.
May be slow network connection.
24/abb, 00:10 – abb:
24/abb, 00:12 – abb:
24/abb, 00:13 -abb”: Thank you very much
24/abb, 00:18 – abb:
24/abb, 19:23 -abb: I m getting this error while install digsi4.93
24/abb, 19:23 -abb: I had V4.92 loaded and it deleted it. I tried again without V4.92 loaded but got this same error.
25/abb, 00:48 – abb”:
25/abb, 01:32 – abb:
25/abb, 02:43 – abb”: thanks
26/abb, 00:44 – abb: Do we require to test , “inter trip” during end to end testing of line differential function. Or only for distance
26/abb, 20:31 – abb’: Yes you have to check
27/abb, 17:11 – abb: Is someone from ERL ???
27/abb, 17:16 – abb’: Ya my senior is working
27/abb, 17:41 -abb”: Hi all I want to implement Autorecloser in PSL and assign an output contact to it (for Micom Agile p443). Which output logic DDB signals, Should i use?
28/abb, 17:47 – Fatima: https://chat.whatsapp.com/JphaWUtn9kCHJprTAqT7LB
28/abb, 19:21 -abb”: Hi all
28/abb, 19:21 -abb”:
04/abb, 10:20 -abb”: Hi all
04/abb, 14:00 – abb: You can use pcm 600
05/abb, 19:27 -abb:
08/abb, 19:49 – abb’: Anybody having Digisi 4.93 download link ?
Please share the link or mail me @ raffimay10@gmail.com
10/abb, 21:13 -abb: Hi, need some help with PCM600 V 2.9. I sucessfully added a relay REG 630 ver 1.3 to it and also read the parameters from the relay. However when I try to debug the logic, its giving an alarm that configuration has changed. Any one knows the possible reason?
10/abb, 23:54 -abb: Guide me how we use spd .how many types of spd
12/abb, 13:11 – abb:
12/abb, 13:12 – abb: I found this error
12/abb, 13:12 – abb: Can any one help?
12/abb, 13:14 -abb “: @919428722864 which software u interface???
12/abb, 13:14 – abb: Digsi
12/abb, 13:21 – abb: Digsi4.92
12/abb, 17:03 -abb”: Delete and reinstall usb driver.
18/abb, 11:21 -abb: Hi everyone
can anyone help me in this issue.I am configuring IEC Here are my settings relay subnet:255.255.255.0 laptop IP:10.22.91.100 now if i put relay IPs from 10.22.91.1 to 10.22.91.92, i get the response from it.
but 10.22.91.93 to 10.22.91.253 arent working.
18/abb, 11:22 -abb: what could be the solution. there is no subnetting, y is it restricting me to 92 devices only
18/abb, 11:27 -abb: and its not just one relay, all siprotec5 are doing the same
18/abb, 11:55 – abb: Subnet must be same
18/abb, 11:55 – abb: Whats the subnet in switch?
18/abb, 12:08 – abb: Relay sunet and switch subnet must be same
18/abb, 13:11 -abb: does a switch has masking? i dont think so
18/abb, 13:11 – abb: Every switch has IP & Mask
18/abb, 13:12 – abb: If you know the ip address of switch
18/abb, 13:12 – abb: Type in ur browser and there u can also check subnet mask
18/abb, 13:12 – abb: Which switch u r using??
18/abb, 13:12 -abb: that is something diff
18/abb, 13:13 -abb: that is just to access the switch conf
18/abb, 13:13 -abb: the ports arent assigned to any VLANS
18/abb, 13:13 -abb: so no need of that
18/abb, 13:14 – abb: It is linked with relays communication, the relay fiber would be connected to switch, if both are not synced, communication with IEC wont work
18/abb, 13:14 – abb: You can check that as a part of trouble shooting
18/abb, 13:14 – abb: Rest as you like!
18/abb, 13:15 – abb: Dznt matter
18/abb, 13:17 -abb: brov its working with IPs 1-92
18/abb, 13:17 -abb: not above.
18/abb, 13:26 – abb: Thats what m saying na, may be other switch has different subnet due to which relay wont be accessible with laptop IP
18/abb, 13:36 -abb”: Hi all
18/abb, 13:36 -abb”: What is wrong?
18/abb, 13:36 -abb”:
18/abb, 13:36 -abb”:
18/abb, 14:16 -abb”: Install device model.
18/abb, 14:16 -abb”: That relay model is missing on your software.
18/abb, 14:18 -abb: Hi all,
20/abb, 02:35 -abb”: This message was deleted
20/abb, 02:42 -abb”:
20/abb, 02:58 – abbs: You have a DIGSI 4.91 or older version?
20/abb, 02:59 – abbs: You need a previus version to DIGSI in you PC.
20/abb, 03:07 -abb: Hi. How can see the learning videos of digs4 about working with it? I’m a beginner 🙏
21/abb, 19:03 – abb: Hi any material/ tools to learn pcm600 quickly
21/abb, 19:05 – abb: Refer Pcm600 product manual to understand various tools
21/abb, 19:05 -abb”: Pcm600 is connection software, not much to learn. Learn your relay model’s configuration.
21/abb, 19:51 – abb: 👍
22/abb, 06:37 -abb: Hello Engineers, if anybody have “The Relay Testing Handbook” Principle and Practice by Chris Werstiuk. full pdf. Please share
22/abb, 11:36 abb: Please share more details such as pulication and issue date
22/abb, 14:54 -abb: I have facing some issue in Micom p642 agile regarding fault recording trigger. Relay dont trigger at the time of differantial trip so please help me for it i have try all the option for the fault trigger all other faults are trigger but when only differantial protection trip at that time fault is not trigger or on graph was generated. Please help me for thi
22/abb, 16:16 -abb: I will send it to you.
22/abb, 16:16 -abb: I sent it some times ago. Didnt I?
22/abb, 16:18 abb: Could you please share it in the group. I need it too. Thanks
22/abb, 16:21 -abb: Could you please share again?
22/abb, 22:47 – abb: Can you send it again
22/abb, 23:09 -abb: I will upload it
22/abb, 23:11 – abb: 👍
24/abb, 14:03 – abb:
24/abb, 15:38 abb: Thank you so much
26/abb, 02:03 – abb: Any one could send me a link for higher version of etap than 12.6
26/abb, 07:28 abb: Www.downloadly.ir
26/abb, 07:47 -abb “: Its not available….at that time to this web……
26/abb, 07:48 -abb “: Offcouse available versions of ETAP 12.6 & 16.0.0
26/abb, 08:28 -abb: Hi any one configured SEL RTAC 3555
26/abb, 08:29 -abb: One doubt.. Micom relays and SEL RTAC connected in same network.. is it possible via RTAC , DR files from Micom relays can be downloaded
26/abb, 11:24 – abb: Thanks
26/abb, 11:24 – abb: Thanks for feedback
28/abb, 09:47 – abb’:
28/abb, 09:48 – abb’:
28/abb, 12:58 – abb:
28/abb, 17:07 -abb “: Dear All Members
I hope that u r all doing well
Kindly mention some points about this question
*future scope of power system protection…..

  • future scope of relay coordination…
    28/abb, 17:10 -abb “: What innovation is required in relay coordination….
    28/abb, 17:11 -abb “: I am waiting for ur feedback
    28/abb, 17:19 – abb: Relay ct module failure
    28/abb, 17:27 – abb’: Thanks
    29/abb, 19:47 – abb: If anybody have PDF book of the relay testing handbook: end-to-end testing kindly forward
    29/abb, 20:09 – abb:
    29/abb, 20:10 – abb: Thank you so much
    29/abb, 21:56 -abb: Hi , anybody having protection relay panel O&M manual of any Kv level..Pls share if U have..
    30/abb, 01:41 – abb”:
    30/abb, 10:04 -abb:
    30/abb, 10:04 -abb: Please don’t touch any electric pole especially when it’s raining. Please pass this msg to your dear and near ones.
    06/abb, 11:47 -abb: Why nobody dont help that poor woman
    06/abb, 17:21 – abb: ?
    06/abb, 17:21 – abb: Hello
    Any one knows how to test Themal protection in ABB REM 543
    07/abb, 12:07 – abb: Mlfb stands for??
    07/abb, 12:24 – abb “:
    07/abb, 12:32 – abb: Thank You so much
    07/abb, 15:59 – abb’: How to change CT Ratio in secure Energy Meter ?
    10/abb, 01:02 -abb”: Hi everybody
    Could you share P441 manual for Areva brand?
    11/abb, 02:01 – abb: I need software for micom p 741. Remote hmi. Please
    11/abb, 02:47 – abb: https://www.schneider-electric.com/en/download/range/60737-Easergy+MiCOM+P740/
    12/abb, 18:29 – abb: Hi team
    Good evening
    12/abb, 18:30 – abb: We have a spl situation
    When DC Source 1 is failed our Breakers got tripped
    What could be the reason for the same ?
    12/abb, 19:19 – abb: Check CTD
    12/abb, 19:19 – abb: Please share the control diagram of the breaker with us
    12/abb, 19:20 – abb: Selective tripping?
    12/abb, 20:41 – abb: undervoltaghe shunt
    12/abb, 21:54 – abb: Kindly how i test REF in 7UT612 siemens
    13/abb, 21:06 – abb: with 1 phase current inject
    13/abb, 22:56 – abb:
    13/abb, 22:57 – abb:
    13/abb, 23:02 -abb: This wire for voltage equalizing so CT body will be same voltage of bus bar .if not connected will cause floating voltage for CT body and resulting partial discharging.
    13/abb, 23:02 – abb: I think it’s capacitive leakage wire to connect to the capacitive indicator.
    You can eliminate capacitive insulator if your CTs have this capability(capacitive leakage).
    13/abb, 23:04 – abb: Iam thanking you for your immediate response.
    13/abb, 23:04 abb: 👍👍👍👍👍And also it will help you to have less noise and corona.
    14/abb, 13:29 – You added abb and AA 3227 Gg X3
    17/abb, 11:37abb: Frnds anybody have VFD Test format or procedure?
    17/abb, 21:50 -abb “: Guys any body configure RSTP at micom p546 ??
    17/abb, 21:54 – abb: Dear admin pls add 9920033140 in this group
    17/abb, 22:11 – Elec Engg: Done🙏
    17/abb, 23:50 -abb: Thanks for joining me in this group
    18/abb, 12:11abb: Guys anybody have Test format for Diesel Generator?
    18/abb, 12:51 -abb: Anybody please help me for the protection of IT devices like server or switches etc…
    19/abb, 11:38 – abb’: How to Check online Measurements in ABB relay through PCM software?
    19/abb, 11:44 -abb:
    19/abb, 11:47 – abb’: Thank you
    19/abb, 12:16 – abb:
    19/abb, 12:17 – abb:
    19/abb, 12:17 – abb:
    19/abb, 12:17 – abb:
    19/abb, 12:17 – abb:
    19/abb, 12:17 – abb:
    19/abb, 12:17 – abb:
    19/abb, 12:18 – abb: Can anyone tell what could be the reason for battery blast in dg during Cranking
    19/abb, 13:02 -abb: Short circuit on crank cable or in crank
    19/abb, 13:03 -abb: Second reason crank can be stuck or engine
    19/abb, 13:11 – abb: How to calculate stall rotor time in in SIMOCODE ?
    19/abb, 16:31 -abb: Use VRLA type to avoid blast
    19/abb, 17:25 – abb: This this battery is 12V;180AH Tata make almost 2.5 years old used to crank 415KVA Dg
    19/abb, 17:31 – abb: Is there any pole calibration happen in ACB for any make to close all pole at the same time??? And if happen then how it’s done??
    20/abb, 17:57 – abb: Urgent Require for Experienced Protection Engineer 8yrs experience location:Mumbai
    20/abb, 18:21 – abb”: Why we use coreopsis conductor inside tubular conductor?
    23/abb, 00:15 -abb”:
    26/abb, 10:09 -abb: If anyone facing this issue in siprotec 5 BCU(6md86),after restarting the device then manually operate the master trip relay(86.1&86.2),that same time given reset command from SCADA but its not getting reset.anyone facing this issue please ping meee
    29/abb, 19:33 -abb:
    02abb, 04:06 – abb: Interested …
    02abb, 18:20 – abb:
    11abb, 02:06 -abb: while communicating ABB relays, how do I know which versions of PCM I need to use ? ( 2.6 or 2.9)
    11abb, 07:31 – abb:
    11abb, 09:00 -abb: Thank you
    11abb, 12:10 – abb:
    11abb, 12:11 – abb: what is 50fu
    11abb, 12:11 – abb: ?
    11abb, 12:11 – abb:
    11abb, 19:53 – abb: Backup Breaker , fuse fail
    12abb, 18:36 -abb: Hello I’m looking for device like Omicron Cpc 100
    12abb, 18:37 -abb:
    12abb, 18:37 -abb: Any one can help me?
    12abb, 18:37 – abb “: Location….?
    12abb, 18:37 -abb: Libya
    12abb, 18:39 – abb “: To purchase or rental…??
    12abb, 18:41 -abb: This message was deleted
    12abb, 18:42 -abb: Purchase
    12abb, 18:44 – abb “: I can give the mail ID of Omicron dealer in Oman. Just send an enquiry to them.
    12abb, 18:45 -abb: How much it cost plz?
    12abb, 18:46 – abb “: Jacob Joy | GIS Oman jacob@gismuscat.com
    12abb, 18:47 – abb “: Approx 45000 USD in Oman…
    12abb, 18:59 -abb: please visit vebko.ir too
    12abb, 18:59 -abb: https://vebko.ir/?lan=en
    12abb, 19:25 -abb:
    12abb, 20:06 -abb: Yry TRAX from Megger
    12abb, 20:07 -abb: Try *
    12abb, 20:38 abb: 👍👍👍👍
    16abb, 23:51 -abb”:
    16abb, 23:51 -abb”: What might happen this insulator failure?
    17abb, 16:53 – abb”: sepam 80 fails to operate shows maintenance key 1. any ideas?
    26abb, 11:11 – abb:
    26abb, 13:24 -abb: Converter issue
    26abb, 13:35 – abb: Which converter? Relay is communicating on Ethernet/LAN
    26abb, 14:32 -abb “: In VT secondary injection. How to calculate phase to phase voltage in unbalanced condition? Eg.: we inject 20V in R phase & 40V in Y phase. What should be the phase – phase voltage. In actual condition multimeter reads 53V. how to prove it theoretically.
    26abb, 14:33 -abb: vector sum
    26abb, 14:36 -abb “: Can you please elaborate.
    26abb, 14:49 abb:
    26abb, 14:51 -abb: Ip1(cosPhy+i sinPhy) + Ip2(cosPhy+ i sinPhy)
    26abb, 15:05 -abb “: Values are not matching.
    26abb, 15:08 -abb “:
    26abb, 15:15 -abb: Dear friends how to calculate operating region of directional over current and earth fault relay
    26abb, 15:42 -abb: u cant add real and imaginary part
    26abb, 15:43 -abb: I= 2root ( real sq + imag sq)
    26abb, 15:43 -abb: this is how u add real and imaginary part
    26abb, 17:23 -abb: Can anyone please help me providing XRIO converter for RED670 V2.1.0? I’ll be grateful
    30abb, 12:32 – You addedabb
    31abb, 10:19 abb:
    02abb, 09:57 – abb: This message was deleted
    02abb, 16:31 – abb:
    02abb, 16:31 – abb: Can anyone tell me the meaning of the number mentioned in the box?
    02abb, 18:41 -abb: Order information i believe
    03abb, 07:33 – You added abb
    07abb, 09:18 abb: Does anyone work in Wind farms or Wind mill ? I need RDS-pp codes for equipments used in wind Power plant.
    07abb, 09:18 abb: RDS-pp is Reference Designation system for power plants
    07abb, 09:19 abb: Any help would be appreciated!!! cheers
    07abb, 09:21 – abb: is tht a grid code?
    07abb, 10:07 abb: no, power plant equipments coding system
    07abb, 10:26 – abb: Dear all ,
    Any one having cracked version of ETAP with patch cord kindly share the link from where it can be downloaded
    07abb, 10:30 -abb “: ETAP 18.0 ver available….share.
    08abb, 09:02 – abb: I also need it.
    08abb, 09:23 – abb: MiCOM EXPERT
    09abb, 10:50 -abb: Digital kits like omicron, meggar can inject voltages and currents of desired magnitudes.
    14abb, 23:45 -abb “: ETAP 12.6 & 4 version power system is available
    14abb, 23:53 -abb “: I will share the link of ETAP 12.6 tomorrow
    Best regards;
    14abb, 23:53 – abbs: 👍🏾
    15abb, 02:47 – abb: @18093904427 el ETAP lo mandamos a pedir antes de ayer con la gente de informática.
    15abb, 11:34 -abb “: https://tabazaengineering.wixsite.com/ahmad/programes
    15abb, 11:35 -abb “: ETAP 12.6 can download and also available download instruction video
    15abb, 11:37 -abb “: First this web can download if anyone cannot download then u move to this website
    15abb, 11:40 -abb “: https://sites.google.com/site/engineeringbooks219/finance-docs
    15abb, 11:41 -abb “: https://www.youtube.com/watch?v=UqXDtPfLA_4&t=136s
    15abb, 11:54 – abb: 👍
    17abb, 18:52 -abb: Location
    17abb, 18:52 -abb: India
    17abb, 19:34 abb: City?
    17abb, 21:11 -abb: As a Protection Engineer you have to roam all around India for different projects
    24abb, 15:53 -abb:
    24abb, 15:53 -abb: I am getting an network error while downloading from server
    24abb, 23:29 -abb “: Follow this link to join my WhatsApp group: https://chat.whatsapp.com/Efu03vtXMIrFcdR7XbfmqD
    25abb, 09:24 – Elec Engg: This group is consist on Different nationality, religion’s, language, …
    25abb, 09:33 -abb “: A life awaits, be the one to save it! it takes less than a minute..
    Giving blood is a quick and enriching way to give back to your community.
    By donating blood, you can help families who have been in accidents or experienced trauma, mothers experiencing labor complications, fathers having heart surgery, children undergoing chemotherapy treatments, premature babies trying to breathe with tiny lungs, or grandparents suffering from severe anemia.
    In as little as few minutes, you can become someones unnamed, unknown, but all-important hero. Saving a life is noble work that starts very simply and easily.
    25abb, 09:38 – abb: Any budy know what is first pole clear factore in sf6 cb it is 1.3 writen on name plate of 220kv cb?
    30abb, 19:53 -abb:
    30abb, 19:53 -abb: Any one can explain CT sparking
    30abb, 19:54 – abb”: Looseness or open Circuit
    30abb, 20:07 -abb: Ok
    30abb, 20:08 – abb”: Isolate the system to avoid any mishap
    30abb, 20:09 -abb: Ok
    01/abb, 22:11 -abb”: Loose connection on side phases!
    01/abb, 22:13 -abb: Ok sir
    02/abb, 13:26 – abb: What is the main difference between low impedence and high impedence bus bar protection scheme ??
    02/abb, 23:07 – abb: High impedance

in the Low impedance relay nothing but biased differential relay in this we have the slopes to avoid relay operation from the through fault current and CT saturation condition also.
03/abb, 10:20 – abb: 👍
07/abb, 17:05 -abb: Could anyone tell me where we use RCCB & ELCB? What is the difference between these two breakers?
07/abb, 19:33 -abb: Follow this link to join my WhatsApp group: https://chat.whatsapp.com/EdQvq2n0NeuJnOphx0q6Ho
07/abb, 19:34 -abb: 00923244032371 please add this number
07/abb, 19:59 – My Irancell Saeed Roostaee changed the group description
09/abb, 00:42 -abb: Hello everyone i need a Etape and ecodill softwer if avilable plz help me
09/abb, 01:04 -abb: Will confirm you tomorrow
09/abb, 01:31 – abb: I also need ETap
09/abb, 14:19 -abb “: Dear;
I have already share the link of ETAP software on the above with complete details for installation kindly check
Best wishes;
09/abb, 14:53 -abb: Thank u but i join the group yesterday .
09/abb, 14:55 -abb: KBro if u have etape and ecodill softwer then share it kindly
09/abb, 15:07 – abb: Hello everyone,
Any one know about REV 615 ,
It is showing secondary current in measurements instead of Primary current.
We have set correct CT ratio.
09/abb, 15:11 -abb “: https://www.youtube.com/watch?v=UqXDtPfLA_4&t=136s
09/abb, 15:12 -abb “: https://tabazaengineering.wixsite.com/ahmad/programes
09/abb, 15:16 -abb: 👍
10/abb, 17:21 – abb: Hello
I have to activate Indication Filter Time In chatter booking
But I can’t find it…
10/abb, 17:21 – abb:
10/abb, 17:21 – abb:
11/abb, 12:31 -abb:
11/abb, 14:52 – abb”: Try to delete the events recorder memory
13/abb, 02:01 – abb: Hey I need help can I find here someone work with elster A1800 consomption counting
13/abb, 04:06 – abb: Any one have auto manual change over test Format..
13/abb, 11:21 -abb: thanks dear
14/abb, 22:48 – abb:
14/abb, 22:48 – abb: CT connection is ok ?
14/abb, 22:49 – abb:
18/abb, 03:55 – abb:
18/abb, 16:06 -abb: Useful
18/abb, 16:06 -abb: Thank you so much
18/abb, 16:07 – abb’:
18/abb, 17:02 – abb”: check the serial cable. also try (test connection) from device list.
18/abb, 17:04 – abb’: Tried with other serial cable Problem solved.
Thanks for your support😊
18/abb, 18:01 – abb”: You are welcom
18/abb, 20:58 – You removedabb
19/abb, 10:21 – abb”: Can any one tell plzz” what is the criteria for Grounding control and power cables, should it be grounded from both ends or from one end”
And the reason for grounding if both sides or single side
19/abb, 11:38 abb: Hi.
1 core power cable shield must be grounded only from one side, otherwise transformation current with inducted to the shield.
I&C& signal cables as well. In this case the induction is from outside.
However, for 3core, 3phase cable it could be grounded in both sides
19/abb, 11:40 – abb”: what about multicore control cable
19/abb, 21:34 abb: In Siemens design which is used for many power plants , it is mentioned that only one Side must be grounded to prevent circulation current.
19/abb, 21:39 abb: 👍👍
23/abb, 23:42 – abb changed their phone number to a new number. Tap to message or add the new number.
25/abb, 01:10 abb: https://www.instagram.com/p/B3_0JbposqM/?igshid=7v793rwe6mnq
25/abb, 05:07 – abb: Hi world some one can help me in F650 HMI with GE config
25/abb, 05:07 – abb: I need to made hmi with modbus protocol
25/abb, 05:09 – abb: I need .mdb data module
28/abb, 17:08 – abb:
28/abb, 17:22 – abb: Checn relay HMI
28/abb, 17:22 – abb: Should not b in Sub menu
28/abb, 17:23 – abb: Make it to the main menu page
28/abb, 17:49 – abb: Plz check the Technical key of the IED in software , is that compatible?
28/abb, 18:04 – abb: Check the report details in common read/write tool to get more information.
Note:It’s not recommended to do common read with lower version of PCM600 if the IED is configured with higher version of PCM600.
28/abb, 18:48 – abb: 👍
02/abb, 08:28 -abb:
02/abb, 08:32 -abb: If anyone know about this issue please revert me urgent.display error name is flashed v1.0,
02/abb, 16:02 -abb: For parallel operation, you need to synch both transformers first, then close the breaker
02/abb, 16:03 -abb: Changing load from one transformer to other,
02/abb, 16:09 -abb: Different tap positions mean different voltage levels (if both transformers are fed from same sourc
& in case of under-voltage, load will draw more current, that might result in OC Fault, over heating of cables.
02/abb, 16:11 -abb: Breaker may trip in second case but in first case, straight damage if you haven’t installed AVR. Breaker doesn’t care for Voltage, it only trips on high currents
02/abb, 16:13 – abb: But one transformer connected to load which has voltage 10.4KV
02/abb, 16:17 -abb: It mainly depends on uk% and load current. having enough data, you can simulate the Network using DigSILENT. In my experience you can parallel both transformer without worrying.
02/abb, 16:23 – abb“: Check impedance voltage persentage
02/abb, 16:23 – abb“: With in limit u can
02/abb, 16:24 – abb: How to check sir
02/abb, 16:24 – abb“: Check impedance voltage persentage at name plate data
02/abb, 16:24 – abb: Sir what is meant by uk
02/abb, 16:25 – abb: Ok Sir I will check it
02/abb, 16:25 -abb: Impedance voltage or short circuit impedance , actually
02/abb, 16:26 – abb: Ok Sir
02/abb, 16:26 – abb: Can u suggest me any documents regarding things
02/abb, 16:27 – abb“: Just impedance only not short ckt
02/abb, 20:16 -abb: When u have two transformers in parallel then you may have to look at the circulating currents that might flow when tap positions are not matching. Account for that circulation current as it will be an issue
02/abb, 21:55 – abb: Sir the same I read in a document due to low impedance in the transformer which has less tap position certain amount of current will circulate within the winding
but why? Sir
02/abb, 22:22 -abb: difference in impedance of the transformer more that 10% will have circulating current too. even if taps are same nd the voltages are same
02/abb, 22:23 -abb: go through any white paper written about paralleling transformers, ull have better idea
02/abb, 22:23 – abb: Ok sir
04/abb, 15:15 – My Irancell Saeed Roostaee addedabb
04/abb, 12:19 – abb: 66kv breaker CG make
04/abb, 12:29 -abb: Your new breaker has better specifications☺ and there is no problem.
04/abb, 12:49 – abb: Sir but our isolator was 31.5KA
Bus ACSR conductor short circuit capacity was 31.5KA
04/abb, 12:59 – abb “: There is no need for SC capacity coordination, your new breaker may be oversize but that’s not problem
04/abb, 13:00 -abb: 40kA/3sec means it can withstand up to 40kA that is higher than 31.5kA. if 31.5kA for your substation is ok, then 40kA is ok, too.
04/abb, 13:58 -abb: U can use
Not a problem higher capacity only.
04/abb, 13:59 -abb: Adnoc Gobi.vcf (file attached)
04/abb, 13:59 -abb: Hi admin Kidly add Mr. Gobi
He working in ADNOC
05/abb, 19:45 -abb: Welcome Mr Gobi
06/abb, 12:31 – abb’:
06/abb, 12:34 – abb“: Sir parallel operation done ?
06/abb, 13:02 – abb: Sir parallel operation done.Thanking you for remembering .
06/abb, 13:33 – abb“: What procedure please explain
06/abb, 17:15 – abb: Can any one have idea, what is mean by cross trigger input TFR ( fault recorder)
06/abb, 19:23 -abb: Cross triggering is used between TFRs to initiate recording all the TFRs and provides system wide dynamic recording e.g. Power swing
06/abb, 19:23 -abb: .
06/abb, 19:28 – abb: 👍
06/abb, 19:40 -abb: Join Prtection Relay 4 ” Zaigham ali:
06/abb, 19:42 -abb: Join Prtection Relay 4 ” Zaigham ali:
06/abb, 19:42 -abb: Join Prtection Relay 4 ” Zaigham ali: FYI only
06/abb, 21:57 – abb “: Hello Mr Zaigham an you please share the drawing of this connection
Is this job and new Bubar connection is retrofit job or all was a new supplied switchgear
06/abb, 22:04 -abb: Join Prtection Relay 4 ” Zaigham ali:
06/abb, 22:04 -abb: Join Prtection Relay 4 ” Zaigham ali:
06/abb, 22:04 -abb: Join Prtection Relay 4 ” Zaigham ali: Yes we have I will send you all documents Boklet
06/abb, 22:06 -abb: Join Prtection Relay 4 ” Zaigham ali: All new auppliied first time I seen and we are installing.
08/abb, 23:34 – abb: Any one knew, how to sync BCU RED670
08/abb, 23:47 – abb: This message was deleted
14/abb, 20:54 – abb ” changed their phone number to a new number. Tap to message or add the new number.
14/abb, 20:54 – abb ” changed their phone number to a new number. Tap to message or add the new number.
14/abb, 20:54 – abb ” changed their phone number to a new number. Tap to message or add the new number.
17/abb, 19:11 – abb: 11kv armoured cable, can be earthed in one end or it need to earthed at both ends
17/abb, 19:33 -abb: Join Prtection Relay 4 ” Zaigham ali: For what purpose. During termination? Otherwise for permanent Connection earthed in both ends
17/abb, 19:35 – abb: During cable end termination
17/abb, 19:35 – abb: And the cable was 300sqmm aluminum cable XLPE
17/abb, 19:36 – abb: 3core
17/abb, 19:37 -abb: Join Prtection Relay 4 ” Zaigham ali: Should be at both ends.
17/abb, 19:38 – abb: Sir what will happen if we earthed at one end
17/abb, 19:38 – abb: One side is enough
17/abb, 19:39 – abb: Any standards are there
17/abb, 19:39 – abb: Sir if any documents you have means kindly share me
17/abb, 19:42 – abb:
17/abb, 19:43 -abb: Join Prtection Relay 4 ” Zaigham ali: If after one year one side gland earth failure then 2nd side shoud be work.
Actually we use both ends for more safety
17/abb, 19:45 -abb: 👍❤
17/abb, 19:47 – abb: Good Idea
17/abb, 19:47 – abb: 🙏🏻
17/abb, 19:47 – abb: Thanking you sir For providing me this document
17/abb, 19:50 – abb: You are welcome, hope useful
17/abb, 20:03 – abb:
18/abb, 15:37 – abb: Please provide earthing in HT cable termination at both ends,must
18/abb, 15:37 – abb: in HT earthing is very important
18/abb, 15:44 -abb: Join Prtection Relay 4 ” Zaigham ali: Yes thanks
18/abb, 15:45 -abb: Join Prtection Relay 4 ” Zaigham ali: LT is at one side only.
04abb, 12:51 -abb:
04abb, 12:52 -abb: Any one have idea?
04abb, 20:31 -abb: In transformer slope testing what is Ibias calculation need to set in the omicron test
04abb, 20:33 -abb: Regarding generator differential slope test I have some doubts anybody free kindly ping me I will call you.
04abb, 21:13 -abb: What is IBias calculation equation to feed in the omicron differential characteristics for generator protection
05abb, 05:45 -abb”: Hi all For ABB 521 ver 2.5
When we send configuration to the relay we will face with syntax error at last step, what is the matter?
05abb, 06:22 -abb”:
05abb, 09:27 -abb: https://electricalbaba.com/percentage-differential-protection-slope-in-differential-protection/
05abb, 09:28 -abb: I hope above link helps
05abb, 10:33 -abb: What help do u need?
05abb, 10:34 -abb: Depends on what relay u are testing.
05abb, 10:36 -abb: In shot test you choose the points on the characteristic curve and the softwares tests only at those points. In search test u select the sweep for IBias e.g. 0.2 to 5 with a some intervals. This will create vertical lines on the characteristic curve and the test set will then determine the Idiff value on each of those lines.
05abb, 10:37 -abb: Test set will determine the Idiff value at which relay operates. Search is like making the test set determine whats the characteristic curve and if the searched point is within the tolerance limit then only the test is considered passed
05abb, 13:32 – My Irancell Saeed Roostaee removed AA 3052 Gg 9 Join “Pradip” eindia
05abb, 20:48 -abb: Hello
05abb, 20:49 -abb: Any one working on
05abb, 20:49 -abb: SVC capacitor protection
05abb, 20:49 -abb: I need help
06abb, 23:49 -abb: Thank you very much
07abb, 10:15 -abb: This message was deleted
08abb, 20:44 -abb: Is it possible to upload SIMARIS.APK ?
10abb, 00:03 -abb: Anyone here to help me, I have p443 distance relay(Micom schnieder make), I tested this relay in zone 1, but it also trips in zone 2 and zone 3 simultaneoulsy..and although I marshalled output contacts to trip..but it doesnot send tripping order to test set..anybody solve this issue
10abb, 00:10 -abb: Which test set are u using? Have u checked the current or voltage connections. Normally this happen when u are injecting current or voltage in reverse, means the relay is looking in reverse. Check whether reverse zone is enabled or not.
10abb, 00:11 -abb: omicron 356
10abb, 00:11 -abb: cmc 356
10abb, 00:12 -abb: U using distance module?
10abb, 00:12 -abb”: Check your trip contact type.
10abb, 00:12 -abb: And double check the psl file.
10abb, 00:13 -abb: 👍🏻
10abb, 00:14 -abb: I test this relay manually through test set not through laptop..I am using time module
10abb, 00:16 -abb: Ok. First confirm ur output relays are properly working and connections are Ok or not. Force them from Commissioning menu and check continuity using multimeter. Check ur wiring. U using dry connection or wet contact.
10abb, 00:17 – abb: Maybe relay SOTF function is on
10abb, 00:19 -abb: Good point. Ensure there is a prefault
time set on the test set. Normally it is 1 sec.
10abb, 00:20 -abb: I disabled sitf
10abb, 00:20 -abb: sotf*
10abb, 00:21 -abb: There are 2 issues. One its ur relay tripping on all zones. And second ur binary output feedback not reaching test set. Solve them one by one.
10abb, 00:24 -abb: ok I will try above mentioned points one by one..thanks for your guidelines bro👍
10abb, 03:06 -abb: Usually zone 1 is inside zone 2 and zone 3 (if all your zones are forward direction).
24abb, 13:48 – abb: Why we use shunt and series resistors for high impedance BB scheme ?
25abb, 00:30 – abb “: ‏Saudi Local Company looking for Substation Testing & Commissioning Engineers to work in their Projects across the Kingdom
25abb, 00:31 -abb: This message was deleted
25abb, 00:31 -abb: This message was deleted
25abb, 00:32 -abb: What will be the salary package
25abb, 00:32 – abb “: I just forward message received from Friends
25abb, 00:33 -abb: Ok
25abb, 00:33 -abb: Is there any data Center infrastructure Operation engineering job opening
25abb, 00:45 -abb: Wish you all Merry Christmas 🌲🎉🎈❤️🎉 🌲 and all the best for upcoming New year 2020
25abb, 01:23 -abb: Merry Christmas 🌹🌹
25abb, 07:23 -abb: Please suggest me
25abb, 07:23 -abb:
25abb, 07:23 -abb: How to fix this ?
25abb, 07:23 -abb: Digsi 5
25abb, 07:57 – abb: Kindly import communication protocol drivers
25abb, 11:04 -abb: Thank you
27abb, 10:30 -abb: While writing a date in upcoming year 2020 , we should write in its full format, e.g. 31/abb and not as 31/01/20.,bcoz anyone can change it to 31/01/2000 or 31/abb or in between any year to his convenience
27abb, 12:25 -abb: Thank you dear bro
27abb, 13:47 -abb: 👍🏻
27abb, 15:16 -h: 👍
28abb, 17:11 – abb: Friends. Can some one share me the download link for Schneider Micom P220 data model.
30abb, 12:49 -abb: Hi Gentlemen!
I would like to take the suggestion from you guys regarding one matter. We have one 13.8KV (15KV sys voltage) Switchgear. Due to increase in the connected load, we want to change the CT in one of its Cubicle. The new CT suggested by the Supplier having following Specs: *CT 300/5, Burden 15VA, 5P10, BIL 10KV. *
Now my question is the 5P10 & the burden suggested by them is correct for this MV Switchgear? I’ve seen some CT having 5P20. Where we will select 5P10 & 5P20? Also, do we need to replace the metering core as well as a load is increased?
30abb, 13:16 -abb: All CT replacement should have a CT CALCULATION ( sizing) according to circuit parameters. You should ask for this document first
30abb, 13:28 -abb: Ok. I will ask about it.
30abb, 13:29 -abb: Thanks
30abb, 13:56 abb: To say if it is match or not you need to know the maximum short circuit current and also you need to know your relay and cables burden because 5P10 means this CT will be stable and will not saturate in the range up to 10 times the nominal current and with 15 VA burden
If you calculate your actual burden then 5P10 might be equivalent to 5P20
02/abb, 10:57 -abb: Hi friends
I need one powergrid feeder scheme. Can anyone forward it
02/abb, 11:01 -abb: Kv rating pls
02/abb, 11:02 -abb: 400Kv
02/abb, 11:02 -abb: With busbar protection and LBB scheme
02/abb, 20:02 – abb: Hello brothers, if we have 1K ohm shunt resistors of 180W for high impedance cable diff prot. But need to change the resistors to 500 ohms as per settings , so how we can calculate watts for 500 ohms resisi
03/abb, 12:53 – abb: Thanking you sir,
03/abb, 12:56 -abb: This message was deleted
12/abb, 17:12 -abb: Hii
12/abb, 17:12 -abb: Anyone know where i can get the touchscreen panel for siemens lcd
12/abb, 17:12 -abb:
12/abb, 17:13 -abb: In uae
17/abb, 23:49 -abb“: Dear all
I am Zahra Adeli from Iran, RAF company. My specialties are: Relays test and commissioning, substation automation specially with 61850.
Glad to be a part of this group👍
17/abb, 23:54 – abb: Welcome to the group
17/abb, 23:55 – abb: Welcome !!
18/abb, 00:11 – abb “: 👏👏👏
18/abb, 00:15 – abb:
18/abb, 19:00 – abb: Thanks sr
18/abb, 19:02 – abb “: I think the definition af armautue is not exact and correct
18/abb, 19:02 – abb “: I was just skimming over the pdf and noticed that
18/abb, 19:03 – abb “: The armature is where voltage is induced in it
It can be either rotary part or stationary part of machine
18/abb, 19:20 – Elec Engg: Thanks for your feedback, this one is power plant dictionary and not electronic. Do we have any stationary armature in power plant machine? I haven’t seen
18/abb, 19:25 -abb: Alternator I guess?
18/abb, 19:29 – Elec Engg: 👏yes you right ❗thanks 🙏
18/abb, 19:53 – abb “: Sure we have
In synchronous generators
Armature is stationary
And the dc voltage is applied to the winding on rotor in order to have a rotating magnetic field
18/abb, 19:55 – abb “: It is more easier to have a stationary three phase output than having a rotating one
18/abb, 19:59 – abb “: Probably it is an technical dictionary
For practical uses
But in academic point of view,things are different
18/abb, 20:53 – abb“: And brushless synchronous generators have rotating armature.
18/abb, 20:55 – abb “: The rotating armature is mounted on the rotor in order to excite the generator’s field circuit
18/abb, 20:56 – abb “: I dont say that we dont have ratating armature
Im saying that the armature and the rotor are 2 different subjects
18/abb, 20:58 – abb “: I think basically there are only two terms… stator and rotor… depending on various conditions and requirements we use either stator as armature or field…. or vice versa…
18/abb, 20:58 – abb “: Exactly
18/abb, 21:00 – abb “: May be in a special type of machine the armature is mounted on the stator
And a the field circuit is on the rotor
18/abb, 21:00 – abb “: And for the other type
The reverse may be true
18/abb, 21:03 – abb “: Yes.. if there is a time varying magnetic field and a stationary coil… voltage will be induced in the stationary coil ….irrespective of stator or rotor … or field or armature… terminologies may differ as per circumstances
18/abb, 21:04 – abb “: This message was deleted
18/abb, 21:05 – abb “: Thanks for clarification
18/abb, 21:12 – Elec Engg:
18/abb, 21:12 – Elec Engg: Any idea about this fault
18/abb, 21:13 – Elec Engg:
18/abb, 21:24 – abb “: I think its not a network fault like short circuit
Its about the relay hardware itselt
As the title suggests
Hw error
18/abb, 21:24 – abb “: But thats what i think
Im not sure
18/abb, 21:45 – abb: Hw error relay has hardware problem
19/abb, 12:25 – abb: ؟؟
19/abb, 12:26 – abb “: Hello
I cant open the diagram
19/abb, 12:28 -abb: its a network topology for DMMs and Relays single ring with redundantancy characteristics for 61850 network
19/abb, 13:21 – abb: Sure it is,
but the question is the connection between HSR &RSTP is correct or not?
And can I use PT-G503 or other switches required?
19/abb, 14:12 – You added AA 6697 Esmaeili
19/abb, 14:22 -abb: i think u cant use different protocols in a single ring. But if u have a saperate ring connected saperately with the switch, there wont be any issue.
RSTP nd HSR can both will work fine.
about the switch PT503, if its an industrial switch, it will work fine.
19/abb, 14:23 -abb: i never worked on these switches. Rugged switchs are fine with these protocols and topology
19/abb, 14:51 – abb: Thanks for your help
19/abb, 15:28 – abb “: Hello everyone
We are looking for a company to upgrade existing ABB Microscada / DCS System Type: 800xA System version 5.1
Project Location: Saudi Arabia
21/abb, 10:32 – abb: Anyone having power substation safety guide/book/material
21/abb, 10:32 – abb: Please share
22/abb, 01:21 – abb: Anyone have activation key for doble software, please share
24/abb, 14:20 -abb: Hi everyone,
Pls share link for Eplan software with complete package if available with anyone
27/abb, 14:56 abb: Salam
27/abb, 15:28 – Elec Engg: Please read the rules and just text in English
https://elec-engg.com/whatsapp-group-for-protection-engineers/
28/abb, 01:34 abb: Hello, i don’t read your message please help me
28/abb, 01:35 – abb “: https://elec-engg.com/whatsapp-group-for-protection-engineers/
28/abb, 01:37 – abb “: There are some rules
Including that people in group must text in English
28/abb, 01:37 – abb “: I dont know about the rest
28/abb, 01:37 abb: What are you on off position
28/abb, 01:37 abb: 😔
28/abb, 01:39 abb: You don’t conversation a boat electric or …
28/abb, 01:39 abb: 🤔
28/abb, 01:40 – abb “: We discuss more about protection
28/abb, 01:40 – abb “: And some related topic
28/abb, 01:43 abb: I don’t see Your old messages
28/abb, 01:46 – abb “: I think Its because you are a new member
28/abb, 01:48 abb: Okay
30/abb, 14:37 – abb:
30/abb, 14:37 – abb:
30/abb, 14:38 – abb: I am unable to connect through DIGSI
30/abb, 14:38 – abb: Can somebody guide me
30/abb, 14:44 -abb: What was the error
30/abb, 14:57 – abb:
30/abb, 15:00 -abb: Any fault is there
30/abb, 15:00 -abb: What is that LED glowing
30/abb, 15:02 – abb: Check com number of laptop in device manager—> ports
30/abb, 15:02 -abb: Change your laptop serial Port configuration
30/abb, 15:02 – abb: Select same com number in laptop and digsi
30/abb, 15:12 abb: Maybe you don’t installed device driver.
30/abb, 17:02 -abb: Please check the VD address in ur digsi
30/abb, 17:02 – abb: Ok Sir
30/abb, 17:25 – abb: Check your siprotecs drivers
01/abb, 12:45 – abb: Can any one tell what is password for the ABB 545
Feeder management relay
01/abb, 12:45 – abb: To access the protection setting and to change the settings
01/abb, 19:45 -abb”: This message was deleted
01/abb, 19:47 – abb: Can anyone guide about Generator Overcurrent with Voltage Restraint protection
01/abb, 20:00 -abb“:
02/abb, 00:00 – abb: Welcome dear
02/abb, 08:56 – abb: Thanks
03/abb, 23:18 -abb“: Question: in our dcs system we can get disturbance records of all relays but one. I checked the relay with ied explorer, cfg exists in the relay but the sbus don’t get it. The comtrade directory address and everything is fine. Can I use wireshark to see what’s happening to the file? I used mms filter, but I need more specific one. Does the file transfer through mms protocol at all? Can anyone guide me?
04/abb, 08:35 – You added AA 6792 Mohsen Mohseninezhad
04/abb, 09:41 – abb: We have AVR fed by PMG…can we disable Voltage Restraint or Voltage Controlled function
04/abb, 09:43 – abb: Kindly use wireshark and check this shall help u
04/abb, 14:16 -abb“: Sorry I’m not that expert to answer this,
04/abb, 14:17 -abb“: With which filter?
04/abb, 14:28 – abb: Can anyone in the group help on this
06/abb, 21:31 – abb”: What is the effect of ambiance temperature on SF6 gas pressure!
06/abb, 21:31 – abb”: Guage readings could be different in day and night timings? Specially in winters
06/abb, 21:33 – abb: Yes
06/abb, 21:33 – abb: Pressure will reduce in Winters
06/abb, 21:34 – abb”: Can u explain?
06/abb, 21:35 – abb: And specially in nights…u might face an alarm or trip in night and that alarm may go away in morning
06/abb, 21:37 – abb: 7 bar at 20 degree
06/abb, 21:39 – abb:
07/abb, 13:24 abb:
07/abb, 14:20 -abb: https://sarthakbelwal.blogspot.com/2020/02/electrified-roads-may-be-future-indian.html?m=1
07/abb, 15:07 – abb “: Who is the writer?
07/abb, 15:42 abb: Hemchandra Madhusudan Shertukde
07/abb, 16:00 – abb “:
07/abb, 16:10 abb: Thanks
07/abb, 16:13 – abb. “: Anyone who is testing high voltage equipment?
07/abb, 16:43 abb: 👍thanks
07/abb, 16:45 abb: Which one?
07/abb, 16:52 – abb “: You’re wellcome
07/abb, 16:52 – abb “: 🌹
07/abb, 22:19 – abb: 👍🏼
08/abb, 15:48 – abb changed their phone number to a new number. Tap to message or add the new number.
08/abb, 18:20 -abb: Does anyone know how to use wire shark software
08/abb, 18:20 -abb: Actually from alstom bcu to siemens bcu one goose signal is coming
08/abb, 18:21 -abb: In Siemens bcu signal is coming as not valid
08/abb, 18:21 -abb: Suggest me any good option for checking goose signal
08/abb, 18:23 -abb “: Is it c264?
10/abb, 13:19 -abb: Nope, sometimes it produces noise due to abrupt movement of device, but that’s false alarm.
When there would be leak, you’ll listen continuous loud alarm
10/abb, 13:29 -abb: Hello to all members. I’m Ali Karimi from Iran, Tehran. I work at SEE1999 company.
I work on overall design of MW solar PV plants.
10/abb, 13:49 – abb “: 🖐
10/abb, 14:10 -abb: 🙏
10/abb, 14:25 -abb: Welcome mr karimi
10/abb, 15:06 -abb: Welcome Mr.Ali
10/abb, 15:08 -abb: Yes
10/abb, 15:16 -abb: Thanks all
11/abb, 12:09 abb: Hello

Can anyone share easergy studio software password
13/abb, 04:08 – abb: The program is free from schneider website
13/abb, 08:31 abb:
13/abb, 08:52 – abb: AAAA
13/abb, 12:29 – abb:
13/abb, 12:31 – abb”: This is common.. Try to reinstall it.. Or try to install Schneider s1 studio
13/abb, 12:32 – abb: Can anybody help me? This switch have been faulty and I dont know why.
13/abb, 12:38 -abb: If ur having a dual DC source then check the healthiness of both DC supplies
13/abb, 12:39 -abb: In some cases If one DC source fails then the switch will give that indication
13/abb, 12:47 – abb: Ok thanks
13/abb, 14:52 -abb: you should connect to switch and read the logs . there maybe any alarm for acknowledge for example a link were down, a link was disconnected or etc.
13/abb, 15:36 – abb: Ok
thank you so much for your help
13/abb, 15:38 -abb: 🙏🏻
14/abb, 10:34 -abb: Hello everyone, Need some help with testing of SR 489 Multilin Phase Differential Characteristic curve using Omicron Diff Operating Characteristic. Has anyone ever verified its operating characteristic?
14/abb, 13:31 -abb: http://sarthakbelwalev.blogspot.com
14/abb, 13:38 – abb: In the one of substaion we have license error in wincc frequently(siemens automation)What I should do for getting rid of this alarm
14/abb, 13:45 – abb: PAS??
14/abb, 13:46 – abb: This message was deleted
14/abb, 13:47 – abb: This message was deleted
14/abb, 13:49 – abb: Yes
14/abb, 13:50 – abb: It’s hardware key. U contact Siemens helpline
14/abb, 13:52 – abb: No It,s software licensas cc no pas
We have dongle for sicam pas
And our server dont have any problem
14/abb, 13:57 – abb: K
19/abb, 18:04 – abb: Hello, my name is Bruno, I’m electrical engineer graduated at UNIFEI – Brasil, I’ve been working with protection and automation since 2018, a short experience but I thing I could contribute with some topics here. I’m here to learn with you my colleagues and discuss anything about electrical engenieering. I have some experience with substations, IEDs and mostly ABB relays.
19/abb, 18:14 – abb: Welcome
19/abb, 18:32 -abb: You’re welcome
19/abb, 18:34 – abb”: You’re welcome bro
19/abb, 18:34 – abb: Thanks!
19/abb, 23:53 – abb: Hello, what is your license error exactly?
20/abb, 00:35 – abb: You can check the log in diagnosis folder/ license.log
20/abb, 00:36 – abb “: Nice to have you in this group
20/abb, 11:00 – abb: Error about pas cc configuration
20/abb, 11:00 – abb: I think I have missed this license
20/abb, 11:01 – abb: It is showing In license.log what is exactly missed
20/abb, 11:02 – abb: Ok I will check it
20/abb, 11:05 – abb:
20/abb, 11:05 – abb:
20/abb, 11:06 – abb: This license is trial and limited
20/abb, 11:07 – abb: If you press the details it showing what is exactly missed
20/abb, 11:08 – abb: Ok . How I can repair it
20/abb, 11:08 – abb: ?
20/abb, 11:09 – abb: https://support.industry.siemens.com/cs/document/24200966/how-do-you-deactivate-the-trial-license-when-the-message-appears-indicating-that-the-trial-license-has-expired-although-the-floating-license-has-been-installed-?dti=0&lc=en-WW
20/abb, 11:09 – abb: Check this link it might help
20/abb, 11:14 – abb: Thank a lot
20/abb, 11:14 – abb: But one question, what about the winCC License?
20/abb, 11:14 – abb: Chakeram
20/abb, 11:20 – abb: I’m dealing with SCC 9, for using that version we have to install winCC at first step, license it, then install SCC and license it
20/abb, 11:39 – abb:
20/abb, 11:40 – abb: Mokhlesam
20/abb, 11:43 – abb: Click details
20/abb, 11:47 -abb: PASCC-configuration licence is missing or expired
20/abb, 11:47 -abb: but how fix it?
20/abb, 11:48 – abb: The trial version is expired
20/abb, 11:50 – abb: This is for deleting the trial version
20/abb, 13:10 -abb: Hi all,
24/abb, 16:11 -abb: Can anybody help me regarding this
24/abb, 16:12 -abb: Hi anybody have configuration manual or videos for simocode relays
24/abb, 16:12 -abb: I need to know just how to communicate with the relay and uploading and downloading procedure
24/abb, 16:15 -abb: Do you have software
24/abb, 16:16 -abb: S
24/abb, 16:16 -abb: Installed??
24/abb, 16:17 -abb: And also you cable
24/abb, 16:17 -abb: I searched in the software
24/abb, 16:17 -abb: Yes I tried to communicate
24/abb, 16:17 -abb: TIA15
24/abb, 16:17 -abb: And I get the settings but I have some doubts
24/abb, 16:17 -abb: From Siemens
24/abb, 16:17 -abb: So only I am asking
24/abb, 16:18 -abb: Yes….
24/abb, 16:18 -abb: ????
24/abb, 16:19 -abb: Regarding communication and upload and download I need to know actual way
24/abb, 16:20 -abb: Because I have experience in digsi and reydisp softwares with that I do that blindly but I couldn’t get the correct methods
24/abb, 16:21 -abb: Ok I will catch you at the airport eve
24/abb, 16:22 -abb: OK sure
24/abb, 16:28 -abb: Do you have licensed software???
24/abb, 16:31 -abb: S I have…
24/abb, 17:49 -abb”: This message was deleted
25/abb, 16:33 – abb: I Install pcm 600 software , after the installation I update the connectivity package by using update manager. It shows error like that ” server couldn’t connect”. How to resolve it.pls any one tell me
25/abb, 16:58 – abb: Check your connection, if you are using an private network such as your company this may occur
25/abb, 17:22 – abb: but I use my own internet and I turn off my firewall also but it again show it same error.
25/abb, 17:33 -abb“: PCM needs SQLSERVER, this software comes with pcm package and during installation you will see that at first SQLSERVER is installing. Maybe it doesn’t install correctly depending your windows configuration
25/abb, 18:16 – abb: Its true but I dont think is this problem, its most likely of beeing something with internet connection, try using vpn
25/abb, 18:19 – abb: Uninstalled SQL server then reinstall issue will be resolved
25/abb, 18:26 -abb: Try this solution
27/abb, 00:38 – abb: In the one substations sometimes we have false alarm. Can anybody help me for finding the reason?
27/abb, 00:39 – abb:
27/abb, 01:18 – abb: Check ied events and the MMS 61850 maping
27/abb, 01:19 – abb: Probably another event is triggering the wrong MMS mapping
27/abb, 01:20 – abb: the ied didnot save anything in the events. How I can check 61850 MMS mapping?
27/abb, 01:20 – abb: Can you cause this event again?
27/abb, 01:21 – abb: You can use an package monitoring software
27/abb, 01:21 – abb: I should trigger this signal manualy
27/abb, 01:21 – abb: Ok
27/abb, 01:23 – abb: I’m not good at suppervisory but i’m preatty sure you can track down on this one the logical device/logical node…etc until discover witch event is causing this false alarm
27/abb, 01:24 -abb: Please try to load the cid once again in the IED
27/abb, 01:24 – abb: Ok I will do it. Tnx
27/abb, 01:24 – abb: Thank you
27/abb, 01:31 -abb“: It seems they are some kind of GI? Don’t you think?
27/abb, 13:30 – abb:
27/abb, 13:30 – abb: Anyone know how to resolve
27/abb, 13:41 -abb”: Restart relay.
27/abb, 13:42 – abb: Already restarted
27/abb, 13:42 – abb: Try to read with pcm 2.6 And pcm 2.9
27/abb, 13:43 -abb”: Try with different laptop.
27/abb, 13:44 – abb: Already tried with another laptop
27/abb, 13:46 – abb: Kindly install latest Hotfix file in your laptop.
27/abb, 13:49 – abb: Which hotflix
27/abb, 13:51 – abb:
28/abb, 13:48 – abb:
29/abb, 01:50 – abb: Thanks for sharing
29/abb, 14:48 – abb:
29/abb, 22:53 -abb: Hi friends,
I have a doubt, if we install fuse and MCB in same rating, then if overload comes what operate first either fuse blown first or mcb operate first, if it is so why? Reason. The same for short circuit condition
29/abb, 23:01 – abb: Fuse
29/abb, 23:01 – abb: Response time is faster than McBride
29/abb, 23:01 – abb: Mcb
29/abb, 23:08 – abb: How?? sir
29/abb, 23:21 -abb: Could you please share me the response time for mcb and fuse.
29/abb, 23:21 -abb: Exactly
29/abb, 23:41 – abb “: The answer depends on the thermal capability curve of each
29/abb, 23:42 -abb: How we can clarify? Any documents for this
29/abb, 23:43 – abb: I have data sheets. Will provide tomorrow
29/abb, 23:43 – abb “: This message was deleted
29/abb, 23:43 -abb: K sir thank you very much.
02/abb, 10:27 -abb: Sir kindly share me the same
02/abb, 16:27 -abb: When Three generators are running in parallel, suddenly one generators got trip. What happen to other generators?
02/abb, 16:28 -abb: I know that the speed of other generators will increase but I don’t know y? Anyone of you explain me
02/abb, 16:30 – abb “: According to drop curve In other word they all agreed to provide the grid with 50/60 Hz sinusuidal voltage waveform
02/abb, 16:36 – abb “: You can only see the actual increase in speed when you disconnect the generator from the grid
02/abb, 17:05 – abb: Exactly
02/abb, 17:14 – abb: This question is quite complex, the generators are running in grid or isolated from the Power system? If are conected you need to know how big are the influence of these generators in the system. In other words you will need a load flow simulation and a transitory simulation engine to know what will happen with the other machines, because syncronous generators have an angular stability that deppends on the intrinsic construtive characteristics. If the system are isolated ia most likely that the tripped machine will acelerate and the other machines will decresce speed, if the variant of power is inside capability and angle stability the speed regulator and the voltage regulator will set a new operation point to garantee the operation delivering the same amount of power (sorry for bad english, just woke up)
02/abb, 17:17 – abb: Actualy this is on a machine conected to a “infinite power” bus. If we are talking about a big loss of generation the machines will swing around the main frequency raising/decreasing speed, right?
02/abb, 17:18 -abb: If frequency of other two generators was raised means the speed has to increase right?
02/abb, 17:19 -abb: Because for speed=120f/p
02/abb, 17:19 – abb: In sincronous machines speed -> frequency
02/abb, 17:19 – abb: Yeah
02/abb, 17:21 – abb: But again, its most likely that the speed of the two remaining generators will decrease.
02/abb, 17:27 – abb: Once you have the same amount of load and have decrease your generation the eletrical current on the remaining generators are higher, this will result on a bigger magnetic flux that will make a force in the opposite direction of the primary machine (turbine), in other words this should break the generator
02/abb, 17:29 – abb: But as our colleague said, in a big power system you shouldnt have speed variations. It will all depend on your system. Is impossible to give a precise anawer without the information
02/abb, 17:35 -abb: Thank you very much I get different view about this
02/abb, 17:49 – abb “: The speed will decrease most likely depends upon the governer response if they running in isolated system
02/abb, 20:39 -abb “: A change in active power demand or in production causes a fluctuation of the speed (frequency).
If a generator trips, the frequency will decline. If the loss of generation is greater than the spinning reserve, the frequency could eventually stabilize at a new value lower than desired one. However, in practice, underfrequency relaying is used to reestablish the balance between power demand and the available production. If the frequency decline is excessive, generating units can be automatically tripped off causing an additional decline of frequency, and possible collapse of the system.
02/abb, 20:43 -abb “: Acceleration torque (Ta) = T (mech) – T (elec)
02/abb, 20:50 -abb “: For small variations 😛 (mech) ≈ T (mech) P (elec) ≈ T (elec)
03/abb, 07:25 -abb: 👍 thank you
11/abb, 10:39 – abb: Jii how to download micom alstom relay software. If you have any software link send it me jii
11/abb, 10:41 – abb: Google MiCOM S1 Agile
12/abb, 19:36 – abb:
13/abb, 10:05 -abb changed their phone number to a new number. Tap to message or add the new number.
13/abb, 21:42 – abb: Please addme new Mobile
13/abb, 21:46 – abb: 1JEAN.vcf (file attached)
14/abb, 03:41 – abb: Thnks
15/abb, 20:04 -abb: Anyone working with ABB Mach systems
16/abb, 19:00 -abb: Hi everyone
Anyone has Torkel win 3.0 (or any) software available?
please share, or send me the link. or bropBox me basim.nasim@hotmail.com
25/abb, 10:09 -abb: anyone has IEC 61850-8-1 Ed 2 pdf ?
26/abb, 16:07 -abb“:
26/abb, 17:51 – abb: Awesome! Thanks a lot
26/abb, 18:39 -abb“: 👍
30/abb, 20:55 -abb: Hi
30/abb, 20:56 -abb: I need to download digisi 4.91 or 4.93 with Windows 10 Pro 64 bit
30/abb, 20:56 -abb: Any one can help me to give me site, I can download directly
30/abb, 21:20 – abb: https://www.myprotectionguide.com/software.html
17/abb, 14:30 -abb: I will check, thanks
17/abb, 14:31 -abb“: Good luck
18/abb, 00:32 -abb: Good evening
18/abb, 00:33 -abb: I need this book protection of electricity distribution network 3rd edition.
18/abb, 08:23 -abb:
18/abb, 08:28 -abb: Thank you so much
19/abb, 11:58 – abb:
19/abb, 11:59 – abb: This alarm what means? How I can get relay config??
20/abb, 01:25 -abb: How to use directional earth fault protection?
https://electricalsystemsengineering.com/how-to-use-directional-earth-fault-protection-to-distinguish-between-a-fault-current-and-a-capacitive-current/
20/abb, 01:25 -abb: How to use directional earth fault protection to distinguish between a fault current and a capacitive current.
I hope you will find this article interesting to read.
20/abb, 05:43 -abb: Hello friends, I would like to know if anyone among you could assign a user curve to any function of the P142 MICOM relay
20/abb, 05:45 -abb: I prepared a curve, unfortunately I don’t know how to import it.
22/abb, 23:52 -abb:
22/abb, 23:52 -abb: I need this book Plz
23/abb, 16:59 abb: You can order it on www.iranpaper.ir at very low price.
23/abb, 22:59 -abb:
24/abb, 00:43 -abb: Just try for 3rd of May and see the change
24/abb, 00:43 -abb: https://forms.gle/TudS8gjYyqugee969
24/abb, 00:43 -abb: Guys…Do register it asap..
It’s the workshop going on…
Happy exercising..
💪🧘‍♂‍🧘‍♀‍🇮🇳
24/abb, 19:13 – abb: This message was deleted
26/abb, 17:52 – abb: this relay does not turn on why ?
26/abb, 18:30 -abbpsicologiaymente.com/psicologos/2058590/andrea-carolina-guerrero-gil
26/abb, 18:32 – abb: Pls ensure the polarity of auxilary suppy
26/abb, 18:42 – abb: Ok C1 is + and C2 is –
26/abb, 18:43 -abb:
26/abb, 19:38 -abb“: Are you sure about the exact output of your dc source?
26/abb, 20:35 – abb “: Insulation failure at the termination… may be due to too much dust or deterioration of the Elbow connector
26/abb, 20:39 -abb: Ok
26/abb, 20:39 -abb: Ok thanks
26/abb, 20:39 -abb: Ok thanks
26/abb, 22:23 -abb”: https://www.thebiomics.com/notes/springer-free-e-books-list.html
26/abb, 22:23 -abb”: Free ebook by Springer.
26/abb, 22:35 abb:
26/abb, 22:40 abb: Hi my friends
Do you know how to reset password of this devise?
27/abb, 00:59 – abb: Yes, i have confirmed a polarity, some problem, relay not turn ON!! 🤔
27/abb, 01:00 -abb: Is it a new relay?
27/abb, 01:00 – abb: Yes i used a cmc 256, auxiliary source.
27/abb, 01:00 -abb: When u turn On supply measure the applied voltages on the terminals of the relay using a multimeter.
27/abb, 01:01 -abb: That happen when u use a test set. When u apply the voltage on the relay, the voltages drop. I face the same issue on Sr 489 relay using a CMC 356
27/abb, 01:02 -abb: Check the applied voltage using a multimeter.
27/abb, 10:10 -abb: Join Prtection Relay 4 ” Zaigham ali: Plzz add 00968 99240411
29/abb, 10:06 – abb: Free books
29/abb, 10:06 – abb:
29/abb, 10:54 – abb: 👍
29/abb, 18:09 -abb”:
29/abb, 18:10 -abb”: This message was deleted
29/abb, 18:11 -abb”: With changing configuration and sending it to the relay, this error appeared, what the reason is?
29/abb, 18:11 – abb: Relay is in pickup condition
29/abb, 18:12 -abb”: which function ?
29/abb, 18:12 -abb”: How can i find?
29/abb, 18:12 -abb”: 7SA522
29/abb, 18:14 – abb: Check
29/abb, 18:19 – abb: Check General Introgation
29/abb, 21:45 -abb“: Can you please share P142 thermal over load calculation sheet.
29/abb, 21:59 – abbs: That’s correct
29/abb, 21:59 – abbs: Exit the pickup condition
30/abb, 20:57 – abb: Is anybody having the wiring diagram no: 811W00138? It is high speed master trip relay.
30/abb, 20:58 – abb: Easun Reyrolle
02/abb 23:29 -abb “: https://mylearning.abb.com/
03/abb 00:47 -abb: https://youtu.be/zCQqCjILtgY
03/abb 00:47 -abb: SCADA System
03/abb 15:50 – abb“:
04/abb 00:47 – abb: Friends. Can anyone have the below document. Pls share if so.

To join our protection relay WhatsApp group, please send interest on Whatsapp +989129613659

Protection Relay c

07abb , 15:20 – abb pcm 600: Can any one assist me with a milliamps current multiplier circuit? My transducer is 5mA output and I need 20mA
07abb , 16:08 – abb pcm 600 “:
What you missed and upcoming webinar !
08abb , 12:18 – abb pcm 600: IMG-20200808-WA0005.jpg (file attached)


https://elec-engg.com/abb-pcm-600-training/

https://elec-engg.com/abb-pcm-600-training-pack/


08abb , 12:19 – abb pcm 600: Any one help me ..while I connect sip 5 bcu like that error I got ..how can I solve that
08abb , 12:20 – abb pcm 600″: Differential initial setting is 0.2*In?
08abb , 12:20 – abb pcm 600″: What is the meaning of it
10abb , 10:44 – abb pcm 600: anyone have software for communicate this relay with pc
11abb , 17:46 – abb pcm 600 “:
CT Testing Theory.pdf
11abb , 20:46 – abb pcm 600″: Anybody have breaker dcrm result & procedure for testing breaker dcrm with megger TM1740 kit.
11abb , 21:25 -abb pcm 600 “: i think the problem is your RAM
11abb , 21:25 -abb pcm 600 “: maybe you can upgrade it to 8gb or 16gb
12abb , 01:11 – Elec Engg: Hello everyone,
12abb , 10:56 -abb pcm 600: Immediate requirement of ABB Experienced SAS & RTU Engineers for TANZANIA project:
Job period: Minimum 6 months
12abb , 17:49 – abb pcm 600:
12abb , 17:49 – abb pcm 600: What is this problem?
12abb , 17:52 – abb pcm 600″: Install the device driver for 7sj80
12abb , 17:52 – abb pcm600: You need to install the 7sj80 device drive
13abb , 09:06 – abb pcm 600″: My breaker got tripped on differential
13abb , 09:07 – abb pcm 600″: Relay is not showing any current
13abb , 09:07 – abb pcm 600″: 87BD In phase R,Y,B
13abb , 09:07 – abb pcm 600″: But no current
13abb , 09:07 – abb pcm 600: W1 or W2
13abb , 09:08 – abb pcm 600″: Wait I am checking
13abb , 09:09 -abb pcm600: Its tap changing problem
13abb , 09:11 -abb pcm600: It is due to imbalance of voltage
13abb , 09:14 – abb pcm 600″: But how?
13abb , 09:18 – abb pcm 600″: Tap was not changed
13abb , 09:27 – abb pcm 600″: In relay 5th harmonic and 2nd harmonic is blocked
13abb , 10:05 – abb pcm 600″: Not showing any winding
13abb , 12:55 – abb pcm600: i just updated firmware of my 7SA82 relay from 7.82 to 8.06, now the relay shows firmware 8.06 but CFG 7.82, when i go to device information page of offline extracted settings, here upgrade option is missing at configuration version, please guide how can i get upgrade option
13abb , 12:55 – abb pcm600: IMG-20200814-WA0003.jpg (file attached)


here you can see, upgrade option is not there near CFG
13abb , 12:56 – abb pcm600: IMG-20200814-WA0002.jpg (file attached)

https://elec-engg.com/wp-content/uploads/2021/03/IMG-20200814-WA0002.jpg


this is what manual shows, but in my case this upgrade option is not there as you can see in above picture.
13abb , 12:56 – abb pcm600: Please help
13abb , 13:31 -abb pcm600: Are u import the communication firmware for this device?
13abb , 14:31 – abb pcm600: issue resolved, by following this “You can go to “Upgrade project device” in project tree, and you will find for upgrade CFG”
13abb , 16:45 – abb pcm600: IMG-20200814-WA0004.jpg (file attached)

https://elec-engg.com/professional-package-digsi-4-digsi-5-iec-61850-configuration-pack/


13abb , 16:46 – abb pcm600: Getting this error when installing digsi 4.94, plz help
14abb , 11:51 – abb pcm 600″: When I am taking megger for pt primary to secondary, then when taking b/w primary and 1a and primary getting 400 Mega ohm, and primary to 1n getting 1.9 giga. Ohm why is the difference
14abb , 11:51 – abb pcm 600″: Can anyone tell me
14abb , 12:56 -abb pcm600: Hi, can someone please share Operation and Maintenance Manual of Feeder Remote Terminal Unit used to automate RMUs? Thanks..
14abb , 13:25 – abb pcm600: What is the applied test voltage
14abb , 13:25 – abb pcm 600″: 5kV
14abb , 14:07 – abb pcm600: Remove secondary connections either connected 1a or 1n. Apply test voltage case1: primary to 1a
Case 2: primary to 1n
14abb , 14:09 – abb pcm600: The values more or less should come same. Sometimes it will shows some difference due to testing machine (Megger) measurement and also ambient temparature(T)
14abb , 15:55 – abb pcm600:
14abb , 15:56 – abb pcm600: IN 7SR relay where to find Characteristic angle
14abb , 15:56 – abb pcm600: Using reydisp evolution
14abb , 17:16 – abb pcm 600: take pri. to earth at 5kv
and seco. to earth at 500 v
14abb , 19:03 – abb pcm600: Any body tested GIPAM 10NZ relay
14abb , 19:05 – abb pcm600: Where is direction selection for 67G SGR Protection
14abb , 19:06 – abb pcm600: In software
14abb , 19:06 – abb pcm600:
14abb , 19:59 – abb pcm 600″: Check in current protection folder
14abb , 20:00 – abb pcm 600″: +-45 by default
14abb , 20:01 – abb pcm600: Yes thank you, I found
14abb , 20:02 – abb pcm600: Any suggestions about this
14abb , 22:09 – abb pcm 600: any ziv zlv distance protection engineer urgent need
16abb , 13:23 – abb pcm600: Unbalance settings is given 30%
16abb , 13:24 – abb pcm600: How to test and justify this 30%
16abb , 15:20 – abb pcm600: How to Test 100% Stator Earth fault protection
16abb , 15:21 – abb pcm600: With 3rd Harmonic
16abb , 15:37 -abb pcm600: It is the power setting
16abb , 15:38 -abb pcm600: When u give the fault with power above 30% . Then only the relay will be active.
16abb , 15:38 – abb pcm600: OK thank you
16abb , 15:39 – abb pcm600: Please
16abb , 15:39 -abb pcm600: Which relay
16abb , 15:39 -abb pcm600: Model
16abb , 15:40 – abb pcm600: 7UM622
17abb , 14:10 – abb pcm 600″: Control cable length is 700mtr then how to calculate voltage drop
17abb , 14:11 – abb pcm 600″: Does anybody have an excel sheet
17abb , 15:50 – abb pcm 600: if 220 kv or any kv panel which recieving end panel thus their relationship angle between v-i is 180 degree apart.? is this right
AAQ CV

https://elec-engg.com/abb-pcm-600-training/https://elec-engg.com/abb-pcm-600-training/

_2020.pdf
18abb , 14:19 – abb pcm600: I am from India, kindly help me out getting a job in switchgear industry.
Please Circulate my Resume among your contacts.
18abb , 17:50 – abb pcm 600″:

Whatsapp +989129613659


18abb , 17:50 – abb pcm 600″: Vph to Vph selected
18abb , 17:50 – abb pcm 600″: Setting is 121 V
18abb , 17:50 – abb pcm 600″: Then for secondary injection how to inject
20abb , 08:24 – abb pcm600: How to test under excitation protection in Siemens relay
20abb , 08:24 – abb pcm600: 7UM
20abb , 12:41 -abb pcm600: U have to first take capability curve of generator and then on under excitation side make 3 part one at 0deg angle, 90deg angle and 120 deg angle
20abb , 12:42 -abb pcm600: For each angle u will get certain MW and Mvar which u can inject through ur secondary injection kit in terms of voltage and current
20abb , 20:00 -abb pcm600: 61850- ؟
21abb , 10:02 – abb pcm 600″:
Can anybody explain me this
21abb , 17:08 – abb pcm600: PTT-20200821-WA0004.opus (file attached)

https://elec-engg.com/abb-pcm-600-training/


21abb , 21:10 – abb pcm600: Can anyone provide DNP3 protocol standard?
22abb , 08:40 – Fatima:
3045_NegativeSequence_GS_20160122-Reduced.pdf
22abb , 09:53 – abb pcm600:
22abb , 09:55 – abb pcm600: On upper side of Relay Ready LED is Blinking
22abb , 09:55 – abb pcm600: That’s why it’s not communicating by software, How to fix it
22abb , 10:28 – abb pcm 600: which led
22abb , 10:28 – abb pcm600: Ready LED
22abb , 10:29 – abb pcm 600: relay faulty indiction is going on annuc.
22abb , 10:32 – abb pcm600: No annunciation is coming on other
22abb , 10:33 – abb pcm 600: but i think relay get faulty
22abb , 10:33 -abb pcm600: Hi all, Please provide this.
22abb , 10:33 – abb pcm 600″: Is relay restarting again and again
22abb , 10:34 – abb pcm 600: any something error internl
22abb , 10:34 – abb pcm 600″: Is it in test mode
22abb , 10:34 – abb pcm 600″: Because it blinks when in test mode
22abb , 10:35 – abb pcm600: It’s not in test
22abb , 10:35 – abb pcm 600″: Is it rebooting
22abb , 10:36 – abb pcm 600: u can also check the error code in the relay
22abb , 10:37 – abb pcm600: Not rebooting
22abb , 10:37 – abb pcm 600: share the display
22abb , 10:37 – abb pcm 600: click the photo
22abb , 10:37 – abb pcm600: HMI working properly
22abb , 10:37 – abb pcm 600″: When you read the data from relay through software what error it is showing
22abb , 10:38 – abb pcm 600: oh ABB show on the display
22abb , 10:38 – abb pcm 600: this is error inside
22abb , 10:38 – abb pcm600: Not communicating with software
22abb , 10:39 – abb pcm 600: must repair
22abb , 10:40 – abb pcm 600″: What is the fault code relay is showing
22abb , 10:41 – abb pcm 600″: Like 2,7,8,10,43,44 etc
22abb , 10:41 – abb pcm600: Not showing any fault
22abb , 10:41 – abb pcm 600″: Or warning code
22abb , 10:41 – abb pcm600: Only ready LED is Blinking
22abb , 10:41 – abb pcm600: Nathing
22abb , 10:42 – abb pcm 600″: Share this screen
22abb , 13:30 – abb pcm600:

https://elec-engg.com/whatsapp-group-for-protection-engineers/


22abb , 13:31 – abb pcm600: Please check
22abb , 13:32 – abb pcm 600″: Laptop screen
22abb , 13:34 – abb pcm600:
22abb , 13:35 – abb pcm600: Now communicated with relay
22abb , 13:35 – abb pcm600: But Blinking problem is not fixed
22abb , 13:37 – abb pcm 600″: Go to main menu/monitoring/IED status/ self supervison
22abb , 13:38 – abb pcm 600″: Check for faulty hardware module
22abb , 13:40 – abb pcm 600″: If it is a diagnostic failure then also it flashes
22abb , 13:40 – abb pcm 600″: Check IRF alarm contact status to find the reason
22abb , 13:42 – abb pcm 600″: It is a internal fault
22abb , 14:05 – abb pcm600: May be
22abb , 15:13 – abb pcm600:
22abb , 15:13 – abb pcm600:
22abb , 15:14 – abb pcm600: Why current in R phase so much high on normal voltage
22abb , 15:16 – abb pcm 600″: Load on r phase might be more as compared to other phases
22abb , 15:18 – abb pcm600: Normal voltage is injected
22abb , 15:19 – abb pcm 600: whats the ct ratio
22abb , 15:19 – abb pcm600: And normal current is injected
22abb , 15:19 – abb pcm600: 400/1
22abb , 15:19 – abb pcm 600: check backup relay
22abb , 15:19 – abb pcm 600: measurmnt
22abb , 15:20 – abb pcm 600: how mny core
22abb , 15:20 – abb pcm 600: in ct
22abb , 15:20 – abb pcm 600: 400-800-1200
22abb , 15:27 – abb pcm600: But i am injecting to relay directly
22abb , 15:27 – abb pcm 600: how
22abb , 15:27 – abb pcm 600: secondry set
22abb , 15:30 – abb pcm 600″: Check ct wiring
22abb , 15:30 – abb pcm 600″: Star point of relay
22abb , 15:31 – abb pcm 600″: Input
22abb , 15:31 – abb pcm 600″: Is correctly wired
22abb , 15:31 – abb pcm 600: star point is only for protction
22abb , 15:42 – abb pcm600: Star point is ok
22abb , 15:43 – abb pcm 600: r u injected or line is charge
22abb , 15:44 – abb pcm600: Relay is separated from PT CT,
22abb , 15:45 – abb pcm600: I am injecting current from omicron
22abb , 15:45 – abb pcm600: PT as well
22abb , 15:45 – abb pcm 600: ok
22abb , 15:46 – abb pcm 600: r u injecting balance current
22abb , 15:46 – abb pcm 600: 1 A
22abb , 15:46 – abb pcm600: Yes
22abb , 15:46 – abb pcm 600: check ct ratio
22abb , 15:46 – abb pcm 600: in the relay
22abb , 15:47 – abb pcm600: CT ratio is OK in relay
22abb , 15:47 – abb pcm 600: when u injecting
22abb , 15:47 – abb pcm 600: is there any currnt in IN
22abb , 15:47 – abb pcm600: Yes same as R phase
22abb , 15:48 – abb pcm 600: ok
22abb , 15:48 – abb pcm600: Check in this, it was fluctuating
22abb , 15:49 – abb pcm 600: inject only r phase
22abb , 15:49 – abb pcm 600: backside of relay terminal
22abb , 15:49 – abb pcm 600: not on tb
22abb , 15:51 – abb pcm600: That I am doing
22abb , 15:51 – abb pcm 600: ok
22abb , 15:53 – abb pcm600: It’s 934 A is showing when I inject only in R phase
22abb , 15:53 – abb pcm 600: Send me the pic of ct ratio
22abb , 15:53 – abb pcm 600: in the relay
22abb , 15:55 – abb pcm600: I will send relay file
22abb , 15:55 – abb pcm 600: ready led is blinking for this relay
22abb , 15:56 – abb pcm600: Yes
22abb , 15:56 – abb pcm 600: which modl
22abb , 15:56 – abb pcm 600: REL670
22abb , 15:56 – abb pcm600: Yes
22abb , 15:56 – abb pcm 600: ok
22abb , 15:56 – abb pcm 600: send me file
22abb , 15:59 – abb pcm 600:


22abb , 15:59 – abb pcm 600: send me this pic
22abb , 15:59 – abb pcm 600: in the rely
22abb , 16:00 – abb pcm600:
REL670.pcmi
22abb , 16:00 – abb pcm 600: pic snd krdo
22abb , 16:01 – abb pcm 600: instll krna pdega
22abb , 16:01 – abb pcm 600: pcm
22abb , 16:01 – abb pcm600: Ok
22abb , 17:18 – abb pcm600:
22abb , 17:19 – abb pcm600: I have imported this file, but why Protection is opening
22abb , 17:20 – abb pcm600: Protection is not opening
23abb , 10:59 – abb pcm 600″: Is circuit breaker contact resistance temperature dependent
23abb , 11:19 – abb pcm600: Yes the hotter it has higher value.
23abb , 11:21 – abb pcm600″: Yes
23abb , 14:51 – abb pcm 600 “: Yes.. That’s why you would have seen that the current is injected for a very short duration.. As not to elevate the temperature
23abb , 19:34 – abb pcm 600″: Does variations in input voltage affects breaker timing
23abb , 19:35 – abb pcm 600″: Input supply varies from 110V to 170V
23abb , 19:35 – abb pcm 600″: Ideal voltage is 110 V
23abb , 19:35 – abb pcm 600″: This message was deleted
23abb , 19:56 – abb pcm 600″: Please can anybody tell me this
23abb , 20:38 – abb pcm 600 “: Are you testing time or contact resistance
23abb , 20:39 – abb pcm 600″: Both
23abb , 20:39 – abb pcm 600″: 132 kV breaker close time =77 ms
23abb , 20:39 – abb pcm 600″: At160V
23abb , 20:40 – abb pcm 600: PT ki 110 v vary kr rhi h
23abb , 20:40 – abb pcm 600″: No pt
23abb , 20:41 – abb pcm 600″: Direct supply from AC source for testing
23abb , 20:41 – abb pcm 600: ac supply for kit
23abb , 20:42 – abb pcm 600″: No for breaker control supply
23abb , 20:42 – abb pcm 600: ok
23abb , 20:42 – abb pcm 600 “: Usually, the higher volts may not affect the timing but will damage the insulation of the coil
23abb , 20:42 – abb pcm 600″: Is this value is acceptable
23abb , 20:43 – abb pcm 600: ac supply use in brekr only for motor
23abb , 20:43 – abb pcm 600 “: Refer to the manual..
23abb , 20:43 – abb pcm 600″: Input ac supply for kit is 260V
23abb , 20:43 – abb pcm 600 “: For MV, I have less than 60ms for one while 40 ms for the other type
23abb , 20:43 – abb pcm 600″: Source is giving 260 V
23abb , 20:43 – abb pcm 600 “: So you have to compare with the values in manual
23abb , 20:44 – abb pcm 600″: Trip time is 46 ms,CO=39ms
23abb , 20:44 – abb pcm 600: accpt
23abb , 21:20 – abb pcm 600:
23abb , 21:20 – abb pcm 600: please check these angle diff. is correct or wrong
24abb , 11:01 – abb pcm 600:
24abb , 11:02 – abb pcm 600: Can you tell me what is the name of this marked portion?
24abb , 11:02 – abb pcm 600: And why it is connected there?
24abb , 13:02 – abb pcm 600: anyone have ETAP software
24abb , 13:04 – abb pcm600: Correct
24abb , 18:06 -abb pcm600: Its correct, inductive.
24abb , 18:09 -abb pcm600: Es un separador de fases
24abb , 18:13 -abb pcm600: Can anyone tell me this?
When i charge the 132kv line, then i get the all secondary 3phase voltage at the panel TB from line cvt.
But i trip the breaker, now the line remains back charge bcz of opposite end connected. In this case i get only R, B phase voltage from same line cvt. Y ph voltage is near to zero(i.e, y=7 v) How it is possible?
24abb , 18:15 – abb pcm 600: line pt install
24abb , 18:15 -abb pcm600: Mm installed
24abb , 18:16 – abb pcm 600: Mm means
24abb , 18:16 -abb pcm600: Sorry
24abb , 18:16 -abb pcm600: Yes installed
24abb , 18:16 – abb pcm600: May Y phase jumper opened in transmission line
24abb , 18:17 – abb pcm 600: please check from remote end
24abb , 18:17 – abb pcm 600: voltage
24abb , 18:28 -abb pcm600: No sir
24abb , 18:28 -abb pcm600: It also perfectly correct
24abb , 18:30 – abb pcm 600: remote end the all three voltage is perfect ?
24abb , 18:30 -abb pcm600: Yes of course
24abb , 18:31 – abb pcm 600: tell me the all three voltage
24abb , 18:32 -abb pcm600: R=63.8
Y=63.03
B=63.35
24abb , 18:32 – abb pcm 600: all is ok
24abb , 18:33 -abb pcm600: Now it is charged at both ends.
24abb , 18:33 -abb pcm600: When i cut our end breaker, then i get only 2 ph voltage
24abb , 18:34 – abb pcm 600: r u seeing in the panel
24abb , 18:35 -abb pcm600: No seeing at pt MB
24abb , 18:35 – abb pcm 600: cut the brekr from remote end chrge from our end
24abb , 18:35 – abb pcm 600: then check
24abb , 18:36 -abb pcm600: Checked
24abb , 18:36 – abb pcm 600: same prblm
24abb , 18:36 -abb pcm600: I get all 3 ph voltage
24abb , 18:36 -abb pcm600: No
24abb , 18:36 – abb pcm 600: ok
24abb , 18:36 -abb pcm600: It is clear
24abb , 18:37 – abb pcm 600: cvt aftr breker or before
24abb , 18:37 -abb pcm600: After
24abb , 18:38 – abb pcm 600: when charge from both end then what about the load
24abb , 18:38 – abb pcm 600: all three load are balance
24abb , 18:38 -abb pcm600: Yes of course
24abb , 18:56 – abb pcm600: Does the problem solved now?
24abb , 19:49 – abb pcm 600″: Check wiring of pt at tb
24abb , 19:49 – abb pcm 600″: Is it loose
24abb , 20:31 -abb pcm600: No
24abb , 20:31 -abb pcm600: Not anymore
24abb , 20:32 -abb pcm600: No
24abb , 20:32 -abb pcm600: It is perfectly connected
24abb , 20:32 – abb pcm600: Wat about pt secondary phase to phase voltage
24abb , 20:32 -abb pcm600: 110 if it is charged at both end
24abb , 20:33 – abb pcm600: Wat about all other phase?
24abb , 20:34 -abb pcm600: All three phase to phase voltage is 110 if the line charged at both ends
24abb , 20:34 -abb pcm600: If i cut my end breaker then i get 2 phase voltage only
24abb , 20:35 -abb pcm600: I am not getting Yph voltage
24abb , 20:35 – abb pcm600: Does the LA in line side shows leakage current?
24abb , 20:36 -abb pcm600: If our side is charged and the other side breaker is off in this case i get all three phase voltage
24abb , 20:37 – abb pcm600: This message was deleted
24abb , 21:46 – abb pcm 600″: Yes check for leakge current in LA
24abb , 21:51 -abb pcm600: Ok
25abb , 13:11 – abb pcm 600″:

https://elec-engg.com/whatsapp-group-for-protection-engineers/


25abb , 13:11 – abb pcm 600″: Does DNP communicate over RS 485
25abb , 13:26 -abb pcm600: Yes, if supported by the relay manufacturer
25abb , 17:08 -abb pcm600: Can any one tell me sir
Motor got tripped on 51n but the all three phase currents are equal,the protection on calculated value of three phase currents internally by the relay .the relay was 7sj66
25abb , 17:08 -abb pcm600: What is causes
IR valu of the motor is good
25abb , 17:11 – abb pcm600: Any one can explain the difference between DNP and Rs 485
25abb , 17:11 – abb pcm 600″: RS 485 is port
25abb , 17:11 – abb pcm 600″: DNP is protocol
25abb , 17:12 – abb pcm 600″: Used in process automation system
25abb , 17:12 – abb pcm600 “: Any one can be explain how to collect ABT meter load survey data through RS 485 port
25abb , 19:30 -abb pcm600: Correct, RS485 RS232 RS422etc is just an standard for serial communication
25abb , 19:30 -abb pcm600: DNP is a protocol which can be communicated over RS232 or RS485 serial port (as rightly answered by Abhishek).

But, I am not sure if DNP3 over RS485 relays can be Daisy Chained which is typical feature of RS485 network. Can someone tell this??
25abb , 19:32 -abb pcm600: DNP can definitely be daisy chained, just use a terminating resistor
25abb , 19:33 -abb pcm600: Ok thanks, so DNP3 outstation address will act like node ID??
How many relays can we drop on a RS485 using DNP3?
25abb , 19:34 -abb pcm600: I mean DNP3 slave address ranges upto 65535
25abb , 19:36 -abb pcm600: The maximum ieds that was successfully daisy chained was 255, however I won’t use anything close to that.
25abb , 19:36 -abb pcm600: Baud??
Network Length??
25abb , 19:39 -abb pcm600: Read through the RS485 standard, all is specified, this is not my area is expertise, but I’ve seen them work over 200m, use a 9600bd 2 wire comms
25abb , 19:47 -abb pcm600: Ok. Thanks
25abb , 20:22 – abb pcm600: With 2 pair, 0.5 twisted shielded pair, proper earthing of spare wires and shield, I used till1400 meter closed loop
26abb , 10:35 – abb pcm 600: any one use kocos artes 440 three phase secondary innection set.
27abb , 17:59 – abb pcm 600″:


Can anybody explain me this
28abb , 10:56 – abb pcm600: Please share detailed explanation of underexcitation Protection
28abb , 17:54 – abb pcm 600″: Please tell me about LBB scheme in 220kV
28abb , 18:18 – abb pcm600: Local Breaker protection scheme basically depends on type of busbar scheme you applied for.
28abb , 18:19 – abb pcm600: What is the type of bus bar scheme used in your 220kV station
28abb , 18:20 – abb pcm600: It is a trip matrix for designing of protection schemes
28abb , 18:21 – abb pcm600: For which type of unit? Is it for generator
28abb , 18:29 – abb pcm600: Class A is for Turbine trip
Class B is for GCB trip
28abb , 18:33 – abb pcm600: Whenever Turbine tripping occurs ..GCB trips consequently..
28abb , 18:40 – abb pcm600: No correlation with generator in this case. It is for transformer.
28abb , 18:43 – abb pcm600: Above transformer is a GT ..
28abb , 18:46 – abb pcm600: Though it is a GT, ptotection group A and Group B is for transformer breaker it self Hv side and LV side(GCB), 86.1 & 86.2
28abb , 18:51 – abb pcm600: GCB doesn’t have HV side CB..
86 means Master tripping …
28abb , 18:53 – abb pcm600: 🤦🏻‍♂️🤦🏻‍♂️
28abb , 18:53 – abb pcm600: Im saying for trafo
28abb , 18:54 – abb pcm600: *GT not GCB
28abb , 18:55 – abb pcm600: Here in trip matrix, Group A & B categorised for master trips only.
28abb , 18:57 – abb pcm600: You mean, GT dont have hv side cb
28abb , 18:58 – abb pcm600: Can you please share such, sld which shows GT side doesnt have hv side cb
28abb , 20:06 – abb pcm600:
Sorry LV side doesn’t have CB I meant to say..if it is 11/33kV GT ..CB will be at 33kV side in small power plants..
28abb , 22:16 – abb pcm600: 👍🏼👍🏼. I got it
29abb , 13:21 – abb pcm 600″: It is transformer
29abb , 14:23 – abb pcm600: For transformer, I have no idea regarding under excitation. We generally use over excitation/flux protection for higher rating transformers.
29abb , 15:09 – abb pcm600: Yes sir, generator only
29abb , 15:40 – abb pcm 600″: No it is transformer
29abb , 15:41 – abb pcm600: Sir actually I asked this yesterday,
29abb , 15:42 – abb pcm600: I want wrt generator
29abb , 15:42 – abb pcm600: For 7UM relay
29abb , 17:43 – abb pcm 600″: Low impedance bubar having main and check zone
29abb , 17:43 – abb pcm 600″: *busbar
29abb , 17:46 – abb pcm 600″: For busbar trip
29abb , 17:49 – abb pcm 600″:
Please tell me how this is working
29abb , 18:46 – abb pcm600: I understood scheme is double busbar with transfer bus scheme.
Main and check zone concept is different from LBB. We use zone system in busbar differential. Whereas, LBB operates when corresponding breaker fails to trip under feeder fault/bay fault condition. LBB will extend to trip concerned busbar of that breaker(two main and transfer scheme) and other end of the line(i. e., opposite end station).
29abb , 18:49 – abb pcm600: You will be more clear with protection schemes, showing LBB operated page.
31abb , 21:07 -abb pcm600: Hii,

Can you please suggest electric safety shoe( composite toe shoe) available online
31abb , 21:09 – abb pcm 600 “: It’s what we are advised to use 👆🏻
01/09/2020, 11:51 – abb pcm 600″: float dc ammeter shows which current?
01/09/2020, 11:51 – abb pcm 600″: In battery charger
01/09/2020, 12:16 – abb pcm600: From DIGSI 5 can we communicate siprotec 4 relay
01/09/2020, 13:17 – abb pcm 600″: No
01/09/2020, 13:18 – abb pcm 600″: But you can install them on single pc
01/09/2020, 13:19 – abb pcm600: OK, thank you
02/09/2020, 11:51 – abb pcm 600:
02/09/2020, 11:51 – abb pcm 600: anyone have drawing for this 11 kv panel
02/09/2020, 11:58 – abb pcm 600: siemens
02/09/2020, 13:36 – abb pcm 600″: I am having tow mfm in different panels both having same voltage and current but KWH is different . Is this possible
02/09/2020, 13:40 – abb pcm600″: Check CTR in both
02/09/2020, 13:40 – abb pcm 600″: Checked it is correct
02/09/2020, 13:44 – abb pcm600: Current may be same now but it might be different in different timings, so results in different kwh ratings.
02/09/2020, 13:44 – abb pcm 600″: Please clarify
02/09/2020, 14:19 – abb pcm600: Load in two feeders could not need to be same all the times. Eventually, results in different kwh rating.
02/09/2020, 14:20 – abb pcm 600″: One is incomer and one is outgoer
02/09/2020, 14:21 – abb pcm600: Only one- one feeder connected in that bus
02/09/2020, 14:21 – abb pcm 600″: No
02/09/2020, 14:22 – abb pcm600: Then how both currents ratings were same
02/09/2020, 14:23 – abb pcm 600″: It is plant of 30mw where incomer is trf and connected to og line
02/09/2020, 14:24 – abb pcm 600″: That incomer is getting input from 6 5MW source s
02/09/2020, 14:43 – abb pcm600: How much is the difference in values in both meters
02/09/2020, 14:51 – abb pcm 600″: 183 and 258
02/09/2020, 14:53 – abb pcm600″: Is meter calibration done
02/09/2020, 14:53 – abb pcm600″: Check PT also
02/09/2020, 16:49 – abb pcm 600″: R-Y 115, Y-B 121 B-R 120
02/09/2020, 16:49 – abb pcm 600″: Current
02/09/2020, 16:49 – abb pcm 600″: No
02/09/2020, 16:49 – abb pcm 600″: Angles
02/09/2020, 19:43 – abb pcm600: In 7SR relay
02/09/2020, 19:50 – abb pcm600: TCS Protection is not there in 7SR17 Relay
02/09/2020, 19:51 – abb pcm600: How to make logic for TCS in 7SR17 Relay
02/09/2020, 19:58 – abb pcm600: This will work only in case of DC coil in VCB
02/09/2020, 20:02 – abb pcm600: OK, but how to make equation for that
02/09/2020, 20:03 – abb pcm600: My existing relay is Rho 5
02/09/2020, 20:05 – abb pcm600: Sorry its Rho3
7SR17_Rho_User_Manual.pdf
02/09/2020, 20:20 – abb pcm600: Thank you
03/09/2020, 15:51 – abb pcm600:
03/09/2020, 15:51 – abb pcm600: In 7SR relay how to make equation
03/09/2020, 15:51 – abb pcm600: Like logic
03/09/2020, 16:00 – abb pcm600:
03/09/2020, 16:01 – abb pcm600: How to make TCS Logic in disp evolution software
03/09/2020, 16:01 – abb pcm600: Please help
03/09/2020, 16:04 – abb pcm 600″: How many trip coils in your breaker
03/09/2020, 16:06 – abb pcm600: Two
03/09/2020, 16:06 – abb pcm 600″: Ok
03/09/2020, 16:07 – abb pcm 600″: Use two equations
03/09/2020, 16:07 – abb pcm600: Yes but please guide
03/09/2020, 16:08 – abb pcm 600″: Assign binary input to 74TCS-1 to 4 in input matrix
03/09/2020, 16:09 – abb pcm 600″: Then assign the same in output matrix by virtual input
03/09/2020, 16:10 – abb pcm 600″: Use E1=V1V2, E2=V3V4
03/09/2020, 16:14 – abb pcm600: 74TCS is not available in relay
03/09/2020, 16:15 – abb pcm 600″: Which relay
03/09/2020, 16:15 – abb pcm600: 7SR17
03/09/2020, 16:51 – abb pcm600: Is it possible to Use TCS in if we don’t have 74TCS
03/09/2020, 16:51 – abb pcm600: ?
03/09/2020, 16:52 – abb pcm600:

Whatsapp +989129613659


03/09/2020, 17:38 -abb pcm600: SEL 311B Manual Operating Password please Share
03/09/2020, 17:49 -abb pcm600: Should be TAIL or OTTER
03/09/2020, 18:23 – abb pcm600: Level 1:OTTER
Level 2: TAIL
03/09/2020, 21:11 – abb pcm600: In CT ,Due to leakage the oil reaches minimum level.In that case how to refill the oil?
Whether we refill directly from top of the CT oresle vacuum pulling thereby bottom filling ?
03/09/2020, 21:32 – abb pcm 600: What can someone recommend as voltage regulator for a 33kv line that experiences voltage fluctuations once there is any loss of any other 33kv feeder all feeding from the same 132kv bus. Meanwhile the one that experiences the voltage dips is not on the 33kv bus.
03/09/2020, 21:38 – abb pcm 600: can we communicate the scheneider relay p442 in micom S1 studio software
03/09/2020, 21:47 – abb pcm 600″: This message was deleted
03/09/2020, 21:48 – abb pcm 600″: Can anyone tell me that when I am injecting 63.5in phase to neutral why I am getting voltages in ph to ph
03/09/2020, 21:56 -abb pcm600: You are injecting in one phase or two phase?
03/09/2020, 21:56 – abb pcm 600″: Only phase to neutral
03/09/2020, 21:56 – abb pcm 600″: Rph only
03/09/2020, 21:58 -abb pcm600: In Y phase also 31V showing
03/09/2020, 22:01 – abb pcm 600″: Not injecting in y phase
03/09/2020, 22:06 -abb pcm600: If injecting in r phase,it should not show in Y and b phase,but it will show in VRY AND VBR.
03/09/2020, 22:07 – abb pcm 600″: Is there neutral problem
03/09/2020, 22:07 -abb pcm600: Try to ground other two phases and check
03/09/2020, 22:08 -abb pcm600: Check with three phase injection also
03/09/2020, 22:08 – abb pcm 600″: Ok
03/09/2020, 22:29 – abb pcm 600: how it solve
03/09/2020, 22:30 – abb pcm 600: during installation of scheneider electric studio

Hello, thank you for visiting our site
By joining our WhatsApp and Telegram groups, talk to the world’s electrical engineers and solve your problems about electricity. You can also benefit from our free files and see our training packages at the link below.
https://elec-engg.com/category/training-course/


03/09/2020, 22:46 – abb pcm 600: and netframe is not support on this window
04/09/2020, 11:28 – abb pcm 600: how can i download the data model package for scheneider
04/09/2020, 13:18 -abb pcm600: You have Schneider software?
04/09/2020, 13:18 -abb pcm600: You can download through data model manager
04/09/2020, 13:19 – abb pcm 600: server not respond
04/09/2020, 13:21 -abb pcm600: If you need any particular data model, I will check and I sent to you.
04/09/2020, 13:21 – abb pcm 600: ok
04/09/2020, 13:21 – abb pcm 600: P442 distance protection relay all software version
04/09/2020, 13:23 -abb pcm600: I will check in my system, if available I will send,email id?
04/09/2020, 13:40 – abb pcm 600: ok
04/09/2020, 13:40 – abb pcm 600: parmod2356@gmail.com
04/09/2020, 14:06 – abb pcm 600″:
04/09/2020, 14:07 – abb pcm 600″: Plz check data model if have then plz
04/09/2020, 14:56 – abb pcm 600″: I am connecting two power supply in series of 48 V but current of one is 10A and 2 A what will be the resultant
04/09/2020, 14:56 – abb pcm 600″: Current
04/09/2020, 14:57 – abb pcm600: Download data models
04/09/2020, 16:12 – abb pcm600: Current will be added in series
04/09/2020, 17:12 -abb pcm600: Check your email. I sent P442 data models
04/09/2020, 17:23 – abb pcm 600: yes i recieved thank you so much
04/09/2020, 19:12 – abb pcm 600″: server not respond
04/09/2020, 22:01 – abb pcm600: Use Ge Micom S1 Agile
http://www.partners.gegridsolutions.com/Assets/View/1950ba21-8ace-4079-9330-35d8d5df2e55
05/09/2020, 13:56 – abb pcm600: How to make Close circuit supervision configuration in 7SR Relay
05/09/2020, 17:12 – abb pcm 600″: earth resistance value without grid must be less than 5 ohm
05/09/2020, 17:12 – abb pcm 600″: Is it correct
05/09/2020, 17:17 -abb pcm600: It depends upon soil,for some soil should be less than 1 ohm
05/09/2020, 17:47 – abb pcm600: hmmm
05/09/2020, 18:36 – abb pcm600:
05/09/2020, 18:36 – abb pcm600: What’s the meaning the meaning of 4 temperature inputs
05/09/2020, 18:37 – abb pcm600″: May be for RTD connections
05/09/2020, 18:38 – abb pcm 600 “: Yeah.. For bearings, stator and rotor
05/09/2020, 19:00 – abb pcm600: What is the application of RTD
05/09/2020, 19:00 – abb pcm 600 “: Monitoring the temperature
05/09/2020, 19:00 – abb pcm600: Ok
05/09/2020, 19:00 – abb pcm 600 “: Resistance temperature detector
05/09/2020, 19:01 – abb pcm 600 “: The resistance changes with respect to the temperature
05/09/2020, 20:03 – abb pcm600: Do we need any configuration in 7SR relay for RTD
05/09/2020, 20:30 – abb pcm 600 “: I haven’t worked on 7sr but RTDs need configuration
05/09/2020, 20:32 – abb pcm600: Dears

https://elec-engg.com/whatsapp-group-for-protection-engineers/

08/09/2020, 09:54 – Fatima added A1 5414
08/09/2020, 12:11 – abb pcm 600″: How to test low impedance ref
08/09/2020, 12:11 – abb pcm 600″: Can anyone tell me
09/09/2020, 11:35 – abb pcm 600″: Can anyone please share testing procedure for line differential relay
09/09/2020, 11:35 – abb pcm 600″: Siemens 7sd522
09/09/2020, 11:36 – abb pcm 600″: It was there in this group but it was deleted in my phone number please share it again
09/09/2020, 11:47 – abb pcm 600″: Thank you
09/09/2020, 12:13 abb pcm600: Thanks
09/09/2020, 14:26 – abb pcm600: Any body have testing format for REM 615. Like overcurrent, earth fault, thermal overload, phase reversal, negative sequence overcurrent protection for motor, motor load jam protection and motor start up supervision .
09/09/2020, 14:26 – abb pcm600: Please share it
09/09/2020, 22:43 – abb pcm 600″: This message was deleted
09/09/2020, 22:43 – abb pcm 600″: Siemens 7SA522
09/09/2020, 22:44 – abb pcm 600″: Testing procedure of 7SA522 if anyone has please share it
Which relay to set directional
10/09/2020, 16:38 – abb pcm600:
Any 1 have Omicrom PTL file for ERL L-Pro 4000
10/09/2020, 16:39 – abb pcm600: Mail me please
10/09/2020, 20:26 – abb pcm600: Does anyone have a SIPROTEC 5 .sim file to share?
12/09/2020, 10:25 – abb pcm 600″: Single phase pick up and three phase pickup will be different for overcurrent
12/09/2020, 10:25 – abb pcm 600″: Protection in relay
12/09/2020, 10:26 – abb pcm 600″: Or not
12/09/2020, 11:00 -abb pcm600: In which relay?
12/09/2020, 11:09 – abb pcm 600″: 7SJ64
12/09/2020, 11:10 – abb pcm 600″: Idmt time at normal setting and 2 times current injection are coming same is this possible
12/09/2020, 11:41 -abb pcm600: At normal setting relay will pick up only.
12/09/2020, 11:41 -abb pcm600: Check the output trip logic
13/09/2020, 11:59 – abb pcm 600: Can I ask mechanical engineering related questions here or can someone please link me to a group where I can ask questions related to mechanical engineering?
15/09/2020, 16:21 – abb pcm 600: please share any test docs for csc162 sifang dpr relay
16/09/2020, 09:26 -abb pcm600: What indicates I2/I1 fault in ABB REJ 601 relay, on what condition it activates.
16/09/2020, 15:16 – abb pcm 600″: Can anyone clarify me LBB scheme 220kV
16/09/2020, 16:09 -abb pcm600: Can earthing of CT 2ndry neutral both side (at panel side and at field side) can cause this differential current ??
16/09/2020, 16:09 -abb pcm600: Does anyone have experienced this case ?

That a transformer differential relay tripped even when breaker is opened. ??

Some differential current flowing when breaker is openend
16/09/2020, 18:22 – abb pcm 600″: Always do single.point earthing
16/09/2020, 18:24 -abb pcm600: 👍👍
16/09/2020, 22:19 – abb pcm600′: In this case the current doesn’t flow in relay coil…it will circulate if both field side and panel side star point earthed
16/09/2020, 22:20 – abb pcm600′: Check DR…
16/09/2020, 22:21 – abb pcm600′: Hope it’s not triped with diff
17/09/2020, 06:13 – abb pcm 600: if transformer trip on diff. relay on through fault whats the reason.
CamScanner 09-17-2020 02.04.59.pdf
17/09/2020, 07:31 -abb pcm600: Check differential settings and harmonic blocking during energization
17/09/2020, 07:45 – abb pcm 600: ok
17/09/2020, 10:25 – abb pcm 600: can we disable external fault trip in micom p642 diff.
19/09/2020, 11:30 – abb pcm 600:
Dear house I still need support from mechanical engineers,after running the generator for 3hrs the turbine guide bearing temperature would rose from 50-62 and if the machine is not shutdown it will continue to alarm and trip point.
19/09/2020, 11:34 – abb pcm 600: Our plant has 6 generators of 96.4mw each,sundenly one of them developed high temperature issue from the turbine guide bearing. It is a hydro power plant
19/09/2020, 15:02 – abb pcm600: Increase the bearing temperature limit upto 85 degree
19/09/2020, 15:02 – abb pcm600: Set point
19/09/2020, 15:24 – abb pcm 600: Won’t that cause bearing burn out as all other generators doesn’t get up 58 degrees?
19/09/2020, 15:24 – abb pcm 600:
19/09/2020, 17:23 -abb pcm600″: What about the oil temperature in that system?
19/09/2020, 17:25 -abb pcm600″: If the oil temp is high, too the bearing temp will be high. So you need to inspect cooling systems for turbine oil.
19/09/2020, 17:32 – abb pcm 600: The oil temperature also do rise but as usual it should be lagging and that is what we are getting
19/09/2020, 17:35 -abb pcm600″: If you are using water in a cooling system, just inspect the water entry. Especially valves which allow cooling water to circulate.
19/09/2020, 17:42 – abb pcm 600: It’s self cooling, when the shaft rotates it stir up oil in between the gap between it and the bearing providing lubrication and cooling at the same time
19/09/2020, 17:48 -abb pcm600″: I know that. What I am saying is that for bearing to be at low temperature, the oil in its gap must be at low temperature too. But the oil is cooled by either air, or cold water system. So I am advising you to inspect cold water system or air system. Because this shows that the system that cools oil is not working properly.
19/09/2020, 17:59 – abb pcm 600: Ok sir,our system is an enclosed type,no water cooling system,and we checked all the breeder points but no issues.
19/09/2020, 18:00 -abb pcm600″: Ok continues to troubleshoot bro.
19/09/2020, 18:13 – abb pcm 600: Thanks so much
20/09/2020, 18:29 – abb pcm600: What’s is the use of IEC Station DIGSI 4
21/09/2020, 12:34 -abb pcm600: Could anyone pls share the Toshiba Relay documents
21/09/2020, 12:35 – abb pcm 600: which relay model
21/09/2020, 12:35 -abb pcm600: Will let u know..
21/09/2020, 12:36 -abb pcm600: How to communicate the relay.. Or wat documents available could u pls share it.. Thanks
21/09/2020, 12:36 – abb pcm 600: for which relay model
21/09/2020, 12:36 – abb pcm 600: particular model
21/09/2020, 12:36 – abb pcm 600: ?
21/09/2020, 12:37 -abb pcm600: 5 min
21/09/2020, 12:37 -abb pcm600: Will come back
21/09/2020, 12:37 – abb pcm 600: ok
21/09/2020, 12:56 – abb pcm 600: can be communicate with RSM100 SOFTWARE
21/09/2020, 13:16 -abb pcm600: 👍
21/09/2020, 21:07 – abb pcm 600: Hi guys….Any one have p543 test report format & test procedure kindly share me
22/09/2020, 01:20 – abb pcm600: Hello, how to check if fiber optic between two relays is a healthy connection
22/09/2020, 01:21 – abb pcm600: Siprotec 5
22/09/2020, 11:16 -abb pcm600: Anybody service provider near bagalkot karnataka.
Like : TL, T/f , ht Panel relay breaker, cables
22/09/2020, 18:00 – abb pcm600: How to make possible for these two devices to communicate, they are connected using optic duplex LC
22/09/2020, 18:26 -abb pcm600: anyone has 7SJ85 test procedure please?
22/09/2020, 18:43 -abb pcm 600 “: do you mean communicate as a protection interface for line diff 87L?
22/09/2020, 18:43 – abb pcm600: yes
22/09/2020, 21:54 -abb pcm600″: Check device id
23/09/2020, 11:36 – abb pcm600: Any body having ABB connectivity packages. ?
23/09/2020, 11:37 – abb pcm600: For witch device
23/09/2020, 11:37 – abb pcm600: REF615, REU615
23/09/2020, 14:51 – abb pcm600: I need help in alstom scada any one person
23/09/2020, 15:24 – abb pcm600: Any issues
23/09/2020, 15:47 – abb pcm 600″: This message was deleted
23/09/2020, 15:48 – abb pcm 600″: Use pcm600 available at ABB site. For all relion(RE) series
23/09/2020, 15:50 – abb pcm600: From ABB server(update manager) is very slow to download the connectivity packages.
23/09/2020, 15:54 – abb pcm 600″: https://search.abb.com/library/Download.aspx?DocumentID=ABB_IED_Connectivity_Package_REU615_Ver._5.1.8.msi&LanguageCode=en&DocumentPartId=&Action=Launch
23/09/2020, 15:54 – abb pcm 600″: For REU615
https://search.abb.com/library/Download.aspx?DocumentID=ABB_IED_Connectivity_Package_REF615_Ver._5.1.8.msi&LanguageCode=en&DocumentPartId=&Action=Launch
23/09/2020, 15:55 – abb pcm 600″: For REF615
23/09/2020, 15:55 – abb pcm600: Tqvm
23/09/2020, 16:08 -abb pcm 600 “:


23/09/2020, 16:09 -abb pcm 600 “: anyone, please help me to solve this
23/09/2020, 16:15 – abb pcm 600″: It’s an old package. Temporarily change your system date to 20/5/19
23/09/2020, 16:50 – abb pcm600: Can i call you
26/09/2020, 12:01 – abb pcm 600″: Can anyone tell me how to test low impedance ref
26/09/2020, 18:50 -abb pcm600: Secondary injections or stability?
26/09/2020, 21:17 – abb pcm 600″: Secondary injection
26/09/2020, 21:18 -abb pcm600: I can email you a test procedure, are you using cmc
26/09/2020, 21:18 – abb pcm 600″: Yes
26/09/2020, 21:19 – abb pcm 600″: Mail me at ar48303@gmail.com
26/09/2020, 21:46 – abb pcm 600″: This message was deleted
26/09/2020, 21:46 – abb pcm 600″: Thanks
28/09/2020, 19:19 -abb pcm600: Anybody facing this issue
28/09/2020, 19:25 -abb pcm600: Anyone having 7SD522 SAS CONFIGURED PROJECT FILE?
28/09/2020, 19:26 -abb pcm600: I am facing problem for distance signals
28/09/2020, 19:26 – abb pcm600″: Hi anyone havi short circuit calculation data
29/09/2020, 09:08 – abb pcm 600″: Configure in extended system interface
29/09/2020, 09:08 – abb pcm 600″: You will get the signals which you require
29/09/2020, 10:45 -abb pcm600: If you have sas configured project file.share with me to my email sampathgreen@gmail.com
01/10/2020, 07:27 – abb pcm600: Need to apply 1500V DC voltage for testing.
Have anyone came through 1500V DC voltage injector kit.
01/10/2020, 16:34 – abb pcm 600″: In 220kV scheme with two main and one transfer bus does the logic inputs of TBC and Bus coupler are fed to that bay relay or not
01/10/2020, 16:34 – abb pcm 600″: Or using Goose it is done can anyone tell me
01/10/2020, 16:42 – abb pcm 600″: This message was deleted
01/10/2020, 16:42 – abb pcm 600″: Does anybody have GE relay engineer no.
01/10/2020, 19:44 – abb pcm600: If I am understanding correctly , I would say yes you would get that signals wired to your bay relay as inputs then if needed send it via GOOSE to any other relay that needs it for its logic.
01/10/2020, 21:03 – abb pcm600′: Only during maintenance you shift to tranfer bus through 89T…so bus bar protection should not Operate for tranfer bus…For bay units only bus isolators status ( 89A&89B) should be given. It should operate for Bus-A and Bus-B fault
03/10/2020, 14:09 – abb pcm 600 “:
04 MiCOM P442 Line Distance – Emad Wagih.pdf
03/10/2020, 16:11 – abb pcm 600: Like notes any available for other differential & busbar relays
03/10/2020, 16:21 – abb pcm 600″: 🙏🏻🙏🏻🙏🏻🙏🏻
03/10/2020, 17:54 -abb pcm600: Shukran Ya Handsa
04/10/2020, 08:26 -abb pcm600: Very very useful thanks
04/10/2020, 11:57 – abb pcm 600″: For directional earthfault relay uses positive sequetor negative or zero
04/10/2020, 11:57 – abb pcm 600″: sequence 04/10/2020, 11:58 – abb pcm600: Generally we negative and zero sequence not positive sequence 04/10/2020, 11:58 – abb pcm 600″: Oo 04/10/2020, 11:58 – abb pcm 600″: Ok 04/10/2020, 12:00 – abb pcm 600″: 04/10/2020, 12:00 – abb pcm 600″: Relay is showing neagative power instead of positive 04/10/2020, 12:07 – abb pcm600: In this case current is lagging voltage 04/10/2020, 12:08 – abb pcm 600″: How, it is leading 04/10/2020, 12:08 – abb pcm 600″: As PF is negative 04/10/2020, 12:08 – abb pcm 600″: In capacitive load current leads voltage 04/10/2020, 12:09 – abb pcm 600″: In inductive load cuurent lags voltage 04/10/2020, 12:09 – abb pcm 600″: Current
04/10/2020, 12:09 – abb pcm 600″: Our is inductive load
04/10/2020, 12:43 – abb pcm600: I guess real power is flowing in reverse direction.
04/10/2020, 12:49 -abb pcm600: You have to reverse the CT staring
04/10/2020, 14:09 -abb pcm600: U have to change the pq direction in Siemens bcu
04/10/2020, 19:08 -abb pcm600: Agree 👍🏻
04/10/2020, 23:47 – abb pcm 600 “:
02 P543 Line Differential – Emad Wagih.pdf
06/10/2020, 03:56 – abb pcm 600 “:
09 P442 Directional Earth Fault – Emad Wagih.pdf
06/10/2020, 04:12 – abb pcm 600 “:
OCR-153-r0.doc

Whatsapp +989129613659


06/10/2020, 07:13 -abb pcm600: -20201006-WA0001 (file attached)
06/10/2020, 15:05 – abb pcm600: Great work and content it will be beneficial for entry level engineers like me
06/10/2020, 15:07 – abb pcm600: Great fantastic work
06/10/2020, 15:08 – abb pcm600: If you have calculations for differential relay for transformer 132/33 , 132/33/11 Kv, can provide us with my regard
07/10/2020, 13:37 – abb pcm 600 “:
09 P442 Directional Earth Fault – Emad Wagih.pdf
07/10/2020, 13:40 – abb pcm 600 “:
08 ABB RED 670 Line Differential – Emad Wagih.pdf
07/10/2020, 13:42 – abb pcm600″: Directional over current (67)please
07/10/2020, 14:59 – abb pcm600: Eppadi irukkae
07/10/2020, 16:29 – abb pcm600: Possible to upload as pdf
07/10/2020, 16:51 – abb pcm 600 “: H
07/10/2020, 16:51 – abb pcm 600 “:


OCR-153-r0.pdf
07/10/2020, 17:20 – abb pcm600: There are interference between drawing possible to amended and reupload
08/10/2020, 01:01 – abb pcm 600 “: I’ll try to convert it from my pc
08/10/2020, 01:02 – abb pcm 600″:
08/10/2020, 01:02 – abb pcm 600″: Relay is not time synced
10/10/2020, 09:13 -abb pcm600: What is SPS scheme used in Power station?
13/10/2020, 09:55 – abb pcm 600: plz. share me z graph micom software.
13/10/2020, 16:32 – abb pcm 600: in micom p442 relay how R1,R2,R3,R4 PP and PG CALCULATE
13/10/2020, 18:16 – abb pcm 600″: How-to measure resistivity of water
13/10/2020, 18:16 -abb pcm600 “:
Flash Report__Mumbai_Blckout_12_10_2020.pdf
14/10/2020, 08:26 – abb pcm 600″: Trafo is getting tripped at night in trafodifferntial
14/10/2020, 08:26 – abb pcm 600″: Even though there is no current in night why it is tripping on differential
14/10/2020, 09:17 – abb pcm 600″:
Can anybody tell me how to read this
14/10/2020, 10:57 -abb pcm600: Can you send complete DR for diff fault to my email sampathgreen@gmail.com
14/10/2020, 16:09 – abb pcm 600″: I am testing a mfm em6400
14/10/2020, 16:09 – abb pcm 600″: I want to change power factor
14/10/2020, 16:09 – abb pcm 600″: From lag to lead
14/10/2020, 16:09 – abb pcm 600″: Using single phase is it possible
14/10/2020, 16:15 – abb pcm 600″: Only positive and negative is changing in inductive
14/10/2020, 17:41 – abb pcm 600: anybody tell me how set the R1,R2,R3 and R4 P-P and P-G in micom p442 its very urgent
14/10/2020, 17:42 -abb pcm600: Which relay ?

Can you send fault data ? And DR
14/10/2020, 23:16 -abb pcm600″: Helow guys, who can help me how to measure the earth resistance using ground clamp meter.
15/10/2020, 16:06 -abb pcm600: Anybody have
Abb vd4 (vcb medium voltage) technical manual
Required Trip,close coil, etc details
16/10/2020, 21:41 – Fatima: Protection Relay Discussion Group in Telegram

https://t.me/joinchat/Cmyg2FiXX-qlTYqyXQ_pjg
16/10/2020, 21:52 -abb pcm600: Friends I have a doubt tat, what is phase over current, and over current in relays
17/10/2020, 17:15 – abb pcm 600″: Can anyone tell me what is Sf in earthing calculation
17/10/2020, 18:31 – abb pcm600: As I referred, it is the diversion factor for which fault is being distributed across the ground network through transmission line ground wires.
17/10/2020, 18:31 – abb pcm600: please share, your understanding from your reference.
17/10/2020, 19:15 – abb pcm 600″: Ratio of Ig/ 3Io
17/10/2020, 20:03 – abb pcm600: Not by an equation, pls explain in practical understanding.
17/10/2020, 20:03 – abb pcm600: Anyone pls
17/10/2020, 20:27 – abb pcm 600″: I am also not able to understand this formula
19/10/2020, 17:21 – abb pcm 600″: MTA is -15deg, rca is +- 90
19/10/2020, 17:21 – abb pcm 600″: Then angle will be 60-0-240
19/10/2020, 17:22 – abb pcm 600″: For earthfault
19/10/2020, 17:23 -abb pcm600: 75 0 255
19/10/2020, 17:29 – abb pcm 600″: Ok
20/10/2020, 14:11 – abb pcm 600:
20/10/2020, 14:11 – abb pcm 600: anyone having a manual for this relay
20/10/2020, 14:11 – abb pcm 600: plz. share
20/10/2020, 14:15 – abb pcm600:
ConAegis Reference Manual.pdf
20/10/2020, 14:15 – abb pcm600:
options.xml
20/10/2020, 14:16 – abb pcm 600: also share communication software
20/10/2020, 14:19 – abb pcm600:
ConAegis_v4.8.0.exe
20/10/2020, 14:19 – abb pcm 600: thanks
20/10/2020, 20:57 – abb pcm 600: have anyone use kocos artes kit for test distance protection relay
21/10/2020, 18:36 -abb pcm600:
How much the knee point voltage of nct
21/10/2020, 18:51 – abb pcm600: Vkp = K * If/CTR * (RCT + RL + RR)
21/10/2020, 18:51 – abb pcm600: Vkp is the knee point voltage
21/10/2020, 18:51 – abb pcm600: K constant taken as 2
21/10/2020, 18:52 – abb pcm600: If – max. Fault current
21/10/2020, 18:52 -abb pcm600:
21/10/2020, 18:52 – abb pcm600: CTR is the CT ratio
21/10/2020, 18:53 – abb pcm600: Rct CT winding resistance
21/10/2020, 18:53 – abb pcm600: RL loop lead resistance in ohms
21/10/2020, 18:53 -abb pcm600: Thank you
21/10/2020, 18:53 – abb pcm600: RR relay burden
21/10/2020, 18:55 – abb pcm600: Or do knee point voltage test
21/10/2020, 18:55 -abb pcm600: What mean by 40Rct+400v in ct details
21/10/2020, 19:10 – abb pcm600:
21/10/2020, 19:34 – abb pcm600: <=40 ohm winding resistance 400v knee point voltage < 30mA at 100 volt while knee point test 21/10/2020, 19:35 – abb pcm600:
21/10/2020, 19:35 – abb pcm600:
21/10/2020, 20:22 – abb pcm 600 “:
2_5222447363104180662.pdf
22/10/2020, 09:46 – abb pcm 600: any contact no. of CGI RELAY
22/10/2020, 12:01 – abb pcm 600:
Greetings house,up till now our problem of guide bearing temperature rise has not been resolved. This sketch is my observation when the generator is operation but I’m not a mechanical engineer.
22/10/2020, 12:02 – abb pcm 600: Other generators doesn’t behave this way
22/10/2020, 20:07 – abb pcm600: How to test under Impedence
22/10/2020, 20:09 – abb pcm600: Setting is 0.02 P. U
22/10/2020, 20:32 – abb pcm600: Relay is REM545
26/10/2020, 13:56 – abb pcm 600: how to test micom p442 distance protection relay as well as setting.
27/10/2020, 18:31 – abb pcm 600″:
In transfer bus how the sequence of operation will be performed
28/10/2020, 08:47 – abb pcm 600: what is cause of tripping of incomer due to outgoing feeder trip on high set earth fault.
28/10/2020, 19:22 – abb pcm600: How to test pole slip
28/10/2020, 19:24 – abb pcm600: If anybody has some written material please share
30/10/2020, 18:19 – abb pcm600: Hallo everyone, Does someone have a standard calculation how many percent Current fault setting from Current nominal?, for Normaly invers and definite Time
30/10/2020, 18:30 – abb pcm600: For overcurrent protection
01/11/2020, 11:09 – abb pcm600: On Which side CT low forward power protection and reverse power Protection is generally there
01/11/2020, 11:10 – abb pcm600: Neutral side CT or Phase side CT
01/11/2020, 12:25 – abb pcm600:
01/11/2020, 12:25 – abb pcm600: What’s the meaning four step in this protection
01/11/2020, 17:02 -abb pcm600 “: Four steps means four different stages
01/11/2020, 17:02 -abb pcm600 “: 4 different level of NPS you can configure
05/11/2020, 17:04 – abb pcm 600″: Which version of digsi is compatible for window 8 ???
11/11/2020, 09:01 – abb pcm600: One problem we are facing that with stator earth intertern trip is also coming
Wiring checked what may be other problem
12/11/2020, 16:49 – abb pcm600: URGENT Requirement of Commissioning Engineers PLCC/SAS/Protection. – PAN India
Kindly share this information with yours friends and relatives it would help us in receiving the most relevant candidates for Job.
12/11/2020, 17:03 – abb pcm600:
12/11/2020, 17:03 – abb pcm600: Hi, can anyone help
12/11/2020, 17:04 – abb pcm600: I cant change the comm mode to RSTP
Updated the firmware to P14231QB….B60L.
12/11/2020, 18:02 – abb pcm600: Can anyone help please?
13/11/2020, 10:11 – abb pcm600:
13/11/2020, 10:11 – abb pcm600: How enter in setting mide
13/11/2020, 10:12 – abb pcm600: Setting mode
13/11/2020, 10:25 – abb pcm600: Anybody please help
13/11/2020, 10:25 – abb pcm600: I am in trouble
13/11/2020, 10:39 -abb pcm600: What do you want to do in settings?
13/11/2020, 10:44 – abb pcm600: To view setting only
13/11/2020, 10:44 – abb pcm600: And to check measurements
13/11/2020, 10:44 -abb pcm600: Press down arrow
13/11/2020, 10:44 -abb pcm600: System data will come
13/11/2020, 10:44 -abb pcm600: Then press right now
13/11/2020, 10:45 -abb pcm600: You will find measurements, configuration, settings
13/11/2020, 10:46 – abb pcm600: I found these now
13/11/2020, 10:46 – abb pcm600: But I am not able to enter to any option
13/11/2020, 10:47 -abb pcm600: If you founds measurements, you have to press down arrow
13/11/2020, 10:48 – abb pcm600: Yea i am pressing but nothing is happening
13/11/2020, 10:49 – abb pcm600:
13/11/2020, 10:51 -abb pcm600: You have to reset the trip and alarm,then you try
13/11/2020, 10:51 – abb pcm600: How to do this sir
13/11/2020, 10:52 -abb pcm600: Press the book 📖 symbol
13/11/2020, 10:52 -abb pcm600: It will show all Alarms,then press c
13/11/2020, 10:53 – abb pcm600: I am pressing book key but nothing is happening
13/11/2020, 10:54 – abb pcm600: How come out of this menu
13/11/2020, 10:55 -abb pcm600: Press c
13/11/2020, 10:58 – abb pcm600: Nothing is happening by pressing c key also

Whatsapp +989129613659


13/11/2020, 10:58 – abb pcm600″: Can u send the photo
13/11/2020, 10:59 – abb pcm600:
13/11/2020, 11:00 -abb pcm600: Troubleshooting or testing?
13/11/2020, 11:01 – abb pcm600: Testing
13/11/2020, 11:01 – abb pcm600″: While pressing c any password is asking?
13/11/2020, 11:01 – abb pcm600: Nothing
13/11/2020, 11:03 – abb pcm600″: Once u can restart nd do the same
13/11/2020, 11:04 – abb pcm600: Sir how to restart
13/11/2020, 11:05 -abb pcm600: You have to switch off the relay,wait for some time then switch on.
13/11/2020, 12:24 – abb pcm600: Ok
13/11/2020, 12:25 – abb pcm600: But working
13/11/2020, 12:25 – abb pcm600: Not working
13/11/2020, 20:48 – abb pcm600:
13/11/2020, 20:48 – abb pcm600: What’s the meaning of I/I in the setting
13/11/2020, 20:49 – abb pcm600:
13/11/2020, 20:49 – abb pcm600: What’s the meaning I/In in this
13/11/2020, 21:11 – abb pcm600: Any body please suggest
06/12/2020, 10:00 – abb pcm600: https://youtu.be/7Dq88HMoub4
07/12/2020, 13:14 -abb pcm600″: Freelance relay engineer wanted. RET670 relay testing, configuration and retro fitting in Chennai.
If anyone interested let me know.
8/12/2020, 21:19 – abb pcm 600″: How compensation factor is used in distance relay
07/12/2020, 21:19 – abb pcm 600″: Can anyone tell me this
08/12/2020, 12:01 – abb pcm 600″: When I change the star point then does protection operate or not
08/12/2020, 12:01 – abb pcm 600″: In case of non directional overcurrent
08/12/2020, 12:03 – abb pcm 600″: Relay is showing power in neagtive
08/12/2020, 12:03 – abb pcm 600″: So I want to change the polarity
08/12/2020, 12:59 -abb pcm600: It will operate
08/12/2020, 13:00 – abb pcm 600″: In directional it will not
08/12/2020, 13:02 -abb pcm600: Depending each direction (reverser or forward ) starpoint to consider
08/12/2020, 13:16 – abb pcm 600″: I have set as forward
08/12/2020, 13:17 – abb pcm 600″: This message was deleted
08/12/2020, 13:17 – abb pcm 600″: P1 is bus side and P2 is line side
08/12/2020, 13:19 – abb pcm 600″: With S1 as star point
08/12/2020, 13:37 -abb pcm600:
08/12/2020, 13:38 – abb pcm 600″: Ok
08/12/2020, 14:03 – abb pcm 600″: When I am shorting the TB for changing the meter the current is still not zero
08/12/2020, 14:03 – abb pcm 600″: It is showing as 5A
08/12/2020, 14:03 – abb pcm 600″: Actual load current is 64A
08/12/2020, 14:03 – abb pcm 600″: After shorting it is showing as 5A not 0
09/12/2020, 14:09 -abb pcm600: Please Share 7UM6211 Test Report
12/12/2020, 16:57 – abb pcm600: Anybody if has CTNM31 Manual please share
14/12/2020, 18:35 – abb pcm 600″:
14/12/2020, 18:35 – abb pcm 600″: Is this a balanced phase
14/12/2020, 18:35 – abb pcm 600″: Or Y and B interchanged
14/12/2020, 18:37 -abb pcm600: Yes the rotation is clock wise
14/12/2020, 18:37 – abb pcm 600″: According to me it is ACB phase sequence
14/12/2020, 18:37 – abb pcm 600″: Ok
14/12/2020, 18:38 – abb pcm 600″: So Y and B needs to be interchanged
15/12/2020, 16:25 -abb pcm600 “: Gents
Am asking if anyone in here knows how to run two generators in parallel and kindly assist with the schematic diagram
15/12/2020, 16:26 -abb pcm600 “: I have two generators

To join our protection relay WhatsApp group, please send interest on Whatsapp +989129613659

Hello, thank you for visiting our site
you can share your problems with electrical engineers and help out each other. You can also benefit from our free files and see our training packages at the link below.

https://elec-engg.com/category/training-course/

Join 20 WhatsApp groups for protection engineers

20 WhatsApp Groups for protection engineers

  • WhatsApp Grp 01: Protection Relay – General
  • WhatsApp Grp 02: Substation Automation – General
  • WhatsApp Grp 03: Transmission line protection
  • WhatsApp Grp 04: Transformer protection
  • WhatsApp Grp 05: Motor protection
  • WhatsApp Grp 06: Generator protection
  • WhatsApp Grp 07: Overcurrent and Earth Fault Protection
  • WhatsApp Grp 08: Busbar protection and Bay controller
  • WhatsApp Grp 09: Breaker protection and control
  • WhatsApp Grp 10: Protection Relay Testing and commissioning
  • WhatsApp Grp 11: DIgSILENT
  • WhatsApp Grp 12: ETAP
  • WhatsApp Grp 13: PSCAD
  • WhatsApp Grp 14: IEC 61850 configuration
  • WhatsApp Grp 15: Switchgear GIS & AIS
  • WhatsApp Grp 16: GE Relay Configuration
  • WhatsApp Grp 17: SIEMENS Relay configuration
  • WhatsApp Grp 18: Schnider Relay configuration
  • WhatsApp Grp 19: SEL Relay Configuration
  • WhatsApp Grp 20: ABB Relion configuration or more services, send a message to our WhatsApp support number: +989129613659

Sample discussion:

– I want to know what is the main Reasons for Transformer Bushing Failures.
– Can u share the image?
– Sir Actually Site Pic Regarding any Problem does not allow to Share as per Site Policy.
So I can’t share it.
– Good afternoon, would anyone know what the default password for ZIV protection relays?
– Try with Ziv or zivercom
– Username; zivercom Password; Ziv
– It worked
– Anyone has substation cad or Revit

– am facing Digsi 4.91 installations problem in windows8.1
– It shows that Digsi 4.91 can’t install in windows 8.1
-Please check system requirements for software installation.
– Check, in manual.
If anyone interested in ETAP discussion Whatsapp group, send ETAP to me on Whatsapp: +989129613659 🙏😊

– Which power analyzer is best for Harmonic measurement? I need to measure Harmonics order’s magnitudes and phase angle
– Fluke 1735
– Fluke 434

Which power companies are using whole IEC61850 (Sample Value, GOOSE, and MMS) in their substations? or they just adept GOOSE and MMS only. The CT and PT are still conventional types?

– How to check this relay?
– the setting is 20%

Inject the current above that value and check the trip time. Pick up and all.
– How to test locked rotor in Easergy p3 g32 relay
– How do know the TMS and type of curve of this overcurrent relay? how to Calculate the time of tripping?
– 3-sec normal inverse curve
– TMS 0.2
– Would you please explain?
– How do you get it?
-100% IDMT settings. 800% instantaneous setting
– Check there I don’t know what to call them, those toggle switch which side they are selected just sum it, And multiply by the factors mentioned and you will get the setting.
– For the left side instant setting
200 + (2+1) 200 = 800 % For TMS 0.12= 0.2

-The upper two are for different purposes
– Different tables are mentioned over there Just check the S 1 -8 no. And then see the upper two toggle positions.
– I hope it is clear to you.

– We have two transformers (66/11.5 kV, 50/55 MVA, 600A NGR earthed on the 11.5kV side). There is two incomer-one bus coupler scheme at 11kV bus.
– Due to some constraints, we are not able to get a 66 kV supply from the grid. However, 11kV direct supply is offered by the grid for no-load charging at 11kV bus from identical transformer on-grid side.
– Please revert with technical constraints related to the subject.
– Hi everyone, l hope you are well, and safe; could you share ” relay coordination and setting for substation 230/400kv(excel sheet+ explanation) thanks in advanced

– We are facing one issue in one of the plants that we have laid 3Core 400 Sq.mm 22KV XLPE cable to provide power supply to one of the small production units. The cable length is approximately 2500Mtrs and the state electricity board has implemented KVAH billing now. So the problem is even though there are zero loads at receiving end source end meter shows 40KVAH apparent power and 40KVAR reactive power. Is it because of cable capacitance? If yes what is the solution to avoid the same?

– As KVAH billing is implemented it is directly impacting on cost very heavily.

– Can experts give your valuable inputs on this.
– Since it is a cable then it will be generating ” VAR”.. hence it not possible 40 kVAH & 40 kVAR
– there is a chance of cable charging current. Once check with the leakage meter in the secondary side of metering MFM, check how much leakage current is showing. And also ensure whether c.t wiring is connected properly or not it means the metering core of c.t is to be connected to meter only and also protection core of c.t is always connected to be relaid. I think the only possibility is to charge current.
– We have checked the wiring and it doesn’t have any issue. Also, we have removed the cable earthing at one end which was connected to both ends earlier. But still, the problem persists.
– Check cable insulation
– Pls share the SLD with CT location.. and also cable parameters.
– Is it a cable feeder or it is connected thru a transformer at your end and of course power provider end power factor to be confirmed
– I think it is OK, cable 2.5km long, 40kVAR is 1 amp at 22kV. Who can explain why it is wrong?
– Hi team, I want to know which electrical software is better to learn to come into the design side?
– If anyone from the design side or if anyone knows better share the knowledge so it will be helpful to someone who doesn’t know.

Electrical engineers can find us on WhatsApp, Likundon, Instagram, site, and email.
To follow
easily talk to engineers around the world. Electrical engineer Dr. Saeed Roostaee with his online training on using and working with relays will help you in working with relays at the shortest possible time and at a reasonable price.
Follow us on
Whatsapp +989129613659

Telegram
t.me/elec_engg

Instagram
instagram.com/elec_engg

Website
Elec-Engg.com
ProtectionRelay.com

Email
info@elec-engg.com

To join our protection relay WhatsApp group, please send interest on Whatsapp: +989129613659

-How to simulate protection function using a virtual injection in Vamp255
– How to assign the DR in Micom Esergy Studio soft

You can also benefit from our free files and see our training packages at the link below.
https://elec-engg.com/category/training-course/

– Can anybody pls provide R, X/Z values of 132kv & 220kv lines with Panther, Zebra ACSR conductors. Rgds
– To be used for distance relay settings
– Anyone can suggest pole slipping protection calculation for 4.9 MW TG. There is a total of 3 incomers on the 11 kv switchboard. 2 from grid trafo and 1 from TG. In the normal operating scenarios, all 3 incomers are synchronized and BC is closed. I have doubts regarding the considering impedance of the transformer.

-Even when differential is less than restraining current Relay operated on minimum operating current.

– Maybe it tripped on cross-phase tripping like detection in one phase trips the other two.
– Because differential always has three-phase tripping.
-Is there any formulae for calculating? I didn’t found any cross-phase calculation in the relay manual
– No sir, the formula is not there, in siemens relay, the function is there. Cross tripping function which we can enable or disable.
– Which relay is this?
– P632
– I don’t think it’s there in this relay
– But it is the case usually, protection operation in one phase, operates the three-phase protection.
-Does anyone have a catalog or technical manual of power panel/receptacle panels/ lighting panels?
– RET? And REM

– Can anyone explain the purpose of cable sheath tests
– It can make sure the cable sheath functionality like a uniform, induced voltage, and one end grounding, etc.
– I mean that are power cables. I am not sure that your meaning is a control or power cable.
– Yes for power cables
– I’m glad to inform you that I finalized my one-year apprenticeship as a relay testing engineer trainee in KSEB Pvt Ltd in India. Now I’m looking forward to entering a new opportunity in the same field. I will be grateful if you inform any suggestions or vacancies related to the same for improving my skill and career. Don’t hesitate to contact me if you have any concerns.
– Guys wanted to know regarding the excitation current of ct.. what will happen if the excitation current is more than the given nameplate data.. for ex: knee voltage >= 500 and knee current <= 25mA in nameplate for px class. But during testing, if knee voltage is more around 800V and knees current 32mA. so what will be the effect on protection in this case?

– I need to change the IP address through the screen of relay 7SJ80 but not accepted relay so how will change only by screen
MAIN MENU > Settings > Setup/Extras > IP-Config > PC port > IP-Address

– Can any Share 220 kV GIS building layout??
– Does anyone has a test report of the p111 relay.
– What is the reason for this?
– I think installation problem once reinstall the software PCM600
– Thank you will come back to you tomorrow
– Can we check coordination between generator 51V and outgoing Transformer feeder 51?
– Yes for phase faults

If anyone interested in IEC61850 discussion Whatsapp group, send ETAP to me on Whatsapp: +989129613659 🙏😊

Hello, thank you for visiting our site
By joining our WhatsApp and Telegram groups, talk to the world’s electrical engineers and solve your problems about electricity. You can also benefit from our free files and see our training packages at the link below.
https://elec-engg.com/category/training-course/

– Why this ramping button is inactive
– Because of size value is zero.
– Ramp it by 0.01A or 0.001A whatever your requirement is.
– Got it to thank you
– Can someone explain the Total Owning cost of the Transformer?
– If you have Can send ABB Ekip training slides?

– Can anyone tell me how to rectify this issue installation problem?
– Need to know one info Freja 300 relay testing kit
– Is it a very good kit or Omicron kit is good lne For CT? 1st core use for main protection 2nd core use for backup protection. 3rd core use for metering purpose Then what is the purpose of the 4th core?
– There may be 6 cores too, for different purposes, like main1, main2 , bus bar1, busbar2, metering, spare.
Depends upon the requirement and scheme of the system.
– Yes It’s True.

– Could you please help me with how to configure in ABB RED670 front panel push bottom configuration to activate one binary output?
– Pcm 600??
-Yes
– please share the screenshots I am waiting
– Go to HW configuration?
– 7sd610 is not communicating to pc when I tried thru the device to DIGSI plug and play
– How to clear this error?
– Do power recycling
– And check supervision relay elements after that upload Pspx file again

– Anyone has an idea how to connect SEL351A with SEL651R?
– How to block power sing in a distance relay? Simply, disable power swing in settings
– Blocking & disable are two different thing
– Which relay you have sir
– SEL

– One HV motor has two feeders for redundancy. we want seamless changeover from one feeder to another in case of mechanical failure. Is it possible for a higher rating HV motor? How?

To receive Dr. Saeed Roostaee’s training packages, send a message to the following number : +989129613659

– What kind of problem and how do you expect mechanical problems in the feeder when it is running
– Basically, the client wants to prevent an outage of power by this. Is it possible in the HV system?
– Online
– Don’t Think mechanical failure expected
– Nice to meet you too, I am Peter
For RTU needs 4 cards: 1. digital input, 2. digital output, 3.analog input 4.analog output
– Bay control unit for SAS system
– Can we say it is like PLC, But with higher availability, redundancy, robust voltage, and disturbance handling, With different comm protocols and Network redundancy.
– Yes
– does it follow any standards like PLC has IEC61131?
– IEC 601850 – 101 & 104
– This is for communication and data sharing. What about logic programming?
– WHAT IS WORK OF FOTE PANEL?
– IEC 601850
– What should be done if VCB doesn’t pass contact resistance criteria? VCB should be used or not?
– What should be done if VCB doesn’t pass closing time criteria?
VCB should be used or not?
– Fiber optic terminal equipment. This is for line communication like PLCC
– No. must repair/service before put into the system
– Yes digital power line carrier
– What about hipot test?
– hipot is passed, cb is old.
– If both contact resistance and timing test fail then it is recommended to go for replacement even hipot passed.
– Finally, check if any mechanical problem can be rectified.
– Is this a vacuum contactor or vacuum circuit breaker?
– Also, compare all 3 phases of contact resistance and timing. And all these tests can be compared with the last test results, FAT.
-How old is this?
– What manual says about a lifetime? With this, you can decide whether it is premature failure due to quality or any inbuilt issues, or lack of maintenance
– What is the distance between ZONE 1, ZONE 2, ZONE 3?
– In distance protection or busbar protection?
– Distance protection
-What is the means of this relay?
– Carrier aided trip or communication aided trip, As per RK commission, Z1 is 80 percent of PL, Z2 is 150 percent of PL and Z3 is 120 percent of PL and Longest line.
– On which mode u have set the line…DTT, DUTT, PUTT, or POTT
– It means that this relay is tripped based on the signal received from the far end relay.

– “How to configure RCBs and Data sets in ABB RED670 relays by referring existing CID files?”.
– If any kind of procedure/guidelines, please share them with me

– You must be able to upload the CID file into the IEC61850 tool and it’ll help you to configure the IED
14/10/2020, 08:43 – AA 3696 Ss Add Kumaravel Muthu: Hi Yorkshire, Thanks for your info. Still, I am not clear. Can you elaborate on it?
– Use PCM600 configuration tool from abb to upload CID file into IED. Download and install PCM600 from the ABB website
– I have PCM600 V2.8 software
– I have an existing PCMP project file that doesn’t have datasets and RCBs. But I have commissioned the CID file back up. Now I want to create new data set and RCBs in the PCMP Project file with help of commissioned CID file. Pls, note I am doing it for V1.1 relays. So pls check and advise me
– Do we need to go for a higher CT ratio If CT secondary is not suitable for peak fault?
Please share your opinion
– Yes.. Greater Knee point voltage CT to be chosen
– you can connect two secondaries of the same CT in series. You can use a secondary reserve, both secondaries must be equals (ratio, class….)

– This connection is similar to install a higher knee point CT
– I have 1s1-1s2 and 2s1-2s2.
– How to connect both ct sec in series? Moreover these 2 secondary connections 2 different relays. In such a case how it should be connected
– Can anyone have a Matlab Simulink model for microgrid protection
– Siemens 7sj66,
– I am facing a problem that after under-voltage takes place, the breaker is tripped, and after reset and normalization of voltage, I can’t able to ON the breaker. So after turn off /on the breaker control supply then I can able to turn on the breaker.

Electrical engineers can find us on WhatsApp, Likundon, Instagram, site, and email.
To follow
And use our WhatsApp groups and easily talk to engineers around the world.
plz text on Whatsapp: +989129613659

Telegram:
t.me/elec_engg

Instagram
instagram.com/elec_engg

Websites:
Elec-Engg.com
ProtectionRelay.com

Email:
info@elec-engg.com

– How to make the Rio file for the ABB (rel670) relay be tested in the distance feature of the omicron 3-ph testing kit?
– Open parameters settings, go to file, export, save as Rio
– Option is export parameters in xrio format?
-Export in xrio
– Load PTL file of RED670 in omicron software, Then import this xrio file But when that was imported in ptl file, only z1 p-e is coming
– Check graphs of all enabled zones are showing or not
– Graphs are showing but when a fault is given, no response
– Relay is sensing fault or not?
– Mean operating or not?
– Not sensing fault
– Not operating
– I think the problem in ptl file, is it different for different version relays?
– Download the latest file from the PTL library
– Will it works in the distance module or in the advanced distance?
– Advance
– But what is the way to test with the distance module as I have only one distance module in my kit
– Anybody having ptl file for P545? If have means please send.
– It can be download from the OMICRON website
– Third-party can download?
– Yes .you have to sign up and register
– Ok let me check
– Can anyone tell what is the issue?
– Anybody from ABB LV?
– Can you send EKIP Connect the latest software manual? Or training slides
– Can anyone help me to find out transformer vector group Dy11d0d(-15)d(+15)

– Anyone has procedure test sheets for test commissioning protection relays
– Any opening for the oil and gas sector?
– Anybody has FCMA soft starting settings

– This is DC supervision relay, often this relay getting problem, In my out of 11, 4 were not working. Although Input DC was correct.
– Please teel why it is getting problm?
– How we have to troubleshoot my site?
– There is some short between two terminals… is that done( I think it I some status)
– Terminal for 220 and 110v dc are different.
– I think you would have connected 220 v dc to 110vvdc terminal
– I have checked 110 VDC from dcdb panel
– Check the relay on Which terminal has connected the supply?

– How to see ethernet NTP IP address in 7sa522 relays?
– Does anybody know the basic working difference of REF in autotransformer besides from REF in conventional transformer?
– Binary input/output card.

– How the mccb is protecting against cable heating issues due to undersize?
– Can anyone tell me how many NO & NC contacts are available for this model number? Alstom UV relay.
– Got it guy’s after seeing the sticker on the box. Thank you

– We lost the password for this how we can reset to default value please help Masibus 2330
– In the substation present, the DC source is 110 v, and the circuit breaker set at 220 v will the breaker operate or not.
Kindly help me.
– some substations have two supply 110v & 220v
– there is only one source 110v
The C.B isn’t working.
– Till now we have not charged the bay
– It’s under construction
– DO YOU TRY TO TEST BY 220V?
– 220v source is not available
– Could you replace the coil?
– manufacturers make different types of coils. For example, 48, 110, 125 and 220V
– Reactive power calculated formula?

– PSS FULL NAME?
– Power System Stabilizer

Electrical engineers can find us on WhatsApp, Likundon, Instagram, site, and email.
To follow
And use our WhatsApp groups and easily talk to engineers around the world.
plz text on Whatsapp:
+989129613659
Electrical engineer Dr. Saeed Roostaee with his online training on using and working with relays will help you to work with relays in the shortest possible time and at a reasonable price.
Follow us on

Whatsapp: +989129613659

Telegram:
t.me/elec_engg

Instagram:
instagram.com/elec_engg

Websites:
Elec-Engg.com
ProtectionRelay.com

Email:
info@elec-engg.com

– Anybody having an overflux curve of 500 MVA ICT of BHEL make?
– How to find excitation voltage in a brushless synchronous motor?
– please let me know if somebody has the loss figures for 100 MVA transformer 132/33kV. How to remove this error?
-What is the purpose of these dual delta primary windings in VFD configuration?
– Harmonic mitigation if phase shifting at secondary
– Ok. But why dual delta. Harmonic mitigation is possible with a single delta also
– Anybody has a download link for SEL ACSELERATOR QuickSet SEL-5030 Software, please?
– Can download it from the SEL website it’s free
– I have applied for an account, but it has not yet been authorized

– What is the password to change the settings
– 0002
– How to calculate the line losses in an ac transmission line? And how to disable directional overcurrent and earth fault settings at this relay
– Please share the DR standardization process of SIEMENS 7SA522 along with CFC.
– Anyone having REL 650 base connectivity package?

– 1I need the ERL LPRO4500 relay setting calculation sheet, if anyone has, pls send it.
– How to calculate REF fault current for transformer
-I injected the same current in all phases but it tripped in earth fault
-Why this happens I checked the wiring it’s fine
– You check the star point of internal CT
– Injected directly at relay backside
– Check the phase angles
-It must be 0, 240 and 120
– Apply three current with the same magnitude and zero phase angle and check N current
– For earth, fault inject individual phase with phase angle 0 degrees. Phase angle is ok
– Which relay is this..?? Line protection..??
– simple over Current and earth fault only
– Can u share a pic of the relay showing phase angles while injecting a 3phase balanced current?
– Relay CT terminal neutral loop wrong
– Got corrected it was a mistake in setting
– How to calculate CT size for motor hp please suggest me
– Sizing of CT should include 120% of FLA and peak fault saturation and sub transient for dynamic half cycle

-Anyone having IEC-61970 standard, please share.
-Anyone in the group has an idea about microgrid relaying protection?
– Do anyone knows about Schnider ltmr relay custom logic preparation?
-No you can’t connect. Because the Current will flow on a low resistance path only. If you used 0-500 tap for R1. The same core you can’t connect R2.
– You can connect two relays in serious on a single adequate tap and configure accordingly. But don’t connect two relays in parallel, as boopathi said, the current will flow on a low resistance path. If it’s a high impedance differential protection, then don’t share the CT.
– And relay may malfunction due to the current magnitude flow into 2 different relays and the direction of the current subject type of protection.
– Can’t we use the same tap for overcurrent and then in series for high impedance REF? Not on different taps but on different cores
-In the REF phase and Neutral CTs are connected in such a way that current is nullified. So it is not possible to use over current with REF.
– In a High impedance circuit, stabilizing resistor and metrosil will be part of the ct circuit, so it’s not advisable to combine both in the same ct core
– Actually, we have commissioned many projects like this. The only thing we extended inputs to overcurrent element first then conjugated with neutral ct adding metrosil and stabilization resistance and fed to REF element.
– Technically we don’t find any issue. Maybe you have any practical experience, please share for taking care. Phase ct and neutral ct should be paralleled in such a way that the current is nullified during normal conditions. Further, how the OC relay will get the correct measurement with a high impedance circuit? Please check your secondary circuits
-High impedance coil input to relay is dedicated and it is voltage-operated although we give current as an input. However, OC elements core must be different than high Z core.
-Are you using RET 670 relay?
– Technically not correct. It may work but note that REF opération depand on CT magnétisation characteristics. It can malfunction also. REF should not operate for external faults. This is RET 670 relay CT connection for REF and over current used

Electrical engineers can find us on WhatsApp, Likundon, Instagram, site, and email.
To follow
And use our WhatsApp groups and easily talk to engineers around the world.
plz text on Whatsapp:
+989129613659

– I support everyone’s input if the overcurrent element not in the relay and phase CT star point not made thru the relay and parallel with neutral ct.
– It all depends on the relay features and how you are making start point phase CTs.
Thanks for all your inputs.
– Hi do anyone have abb ret 543 relay communication software
– What should be the value of coil current taken by a trip coil of the breaker?
– 400 kV GE make Breaker
– Nonmagnetic cable gland is required in single-core DC cables?

– I am facing a problem with the abb rel670 relay. When the line is charged condition with both main and tie breakers in close position. If we open the main breaker, abb rel 670 is sending DT on another end. But we check the DT send logic, it is ok we checked it by taking a shutdown.
– What will be the problem?
– This is the normal logic for DT. DT is for Over Voltage, Manual Open, LBB, and Busbar trip.
– On manual-open main CB, DT will send only if tie CB is already open
– Ok.. Tie CB status is given to this relay..? But here the problem is when is in charged condition with both main & tie CB in the closed condition when we open the main CB only DT is sending
– Normally REL670 will not mal operate. I think there may be an issue with the logic.
– You check online signal monitoring and find out which outputs is energized during that time
10/02/2021, 12:20 – AA 3710 Ss Add noufal: This message was deleted

– main incomer breaker of capacitor bank get trips by lsig relay when the power factor exceeds 0.86. The capacitor banks are newly installed. What May the reason for capacitor banks to draw more current
– Did u checked each capacitor bank-wise currents?
– Check the load settings of the breaker.
– We are using Tapcon 320 expert in one of our sites, in which we are trying to communicate the Tapcon using the ethernet port. During which link/activity light is not glowing in ethernet port. Tapcon is showing error event 38. No connection to the communication interface card. Communication info is showing as blank; no version available in the Tapcon

Today, it is impossible to perform many of the required analyzes in electrical networks without using the relevant engineering software. Therefore, engineering software has been very effective in industrial environments. One of the most famous software is ETAP which is used in the analysis of distribution networks in industrial Plants and is made by the Operational Technology company. In this training package, in addition to collecting the required technical information in an attractive multimedia environment, various analyzes, and how to do them using ETAP software are presented practically.     

ETAP Certificate links:

ETAP Training Certificate: E 1000
ETAP Training Certificate: E 1001
ETAP Training Certificate: E 1002
ETAP Training Certificate: E 1003
ETAP Training Certificate: E 1004
ETAP Training Certificate: E 1005
ETAP Training Certificate: E 1006
ETAP Training Certificate: E 1007
ETAP Training Certificate: E 1008
ETAP Training Certificate: E 1009
ETAP Training Certificate: E 1010
ETAP Training Certificate: E 1011
ETAP Training Certificate: E 1012
ETAP Training Certificate: E 1013
ETAP Training Certificate: E 1014
ETAP Training Certificate: E 1015
ETAP Training Certificate: E 1016
ETAP Training Certificate: E 1017
ETAP Training Certificate: E 1018
ETAP Training Certificate: E 1019
ETAP Training Certificate: E 1020
ETAP Training Certificate: E 1021
ETAP Training Certificate: E 1022
ETAP Training Certificate: E 1023
ETAP Training Certificate: E 1024
ETAP Training Certificate: E 1025
ETAP Training Certificate: E 1026
ETAP Training Certificate: E 1027
ETAP Training Certificate: E 1028
ETAP Training Certificate: E 1029
ETAP Training Certificate: E 1030
ETAP Training Certificate: E 1031
ETAP Training Certificate: E 1032
ETAP Training Certificate: E 1033
ETAP Training Certificate: E 1034
ETAP Training Certificate: E 1035
ETAP Training Certificate: E 1036
ETAP Training Certificate: E 1037
ETAP Training Certificate: E 1038
ETAP Training Certificate: E 1039
ETAP Training Certificate: E 1040
ETAP Training Certificate: E 1041
ETAP Training Certificate: E 1042
ETAP Training Certificate: E 1043
ETAP Training Certificate: E 1044
ETAP Training Certificate: E 1045
ETAP Training Certificate: E 1046

E-1050: