1: Right click on IED and select Write to IED.

Sometimes in the case of 650 IED, it will throw an error saying the technical key doesn’t match in PCM and IED. In this case, we should set a similar technical key & try to write to IED.

Be careful, write operation may delete all IEC61850 communications if the write operation is not carried out with proper structure & communication mappings.

Assuming Communication is established between PC & IED (Online mode).

2. For confirmation read/write operation (from proper IED), it will ask you for confirmation to confirm. click yes to continue write operation.

Read/write operation log is shown in the Output window

3. It will ask for confirmation, whether to write the new IEC61850 communication configuration into the IED. If yes, click yes. click No to proceed further writing operation.

These pictures are part of our supplementary files for ABB PCM 600 training that is mix with Oral explanations to help you in the best way of understanding this course. These auxiliary files have gathered and attached to our ABB PCM600 training course, you can get more information by clicking on the following link:

https://elec-engg.com/abb-pcm-600-training/

Hardware Configuration in PCM600

  1. Right click on IED & select Hardware Configuration.

2. To compare hardware configuration between PCM600 & IED, click on icon C.

3. You can see PCM Configuration & IED configuration & information saying Confirmation is matching.

4. create an intentional difference in Hardware configuration by changing & saving it. Then compare Hardware configuration to see the changes made.

5. You can see the difference in IED and PCM configuration ( highlighted) & information saying configuration is miss-matching.

6. Change the Display type & compare after saving it.

7. You can compare configuration by click IED, compare configuration

8. To print Hardware configuration, click on magnifier icon

9. To save this report or hardware configuration, click on Save icon

These pictures are part of our supplementary files for ABB PCM 600 training that is mix with Oral explanations to help you in the best way of understanding this course. These auxiliary files have gathered and attached to our ABB PCM600 training course, you can get more information by clicking on the following link:

https://elec-engg.com/abb-pcm-600-training/

ABB Relion 600 series has a wide range of applications. PCM 600 is the software to config these relays. If you want to be a professional in the protection system, I suggest you learning ABB relay manuals and configuration software. 
Since time matters, we’ve also gathered important related files/videos & mix them with understandable oral explanation for helping you in time-saving & convenience. This course requires to complete the DIGSI 5 and IEC 61850 training first because they are prerequisite Lessons for understanding this topic.

we can provide a training course at your site or online too, contact us for reservation.

PCM 600 Video Training

  • Language: English
  • Trainer: Dr. Saeed Roostaee (Profile on Linkedin)
  • Prerequisite: DIGSI 5 and IEC 61850 training
  • Supplementary Files (.pcmi files / video / pdf/ PCM 600/ connectivity package …)
  • Certificate of Completion
  • For more details and offer, please write a comment below this post or contact us
ABB PCM 600 IED manager
ABB PCM 600 training – Distance relay configuration
ABB Relion 670 series application
Supplementary training files – Part 1 (4 hrs video)
Supplementary training files – Part 2 (5 hrs video)
Supplementary training files – Part 3 ( hrs video)
Supplementary training files – Part 4 ( hrs video)
ABB PCM 600 training – Fault location function
PCM600 ABB Protection and control IED manager